Kosan Crisplant – Small Scale LNG Bunkering

Anders BjörnProject Director13-06-2017

Page 2: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

2

65 years in the Gas Business

We are ”GAS PEOPLE”LPG, LNG, Industrial Gas

Page 3: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

3

Worldwide References

• More than 3,500 plants/larger installations supplied since 1951

• Clients in more than 130 countries

Page 4: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

4

Project Areas - know-how & know-why

Systems and turnkey After-sales, and facility management

A one-stop shop for gas equipment

Page 5: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

5

Around 750 employees plus freelancers/partners worldwide

12 (+90) 30 120 12+16 93 335 8

2 22 5 26 10 85 23

42(+135)

Page 6: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

6

LNG Bunkering

Page 7: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

7

Methods of LNG Bunkering

Source: ABS, USA

Page 8: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

8

Source: SSPA, Sweden

Advantages & Disadvantages

Page 9: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

9

Source: SSPA, Sweden

The 4th Option

Page 10: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

10

The ”Samsø” Project

Page 11: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

11

The Samsoe Project

Page 12: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

12

Prinsesse Isabella

Page 13: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

13

Tender for the Bunkering facility

► No permanent tank on quay-side

► Maximum bunkering time <15 min

► No permanent staff on shore

► Entire facility has to be moved to Samsoe in less than 5 year

► Green Profil = No Emission

► Turnkey

Page 14: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

14

GATE Terminal

Source of the LNG

Port of Hou

Page 15: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

15

Logistic Supply Chain

Page 16: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

16

LNG Bunkering Unit

Page 17: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

17

Operation

Page 18: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

18

Zero Emission

• As the ferry leaves the remaining liquid in the lines will be vaporized and displaced to the road tanker through the vapour line due to thermal expansion and lower pressure in the road tanker

• Econimizers will lead the gas around the saftey valves just a bar below the limited before the valve opens.

• The Global warming from Methane has been estimated to be 25 times greater than CO2Danish Patent No. PR 178151

Page 19: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

19

Bunkering from Multi Trailers

Page 20: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

20

Dual Trailers

2-4 Tank Trailers

Serial or Parallel Connections

Flow rates from 40-240 m3/h

Page 21: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

21

Multi Trailers

4 Tank Trailers

Serial or Parallel Connections

2 Pumps each with 60 m3/h

Flow rates 120 m3/h

Page 22: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

22

Bunkering from Movable Multi Trailers

Page 23: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

23

Movable Multi Trailers (Movable MTTS)

40 - 240 m3/h bunkering flow

Optionally equipped with PBU for fast bunkering

Up to six trailers connected simultaneously

Page 24: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

24

Movable Multi Trailers (Movable MTTS)

Page 25: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

25

Bunkering with Intermediate storage tanks

Page 26: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

26

Intermediate tank on quay

2 x 300 m3 tanks

Pump unit

2 x 65 m3/h pumps

Flow rates from 40-130 m3/h

One truck loading point

Page 27: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

27

Bunkering with Intermediate storage tanks + Multi trailers

Page 28: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

28

Stationary storage tank with Multi Trailer

40 - 320 m3/h bunkering flow

5-450 m3 per bunker operation

Optionally equipped with PBU for fast bunkering

Ideal to achieve high flow and maximum flexibility

Possible to increase capacity and flow rate in phases

Page 29: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

29

Flow

Total volume m3

40 m3/h 120 m3/h 160 m3/h 240 m3/h80 m3/h

40 m3

60 m3

80 m3

120 m3

160 m3

240 m3

500 m3

400 m3

300 m3

LNG Bunkering Solutions Overview

Page 30: Kosan Crisplant – Small Scale LNG  · PDF file1 Kosan Crisplant – Small Scale LNG Bunkering Anders Björn Project Director 13-06-2017

30

Advantages

► Less fixed assets

►Bunker fast and safe – 200-250 m3/hour

►High volumes of LNG

►No methane emission

►Very low operational costs – no fixed staff