KSA Top Megaprojects
Execution $300 bn
Design & Study $250 bn
Bidding $45 bn
KSA total projects $600 bn
Megaprojects
Power& Energy
projects
Housing projects
Medical cities
projects
Metro projects
Mining projects
Airport projects
Power projects
Plan :The government estimates the anticipated demand for electricity in the Kingdom is expected toalmost triple from 45 Giga Watts (GW) in 2012 to 120 GW in 2032.
• In 2032 50% of all electricity generated will be from non-fossil fuels.
Project Name City ($m)
SEC - Rabigh Power Plant Extension - Phase VI Rabigh 3,400
SEC - Shuqaiq Steam Power Plant Al-Shuqaiq 3,300
SEC - Jeddah South Thermal Power Plant Jeddah 3,120
Hajr Electricity Production Company - Qurayyah IPP 1 & 2 Qurayyah 2,850
SWCC / Maaden - Ras Al-Khair Power Plant Ras Al-Khair 2,420
SEC - Rabigh 2 IPP Rabigh 1,500
SWCC / Marafiq - Yanbu Power Plant: Phase 3 Yanbu 1,500
SEC - PP10 Steam Turbines Power Plant Riyadh 1,434
SEC - Riyadh PP12 Combined Cycle Power Plant Riyadh 1,260
KA-CARE - Renewable Energy Program
• KA- CARE planning to develop 54.1GW of renewable power by2032:
- Including 41GW from solar power
- 1GW by geothermal
- 9GW by wind power plant
- 3GW by waste-to-energy.
• planning to construct 16 nuclear reactors by 2032.
Round 1Oct 2014 - Mar 2017
Round 2Nov 2015- Apr 2018
Round 3Mar 2014- Jan 2016
Value/$ 8.4 bn 10.9 bn 2.3 bn
Status Study Study Study
Contractor NA NA NA
Consultant NA NA NA
Scope
• Photovoltaic solar power plant (11 -55 units, 1100MW)
• Solar thermal power plant (5 - 25 units, 900MW)
• Wind power plant (650MW) • 50 - 350MW power plant from other
sources including geothermal and waste-to-energy
• Photovoltaic solar power plant (15-65 units,1300MW)
• Solar thermal power plant (7 - 30 units,1200MW)
• Wind power plant (1050MW)• 50 - 350MW power plant from other
sources including geothermal and waste-to-energy
• Power Plant (5-7 units, 500-800MW)
-Photovoltaic solar power plant (1-3 units) -Solar thermal power plant (1-3 units)-Wind power plant (0-1 unit) -Balance of plants
1- Renewable Energy program $ 150 bn
Nuclear Power Reactor (parent)Mar 2015 - Jan 2032
Reactor - Package 1Mar 2015 - Mar 2019
Value/$ 70 bn 7 bn
Status Study Study
Contractor NA NA
Consultant NA NA
Scope• Nuclear reactor
Associated facilities• Package 1 (Reactor)
Associated facilities
2- Nuclear Power Reactor $ 70bn
Ministry of Housing - Saudi Housing Project
Plan :
• King Abdullah announced in 2011 a 250 billion riyal($68bn) scheme to build 500,000 housing units overseveral years to help address a housing shortageamong lower-income Saudis.
• Ministry of Housing has revised it's strategy, in themain cities, from building homes to landdevelopment and distribute it to the citizens bygiving them loan to build.
Saudi Housing ProjectSep 2011 - Sep 2016
Value/$ 68 bn
Status Execution
Contractor many
Consultant Parsons
ScopeResidential units (500,000 nos.)Associated facilities
Project Name ($m) Status
Saudi Housing Project: Phase 1 $5,000 Execution
Saudi Housing Project: Riyadh: Dawadmi $169 Execution
Saudi Housing Project: Eastern Province: Hafr Al Batin $145 Execution
Saudi Housing Project: Tabuk: Taimah $107 Execution
Saudi Housing Project: Infrastructure Package (Bisha) $100 Design
Saudi Housing Project: Northern Borders: Arar $85 Execution
Infrastructure Package (Hotat Bani Tamim) $75 Design
Saudi Housing Project: Infrastructure Package (Afif) $73 Design
Saudi Housing Project: Riyadh: Alayeniah $70 Execution
Saudi Housing Project: Riyadh: Shaqra $68 Execution
Saudi Housing Project: Riyadh: Majmaa $60 Execution
Saudi Housing Project: Northern Borders: Rafha $55 Execution
Saudi Housing Project: Jouf: Sakaka 1 $48 Execution
Saudi Housing Project: Jouf: Qurayat $38 Execution
Saudi Housing Project: Eastern Province: Khobar $32 Execution
Saudi Housing Project: Infrastructure Package (Huraimla) $32 Design
Saudi Housing Project: Riyadh: Remah $24 Execution
Saudi Housing Project: Eastern Province: Ahsa 2 $23 Execution
King Abdullah in Makkah
King Fahad Expansion in Riyadh
King Faisal Medical City in Asir phase 1,2
King Khaled in Dammam
Prince Moh Bin Abdul Aziz in Joufphase 1,2
Value/$ $1067 mn $426 mn $500 mn $1200 mn $312 mn
Status
PQAl Rajhi Holding Group
China State Construction El Seif
Saudi Binladin Group
ExecutionExecution 1Design 2 PQ
Execution 1Design 2
Contractor NALatifia Trading & Contracting / Al
Habtoor Leighton JV
Al Fouzan Trading & General Construction
NAAl Fouzan Trading & General Construction
ConsultantRTKL, Saudi DiyarConsultants
Dar Engineering, HKS, RKD Architects, TPEConsulting Engineers
-Zuhair Fayez Partnership (ZFP)-HDR Ryan Cambell
Aecom
Zuhair Fayez Partnership (ZFP)
Scope
Cardiac center (150 beds) *Center for specialized surgery and organ transplantation (100 beds) *Center for cancer treatment and surgical oncology (200 beds) *beds)
*Medical city (510 beds) -Neuroscience Center (12 storeys, 50,000 sq.m.) -Cancer Center (12 storeys, 55,000 sq.m.) -Cardiac Center (4 storeys) -Central Services Building (4 storeys, 12,000 sq.m.) *Associated facilities
*Hospital building (500 beds) *Associated facilitiesHospital building (850 beds)
-Residential complex -Research centre -International academy -Beds (1500 nos.) -Specialised medical centres (7 nos.) -Associated facilities
Hospital building (500 beds)
Hospital building (500 beds)
• Ministry of Interior is planning to build security medical complex
at Riyadh and Jeddah with total value $7bn on an area of
• The total built-up area for one medical facilities is 400,000 sqm.
The residential villas and apartments will have a total built-up
area of about 500,000 sqm. The medical complexes will have
about 200,000 sqm of car parking.
Security Forces Medical Complex
MoI - King Abdulla bin Abdulaziz Project: Riyadh Security Forces Medical Complex
MoI - King Abdulla bin Abdulaziz Project: Jeddah Security Forces Medical Complex
Value/SR 3.4 bn 3.4 bn
Status Execution Execution
Contractor
ABV Rock GroupSub contractors:- Saudi Canadian- Bin Dayel Metwali Khalifa - Hassan Allam
Saudi Binladin
Consultant Dar Al Handasah (Shair & Partners) Dar Al Handasah (Shair & Partners)
Scope
Riyadh security medical complex (1,300,000) -Hospital building (3 nos.) -Academic and clinical centre -Research centre -Office buildings -Service stations -Residential villas -Apartments -Car parking (200,000 sqm) Associated facilities.
Jeddah security medical complex (1,300,000) -Hospital building (3 nos.) -Academic and clinical centre -Research centre -Office buildings -Service stations -Residential villas -Apartments -Car parking (200,000 sqm) Associated facilities.
Metro projects
( Riyadh – Jeddah – Mecca)
BACSباكس
• Blue line ( Olaia – Batha ) $6.5 bn.
• Red line ( King Abdulla road )$ 2.9 bn.
الرياض نيو ANMموبيليتي
• Orange line ( Madinah road) $6.5 bn.
FASTفاست
• Yellow line ( King Khaled airport road ) $3 bn
• Green line ( King Abdul Aziz road ) $2.6bn
• Violet line ( Abdul Rahman bin Aowf road) $ 2.2 bn
BACSباكس
• Bechtel (USA)
• Siemens to manufacture trains (Germany).
• Almabani (Saudi Arabia).
• AECOM (United States).
• Consolidated Contractors Company- CCC (Saudi Arabia).
الرياض نيو ANMموبيليتي
• Ansaldo STS for manufacturing control systems (Italy)
• Ansaldo Breda for manufacturing trains (Italy).
• Impregilo (Italy).
• Larsen & Rudolfo (India).
• Nesma & Partners (Saudi Arabia).
• Hyder Consulting (UK).
• Edom Company (Spain).
• Worley Parsons Company Limited (Arabia).
FASTفاست
• FCC (Spain)
• Alstom Transport manufacturing trains (France)
• Samsung C & T Corporation (Korea).
• Alpine (Austria).
• Seville (Netherlands).
• CITIC (France).
• Technica (Spain).
Lines 1 & 2Jul 2013 - Nov 2018
Line 3Jul 2013 - Nov 2018
Lines 4, 5 & 6Jul 2013 - Nov 2018
Value/$ 9 bn 6 bn 7 bn
Status Execution Execution Execution
ContractorBACSBechtel / Siemens / Almabani / CCC
ANMAnsaldo STS / Impregilo / L&T / Nesma &
Partners
FASTFCC / Alstom / Samsung / Strukton /
Setec
Consultant
AecomDar Al Handasah (Shair & Partners)Dornier Consulting GmbHEgisIBI GroupOmrania & AssociatesPerkins+Will
AecomDar Al Handasah (Shair & Partners)Dornier Consulting GmbHEgisIBI GroupOmrania & AssociatesPerkins+Will
AecomDar Al Handasah (Shair & Partners)Dornier Consulting GmbHEgisIBI GroupOmrania & AssociatesPerkins+Will
Scope
Phase 1:Light rail (44 km, north-south route and will extend from the northern side of the ring road to Olaya and Bathastreets up to the southern ring road)Stations (39 nos.)
Phase 2:Light rail (22 km, the rail will extend from the eastern side of the ring road across King Abdulaziz Road up to King Khaled Road in the west)Stations (13 nos.)
Phase 3Light rail (45 kms route will start from Al-Madinah and Al-Munawwararh roads)Stations (32 nos.)
Phase 4:-Light rail (32km will run from north to south alongside Prince Saud bin-Muhammad bin Muqrin street, Stations (13 nos.)
Phase 5:Light rail (26 kms line will run in the North-South direction alongside and under King Abdulaziz Stations (25 nos.)
Phase 6:Light Rail (12 kms will run in an East-West direction Stations (9 nos.)
Orange & Blue Lines Jul 2014 - Jul 2018
Green Line Jan 2015 - Jan 2019
Value/$ 10 bn 1.9 bn
Status Design Design
Contractor NA NA
Consultant- Egis- Gulf Engineering House- IBI Group
IBI Group
Scope
Orange Line (76 km, will run from Old Makkah Road to downtown, before finishing at Sari Road)-Station (22 nos.)
Blue Line (24 km, will run along Prince Majed Street from King Abdul Aziz International Airport)-Station (17 nos.)- The metro will be elevated.
Green Line (17 km, will run along Palestine Road)-Station (7 nos.)
Mecca Metro $16 bn
• Execution will be on 3 stages.
• Consisting of 4 metro lines.
• The total length 182 KM and 88 stations.
1. The first phase value $6.8 bn - 3 years.
2. The second phase value $5 bn - 5 years
3. The third phase value $ 4.5 bn – 2 years
• Saudi Arabia possesses valuable resources other than oil and gas.
• There are three main sites for phosphate:1. The Al Jalamid site2. Ras Al Khair3. Wa’ad Al Shammal – King Abdullah Project for the Development of Promise of the
North
• Ma'aden has entered into an agreement with the MosaicCompany and (SABIC) to establish a joint venture (JV) anddevelop an integrated phosphate complex with value of $7 bn.
• Ma'aden is expected to hold 60% in the JV, while Mosaic will own25% and the remaining will be taken up by Sabic.
• The complex is expected to have a total production capacity of16MTPA, including 3MTPA of finished fertilizer products
Waad Al ShamalJul 2013 - Dec 2016
Value/$ 7 bn
Status Execution
Contractor many
Consultant
Bechtel CorporationFluor CorporationJacobs
Scope
Upstream Project-Mining Operations-Power distribution plant-Related offsites and utilities.
Downstream Projects-Fertilizers, ammonia and animal feed plants-Ammonia PLant-Mono-Potassium Phosphate Plant-Tri-Acetate Phosphate Plant-Export facilities-Housing-Commercial centers-Schools-Infrastructure and associated services
Project Name ($m) Status
Package 2: DAP / NPK / BOP $750 Main Contract Bid
Package 1: Ammonia Plant $850 Execution
Balance Downstream Plant $500 Main Contract Bid
Enabling Work/O & U/ Infra $500 Main Contract Bid
Phosphate Mines $1,000 FEED
SAP/Power Plant/ Power Dist $1,500 Main Contract Bid
Phosphoric Acid Plant $400 Main Contract Bid
Benefication//Mine Infrastructure $750 Main Contract Bid
Plan:
• There are 26 domestic airports in Saudi Arabia and four international airports:King Fahd in Dammam, King Abdul Aziz in Jeddah, King Khalid in Riyadh, and PrinceMohammad Bin Abdul Aziz in Medina.
• The General Authority of Civil Aviation (GACA) has disclosed plans to expandand build around 28 airports in the coming twenty years.
• Plans are underway by GACA to spend between $10bn and $15bn on building,developing and upgrading airports by 2020.
Project Name City ($m) StatusGACA - Prince Mohammed Bin Abdulaziz Airport Expansion Madinah 1500 Execution
GACA - Abha Regional Airport Abha 1000 Main Contract Bid
GACA - King Abdullah bin Abdulaziz Airport in Jazan Jizan 900 Main Contract Bid
GACA - King Khalid International Airport Expansion Riyadh 500 Execution
GACA - Qassim Domestic Airport Expansion Buraydah 270 Design
GACA - Al Baha Domestic Airport Expansion Al-Bahah 160 Design
GACA - GACA Building Jeddah 101 Execution
GACA - Al Jouf Domestic Airport Al-Jawf 100 Design
GACA - Arar Domestic Airport Expansion Arar 84 Main Contract Bid
• The program aims to expand King Abdulaziz International Airportin Jeddah to 80 million passengers a year by 2035.
• The development will be carried out in three phases with thephase I expected to complete in 2014 value $7 bn , the secondand third phases scheduled for completion in 2035.
• The first phase of the airport expansion involves the overhaul andconstruction of 2 passenger terminals (north and south), hajjterminal, and revamping of new terminal along with otherfacilities.
GACA - King Abdulaziz International Airport
Oct 2010 - Oct 2035
Value/$ 28 bn
Status Execution
ContractorSaudi Binladin Group
Consultant
- Aeroports de Paris- Atkins- Dar Al Handasah (Shair & Partners)- Netherlands Airport Consultants BV (NACO)
Scope
• The development will be carried out in three phases with the phase I expected to complete in 2014 with the second and third phases scheduled for completion in 2035.
• The first phase of the airport expansion involves the overhaul and construction of 2 passenger terminals (north and south), hajj terminal, and revamping of new terminal along with other facilities.
• The program aims to expand King Abdulaziz International Airport in Jeddah to 80 million passengers a year by 2035.
Project Name ($m) Status
GACA - KAIA: Phase 1: New Terminal: Package 1 $3,013 Execution
GACA - KAIA: Phase 1: New Terminal: Package 2 $3,077 Execution
GACA - KAIA: Phase 2$10,000
Study
GACA - KAIA: Phase 3$10,000
Study
GACA - King Abdulaziz International Airport: Apron 6 Rehabilitation
$350 Bid
GACA - King Abdulaziz International Airport: Maintenance Hangars Expansion
$100 Execution
GACA - King AbdulAziz International Airport: Phase I: Airport Facilities Upgrade
$250 Complete
GACA - King AbdulAziz International Airport: Phase I: Hajj Terminal
$200 Complete
GACA - King AbdulAziz International Airport: Phase I: North & South Terminals
$130 Complete
GACA - King Abdulaziz International Airport: Rehabilitation of North Entrance
$40 Bid
Saudi Airlines - King Abdulaziz International Airport: Jet Propulsion Center
$133 Execution