KOSCIUSZKO BRIDGE Bike Connections Update Presented to Queens Community Board 2 June 3, 2019 1

KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

KOSCIUSZKO BRIDGE

Bike Connections Update

Presented to Queens Community Board 2

June 3, 2019

1

Page 2: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

2

Kosciuszko Bridge Connections

Presentation Overview

Background: Project Area

Proposal Recap: Working with SDOT Bike Network Connections

Updates: Project Area Site Visits Working with SDOT

Appendix Original Presentation with Cross

Sections

Page 3: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

1Background

3

Page 4: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

New Ped

Bridge

2019 Proposed Route

K-Bridge Path

Entrance

In Development

Background

Project Area

Kosciuszko Bridge (State DOT)New Neighborhood Destinations Shared Use Path (Open 2019) Laurel Hill Blvd Shared Use Path

(Working with SDOT)

Existing Roadway Network:Challenges Limited Bike Network Connections

Greenpoint Ave, 47th Ave, Queens Blvd

Industrial Area Midtown Expressway and Brooklyn Queens

Expressway Interchange

Page 5: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

5

Proposal Recap

2

Page 6: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

New Ped

Bridge

Working with SDOT Bike and pedestrian connection at bridge path

entrance on Laurel Hill Blvd

Improved Bike Network Connections Bike connection to the Kosciuszko Bridge Path

43rd St: standard lanes and bike path 50th Ave: shared lane

North-south bike connection to Queens Blvd 47th St: standard bike lane and

protected bike lane under LIE 48th St: standard bike lanes and shared

lane on 48th St from Greenpoint Ave to 47th Ave

Continue to study other connections 56th Rd, Review Ave, Rust St

Maintains traffic capacity and parking

Bike Network Recap

Proposal

Page 7: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

3Updates

7

Page 8: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Project Area Site Visit

Site Visits with CB 2 in April/MayIssues Raised 43rd St

protection for shared use sidewalk path maintenance

47th St at Laurel Hill Blvd provide pedestrian improvements

48th St speeding

43rd St

47th St 48th St

Updates

Page 9: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Existing

Proposed

Site Visits with CB 2 in April/MayUpdates

43rd St provide jersey barrier protected bike path debris was cleaned May will continue to work with SDOT for long

term maintenance upgrading lighting

43rd St, looking north

43rd St, looking south

Debris removed early May

Project Area Site Visit

Updates

Page 10: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Site Visits with CB 2 in April/MayUpdates

47th St at Laurel Hill Blvd refresh markings and update any

necessary signage open a signal study working with SDOT to see if jersey

barriers can be adjusted sidewalk path is an alternative design

48th St provide traffic calming and refresh all

crosswalk markings

48th St: 47th Ave to 47th St 48th St: 47th St to 56th Rd

47th St at Laurel Hill Blvd

Option 1 Option 2

Project Area Site Visit

Updates

Page 11: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Staging area for SDOT K-Bridge construction Limited Access between 54th Ave and 56th Rd

Expanded Sidewalk with Shared Use Path Connecting to the Bridge Between New Pedestrian Bridge and Bridge Entrance

Proposed (In Development)

Existing

On Street Protected Bike Lane Connecting to the Bridge Between Bride Entrance and 56th Rd

Working with SDOT

Updates

Page 12: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Questions?

THANK YOU!

12

NYCDOT nyc_dot nyc_dot NYCDOT

Page 13: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

3Appendix

13

Page 14: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Kosciuszko Bridge Connection

Proposal: 43rd St (BQE On-ramp)

Shared Use Sidewalk Connecting to Pedestrian Bridge 43rd St, Pedestrian Bridge and Queens Midtown Expressway

Proposed

Existing

Proposed

Page 15: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Kosciuszko Bridge Connection

Proposal: 43rd St, 50th Ave

Bike Lanes 43rd St, Queens Midtown Expressway and 50th AveShared Lanes 50th Ave, Greenpoint Ave and 48th St

Proposed

50th Ave43rd St

Existing

Proposed

Existing

Proposed

Page 16: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Kosciuszko Bridge Connection

Proposal: 48th St

Buffered Bike Lanes 48th St, 56th Rd to 47th St

Proposed

Existing

Proposed

Page 17: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Kosciuszko Bridge Connection

Proposal: 47th St, 48th St

Standard Bike Lanes 48th St, 47th Ave to 47th St 47th St, 48th St to Greenpoint Ave

Proposed

48th St

Existing

Proposed

47th St

Page 18: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Kosciuszko Bridge Connection

Proposal: 47th St, 48th St

Shared Bike Lane 48th St, Queens Blvd to 47th AveCurbside Protected Bike Lane 47th St, under the LIE

Proposed

48th St

Existing

Proposed

47th St

48th St

Page 19: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Staging area for SDOT K-Bridge construction Limited Access between 54th Ave and 56th Rd

Kosciuszko Bridge Connection

Proposal: Laurel Hill Blvd

Shared Use Path Connecting to the Bridge Between New Pedestrian Bridge and 56th Rd

Proposed (In Development)

Existing

Page 20: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

Kosciuszko Bridge Connection

Proposal: 56th Rd, Rust St

48th St

48th St

Wide street with trucks, cyclists, and edge condition with limited intersections

Bike Connection to the Kosciusko Bridge

Proposed (In Development)

Existing

Page 21: KOSCIUSZKO BRIDGE - nyc.govBridge Working with SDOT Bike and pedestrian connection at bridge path entrance on Laurel Hill Blvd Improved Bike Network Connections Bike connection to

New Ped

Bridge

Working with SDOT Bike and pedestrian connection at bridge path

entrance on Laurel Hill Blvd

Improved Bike Network Connections Bike connection to the Kosciuszko Bridge Path North-south bike connection to Queens Blvd Dedicate space for cyclists where feasible Maintains traffic capacity and parking

Kosciuszko Bridge Connections

Summary of Benefits