Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Corporate Presentation
� Group Overview
� Vision & Values
� Business Segments
• Power Transmission & Distribution (T&D) EPC
• Power Substation EPC
� Financial Highlights
Contents
1
� Financial Highlights
� Safety, Environment and Quality
� Learning and Development
� Credentials
� Established in 1969
� Among the largest real estate developers in India
� Over 1,000 professionals
59%
� Leading EPC player in power transmission and oil & gas infrastructure sector
with over 3 decades of experience
� Offers integrated solutions from designs to construction of upto 1,200 kv
� Installed capacity of 180,000 MTs in India
� Footprints in 40 countries, Over 2,000 professionals
Group Overview
100%
Kalpataru Group
67%
� Leading EPC player in civil construction and infrastructure with
experience of over 3 decades
� Offers integrated solutions for factories, buildings, roads, flyovers,
metro lines and stations, water pipelines
� Presence across India
� Over 3,000 professionals
� FY14 turnover of US$ 440 Mn
Footprints in 40 countries, Over 2,000 professionals
� FY14 Consolidated turnover of US$ 1.2 Bn
� Consolidated order book of US$ 1.9 Bn
� T&D EPC order book of around US$ 1 Bn
2
70%
� Among the largest private players in agri-logistics sector
� Managing 95 warehouses with total capacity of 1.7 Mn MTs
“To be a dependable leader in energy transmission and
construction industry globally while enhancing the
value offering in other infrastructure verticals and
increase stakeholders’ value”
Vision & Values
Vision
3
Core Values
• Delivery & Quality driven efforts
• Cost & profitability focus
• Transparency, integrity & accountability towards all stakeholders
• Empowering performance through training
• Providing diverse opportunities
• Corporate social responsibility
• Health, Safety & Environment consciousness
3
Power Transmission EPC
44
Power T&DBest global practices across value chain..
Manufacturing ConstructionDesigning & Testing
Among the largest tower testing and
R&D centre across globe
• Testing capability of upto 1,200 kv tower
Integrated manufacturing capacity
of over 180,000 MT’s in Gujarat &
Chhattisgarh
Undertaking across 21 countries
5
Experience of all International
standards & specifications
Latest Technologies/Software
• PLS, STADD III, iTower for Tower Design
• PLS CADD for Profiling
• AutoCAD and BoCAD for Drawing/Detailing
• Micro station
• Testing capability of upto 1,200 kv tower
• Helicopter simulation facility to test upto 85
mtrs tower
Chhattisgarh
Delivered over 40,000 towers across
globe
Strategically located plants
Workforce of over 15,000
Capable of Helicopter erection
facilities
Latest Technologies/Software
• STAAD III, PLS Tower & iTower for Tower Design
Among the largest tower testing station & R&D Centre across globe
• Successfully tested upto 1,200 KV, 80 MT, 85 Mtrs height tower
• Helicopter simulation facility to test upto 85 mtrs tower
• Tested over 250 tower for various domestic & international clients
• Using SCADA, Highly advanced gauges, Smart Control Recording &
Monitoring System
Power TransmissionDesigning & Testing Capabilities
Dedicated technical design team of around 70 professionals
• STAAD III, PLS Tower & iTower for Tower Design
• PLS CAD for Profiling
• AutoCAD and BoCAD for Drawing/Detailing
• Micro station
Experience of all International Standards & Specifications
TCVN, BSEN CSA, IEC 60826, ASCE 52, GOST with loading as per ASCE
74 (USA), DIN VDE 0210 (Germany), Cenelac (European), ASTM CSA &
Country Specific Standards
6
• 26 CNC/PLC controlled machines for fabrication process
• Design outputs directly inputted to CNC machines
• Automatic PLC controlled European hot dip facility for complete
galvanizing capacity of 125,000 MTs
• Three galvanizing units to handle multiple projects at a time
• Heavy Duty EOTs for CNC shops & Galvanizing zones
• Huge fleet of loading & unloading cranes, lifters & carry mobile cranes &
tractors
Manufacturing capacity of 125,000 MT’s in Gujarat
Power TransmissionManufacturing Capabilities
tractors
• Acid fume extractors, White fume extractors, Flux re-generation plants,
High Standard equipment's & Modernized instruments ensuring
compliance with safety, environment and fully cycle quality processing
• Rain water harvesting spread in 50,000 sqft plant area
Delivered over 40,000 towers across globe
ISO 9001 & ISO 14001 certified plants
7
Newly set up world class plant of over 55,000 MT’s in Raipur
Completed 14,000 kms of EHV* Over-head lines
Power TransmissionConstruction Capabilities
Accomplished River crossing project of
Height 133 Mtrs, Span 815 M, Weight 158 MT
Capable for Helicopter erection facilities
Own over 55 sets of Tension Stringing Equipment (TSE) &
Huge fleet of cranes & lifters
8
* EHV - Extra High Voltage
Australasia
• Australia
• Bangladesh
• Indonesia
• Laos
• Malaysia
• Nepal *
• Philippines **
• Thailand **
• Vietnam
• India **
• Srilanka **
• Bhutan **
Africa
• Algeria **
• Congo **
• Djibouti *
• Ethiopia **
• Kenya **
• Mozambique
• Namibia
• Nigeria
• S. Africa **
• Tanzania **
• Uganda **
• Zambia **
Power TransmissionGlobal Footprints across 40 countries
• Bhutan **
• Tajikistan (CIS) **
Middle East
• Iraq
• Kuwait *
• Syria
• UAE **
• Qatar *
• Saudi Arabia **
Europe
• Turkey *
• Ukraine (CIS) **
• Armenia (CIS) **
Americas
• Canada
• Mexico
• Peru
• USA
• Zambia **
• Egypt **
• Rwanda **
Major Turnkey Projects under execution
* Projects executed on Turnkey basis
9
** Projects under execution on Turnkey basis in 21 countries
Location Congo I & II
(Africa)
Ukraine
(CIS Country)
Bhutan
(SAARC)
Zambia
(Africa)
Thailand
(Asia)
Order Size US$ 265 Mn US$ 170 Mn US$ 95 Mn US$ 84 Mn US$ 62 Mn
Key Highlight 500 KV – 1700 km (REHAB)
400 KV – 258 Km
750 KV – 353 km
(Ukrenergo)
400 kV – 80
(BPC)
330 kV – 466 km
(ZESCO)
500KV – 167 Km
(EGAT)
Power TransmissionKey Achievements
Domestic
640,000 MT’s
International
260,000 MTsTotal Experience
US$ 266 Mn from MSETCL
(State govt.) US$ 250 Mn from MEW Kuwait
10,500 Kms 3,500 Kms
Supply & Installation of first
800kv HVDC line in India (PGCIL)
First Indian supplier to US
market – Supplied over 15,000
MTs in 2 yrs
Largest Value Order
Experience in EHV/HV lines
Triumph Contracts
10
Power Substation EPC
1111
Capability to offer
Substation EPC
Successfully Completed
• High voltage AIS & GIS solution
• Integrated solution of transmission lines & substations
• Integrated EBOP with civil works and power evacuation lines
• Substations for railways and solar panels connectivity
• Over 5 nos 132KV bays on EPC basis for MSETCL
• Over 30 new 33/11 KV substations
• Augmentation of 30 nos 33/11 KV substations
Projects under execution
• Over 30 nos 132 KV bays & 5 nos 220 KV bays on EPC basis for MSETCL
• 2 nos 400/220 KV substation with 2 nos 315 MVA transformers each as part
of BOOT project ( by JV partner )
12
• AIS – Air Insutalted sub-station
• GIS – Gas Insutaled sub-station
• EBOP – Electrical Balance of plant
Transmission - Domestic
15%
Transmission - Overseas
35%
JMC (Civil EPC) 45%
Infra (Pipeline & Rail) 5%
Order Book of US$ 1.9 Bn
Financial Highlights and Order bookYielding strong growth
PGCIL 9%
SEB’s 4%
Private &
In-house
2%
Africa 18%
CIS 7%
SAARC 5%
Far East/Middle East 4%
US/Canada/Others 1%
US$ = Rs 60
13
Safety, Environment and Quality
Green Policy
ISO 9001:2008 Certified Plants
ISO 14001 Certified Export Unit
ISO 14001 Certified Overseas Construction Units
14
Green Policy
• Adopts environment friendly dull finishing of products
• Maintains 100% fumigation of export containers
• Installed Flux regeneration plants, Acid and white fume extractors, Eco- ventilator
fans to maintain desired HSE and Quality levels
• Obtained CER for both the Biomass Power Plants
Learning & Development
Running In-house Training Centre over 5 yrs with state-of art
infrastructure
Spread over 120,000 sqft area Training halls for 300 students Additional discussion rooms
Well-resourced library Hi-tech Computer Centre Boarding for 100 students
15
Imparted training to over 10,000 man-days
Conducted over 500 training programs
Tie-ups with esteemed education institutes like NIRMA
& AES* to groom managerial skills
* Ahmedabad Education Society
Under “Vibrant Gujarat Summit 2011” signed MOU with Gujarat govt to establish Skill Development
Centre for empowerment & employment of over 1,000 semi-skilled workers per year
Credentials
16
Credentials That Speaks Volume. ..
Credentials
Credentials That Speaks Volume. ..
Credentials
Credentials That Speaks Volume. ..
Credentials
Credentials That Speaks Volume. ..
Credentials
Credentials That Speaks Volume. ..
Credentials
Credentials That Speaks Volume. ..
Credentials
Credentials That Speaks Volume. ..
Credentials
Credentials That Speaks Volume. ..
Credentials
Credentials That Speaks Volume. ..
Credentials
Credentials That Speaks Volume. ..
Credentials
Credentials That Speaks Volume. ..
Credentials
"Apart from your excellent machine plants, well organized quality assurance system and experienced staff, we are deeply impressed by the fact that many staff have been
working in the Company for many years". MR. T.NAKAMURA
Manager Overseas Transmission Projects Department, Fujikura Limited, TOKYO. February 1998
"We further confirm that Kalpataru Power Transmission Limited has executed the order as per our entire satisfaction and deliveries were completed ahead of contractual
schedule".
Credentials That Speaks Volume. ..
Credentials
schedule".A.DE MARZIANI(Project Manager) ENELPOWER, ITALY.
10.06.2002
"ABB has been completely satisfied with the performance of Kalpataru Power in executing the contract works, quality of the product supplied and timeliness of
deliveries". MR. SIMON LE BARS
General Manager, PTR Division ABB Engineering Construction Pty. Ltd. Sydney. AUSTRALIA.
3 February 1999
29
In close proximity with Inland Container
Depot (ICD) & Export adaptable
Environment
Power TransmissionManufacturing Plant Location
30
Seamless Road, Rail & Air connectivity with
ports & other business centers
30