Kororoit Creek Road Consultation Outcomes and Submissions Summary Report December 2016

Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

Embed Size (px)

Citation preview

Page 1: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

KororoitCreekRoadConsultationOutcomesandSubmissions

SummaryReport

December2016

Page 2: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|2

1 ContentsExecutiveSummary................................................................................................................................................4

Aboutthisreport................................................................................................................................................5Structureofthisreport......................................................................................................................................5Projectoverview................................................................................................................................................5Background........................................................................................................................................................5Needfortheproject...........................................................................................................................................6

PartA:Consultationprogramandfindings............................................................................................................7Ourconsultationprogram..................................................................................................................................7Summaryofourconsultation.............................................................................................................................7Feedback............................................................................................................................................................8Qualitativefeedback..........................................................................................................................................8Overalltrends.....................................................................................................................................................8Publictransportchangesandimpacts...............................................................................................................9Design.................................................................................................................................................................9Construction.......................................................................................................................................................9Planning..............................................................................................................................................................9Benefittothecommunity..................................................................................................................................9Summaryofengagementoutcomes................................................................................................................11

PartB:Writtensubmissionsandresponses.........................................................................................................13Aboutthesubmissionsprocess........................................................................................................................13Whatweheard.................................................................................................................................................13Ourresponses..................................................................................................................................................14

1 RequestsforotherchangestoAltonaLoop.................................................................................................14Whatweheard.................................................................................................................................................14Ourresponse....................................................................................................................................................14

2 Oppositiontotheproject.............................................................................................................................14Whatweheard.................................................................................................................................................14Ourresponse....................................................................................................................................................14

3 Impactontraffic...........................................................................................................................................15Whatweheard.................................................................................................................................................15Ourresponse....................................................................................................................................................15

4 Trainsandservicereplacementsduringconstruction.................................................................................15Whatweheard.................................................................................................................................................15Ourresponse....................................................................................................................................................15

5 Supportfortheproject.................................................................................................................................15Whatweheard.................................................................................................................................................15Ourresponse....................................................................................................................................................16

Page 3: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|3

6 Landscaping..................................................................................................................................................16Whatweheard.................................................................................................................................................16Ourresponse....................................................................................................................................................16

7 Impactonbicycleandpedestrianpaths.......................................................................................................16Whatweheard.................................................................................................................................................16Ourresponse....................................................................................................................................................16

8 Safety............................................................................................................................................................16Whatweheard.................................................................................................................................................16Response..........................................................................................................................................................17

9 Constructionimpacts...................................................................................................................................17Whatweheard.................................................................................................................................................17Ourresponse....................................................................................................................................................17

10 Design......................................................................................................................................................17Whatweheard.................................................................................................................................................17Ourresponse....................................................................................................................................................17

11 Communityconsultation.........................................................................................................................18Whatweheard.................................................................................................................................................18Ourresponse....................................................................................................................................................18

Appendix1–Specificissuesandresponses.........................................................................................................20

Page 4: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|4

ExecutiveSummary

Thisreportdescribesthe2016consultationprogramfortheLevelCrossingRemovalProject:KororoitCreekRoad,WilliamstownNorth,includingthepublicsubmissionsreceivedandproposedresponsetoissuesraised.

ConsultationallowedtheLevelCrossingRemovalAuthority(LXRA)todevelopasoundunderstandingofhowthecommunityusesthecrossingandthesurroundingarea,enablingittoconsiderhowthedesigncouldenhancelocalaccessandconnectivity.

Duringpartsofourconsultationwefoundthat73percentofpeoplethatprovidedfeedback,supportedtheprojectastheybelieveditwouldbenefitthelocalarea.

LXRAsoughtwrittensubmissionsontheproposeddesignsfortheprojectduringtheformalconsultationperiodbetweenFriday7October2016andSunday6November2016.ThroughthisperiodLXRAreceived41writtensubmissionsfromresidents,owners,businessesandotherinterestedstakeholders.

Communityconsultationhasbeenkeytodeliveringapositiveoutcomeforthelocalcommunity.Specifically,the800metrepartialduplicationoftheAltonaLooptohelpimprovethereliabilityofthetrainserviceisadirectresultofearlyconsultation.

Page 5: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|5

AboutthisreportThisreporthasbeenpreparedinresponsetotheconsultationprogramundertakenin2016fortheKororoitCreekRoadLevelCrossingRemovalProject(LXRP),andthefeedbackreceivedfromthecommunity,businesses,stakeholdersandgovernmentagenciesduringthisconsultationprogram.Itdescribesthewrittenpublicsubmissionsreceivedduringtheformalconsultationperiod,from7October2016toSunday6November2016,andprovidesaresponsetotheissuesraisedduringtheconsultationperiod.

StructureofthisreportThisreporthasbeenstructuredintotwoparts:

• PartA:consultationprogramandfindings.ThissectionprovidesacomprehensivedescriptionoftheactivitiesundertakenbyLXRAtoconsultwithresidentsintheprojectcorridor,tradersinkeybusinesscentres,alargegroupofstakeholders,includingpeakbodiesandindustrygroups,thewidercommunityandHobsonsBayCityCouncil.

• PartB:writtensubmissionsandresponses.Thissectionidentifies,categorisesandrespondstothekeyissuesraised,includingthe41writtensubmissionsreceivedduringtheformalconsultationperiod.

ProjectoverviewTheKororoitCreekRoadLXRPispartoftheVictorianGovernment’sprojecttoremove50dangerousandcongestedlevelcrossingsacrossMelbourneby2022.ItformspartofthebroaderprogramofworkstoupgradeandimprovethecapacityacrossMelbourne’spublictransportnetwork.

Removingthislevelcrossingwillimprovesafetyfortrainpassengersandroadusers,improveconnectionsbetweentheWilliamstownNorthindustrialprecinct,WilliamstownandnearbyportstothePrincesFreeway,helpimprovereliabilityoftheAltonaLoopservicebyenablingpartialduplicationofthelineandimprovesafetyforcyclistsandpedestrians.

Duringearly2016,LXRAsoughtcommunityfeedbackonthepreferreddesignforthelevelcrossingremoval.TheproposeddesignistobuildarailbridgeoverKororoitCreekRoad,including800metresofduplicatedtrackandimprovedcyclingandpedestrianpaths.

Thereareseveralcriticalsitefactorsthatledtothisdesignbeingthepreferredoption,including:

• thepresenceofdensebasaltrockinthearea,whichmakestrenchingortunnellingnoisy,disruptiveandlengthy

• criticalundergroundservicesincludingseverallicencedpipelinesduetoMobilAltonaRefinery’soperations

• ahighwatertableandnearbyKororoitCreekwouldmakeanyundersolutionsubjecttoflooding;• andminimaldeliveryimpact,timeandcost.

BackgroundLXRAisseekingpermissionfromtheVictorianGovernmenttoremoveKororoitCreekRoad,WilliamstownNorthlevelcrossingbyelevatingtheAltonaLoopoverKororoitCreekRoad.

CentraltothispermissionistheapprovalofaPlanningSchemeAmendment(PSA)underSection20(4)ofthePlanningandEnvironmentAct1987(Vic).

AmongthesupportinginformationforthePSArequestisarecordofthewrittensubmissionsreceivedbyLXRAfromindividualsandorganisationsandtheProject’sresponsetotheissuestheyraised.

ThisreportrespondstowrittensubmissionsontheKororoitCreekRoadLXRPreceivedbyLXRAduringAugustandSeptember2016.ThisroundofpublicconsultationalsosupportsLXRA’srequesttotheMinisterforPlanningtoissueaPlanningSchemeAmendmentontheproject.APlanningSchemeAmendmentprovidesplanningpermissionfortheworks.

Page 6: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|6

Thereasonsforseekingwrittensubmissionswereto:

§ provideopportunityforanyonetomakeawrittensubmissiontoLXRAontheProject § formallyseektheviewsofthosepotentiallyaffected,includinglandownersandoccupiers,key

stakeholdersandthewidercommunityontheproposeddesignstoinformfurtherdesigndevelopment

§ informLXRA'sPSArequest.

ThisreportdescribesthekeyissuesinthewrittensubmissionsandLXRA'sresponses.

NeedfortheprojectAsMelbournecontinuestogrow,weneedtoensureroadandrailinfrastructurecanmeettheextrademand,whilealsoimprovingexistingsafetyandcongestionissuesforcommutersandprovidingefficientfreightroutesforindustry.

The50levelcrossingstheStateGovernmenthascommittedtoremovingaddressesissuesonMelbourne'sbroadertransportnetwork,includingroad,railandfreightnetworks.Whileimprovingsafety,easingcongestionandcreatingefficientfreightroutestheprojectisalsoakeysteptowardtransformingMelbourne’spublictransportsystemintoaninternational-stylemetro,withmoretrainsrunningmoreoften.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.

RemovingthislevelcrossingwillimprovetrafficflowalongthiskeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandlocalresidentstothePrincesFreeway.

TheprojectisalsoenablingthepartialduplicationoftheAltonaLoopwhichwillresultinimprovedreliabilityfortheservicebyallowingtrainstopassoneanotherwithoutwaitingontheWerribeeLine.

Itwillalsoimprovesafetyintheareabyeliminatingtheriskofincidentsbetweenpassengertrainsandroadvehicles,includinglargefreightvehiclesthatusetheroaddaily,andprovidesaferpassageforpedestriansandcyclists.

Page 7: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|7

PartA:ConsultationprogramandfindingsOurconsultationprogramTheoverallconsultationprogramfortheprojecthasbeendividedintothreephases.InthefirstphasefromNovember2015toFebruary2016,weconductedgeotechnicalandsiteinvestigations,gatheredinformationfromkeystakeholdersandcommunity,developedtheconceptdesignfortheproject,andobtainedfeedbackfromthecommunitytobetterunderstandwhatisimportanttoresidents,landowners,businessesandotherlocalstakeholders.

Thesecondphase,fromMarch2016toJune2016,wepresentedourpreferreddesignoptiontothecommunity,sharedtheresultsofourphaseoneconsultationandgatheredfurtherfeedbacktohelprefinethedesign.

Ourthirdphaseofconsultation,beginninginJuly2016,involvedpresentingthelatestdesigntokeystakeholdersandcommunity,seekingcommunityviewsonurbandesignelements,informingcommunityonconstructionimpactsandseekingfeedbacktohelpminimisethese.

DuringthisthirdphasewehavealsosoughtwrittensubmissionstoinformLXRA’srequesttotheMinisterforPlanningforplanningapproval.APSAistoprovidepermissiontoconductconstructionwithoutneedingplanningpermitsforeachpartoftheconstructionprocesses.

Summaryofourconsultation

Eightcommunitypop-upsat

stationsandshoppingcentres

distributingmorethan3000

postcards

Sevencouncilbriefings

NinemeetingswithMobilAltona

Refinery

Sevencommunityinformation

sessionsattendedbyalmost220

localresidentsandbusinesses

26businessesdoorknockedinthe

areasurroundingthelevelcrossing

Fouremailupdatestoanaverage

of1465subscribers

Threecommunityupdates

distributedtomorethan3000

residentsandlocalbusinesses

Sevenadsinthelocalmedia

publications

12postsonFacebookwithan

averagereachof1897

Page 8: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|8

FeedbackFeedbackfromourconsultationcameintwoforms:

• qualitativefeedbackgatheredthroughdoorknockingthelocalarea,conversationswithcommunitymembersatcommunityinformationsessions,meetingswithkeystakeholdersandphonecallsandemailsfromthepublictoLXRA;

• andfeedbackformswithamixofqualitativeandquantitativedata.Feedbackformsweredistributedatthecommunityinformationsessions,availabletocompleteonlineandpromotedthroughsocialmedia.

QualitativefeedbackConsultationwasbasedonthepreferreddesign,andfeedbackpresentedsomeclearthemesthatassistedtheprojectteamtofurtherdevelopthedesignandaddresskeyareasofconcernforthecommunity.

PeopleweregenerallysupportiveofthebroaderLXRP,howeverquestionedtheselectionofthislevelcrossingasapriorityaheadofothersintheWesternAlliancepackageoflevelcrossingremovalworks.

ThelocalcommunitywasgenerallyacceptingofthepreferredsolutionofraisingtheraillineoverKororoitCreekRoadastheyunderstoodthecriticalsitefactorsthatinfluencedthedecision,particularlytheundergroundservicesandMobilAltonaRefinery’spipenetwork.

Therewasastrongviewwithinthecommunityandlocalactiongroup,AltonaLoopGroupthatitwouldbeunacceptabletodisruptAltonaLoopservicesforuptothreemonthswithoutdeliveringsomenetworkimprovementsatthesametime,suchasthepartialduplicationoftheAltonaLoop.

Thekeyareasofinterestduringconsultationwerehowtheprojectwouldimpactonpublictransportbothduringandafterconstruction,theprojectdesign,constructionimpactsonthelocalroadnetworkandselectionofthelevelcrossingforremoval.

OveralltrendsThechartbelowshowsthekeytrendsthatemergedacrossthefulldurationofbothphasesofconsultation.Thechartisbasedonatotalof135interactionswithindividualstakeholders,organisations,communityactiongroupsandCouncil.

Overalltrendsbasedonclassifiedfeedback

Page 9: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|9

PublictransportchangesandimpactsPublictransportemergedasasignificantconcernforthelocalcommunityearlyintheconsultationprocess,particularlytheexpectedthreemonthservicedisruptionwithoutmakinganychangestotheAltonaLoopthatwouldenableserviceimprovements,suchaspartialduplicationofthetrainlineaspartoftheproject.

TheannouncementthatpartialduplicationwouldbeincludedaspartoftheLXRPresultedinpositivefeedbackfromthelocalcommunity,withsomemembersattendingthephasetwocommunityinformationsessionsjusttothankLXRAstafffortheireffortsinachievingthepartialduplication.

Timetableissueswerealsoakeythemeraisedthroughoutconsultation,namelythrough-servicestothecityfromAltonaresumingsocommutersnolongerhavetotransferatNewportStation.TimetablingisoutsideofthescopeofLXRA’sactivities,howeverrelevantfeedbackwasprovidedtoPTV.

InNovember2016,PTVannouncedfromMonday30January2017,10existingAMweekdayserviceswilltraveldirectlytothecityandfurtherserviceswilllooktobeaddedinlate2017.

DesignFeedbackrelatingtodesigninitiallyfocusedonimprovingtheAltonaLoopservicebylayingasecondtrackaspartoftheprojectbetweenAltonaJunctionandSeaholmetoenabletrainstopassandreducethelikelihoodofservicesbypassingtheloop.

Followingtheannouncementofthe800mpartialduplication,communityinterestinthedesignoftheprojectshiftedtourbandesign,includinglandscaping,communityartbeingincorporatedintotheprojectandwhatwouldbedonetopreventgraffiti.Severalpeoplecalledforlocalartiststocreateamuralonthestructureasagraffitideterrent.

Therewasalsofeedbackfromasmallnumberofpeoplewithinthecommunityaboutchangingthedesigntoenablearight-handturnfromRacecourseRoadintoKororoitCreekRoad.

ConstructionConstructionconcernswereprimarilytodowiththeimpactstocommutersduringtheexpectedextendedclosureoftherailline.Manyresidentswereconcernedthatthe12weekclosurewouldbeincrediblydisruptivetocommuters.Thecommunitywasalsoconcernedaboutwhatreplacementserviceswouldrunandwhataccessthereplacementserviceswouldhavefordisabledandelderlycommuters.

DuringphasethreeconsultationitbecameevidentthatsomeassumedthattherewouldbeextendedroadclosurestoKororoitCreekRoadandRacecourseRoadduringconstruction.LXRAexplainedthatnoextendedroadclosuresareexpected,howevertemporaryroadclosuresarelikelytooccuratnightsoronweekends.

PlanningPlanningconcernswerelargelybasedonpublictransportservicechangesandtrafficimpacts.

Duringphaseonepeoplequestionedthebenefitsoftheproject,otherthanaslightlyimprovedtrafficflowonKororoitCreekRoad.Manytooktheopportunitytorequestthattheprojectbeplannedtoincludethepartialduplicationtoensurethereweresomelong-termbenefitsintheformofanimprovedtrainservice.

Muchoftheplanningfeedbackreceivedduringphasetwooftheprojectwaspositive,withmanyabletoseehowtheprojectwillbenefitthelocalcommunitywiththeinclusionofthepartialduplication.

BenefittothecommunityThechartbelowshowsthelocalcommunity’sviewwhenaskedifthelevelcrossingremovalwouldbenefitthelocalcommunity.

Page 10: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|10

Willtheprojectbenefitthelocalcommunity?

Almostthreequartersofrespondents(73%)thoughttheprojectwouldbenefitthelocalcommunity.Ofthosethatstatedtherewouldbeabenefittothelocalcommunity,themajority(56%)citedthepartialduplicationastheprimarybenefit.

22percentdidnotbelievethelevelcrossingwouldprovideanybenefittothecommunity,howevermanyrespondentsdidnotofferareason.

Severalrespondentsalsotooktheopportunitytohighlightotherlevelcrossingsthattheyfeltneededaddressingandthatimprovingpublictransportservicesinthelocalareashouldbeapriority.

Thegraphbelowreflectswhatthelocalcommunityconsideredtobemostimportantintermsoftheproject.

Localcommunityvalueswithregardstotheprojectinphasetwo

ThebelowchartshowsthereisanoverwhelmingpreferenceforservicereplacementstoruntoNewportStation,howeverseveralpeopleaskedwhetheratrainshuttleservicecouldrunontheAltonaLoopline

Page 11: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|11

betweenSeaholmeandLavertonstationsduringconstructionoftheproject.LXRAwillforwardthisfeedbacktoMetroTrainsMelbourne(MTM)forconsiderationaspartoftheoccupationstrategy.

Preferenceoftransferstationforservicereplacements

Ofthosethatrespondedtothequestionsaboutaccessrequirementsonservicereplacements,thefollowingrequirementswerehighlighted:

• Busesstoppingatconvenientlocationsoratthestationsthemselves• Strictreservedseatingatthefrontofthebusesforthosewithdisabilities• Bicycleaccesstobemaintained.

SummaryofengagementoutcomesThecommunityandstakeholderengagementprocesshasbeenkeytoworkingtowardsapositivesolutionforthelocalcommunityfortheKororoitCreekRoadLXRP.

ConsultationallowedLXRAtodevelopasoundunderstandingoftheongoingissuesthelocalcommunityfaceswithregardstopublictransportandwhydisruptingservicesforuptothreemonthswithoutdeliveringnetworkimprovementswouldbeunacceptable.ThisenabledLXRAtoworkwithMTMandPublicTransportVictoria(PTV)todeliverpartialduplicationoftheAltonaLoopaspartofthisproject.

Therewasasignificantincreaseinthelevelofsupportfortheprojectwithinthecommunityasaresultoftheinclusionofthepartialduplication.Responsestofeedbackformsshowinitially29percentofpeoplethoughttheprojectwouldbenefitthelocalcommunity,howeverfollowingtheannouncementthisfigurehadmorethandoubledto73percent.Ofthosethatthoughttherewouldbeabenefit,themajoritycitedtheinclusionofthepartialduplicationoftheAltonaLoopastheprimarybenefit.

Frustrationabouttheongoingissueswithtrainservicesparticularlyaboutlevelsofservicesbeingreducedwasconsistentlyraisedacrossallphasesofconsultation.

InNovember2016,PTVannouncedfromMonday30January2017,10existingAMweekdayserviceswilltraveldirectlytothecityandfurtherserviceswilllooktobeaddedinlate2017.

Page 12: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|12

Mostrecentengagementrevealedthereisstillstronglocalinterestintheprojectasitprogressesandthereisaneedtocontinuetokeepthecommunityuptodatewithconstructionimpactsandservicereplacementsasearlyaspossible.

Whilethereisnostrongoppositionorcriticismofthesolutionbeingdelivered,thereremainssomescepticismwithinthecommunityaboutwhythislevelcrossingwasselectedtoberemovedasaprioritywithmanycitingmoreproblematicandcongestedlevelcrossingsinthelocalarea.

Page 13: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|13

PartB:WrittensubmissionsandresponsesAboutthesubmissionsprocessLXRAsoughtwrittensubmissionsontheproposeddesignsfortheKororoitCreekRoadLXRPduringtheformalconsultationperiodbetweenMonday10October2016andSunday6November2016.

PartBofthisreportdescribestheissuesraisedbythewrittensubmissionsandLXRA’sresponse.

Communitymemberswereabletomakesubmissionsbyseveralmethods,including: § submissionforms(AppendixA)completedatpublicinformationsessionsandotherevents§ submissionspostedtoLXRA§ onlinesubmissionformontheLXRAwebsite§ emailtothegeneralprojectcommunicationsemailrequestingtobeconsideredasawritten

submission.

LXRAreceived41writtensubmissionsfromresidents,owners,businessesandotherinterestedstakeholders.

WhatweheardOverallsummaryofsubmissionsreceived

Areaofsubmission Submissionsperissue Percentageoftotalsubmissions

RequestsforotherchangestoAltonaloop 9 22.5%

Oppositiontotheproject 9 22.5%

Impactontraffic 6 15.0%

Operationoftrains(afterconstruction) 6 15.0%

Supportfortheproject 5 12.5%

Landscaping 3 7.5%

Impactonbicycleorpedestrianpaths 3 7.5%

SafetyIssues 3 7.5%

ConstructionImpacts 3 7.5%

Designissues 2 5.0%

Visualimpact/Urbandesign 2 5.0%

Graffiti 2 5.0%

Heritage 2 5.0%

Operationofpublictransportafterconstruction 2 5.0%

CommunityConsultation 2 5.0%

AreaofsubmissionSubmissionsperissuePercentageoftotalDetailsofeachsubmissionincludingtheissuesraisedwererecordedinaregister.

Tocaptureandrespondfullytoeach,wecategorisedandsortedtheissuesintothefollowingbroadthemes:

§ supportfortheproject§ selectionoftheLXRP§ visualimpact/urbandesign§ landscaping§ impactontraffic§ operationofpublictransportpost

construction§ safetyissues

§ requestsforotherchangestoAltonaLoop§ designissues§ graffiti§ heritage§ operationoftrains(duringconstruction)§ constructionimpacts§ communityconsultation§ impactonbicycleorpedestrianpaths

Page 14: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|14

OurresponsesThefeedbackandsubmissionswereceivedhavehelpedidentifysomedesignrefinementsfortheprojectandareasofconcerntoconsiderduringconstruction.Thecommunity’sresponsehasguideddecisionmakingonseveralpartsoftheproject.

Thechangeswehavemadethatrespondtothecommunity’scommentsaresummarisedbelow.LXRAwillcontinuetoconsultwithresidents,traders,councilsandothergroupstoensuretheprojectdeliverstheoutcomesexpectedbyourcommunityandtheGovernment.

1 RequestsforotherchangestoAltonaLoopWhatweheard

• Requestsforduplicationtobeextended• Requestsforduplicationtogonofurther• ImproveservicesontheAltonaLoop• GradeseparationoftheAltonaJunctionshouldbecompletedaspartoftheproject

OurresponseThe800mpartialduplicationachievesimprovedreliabilitybyenablingtrainstopassoneanotherontheAltonaLoopratherthanwaitingontheWerribeeLine,whichcansometimesleadtotrainsbypassingtheAltonaLoop.

Thepartialduplicationcanbeeasilydeliveredaspartofthisproject.Duringdelivery,PTVwillinvestigateopportunitiesforfurtherduplicationoftheline.

InNovember2016,PTVannouncedfromMonday30January2017,10existingAMweekdayserviceswilltraveldirectlytothecityandfurtherserviceswilllooktobeaddedinlate2017.

2 OppositiontotheprojectWhatweheard

• MaddoxRoad,MaidstoneStreetlevelcrossingsandthoseinHoppersCrossingandWerribeearemorecongestedandshouldbeprioritised

• Thiscrossingisneitherdangerousnorcongested• Thereisnopurposetoapartialduplication• TheissuewiththeAltonaLoopislevelofservice,notthelevelcrossings.

OurresponseThe50levelcrossingstheStateGovernmenthascommittedtoremovingaddressesseveralissuesonMelbourne'sbroadertransportnetwork,includingroad,railandfreightnetworks.Whileimprovingsafety,easingcongestionandcreatingefficientfreightroutestheprojectisalsoakeysteptowardtransformingMelbourne’spublictransportsystemintoaninternational-stylemetrobyenablingmoretrainstorunmoreoften.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.

RemovingthislevelcrossingwillimprovetrafficflowalongthiskeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandlocalresidentstothePrincesFreeway.

Page 15: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|15

TheprojectisalsoenablingthepartialduplicationoftheAltonaLoopwhichwillresultinimprovedreliabilityfortheservicebyallowingtrainstopassoneanotherwithoutwaitingontheWerribeeLine.

Itwillalsoimprovesafetyintheareabyeliminatingtheriskofincidentsbetweenpassengertrainsandroadvehicles,includinglargefreightvehiclesthatusetheroaddaily,andprovidesaferpassageforpedestriansandcyclists.

WerribeeStreetandCherryStreetlevelcrossingsinWerribeeareonthelistof50toberemovedby2022.ThereareseveralotherlevelcrossingsinMelbourne’swestthattheStateGovernmentwouldliketoremoveandithopestobeabletoaddresstheseinthefuture.

3 ImpactontrafficWhatweheard

• Theprojectwillresultinbettertrafficflow• TrafficlightsshouldbeinstalledattheKororoitCreekRoadandRacecourseRoadintersection• Projectshouldallowforaright-handturnintoKororoitCreekRoadfromRacecourseRoad

OurresponseTheprojectwillresultinabetterflowoftrafficalongKororoitCreekRoad.

ReconfigurationoftheRacecourseRoadintersectionisoutsideoftheprojectscopeofworks.Theworkswillnotprecludeinstallationoftrafficsignalsinthefutureifwarranted,howeverVicRoads’studiesshowthattrafficvolumesfromRacecourseRoaddonotcurrentlymeettherequirementsthatwouldnecessitatesignalisation.AdvicefromVicRoadsalsostatesthatthecurrentleftin/outoperationisthesafesttreatment.

4 Trainsandservicereplacementsduringconstruction

Whatweheard• ConsiderrunningshuttletrainsfromSeaholmetoLavertonaspartoftheservicereplacement• Ensurebusesheadintheoppositedirectionstopeakhourservicestonotaddtocongestion• Thereneedstobegoodinformationonwhentrainswillstopandalternativetimetables.

OurresponseAservicereplacementstrategywillbedevelopedwhichwillinvestigateoptionsforthereplacementoftrainservices.Thisinvestigationwilltakeintoaccountmayfactorsincludingfeedbackreceivedatcommunityinformationsessions.Communityengagementwillcontinueintheleadupandthroughoutconstruction.

Advancenoticewillbeprovidedtocommutersaboutservicedisruptionsandincreasedsignageandcustomerservicerepresentativeswillbepresentduringthepeaktraveltimestoassistpeoplewiththetemporarychanges.

5 SupportfortheprojectWhatweheard

• Theprojectwillimprovetrafficsafetybypreventinglevelcrossingaccidents

Page 16: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|16

OurresponseThelevelcrossingremovalwillmaketravellingalongKororoitCreekRoadsaferforthe22,000vehiclesthatusetheroaddaily.

6 Landscaping Whatweheard

• Useindigenousplants• Wouldliketoseegreenspace• Communityartshouldnotdistracttraffic.

OurresponseThetypesofplantsusedwillbedeterminedatalaterstageinthedesign.Treeswillbeselectedinconsultationwithkeystakeholdersandinaccordancewiththesafetyrequirementsoftherailoperatorastheprojectworksarelocatedwithintherailreserve.

Theurbanandlandscapedesignwillbeconductedinconsultationwithkeystakeholdersandinaccordancewithsafetyrequirementsoftherailoperator.WherepossibleLXRAwilllooktolandscapethecorridor.

Safetyisakeyurbandesignprinciple.Theurbandesignconcepthasbeenconceivedasanindustrially-scaledgatewaybridgethatismodestlydetailedwithdesignreferencestoitsindustrialcontextandlinkstotheheritageoftheadjacentAltonaRefinery.

7 ImpactonbicycleandpedestrianpathsWhatweheard

• Generalinterestinbicycleandpedestrianaccessarrangements• Includealookoutoverthebayaspartoftheprojectandextendwalkingpathstojoinwiththeexisting

track• IncludeimprovementstopedestriancrossingsandwalkwaysfromNordenneEstate.

OurresponseThesharedusepathconnectingKororoitCreekRoadwiththeCoastalParkwillberetainedandimprovedallowingcycliststocontinueontoKororoitCreekRdaBicyclePriorityRoute,acrossingpointwillalsobeprovidedattheintersection.LocalpedestrianconnectivityimprovementsareproposedaspartoftheworksimprovingaccesstobusstopsandtheCoastalPark.

Therailbridgewillbelocatedwithintheoperationalrailcorridor.Itwillnotbeaccessibletogeneralpublicduetosafetyandsecurityconcernsandthereforealookoutaspartofthestructureisnotfeasible.

ChangestoNordenneEstatewalkwaysisoutsideofthescopeofthisproject.

8 SafetyWhatweheard

• Safetyisakeyconcernforthecommunity

Page 17: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|17

• Onecommentrelatedtotrainstravellingthroughtherefineryandwantingdetailsonwhentherefinerywillceaseitsoperations.

ResponseSafetyisakeypriority.Removingthelevelcrossingwillmaketheareasafer.

9 ConstructionimpactsWhatweheard

• Concernaboutaccesstobusiness• Delivertheprojectefficiently.

OurresponseConstructionoftherailbridgeisabletooccurwithminimaldisruptiontoKororoitCreekRd.Closureswillbeminimalandrestrictedtooffpeakperiods.

AclosureoftheAltonaLoopraillineforuptothreemonthsisexpectedmid-2018todelivermajorconstructionworksforthelevelcrossingremovalandpartialduplication.

Allopportunitiestogainefficienciesanddecreasethedisruptionperiodwillbeinvestigatedasthedesignprogresses.

10 DesignWhatweheard

• EnsurethebridgeheightallowsforthetrafficthatneedstouseKororoitCreekRoadasakeytransportcorridorintotheindustrialandportareas,includinglargetrucksandtowedboats

• Considerdesigninthecontextofthesurroundingindustrialarea• Architecturalfeaturesshouldbefinanciallypracticableandsafe,withdesignofthestructure

prioritisingcyclistsafetyanddrivervisibility• Anti-graffitimeasuresshouldbeused• Acknowledgetheheritageoftheareawithaplaque.

OurresponseAminimumverticalclearanceof5.9mwillbeadoptedasKororoitCreekRdwillbeclassifiedbyVicRoadsasanOversizedOvermass(OSOM)Routeinthefuture.

Theurbandesignconcepthasbeenconceivedasanindustrially-scaledgatewaybridgethatismodestlydetailedwithdesignreferencestoitsindustrialsurroundingandlinkstotheheritageoftheadjacentAltonaRefinery.SafetyandaccessibilityarekeyurbandesignprincipalsfortheProject.

Projectassetswillbedesignedandconstructedtodiscouragegraffitiandtoprovidefortheconvenientremovalorconcealmentofgraffitiinhighriskareaswithoutdiminishingtheurbandesignoutcome.

LXRAwillinvestigateopportunitiesfortheinclusionofdesignreferencesthatacknowledgethelocalhistoryofthearea.

Page 18: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|18

11 Communityconsultation

Whatweheard• Requestsforongoingcommunicationwiththecommunityonprogressoftheproject.• Complaintthatinformationhasbeenlimitedtonewspapers.

OurresponseCommunityengagementwillcontinueintheleadupandthroughoutconstruction.Engagementandcommunicationwilladdressexpectedconstructionimpacts,projectprogressandtimelynoticeofrailorroaddisruptions.

Throughout2016thecommunityhasbeenkeptinformedabouttheprojectthrougharangeofcommunicationchannelsincludingcommunitynewslettersletterboxdropped,flyersbeingdistributedthroughoutthecommunitybyLXRAstaff,emailupdates,socialmedia,communityinformationsessionsandnewspaperadvertising.

Ourconsultationprogramisexplainedonpage3ofthisreport.Thetablebelowsummarisesthekeypartsoftheconsultationandengagementprogramtodate.

Communicationtool Audience Date

Factsheet

What'shappening?Whyremovetheboomgates;methodology;siteinvestigations;projecttimeline;promotingFebruary2016infosessions

Approximately1000properties

December2015

Informationsessions Widercommunity 9February2016

17February2016

17March2016

Communitynewsletter

We'vebeenlistening:AnnouncementofpartialduplicationofAltonaLoop;whyrailoverroadsummary;benefitsofpartialduplication;what'snext?;promotingJune2016infosessions

Approximately3100properties

4June2016

Informationsessions Widercommunity 9June2016

16June2016

Communitynewsletter

We'reremovingthelevelcrossing:Promotingcommunityinfosessions,howdidwedecide,whythiscrossing,communityengagementsofar,howweengaged,nextsteps,whattoexpectduringconstruction,projectconceptdrawing

Approximately3100properties

14October2016

Page 19: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|19

Communicationtool Audience Date

Informationsessions Widercommunity 19October2016

27October2016

Stakeholderbriefings HobsonsBayCityCouncil

LocalMPs

MobilAltonaRefinery

AltonaLoopGroup

Otherkeystakeholders

Variousdatesthroughout2016

Page 20: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|20

Appendix1–Specificissuesandresponses

Note:noteveryissueraiseddealtwithaspecificpointeg.Asubmissionthatsimplystated“safety!”isincludedinthestatisticsaboveasitisasubmissionraisingconcernsaboutsafetygenerally,butasthissubmissiondoesnotraiseanyspecificconcerns,itisnotrecordedinthetablebelow.

NatureofSpecificIssue Response

Considersthattheprojectisgoodprogressandwillimprovetrafficsafetybypreventinganylevelcrossingaccidents.

N/a

AsksthattheMaddoxRoadlevelcrossingberemovedinsteadasthereisfarmorecongestionatMaddoxRoadandthislinecarriesfreightandtheVline,whereastheKororoitCreeklineisonlyintheloop.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.ItisakeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandWilliamstowntothePrincesFreeway.

TheremovalwillalsoenablethepartialduplicationoftheAltonaLooptohelpimprovereliabilityoftrainservices.

ThereareseveralotherlevelcrossingsinMelbourne’swestthattheStateGovernmentwouldliketoremove,includingMaddoxRoad,andithopestoaddresstheseinthefuture.

Thislevelcrossingisnotdangerous,isnotbusyanddoesn'tneedreplacing.MoneywouldbebetterspentoncrossingsinHoppersandWerribee-Iusethiscrossingeverydaywithoutanyproblem.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.ItisakeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandWilliamstowntothePrincesFreeway.

TheremovalwillalsoenablethepartialduplicationoftheAltonaLooptohelpimprovereliabilityofthetrainservice.

WerribeeStreetandCherryStreetlevelcrossingsinWerribeeareonthelistof50toberemovedby2022.ThereareseveralotherlevelcrossingsinMelbourne’swestthattheStateGovernmentwouldliketoremove,includingHoppersCrossing,andithopestoaddresstheseinthefuture.

Thisisanunnecessarywasteoftaxpayerdollars.Thereareotherprioritiesthatshouldbeinvestedinbeforethiscross-andasamotoristIusethiscrossingeveryday.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.ItisakeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandWilliamstowntothePrincesFreeway.

TheremovalwillalsoenablethepartialduplicationoftheAltonaLooptohelpimprovereliabilityofthetrainservice.

Questionswhythiscrossingisbeingremovedwhentherearenopedestriansthatusethiscrossingatall.Theremustbemoredangeroussiteswherepedestriansafetyismoreofaconcern-theseshouldbetheGovernment'spriority.

TheremovaloflevelcrossingsacrossMelbourneseekstoaddressseveralissuesonourbroadertransportnetworkincludingdriverandpedestriansafety,trafficcongestion,creatingefficientfreightroutesandenablingamoreefficienttrainsystemrunningmoreservicesmorefrequently.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.ItisakeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandWilliamstowntothePrincesFreeway.

TheremovalwillalsoenablethepartialduplicationoftheAltonaLooptohelpimprovereliabilityofthetrainservice.

Page 21: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|21

NatureofSpecificIssue Response

WhywastemoneyonasingletracklevelcrossingremovalwhenMaddoxRoadcrossingisthreetracksandtherearesignificantdelaysatthatcrossing.Thisprojectisacompletewasteoftimeandmoney.

TheremovaloflevelcrossingsacrossMelbourneseekstoaddressseveralissuesonourbroadertransportnetworkincludingdriverandpedestriansafety,trafficcongestion,creatingefficientfreightroutesandenablingamoreefficienttrainsystemrunningmoreservicesmorefrequently.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.ItisakeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandWilliamstowntothePrincesFreeway.

ThereareseveralotherlevelcrossingsinMelbourne’swestthattheStateGovernmentwouldliketoremove,includingMaddoxRoad,andithopestoaddresstheseinthefuture.

Supportsthelevelcrossingremovalprojectgenerally,butconsidersthatthiscrossingishardlydisruptiveordangeroustotraffic.Afterlivingintheareaforover30years,hasbeendelayedbyboomgatefailureonlyonce.Wouldprefertoseemoredangerouslevelcrossingsremoved.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.ItisakeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandWilliamstowntothePrincesFreeway.

TheremovalwillalsoenablethepartialduplicationoftheAltonaLooptohelpimprovereliabilityofthetrainservice.

ThereareseveralotherlevelcrossingsinMelbourne’swestthattheStateGovernmentwouldliketoremoveandithopestoaddresstheseinthefuture.

Totallydisagreeswiththeproject.Isveryrarelyheldupatthiscrossing-thecrossingatMaddoxStreetisaconstantdelayandthiscrossingshouldberemovedfirst.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.ItisakeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandWilliamstowntothePrincesFreeway.

TheremovalwillalsoenablethepartialduplicationoftheAltonaLooptohelpimprovereliabilityofthetrainservice.

ThereareseveralotherlevelcrossingsinMelbourne’swestthattheStateGovernmentwouldliketoremove,includingMaddoxRoad,andithopestoaddresstheseinthefuture.

Extremelydisappointedthatthiscrossinghasbeenprioritisedoverothercrossingsinthearea.Usestheroadmultipletimesadayanditisnotacongestion/safetyconcern.MaddoxRoadandMaidstoneStreet(forexamples)arewaymoreurgent-thisoneisawasteofmoney.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.ItisakeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandWilliamstowntothePrincesFreeway.

TheremovalwillalsoenablethepartialduplicationoftheAltonaLooptohelpimprovereliabilityofthetrainservice.

ThereareseveralotherlevelcrossingsinMelbourne’swestthattheStateGovernmentwouldliketoremove,includingMaddoxRoadandMaidstoneStreet,andithopestoaddresstheseinthefuture.

Page 22: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|22

NatureofSpecificIssue Response

ThelevelcrossingisnottheproblemforcommutersontheAltonaLoop,itisthelackofreliable,convenientservices.Whileanoverpasswilltakethetrainsofftheroad,thisisnotaverybusyroadandthereisnopurposetoduplicatingonly800moftrack-thisisawasteofmoney.

The800mpartialduplicationachievesimprovedreliabilitybyenablingtrainstopassoneanotherontheAltonaLoopratherthanwaitingontheWerribeeLine,whichcansometimesleadtotrainsbypassingtheAltonaLoop.

Thepartialduplicationhasbeenincludedinresponsetocommunityconsultationthatcalledforthisimprovementandcanbeeasilyaccommodatedaspartofthelevelcrossingremovalproject.

Duringthedeliveryoftheworks,PTVwillinvestigateopportunitiesforduplicatingthetracksouthofKororoitCreek.

KororoitCreekRoadisusedby22,000vehicleseachdayandispartofVicRoads’PrincipalFreightNetwork.ItisakeytransportcorridorthatconnectstheWilliamstownNorthindustrialarea,nearbyportsandWilliamstowntothePrincesFreeway.

GradeseparationofAltonaJunctionmusttakeplaceatthesametimeasthelevelcrossingremovaltocutdownraildisruptions,socity-boundtrainsdonothavetocrosstheoutboundmainlinetrack.

ThisispartofPTV’sNetworkDevelopmentPlan,howeveritisoutsidethescopeofthisproject.

Extendthedoubleline. The800mpartialduplicationachievesimprovedreliabilitybyenablingtrainstopassoneanotherontheAltonaLoopratherthanwaitingontheWerribeeLine,whichcansometimesleadtotrainsbypassingtheAltonaLoop.

Thepartialduplicationcanbeeasilydeliveredaspartofthisproject.Duringdelivery,PTVwillinvestigateopportunitiesforfurtherduplicationoftheline.

Iftheprojectdoesgoahead,atleastmaketheloopduallines.

Asabove.

RequeststhattheduplicationoftheAltonaLoop-'goesnofurther'!DuplicationshouldstopattheoverpassandnevercomethroughAltona.

Thepartialduplicationincludes800mofnewtrackandwillstopbeforeKororoitCreek.Aspartofthisprojecttherearenoplanstoextendtheduplicationpastthispoint,howeverPTVwillinvestigateopportunitiesforfurtherduplicationoftheline.

Asksforfurtherduplicationandimprovementsdowntherailline

The800mpartialduplicationachievesimprovedreliabilitybyenablingtrainstopassoneanotherontheAltonaLoopratherthanwaitingontheWerribeeLine,whichcansometimesleadtotrainsbypassingtheAltonaLoop.

Thepartialduplicationcanbeeasilydeliveredaspartofthisproject.Duringdelivery,PTVwillinvestigateopportunitiesforfurtherduplicationoftheline.

Infavourofadual-directionline(duplication).

Asabove.

Supportsduplication. Asabove.

Page 23: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|23

NatureofSpecificIssue Response

ThisisabigmissedopportunitytonotaddressthesingletrackissueontheAltonaLoop.Toshutdownthetrainsforthislong,andnotimprovetheAltonaLoopisneglectfuloftheGovernment.

Asabove.

Ensurefunctionalityisahighpriorityinthedesignconsiderationgiventhelocationinanindustrialarea.

Aminimumverticalclearanceof5.9mwillbeadoptedasKororoitCreekRdwillbeclassifiedbyVicRoadsasanOversizedOvermass(OSOM)Routeinthefuture.

TheUrbanDesignConcepthasbeenconceivedasanindustrially-scaledgatewaybridgethatis

modestlydetailedwithdesignreferencestoitsindustrialcontextandlinkstotheheritageofthe

adjacentAltonaRefinery.

Heightrestrictionsareakeyconsiderationgiventhatthisthemainthoroughfareinto/outofWilliamstown.Thecurrentmaximumroadheightis6.3mduetopipestotheShellrefinery.Asabusinessownerwhohasmanytruckdeliveries,andalsoneedstobringboatsuptomyworkshop,anyheightreductionlowerthantheabovewillhaveasignificantdetrimentalimpactonhisbusiness-alternativeaccessroutesintoWilliamstownhaveturnsandroundabouts.KororoitCreekhasalwaysbeentheprimaryrouteformovingboatstoandfromtheworkshop.

Aminimumverticalclearanceof5.9mwillbeadoptedasKororoitCreekRdisclassifiedbyVicRoadsasanOversizedOvermass(OSOM)Route.

Anyarchitecturalfeaturesshouldbefinanciallypracticableandsafe.Keepcyclistsandvisibilityfordriversapriority.

SafetyandaccessibilityarekeyUrbanDesignprincipalsfortheProject.

Anyarchitecturalfeaturesshouldbefinanciallypracticableandsafe.Keepcyclistsandvisibilityfordriversapriority.

SafetyandaccessibilityarekeyUrbanDesignprincipalsfortheProject.

Thereneedstobesustainablearchitecturalfeatures,noteyesoresthatwilllookoutdatedin10yearslikemostnewrailwaystations.

Architecturalfeatureswillneedtomeetdesignliferequirements.TheUrbanDesignConcepthasbeenconceivedasanindustrially-scaledgatewaybridgethatismodestlydetailedwithdesignreferencestoitsindustrialcontextandlinkstotheheritageoftheadjacentAltonaRefinery.

Wouldlikeanti-graffitimeasures-theworksaroundFootscrayaredisgraceful.

ProjectAssetswillbedesignedandconstructedtodiscouragegraffitiandtoprovidefortheconvenientremovalorconcealmentofgraffitiinhighriskareaswithoutdiminishingtheurbandesignoutcome.

Anti-graffitipaintshouldbeusedatgroundlevelandabovetostopgraffiti.

ProjectAssetswillbedesignedandconstructedtodiscouragegraffitiandtoprovidefortheconvenientremovalorconcealmentofgraffitiinhighriskareaswithoutdiminishingtheurbandesignoutcome.

Page 24: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|24

NatureofSpecificIssue Response

Useindigenouslocalplants Thetypesofplantsusedwillbedeterminedatalaterstageinthedesign.Treeswillbeselectedinconsultationwithkeystakeholdersandinaccordancewiththesafetyrequirementsoftherailoperatorastheprojectworksarelocatedwithintherailreserve.

Wouldparticularlylikegreenspace TheUrbanDesignandLandscapeDesigntobeconductedinconsultationwithkeystakeholdersandinaccordancewithsafetyrequirementsoftherailoperator.WherepossibleLXRAwilllooktolandscapethecorridor.

Anycommunityartshouldnotcreateasafetyriskbydistractingtraffic.

SafetyisakeyUrbanDesignprinciple.TheUrbanDesignConcepthasbeenconceivedasanindustrially-scaledgatewaybridgethatismodestlydetailedwithdesignreferencestoitsindustrialcontextandlinkstotheheritageoftheadjacentAltonaRefinery.

Wouldliketoseesomerecognitionoftheold,adjoiningWilliamstownRacecourseincorporatedintotheurbandesign.

TheUrbanDesignConcepthasbeenconceivedasanindustrially-scaledgatewaybridgethatismodestlydetailedwithdesignreferencestoitsindustrialcontextandlinkstotheheritageoftheadjacentAltonaRefinery.

Wouldliketoseeaplaqueatthesiteacknowledgingseveralaspectsoflocalrailhistory,ie.thepreviousnearbystationsincludingthe'Mobiltown'stationandthe'WilliamstownRacecourse'station.Thesestationsarebothimportanttolocalhistory.

LXRAwillinvestigateopportunitiesfortheinclusionofdesignreferencesthatacknowledgethelocalhistoryofthearea.

NeedtrafficlightsatRaceCourseRoadandKororoitRoadintersection.

ReconfigurationoftheRacecourseRdintersectionisoutsideoftheprojectscopeofworks.Theworkswillnotprecludetheinstallationoftrafficsignalsinthefutureifwarranted.

NeedlightsattheintersectionofKororoitCreekRoadandRacecourseRoadforsafetyreasons.

ReconfigurationoftheRacecourseRdintersectionisoutsideoftheprojectscopeofworks.Theworkswillnotprecludetheinstallationoftrafficsignalsinthefutureifwarranted.

ReconsiderRacecourseRoadaccessintoWilliamstownviaKororoitRoad.

ReconfigurationoftheRacecourseRdintersectionisoutsideoftheprojectscopeofworks.Theworkswillnotprecludetheinstallationoftrafficsignalsinthefutureifwarranted.

Notesthattherewillbebettertrafficflows(withtheproject).

Agree

RoadaccessbetweenAltonaandWilliamstownisimportant.PleasednottobelosingaccesstoRacecourseRoad-needtobeabletodropchildrenofftoWilliamstownlinetrains.

Removingthislevelcrossingwillimprovetrafficflowforthe22,000vehiclesthatuseKororoitCreekRoaddaily.Itwillalsoimprovesafetyintheareabyremovingtheriskofincidentsbetweencommutertrainsandroadvehicles,includinglargefreightvehicles,andprovidesaferpassageforpedestriansandcyclistsinthearea.

Wouldliketoseeanopeningandeasyaccesstothebusinessat16RacecourseRoad,WilliamstownNorth.

ReconfigurationofaccesstopropertiesfromRacecourseRdisoutsideoftheprojectscopeofworks.ThefunctionalityoftheexistingKororoitCreekRdandRacecourseRdintersectionwillberetained.

Page 25: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|25

NatureofSpecificIssue Response

HavethetraingotothecityfromLavertonaswellasWerribee,orhaveshuttletrainstoLaverton.

AservicereplacementstrategyiscurrentlybeingdevelopedwhichwillinvestigateoptionsforthereplacementofTrainservices.Thisinvestigationwilltakeintoaccountmayfactorsincludingfeedbackreceivedatcommunityinformationsessions.

HaveshuttletrainsbetweenSeaholmeandLaverton.

AservicereplacementstrategyiscurrentlybeingdevelopedwhichwillinvestigateoptionsforthereplacementofTrainservices.Thisinvestigationwilltakeintoaccountmayfactorsincludingfeedbackreceivedatcommunityinformationsessions.

ConsidershuttletrainsbetweenSeaholmeandLaverton(andreverse)fordisplacedpassengers.

AservicereplacementstrategyiscurrentlybeingdevelopedwhichwillinvestigateoptionsforthereplacementofTrainservices.Thisinvestigationwilltakeintoaccountmayfactorsincludingfeedbackreceivedatcommunityinformationsessions.

ThereliabilityoftheAltonaLoopserviceneedstoimprove-it'snotrightthatcommutershavefewertrainsandchangeatNewportStation.Thisisunjustandwehavegonebackwardssincemanlandedonthemoon.

TimetablingistheresponsibilityofPTVandinNovember2016itannouncedthatitwouldextend10servicestorundirecttothecityfrom30January2017aspartoftimetablingupgrades.Itwilllooktoaddmoreinlate2017.

TheprojectscopeincludespartialduplicationoftheAltonaLoopwhichwillimprovethereliabilityofservicesthroughtheAltonaLoop.

TheAltonaLoopisusedasa"catchup"whentrainsarelateandisbypassedtoavoidfines.TrainsthenrundirecttoWerribee-wecannotreliablycatchtrainsinAltona.Adualdirectionlinewillhelpwithspeedoftravelandhopefullyprovidemorereliabletraintimes.

TimetablingistheresponsibilityofPTVandinNovember2016itannouncedthatitwouldextend10servicestorundirecttothecityfrom30January2017aspartoftimetablingupgrades.Itwilllooktoaddmoreinlate2017.

TheprojectscopeincludespartialduplicationoftheAltonaLoopwhichwillimprovethereliabilityofservicesthroughtheAltonaLoop.

Thereneedstobegoodinformationonwhentrainswillstopandalternativetimetables.

AservicereplacementstrategyiscurrentlybeingdevelopedwhichwillinvestigateoptionsforthereplacementofTrainservices.

Advancenoticewillbeprovidedtocommutersbyincreasedsignageandcustomerservicerepresentativespresentduringthepeaktraveltimestoassistpeoplewiththetemporarychanges

HavebusestoLavertonagainstthetraffic. AservicereplacementstrategyiscurrentlybeingdevelopedwhichwillinvestigateoptionsforthereplacementofTrainservices.Thiswillalsotakeintoaccountfeedbackreceivedatcommunityinformationsessions.

AvoidbusesgoingdownMillersRoad. AservicereplacementstrategyiscurrentlybeingdevelopedwhichwillinvestigateoptionsforthereplacementofTrainservices.Thiswillalsotakeintoaccountfeedbackreceivedatcommunityinformationsessions.

Interestedinbicycleaccessarrangements ThesharedusepathconnectingKororoitCreekRoadwiththeCoastalParkwillberetainedandimprovedallowingcycliststocontinueontoKororoitCreekRdaBicyclePriorityRoute,acrossingpointwillalsobeprovidedtheintersection.

Page 26: Kororoit Creek Road - levelcrossings.vic.gov.au · Executive Summary ... • critical underground services including several licenced pipelines due to Mobil ... , meetings with key

LevelCrossingRemovalAuthorityConsultationOutcomesandSubmissionsSummaryReport|26

NatureofSpecificIssue Response

Includealookoutoverthebayaspartoftheproject,iftheconstructionishighenough.Extendthewalkingpathstojoinwiththeexistingtrack.

Therailbridgewillbelocatedwithintheoperationalrailcorridor.Itwillnotbeaccessibletogeneralpublicduetosafetyandsecurityconcerns.

LocalpedestrianconnectivityimprovementsareproposedaspartoftheworksimprovingaccesstobusstopsandtheCoastalPark.

Ifpossible,includeimprovementstopedestriancrossingsandwalkwaysfromNordenneEstate-thesightlinesaredangerouslyshort.Asmallbridgeoverthechanneltothesoutherncrossingwouldfixthis.

Thisisoutsideofthescopeoftheproject.

Concernedaboutsafety. Safetyishighpriorityfortheproject.ThiswillbereflectedintheUrbanDesigntreatment.

Concernedaboutsafetyissueswiththetraintravellingalongsidearefinery.Askswhentherefinerywillceaseitsoperations-itistheonlyrefineryintheworkthathasamainarterialroutegoingthroughitandanelectrictrainadjacenttoit.Thisisadisasterwaitingtohappen.

Risksassociatedwiththerefineryandrailbridgewillbemitigatedbythedesign.

LXRAisunabletoprovideanyinformationregardingtherefineryoperations.

Asabusinessowner,hisconcernisaccessingthebusiness(CitiwestRentals)fromKororoitCreekRoadwhileworkisbeingcompleted.

ConstructionoftherailbridgeisabletooccurwithminimaldisruptiontoKororoitCreekRd.Closureswillbeminimalandrestrictedtooffpeakperiods.

Requeststhattheprojectbecarriedoutwithefficiencyandtimeliness

AclosureoftheAltonaLoopraillineforuptothreemonthsisexpectedmid-2018todelivermajorconstructionworksforthelevelcrossingremovalandpartialduplication.Allopportunitiestogainefficienciesanddecreasethedisruptionperiodwillbeinvestigatedasthedesignprogresses.

Thereneedstobegoodinformationonwhentrainswillstopandalternativetimetables(duringconstruction).

DuringtheclosuresMetroTrainswillprovideservicereplacementsthatwillmatchexistinglevelsoftrainservices.

Advancenoticewillbeprovidedtocommuterswhowillnoticeincreasedsignageandcustomerservicerepresentativespresentduringthepeaktraveltimestoassistpeoplewiththetemporarychanges.

Requestsongoingcommunicationwiththecommunityonprogress

Communityengagementwillcontinueintheleadupandthroughoutconstructiontheproject.

Thereneedstobetimelyandregularinformationforthecommunity.InformationforAltonaResidentshasbeenlimitedtonewspapers.

Communityengagementwillcontinueintheleadupandthroughoutconstructiontheproject.

Thecommunityhasbeenkeptinformedabouttheprojectthrougharangeofcommunicationschannelsincludingcommunitynewslettersletterboxdropped,flyersbeingdistributedthroughoutthecommunitybyLXRAstaff,emailupdates,socialmedia,communityinformationsessionsandnewspaperadvertising.