Upload
hkhyeung-keun-kook
View
23
Download
0
Tags:
Embed Size (px)
Citation preview
Kook’s Portfolio
2015. 01
I just am honest.
I just enjoy working.
I honor human beingHonesty is my dearest value. Through all situation it is the best way to go. Without it,the whole work is at risk of failure.
ContentsI am honest.
I love work.
I honor human beingHonesty is my dearest value. Through all situation it is the best way to go. Without it,the whole work is at risk of failure.
•Main project
•Kia Motors construction (KMM-PROJECT) in Monterrey in Mexico(2014~)
• SSOW _PROJECT Melbourne in Australia(2006~2007)
• Media façade of Bay gate in Dubai((2007~2008)
• Media façade in Tripoli (2009 ~2010)
• Project in USA
• Project in Dubai
•Finetechnix• Planning Fork village Outdoor Performance lighting (2011)
• Planning water proof lighting (RGB) in Suwon (2010)
• Planning & managing the project of interactive room lighting & shelter (2010)
• Processing the project of a bridge in Daegu (2010)
• Planning Landscape lighting in Il San(2009~2010)
• CONSULTING for master plan of landscape performance lighting plan in Iksan
• Replacing High bay lighting (GS caltex) in Slovakia (2012)
• Vietnam JV (Joint venture) (2011~2012)
• Replacing LED street lighting to the existing street lighting (2011)
• Project : Planning LED Down lighting of architecture in Paraguay.
• Replacing LED Down lighting in slot machine branch in Nagoya, Tokyo, Japan. (2011)
• Planning for road Illumination
• Planning for sports facilities_ Soccer field
• Planning for sports facilities_ Tennis field
• Planning booth in Japan exhibition
• Show room in Seoul for domestic market in Seoul
• Processing domestic and oversea exhibition.
• Processing _ MANAGEMENT
ContentsI am honest.
I love work.
I honor human beingHonesty is my dearest value. Through all situation it is the best way to go. Without it,the whole work
is at risk of failure.
•B2_Projects• Management of landscape lighting Plan in Song do central park (2009)
• Management of media Façade lighting installation in Song do E6 hotel (2009)
• Lightpia _Projects• Public Office building in kwang Ju(2009)
• Award of Gung hee gung performance lighting competition(2009)
• Planning and managing Outdoor lighting performance at commercial
complex in Daegu. (2008)
• Planning & sales M-PARK project in GUJE (2006)
• Planning performance of commercial complex
in cross of Seoul national station. (2006)
• KC Environmental Design.
• Planning Performance lighting of Siwha Memorial building in Ansan (2003)
• Award in competition performance lighting plan regarding Jeon ju Folk
village(2005)
• Naissance; Planning Commercial complex lighting performance in Ansan (2003)
• Competition about performance big bridge in Han river (2003)
Project.
Layout.
Evaluation.
Process.
• SSOW _PROJECT Melbourne in Australia(2006~2007)
OPERATION ROOM
HUB
Wheel
•System composition & LED fixture
•Schematic graphic of System distribution
A. B.
A. SB box on frameSB box: Data splitter
for distrusting into LEDTUBE
B. Assembly 3D
C. ETA_ System by Lightpia
Rack for attaching on the surface onhub
Number: 2978eaLEDIVA(LEDTUBE)
D. Distribution From ETA controlto LED TUBE(LEDBAR)
E. BIG WHEEL
C.
D. E.
•Installation & Assembly 3D
Representative Project.
• the Australian government planned a Big wheel near Dockland in Melbourne to promote
Global Landmark like Big wheel at Odawa in Japan and London eye in London.
We have planed to install media façade on the frame of wheel.
• Planning is so difficult because of the consideration of the dynamic nature of the wheel
regarding installing LED fixture.
•Specially it is so important to communicate with constructor (supervisor)
•Above all this project won the competition with KC(color kinetics)
•Processing in site
A. B.
C. D.
E. F.
A. Process of construction
B. Discussing with supervisor
C..SB BOX Installationon wheel
D. Checking site
E. Checking wheel for installation
F. Completing wheel.
Process.
Representative Project.
• Media façade of Bay gate in Dubai
+41.65
F03
F06
F07
F08
F09
F14
F15
F16
F17
F18
F19
F20
F21
F22
F27
F29
F30
F31
F32
F33
F34
F35
F36
F38
F39
F10
F11
F12
F37
F28
F13
P01
P02
P03
P04
F02
F01
P05
P06
F04
F05
P07
R1
P08
P09
MECH 02
MECH 01
GROUND
+9.828
+13.104
+16.380
+19.656
+22.932
+26.208
+29.484
+32.760
+36.036
+40.404
+44.408
+48.412
+52.416
+56.420
+60.424
+64.428
+68.432
+72.436
+76.44
+80.444
+84.448
+88.452
+92.456
+96.46
+100.464
+104.468
+108.472
+112.476
+116.48
+120.484
+132.496
+136.6
+140.504
+144.508
+148.512
+152.516
+156.52
+160.524
+164.528
+168.532
+172.536
+176.54
+180.544
+184.548
+124.488
+0.000
R2
BMU Track Roof
F03
F06
F07
F08
F09
F14
F15
F16
F17
F18
F19
F20
F21
F22
F27
F29
F30
F31
F32
F33
F34
F35
F36
F38
F39
F10
F11
F12
F37
F28
F13
P01
P02
P03
P04
F02
F01
P05
P06
F04
F05
P07
R1
P08
P09
MECH 02
MECH 01
R2
•Distribution diagram
• LED FIXTURES
A. B.
A. Simulation for performance
B. DistributiondiagramSystem: ETA
Nodes number:
C. FixturesNumber: 8200eaBL-1BL-2BL-3BL-4
C.
Representative Project.
Project.
Layout.
Evaluation.
Process.
The objective of Media façade for Bay gate located near business bay in Dubai promoted
identity as differing from others, In addition, Client expected that this building became
Landmark in Dubai
In processing this project , It was so important to attach fixtures with structure materials harmoniously because LED fixtures is aligned through inner frames of curtain walls in indoor
•Processing in site
Representative Project.
A.
B.
C.
D.
E.
F.
G.
A. Sample installationof BL-3
b. SB BOXSpilter
C..BL-1 attached oninside frame
D. Location of BL-4
E. 3D/ Drawing
F. Checking site
G. Processing ofconstruction
Process.
•Media façade in Tripoli
Cap
Cover
LED Oval
Housing
M6
Duct
LED FIXTURE
Vertical alignment of LED fixtures along with the pattern of window’s glass. This project was a prominent Landmark in Tripoli
•Installing LED fixtures on surface of window glass frame should be harmonious because finishing should not give damage the outline image of architecture.
• It was difficult to connect outsidecable with inside cable
A. B.
C.
A. InstallationAssembly
B. LEDIVA on curtain wallSystem: ETA
C. Completed work
Representative Project.
Project.
Layout.
Evaluation.
Process.
OverseaProject.
Project in USA
Columbus Plazalighting design 2008
1800 3800 4000 3000 4100 6600 2950 3900 3250
LED 적용범위
1750 3750 4000 3000 4000 6500 2750 3750 3250
LEDModule 수량
1M+ 0.75M
3M+ 0.75M
4M 3M 4M 6M+ 0.5M
2M+ 0.75M
3M+ 0.75M
3M+ 0.25M
Saint Louis Big wheel2009
Las Vegas(2007)
A. B.
C.
D. E.
A. Simulation for Sales
B. Assembly 3D Promotion item
C. ETA_SystemNumberby Lightpia
D. Wheel Drawing
E. Distribution diagram
OverseaProject.
Project in Dubai
platinum tower in Dubai 2009
HHHR Tower in Dubai 2009 AL AMERI TOWER AL AMERI TOWER 2009
Donna Towers in Dubai2009
A.
B.
C. D.
E.
A. Simulation for Sales
B. Checking site
C. Simulation for Sales
D. Simulation for Sales
E. Simulation for Sales
•Planning Fork village Outdoor Performance lighting
FineTechnixProcessing
• It was difficult to remove existing concrete bottom for cabling.This project focused on Installation because at completion it should be
harmonious around facilities and environment
A. Concept
B. Simulation for Sales
A.
B.
Project.
Layout.
Evaluation.
Process.
Creating new night image to existing Landmark. Planning for images of tradition and modern in harmony
•Planning water proof lighting (RGB) in Suwon (2010)
• Paldalgu office planned to provide the citizens with an enjoyable night sene in Suwon
master plan included installation of water proof Performance fixtures.
•Specification: LED Liner Flood lighting
•It happen to output partial performance because aiming point was deep inside.
Processing _Project FineTechnix
A. Completed work
B. Section view
A.
B.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
•Planning & managing the project of interactive room lighting & shelter (2010)
This project focused on Landmark of IT street, specially Media Column symbolize the image of hi-tech region of Kumcheongu.
The project is similar to installation art.
Processing _Project
•Completion is even not matched with the initial concept because the direction of the touch screens were toward inside. However, Kumcheon citizens can experience media directly.
A. Plan drawing for location ofmedia column
B. 3D
C. Media columnInteractive medai
D. Completed work
A. B.
C. D.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
•Processing the project of a bridge in Daegu (2010)
Processing _Project
•This project with Daegu international festival supply visitors to enjoyable and beautiful scenes.
•In addition, Daegu identity will rise up through outdoor performance lighting and Media column plan
•Even awarding in competition, because Finetechnix did not hold its items,It could not supply it to Daegu government. In processing this project, the performance scenes and specification of fixtures had been changed frequently
SafetyBeauty
Identity
안전성
아이덴티티
아름다움
야간경관의목적
감동을 주는야간경관 연출
도시의 개성을 표현
안전하고 쾌적한시민생활환경 만들기
Background Media column A. Concept
B. 3D of media column
C. Simulation for competition
A.
B.
C.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
•Planning Landscape lighting in Il San(2009~2010)
• Performance focus on color changes of top of canopy by color temperature.
• It had been Checking the clarity of cabling completion with the wall of top floors
supervisor keenly
Project.
Layout.
Evaluation.
Process.
Processing _Project
• Installing the lighting scenes at canopy on top floor.
• media façade installed on the surface of the middle level of the elevation for
advertising.
A. Simulation for biding
B. Elevation ofart media
C. Completed work
B.
A. B.
C.
FineTechnix.
•CONSULTING for master plan of landscape performance lighting plan in Iksan
•Planning for promoting regional economic condition.
•Rejecting this project due to being hard to secure budget.
Processing _Project
A. Simulation
B. Simulation
A.
B.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
•Replacing High bay lighting (GS caltex) in Slovakia (2012)
•This objective maximize energy saving though replacing LED high bay lighting in interior of factory (GS caltex) in Slovakia.
• it was necessary to obtain certification of EU (CE)• Construction of sales network in EURO zone
•Finetechnix won contract in sales network of Philips or Oslram in Slovakia•The success point was to manage rapidly regarding certification.• Cooperation with local branch
•Dimensions Ø374 × 306(H)
•Weight(Kg) 6.3
•Base Lead wire
•Input Voltage(V) AC 100~277
•Power Consumption(W) 180
•Luminous Flux(Lumen) 14,000<
•Luminaire Efficiency(Lm/W)
75<
•Color Temperature(K) 5,700
•CRI 75<
•Beam Angle()〬 70
•Lifespan(H) 30,000~50,000
Processing _Project
A. FinetechnixHigh bay lightingHL-150_Series
B. Simulation of illumination
A.
B.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
•Vietnam JV (Joint venture) (2011~2012)
• JV for establishing manufacturing factory.• Construction of sales network in ASEAN Country• Installation of Flood lighting in KHAI VY factory• Feasibility study for localization.
JV had stopped because Vietnam ‘s economic condition was serious and policy was incomplete.
Processing _Project
A. Khai VY website
B. Meeting for JV
Feasibility study
A.
B.
FineTechnix.
•Replacing LED street lighting to the existing street lighting (2011)
1. Wattage 510 (W)
2. Input Voltage AC 90-277 (V)
3. Beam Angle 55˚
4. Luminous Flux >42,840 lm
5. Luminaire Efficacy >83Lm/W
6. CCT 5,000 K
7. CRI Typ. 70
8. IP 66
9. Rated Life hours 50,000 hrs
10.Dimension(mm)(L)x(W)x(H)
593(L)x178(W)x486(H)
•Objective: maximizing efficiency of energy saving through replacing LED lighting.
•Construct of the network for distribution in USA
• Supplying type of flood lighting(XL_140 Series)• Constructing sales network in USA through processing of project.
Processing _Project
A. Street lightingaround parking lot
B. Sample installation
C. Night sceneFloodlightingXL-420_Series
D. Specification
E. 3D/ DrawingA. B. C.
D. E.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
Process.
Processing _Project
A. 3D/ Drawing
B. Parking lotDrawing
C. Simulation data
A. B.
C.
FineTechnix.
•Project : Planning LED Down lighting of architecture_ Paraguay
Planning on consideration with both replacing LED and ceiling design
•Because it got terrible to communicate with agent and to understand the local characteristics, the contract was only parcel items.
Processing _Project
A. FinetechnixDownlightDL_ Series 25WFL_ Series 18WXL_ Series 140w
B. Analysis in site
A. B.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
•Replacing LED Down lighting in slot machine branch in Nagoya, Tokyo, Japan. (2011)
• We need even lot of time to overcome the Japanese culture of vender, The number of contract have been increasing since 2012
Processing _Project
Planning on consideration with both replacing LED and ceiling design.
A. Checking site
B. Checking site
C. Downlight
A.
B.
C.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
•일본 빠징코 내부 조명 교체 사업 관련
Processing _Project
A. Simulation for Design
B. DL- Series by Finetechnix
C. Simulation
A.
B.C.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
1. Power Consumption(W)/ Power Factor
150 /0.9
2. Size (L*W*H) mm 785*394*185(H)
4. Color Temperature(K) 5,665±355K(주광색)
5. CRI 70
6. Beam Angle ( ˚ ) V:120, H:80
8. Installation Method Lead Wire
•Planning for road Illumination
• class for Motorized Traffic ( M1~ M5)• standard of illumination• Width of road• Distance of fixtures• Height of fixture
• Confirmation of illumination• Confirmation of uniformity
Processing _Project
A. Specification
B. Simulation
C. Simulation
A.
B. C.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
1. Power Consumption(W)/ Power Factor
420/0.9
2. Size (L*W*H) mm 593(L)x178(W)x486(H)
4. Color Temperature(K) 5,000K
5. CRI 80
6. Beam Angle ( ˚ ) 40˚ 60˚ 40˚
8. Installation Method Lead Wire
•Planning for sports facilities_ Soccer field
Processing _Project
• Confirmation of illumination (level of brightness). • Confirmation of uniformity.
A. Specification Image
B. Specification
C. SimulationA. B.
C.
FineTechnix.
Project.
Layout.
Evaluation.
Process.
• The standard of planning (KS, IESN) • Uniformity(U1 U2)• Location of lighting fixture around field• Height of lighting fixture
1. Power Consumption(W)/ Power Factor
280/0.9
2. Size (L*W*H) mm 593(L)x178(W)x336(H)
4. Color Temperature(K) 5,000K
5. CRI 80
6. Beam Angle ( ˚ ) 40˚ 60˚ 40˚
8. Installation Method Lead Wire
• The standard of planning (KS, IESN) • Uniformity(U1 U2)• Location of lighting fixture around field• Height of lighting fixture
• Confirmation of illumination (level of brightness). • Confirmation of uniformity.
Processing _Project
•Planning for sports facilities_ Tennis field
A. B.
C.
FineTechnix.
Project.
Layout.
Evaluation.
Process.A. Specification
Image
B. Specification
C. Simulation
•Planning booth in Japan exhibition
•Booth design Concept: in harmony with identity of Finetechnix
•Difference from other booths
•Booth design symbolized metal stamping that is Finetechnix advantage of manufacturing,
which is kind of press process.
• Visitors felt uncomfortable in Real completion because the circulation of visitors is so ortho-structure in process with expressing the symbolization of Finetechnix.
Processing _Project
A.
B.
FineTechnix.
Project.
Layout.
Evaluation.
Process.A. 3D OF DESIGN
B. Completed work
•Show room in Seoul for domestic market in Seoul
• Constructing sales network in Seoul
•Planning to promote Finetechnix’s identity of product
•Guiding information of Finetechnix & Supplying Comfortable rest space
•The space was extensively-used at one side, but left a bit empty on the other. •Organizing the high bay lighting in front of window to promote the image of
Finetechnix.
Processing _Project
A.
C.
B.
FineTechnix.
Project.
Layout.
Evaluation.
Process.A. 3D OF DESIGN
B. Products for display
C. Completed work
•Processing domestic and oversea exhibition.
•Planning Frankfurt exhibition in Germany. (2012) •Planning exhibition in Thailand.(2012)•Planning exhibition in Philippines.(2012)•Planning exhibition in Japan.(2011)•Domestic exhibition
•It focused on Finetechnix features and promotion•Consideration of various items
Processing _ProjectFineTechnix.
A. Booth in Thai exhibition
B. Booth in abudabi
C. Domestic
B.
A. B.
C.
Project.
Layout.
Evaluation.
Process.
•Management according to division
Processing_ Management FineTechnix
•Management of media Façade lighting installation in Song do E6 hotel (2009)
• LED media façade installation on ceiling through the upper inner frame of the curtain wall in the room
•This product is divided with drive of address.
LED RGB Linear light Dragon Bar 55W
Processing _Project
A. Elevation
B. Simulation
C. Completed work
D. Detail of installation
E. Detail drawing
A. B. C.
D. E.
B2.
Project.
Layout.
Evaluation.
Process.
•Management of landscape lighting Plan in Song do central park (2009)
Song-do central park is vetch marking from New York Central park.
This project focus on difference with domestic existing park.
Processing _Project
A. Completed work
B. Completed work
C. Checking site
D. Detail of installation
A. B.
C. D.
B2.
Project.
Layout.
Evaluation.
Process.
. This project had been not completed within schedule because it had gotten
terrible communicating with local worker
Because Fixtures installation sites was separated around the park, It was hard to manage
•광주 보훈 회관 영상 Public Office building in kwang Ju
LED (RGB 12W)
•Installing Media Façade on the surface of curtain wall window frame.
•Consideration for performance of seasons color characteristic.
•Various performance on event
•little problem happened about cabling because distribution drawing was not well applied to site during planning. The real structure of ceiling was different from ceiling plan. clarity was important for completion of cabling.
Processing _Project
A. Simulation for performance
B. Elevation drawof location of System
ETA_Systemby Lightpia
C. Completed work
A.
B. C.
Lightpia.
Project.
Layout.
Evaluation.
Process.
•Award of Gung hee gung performance lighting competition
•Planning lighting performance in gung hee palace.•Rental type fixtures•Consideration of both Convenience installation and safety of fixtures
Processing _Project
•Consideration of historic and conservative site, on the other hand requiring colorful scenes.
A. Completed workWhole view
B. Section view
C. Section view
A.
B.
C.
Lightpia.
Project.
Layout.
Evaluation.
Process.
•Planning Outdoor lighting performance at commercial complex.
•Planning performance and media façade for constructing landmark in Daegu.Installing module 8 x 8 at meddle level in elevation.
•It spent lot time to maintaining modules because heat emission is higher than calculating at beginning time.
Processing _Project
A.
Lightpia.
Project.
Layout.
Evaluation.
Process.A. Completed work
•Planning M-PARK project in GUJE (2006)
Processing _Project
•Planning performance and media façade for constructing landmark in Daegu.Constructing new paradigm building
•Client complained about lighting scenes because lighting size at middle level on elevation is smaller than calculating at beginning time.
A.
B. C.
Lightpia.
Project.
Layout.
Evaluation.
Process.A. Simulation panel
for performance
ETA_Systemby Lightpia
B. Completed work
•Planning performance of commercial complex in cross of Seoul national station.
Concept: promoting and advertising this building identity
New concept, which combined the Display with Outdoor performance lighting was applied to
this building
•Discussing closely with interior management.
Quitting the operation (Display on elevation) before passing 1 yr due to several
breakdowns (Main reason: ventilation system was not equipped inside the cabin of
display)
Processing _Project
A. Simulation
B. Completed work
A.
B.
Lightpia.
Project.
Layout.
Evaluation.
Process.
DomesticProject.
A. Commercial complex
Lightpia _Projects
B. Commercial complex
C. Commercial complex D. Commercial complex E. Commercial complex
F. Commercial complex G. Commercial complex
A~G .Simulationsin domestic
A. B.
C. D. E.
F. G.
•Award in competition performance lighting plan regarding Jeon ju Folk village(2005)
•Ranked second, hence didn’t get the contract
Processing _Project
•Landscape performance lighting for providing various lighting scenes to visitors.
• Promotion of regional identity for booming economic conditions
• emphasizing traditional city through performance.
A. B.
C.
KC Environmental
Design.
Project.
Layout.
Evaluation.
Process.A. 3D
of fixtures design
B. Simulation panelfor performance
C. Sections
•Planning Performance lighting of Siwha Memorial building in Ansan
• Planning lighting performance for Memorial Building for promoting K-Water in Korea
•This performance was well evaluated to express the volume of building by lighting.
Processing _Project
A. Simulation panelfor performance
B. Section
C. Completed work
A. B.
C.
KC Environmental
Design.
Project.
Layout.
Evaluation.
Process.
•Naissance; Planning Commercial complex lighting performance in Ansan
• Performance to mixing conventional lighting with LED lighting for expressing the volume of building and color scenes
•Consideration on stable and colorful image regarding station influence area
Processing _Project
•This performance was well evaluated good to express the volume of building by lighting. • it had been difficult to manage variouslighting type.
A. Simulation
B. Completed workWhole view
A.
B.
KC Environmental
Design.
Project.
Layout.
Evaluation.
Process.
•Competition about performance of big bridge in Han river.
Processing _Project
•Big bridge outdoor lighting performance competition by Seoul government’s lighting master plan.
•It failed to win the competition •Estimation had exceeded the upper limitation.
B.A.
C.
KC Environmental
Design.
Project.
Layout.
Evaluation.
Process.A. Simulation
of luminance
B. Simulationfor performance
Thank for attention.By Hyeung Keun Kook
Hyeung keun Kook (Male)Birth: 28th sep /1976
Phone No.: 010-8649-2569E-mail: [email protected] /
[email protected]: Enhang namu officetel 1462-42, Shinrimdong
Gwanakgu, Seoul