DATES AND TIMES OF PROJECTS MAY CHANGE DUE TO WEATHER OR OTHER UNFORSEEN ISSUES. CHECK OPEN NOTAMS DAILY FOR UPDATES. Page 1
KRIC Airfield Maintenance/Construction AdvisoryIssued: 03/07/2019
(Discard any previous versions)
•Find this “KRIC Airport Construction Update” on the web at: http://arff.flyrichmond.com/fcr/RICRWY.pdf•Current KRIC ISSUED NOTAMS: http://arff.flyrichmond.com/fcr/open_notams.html
•Official FAA NOTAMS Web Site: https://pilotweb.nas.faa.gov/PilotWeb/
Project Advisories and Updates
• Concourse A (Con A) Extension : Phase One Near Completion• ****Concourse A Con A) Extension : NAC Ramp Closure****• East Ramp One Construction: Taxiway (TWY) and Vehicle Service Road Closures (VSR)
Operational Impacts to Richmond International Airport Check airport issued NOTAMS for exact times and additional details.
Current and Planned Surface Closures
Type Date(s) Details Reason for Closure
Concourse A ExtensionPhase One
January-March 2019
Concourse A Gate A5 is temporarily closed for active construction in the gate area. Portions of the North Air Carrier Ramp and Vehicle Service Roads (VSR) along the RIC’s Central Plant. See Page 4
Installation and Realignment of Storm water facilities. Installation of New Electrical Power Hand-hole and Manhole structures.
Concourse A Ext Phase Two
Apr – Dec 2020
Expect a Re-alignment of Existing VSR and Ramp Markings. North Carrier Ramp no longer available for Diversion Parking. See Page 5
Installation of Steel, Masonry, and Columns to Support New Building Expansion.**Massive Ramp Closure**--Enclosed with Large Fence Barrier.
East Ramp One Oct 2018 Dec 2019
Portion of TWY M (Between TWY M1 and TWY M2) is Closed. Moreover, Vehicle Service Roads are Blocked.
Installation of A New Concrete Apron and Adjoining Taxiway Stubs.
NOTE: This is an advisory from the Richmond International Airport Operations Department concerning construction activities taking place on the KRIC airfield. Schedules are forward looking and subject to change for a variety of reasons. Aircraft Operators should check often for updates and changes. As always, official notification impacting aircraft movement areas shall be done via airport issued NOTAMs. Contact Airport Operations at (804) 226-8590 with questions.
DATES AND TIMES OF PROJECTS MAY CHANGE DUE TO WEATHER OR OTHER UNFORSEEN ISSUES. CHECK OPEN NOTAMS DAILY FOR UPDATES. Page 2
KRIC Scheduled Runway Maintenance Closures for 2019
RUNWAY 16/34 (9003’)08:00 (L) to 12:00 (L)2nd Saturday of Each Month except as noted with an “*”
RUNWAY 2/20 (6607’)08:00 (L) to 12:00 (L)2nd Tuesday of Each Month except as noted with an “*”
January 12 July 13 January 8 July 9
February 9 August 10 February 12 August 12
March 9 September 14 March 12 September 10
April 6* October 12 April 9 October 8
May 11 November 9 May 14 November 12
June 8 December 10 June 11 December 14
Scheduled routine runway maintenance closures. Runway 16/34 will close on the second Saturday of each month (except as noted) and Runway 2/20 will close on the second Tuesday of each month (except as noted). Closures will be four hours to six hours in duration.
Please note that closures may be cancelled or rescheduled based on weather or other conditions. NOTAMS will be issued approximately 72 hours prior to each event.
* Scheduled Closure Dates May Be Altered Due to Ongoing Construction Projects and Special Events!
DATES AND TIMES OF PROJECTS MAY CHANGE DUE TO WEATHER OR OTHER UNFORSEEN ISSUES. CHECK OPEN NOTAMS DAILY FOR UPDATES. Page 3
CONCOURSE A EXTENSION PROJECT:UNDERWAY JANUARY 2019 (MULTIPLE YEARS PROJECT)
NEW A CONCOURSE
DEVELOPMENTRAMP SPACE TO BE UTILIZED FOR
ALTERNATE TAXILANES, ADJACENT
AIRCRAFT HOLD SPACES, AND
PARKING!
THIS PROJECT IS NEW DEVELOMENT AT THE
RICHMOND INTERNATIONAL
AIRPORT (RIC) FACILITY. PROJECT INCLUDES ESTABLISHMENT OF
NEW GATES AND TENANT SPACES
(HOLDROOMS, GATE AREAS, CONCESSIONS,
AND FACILITIES).
NO MOVEMENT AREA CLOSURES ARE EXPECTED
WITH THIS PROJECT DEVELOPMENT!
DATES AND TIMES OF PROJECTS MAY CHANGE DUE TO WEATHER OR OTHER UNFORSEEN ISSUES. CHECK OPEN NOTAMS DAILY FOR UPDATES. Page 4
PHASE ONE NOTES: • GATE A5 IS CONTINUOUSLY CLOSED.• GATE A7 MAY BE CLOSED NIGHTLY
FROM 7PM UNTIL 7AM.
• AIRCRAFT TRAVELING TO GATES A1 AND A3 WILL HAVE TO USE THE TAXILANE FURTHEST NORTH ON THE NORTH AIR CARRIER (NAC) RAMP--DUE TO BARRICADED AREAS!
THE NORMAL TAXILANE TO THESE GATES IS UNAVAILABLE!
A3
A5
A7
A1
TAXILANE UNAVAILABLE!!
CONCOURSE A EXPANSION: PHASE ONE ESTIMATED COMPLETION EARLY SPRING 2019.
GATE A5 WILL RE-OPEN AT THE CONCLUSION OF WORK IN PHASE ONE
WORK AREA
AREA UNAVAILABLE FOR AIRCRAFT TAXI!!!!
DATES AND TIMES OF PROJECTS MAY CHANGE DUE TO WEATHER OR OTHER UNFORSEEN ISSUES. CHECK OPEN NOTAMS DAILY FOR UPDATES. Page 5
UPCOMING LONG DURATION CLOSURES
SURFACE AFFECTED TENATIVE DATE
NORTH AIR CARRIER (NAC) RAMP MARCH 2019 – SEPTEMBER 2020
PLEASE NOTIFY YOUR PLANNING DEPARTMENTS OF THESE UPCOMING LONG DURATION CLOSURES AFFECTING AIR CARRIER RAMPS AT
RICHMOND INTERNATIONAL AIRPORT (RIC)!!!!
***CLOSURE OF RIC’S NAC RAMP SEVERELY AFFECTS THE AIRPORT’S ABILITY TO ACCOMADATE PARKING FOR NON-SCHEDULED AIR CARRIER AIRCRAFT!***
*****AVAILABLE AIRLINE AIRCRAFT BOARDING GATES ARE SEVERLY LIMITED AND MAY NOT BE READILY AVAILABLE!!!*****
SEE NOTAM 02/092RIC APRON NORTH AIR CARRIER RAMP CLSD TO NON SKED AIR CARRIER ACFT !!!!
DATES AND TIMES OF PROJECTS MAY CHANGE DUE TO WEATHER OR OTHER UNFORSEEN ISSUES. CHECK OPEN NOTAMS DAILY FOR UPDATES. Page 6
EAST RAMP ONE PROJECT: THIS IS AN ESTIMATED 270 DAY PROJECT TO COMPLETE A NEW
RAMP AT RICHMOND INTERNATIONAL AIRPORT (RIC)!• FIRST TAXIWAY AND ROADWAY CLOSURES ASSOCIATED
WITH THIS PROJECT ARE UNDERWAY!
AREA UNDER CONSTRUCTION
TWY M1 CLOSED
NO THROUGH
ACCESS ON
THIS VEHICLE
SERVICE ROAD!
THIS SECTION OF TWY MIKE CLOSED TWY M2
HEAVY CONSTRUCTION TRAFFIC
WILL BE PRESENT ON
EAST SIDE ROAD!