43
Kook’s Portfolio 2015. 01 I just am honest. I just enjoy working. I honor human being Honesty is my dearest value. Through all situation it is the best way to go. Without it, the whole work is at risk of failure.

Kook_ Portfolio_Rev 01

Embed Size (px)

Citation preview

Page 1: Kook_ Portfolio_Rev 01

Kook’s Portfolio

2015. 01

I just am honest.

I just enjoy working.

I honor human beingHonesty is my dearest value. Through all situation it is the best way to go. Without it,the whole work is at risk of failure.

Page 2: Kook_ Portfolio_Rev 01

ContentsI am honest.

I love work.

I honor human beingHonesty is my dearest value. Through all situation it is the best way to go. Without it,the whole work is at risk of failure.

•Main project

•Kia Motors construction (KMM-PROJECT) in Monterrey in Mexico(2014~)

• SSOW _PROJECT Melbourne in Australia(2006~2007)

• Media façade of Bay gate in Dubai((2007~2008)

• Media façade in Tripoli (2009 ~2010)

• Project in USA

• Project in Dubai

•Finetechnix• Planning Fork village Outdoor Performance lighting (2011)

• Planning water proof lighting (RGB) in Suwon (2010)

• Planning & managing the project of interactive room lighting & shelter (2010)

• Processing the project of a bridge in Daegu (2010)

• Planning Landscape lighting in Il San(2009~2010)

• CONSULTING for master plan of landscape performance lighting plan in Iksan

• Replacing High bay lighting (GS caltex) in Slovakia (2012)

• Vietnam JV (Joint venture) (2011~2012)

• Replacing LED street lighting to the existing street lighting (2011)

• Project : Planning LED Down lighting of architecture in Paraguay.

• Replacing LED Down lighting in slot machine branch in Nagoya, Tokyo, Japan. (2011)

• Planning for road Illumination

• Planning for sports facilities_ Soccer field

• Planning for sports facilities_ Tennis field

• Planning booth in Japan exhibition

• Show room in Seoul for domestic market in Seoul

• Processing domestic and oversea exhibition.

• Processing _ MANAGEMENT

Page 3: Kook_ Portfolio_Rev 01

ContentsI am honest.

I love work.

I honor human beingHonesty is my dearest value. Through all situation it is the best way to go. Without it,the whole work

is at risk of failure.

•B2_Projects• Management of landscape lighting Plan in Song do central park (2009)

• Management of media Façade lighting installation in Song do E6 hotel (2009)

• Lightpia _Projects• Public Office building in kwang Ju(2009)

• Award of Gung hee gung performance lighting competition(2009)

• Planning and managing Outdoor lighting performance at commercial

complex in Daegu. (2008)

• Planning & sales M-PARK project in GUJE (2006)

• Planning performance of commercial complex

in cross of Seoul national station. (2006)

• KC Environmental Design.

• Planning Performance lighting of Siwha Memorial building in Ansan (2003)

• Award in competition performance lighting plan regarding Jeon ju Folk

village(2005)

• Naissance; Planning Commercial complex lighting performance in Ansan (2003)

• Competition about performance big bridge in Han river (2003)

Page 4: Kook_ Portfolio_Rev 01

Project.

Layout.

Evaluation.

Process.

• SSOW _PROJECT Melbourne in Australia(2006~2007)

OPERATION ROOM

HUB

Wheel

•System composition & LED fixture

•Schematic graphic of System distribution

A. B.

A. SB box on frameSB box: Data splitter

for distrusting into LEDTUBE

B. Assembly 3D

C. ETA_ System by Lightpia

Rack for attaching on the surface onhub

Number: 2978eaLEDIVA(LEDTUBE)

D. Distribution From ETA controlto LED TUBE(LEDBAR)

E. BIG WHEEL

C.

D. E.

•Installation & Assembly 3D

Representative Project.

• the Australian government planned a Big wheel near Dockland in Melbourne to promote

Global Landmark like Big wheel at Odawa in Japan and London eye in London.

We have planed to install media façade on the frame of wheel.

• Planning is so difficult because of the consideration of the dynamic nature of the wheel

regarding installing LED fixture.

•Specially it is so important to communicate with constructor (supervisor)

•Above all this project won the competition with KC(color kinetics)

Page 5: Kook_ Portfolio_Rev 01

•Processing in site

A. B.

C. D.

E. F.

A. Process of construction

B. Discussing with supervisor

C..SB BOX Installationon wheel

D. Checking site

E. Checking wheel for installation

F. Completing wheel.

Process.

Representative Project.

Page 6: Kook_ Portfolio_Rev 01

• Media façade of Bay gate in Dubai

+41.65

F03

F06

F07

F08

F09

F14

F15

F16

F17

F18

F19

F20

F21

F22

F27

F29

F30

F31

F32

F33

F34

F35

F36

F38

F39

F10

F11

F12

F37

F28

F13

P01

P02

P03

P04

F02

F01

P05

P06

F04

F05

P07

R1

P08

P09

MECH 02

MECH 01

GROUND

+9.828

+13.104

+16.380

+19.656

+22.932

+26.208

+29.484

+32.760

+36.036

+40.404

+44.408

+48.412

+52.416

+56.420

+60.424

+64.428

+68.432

+72.436

+76.44

+80.444

+84.448

+88.452

+92.456

+96.46

+100.464

+104.468

+108.472

+112.476

+116.48

+120.484

+132.496

+136.6

+140.504

+144.508

+148.512

+152.516

+156.52

+160.524

+164.528

+168.532

+172.536

+176.54

+180.544

+184.548

+124.488

+0.000

R2

BMU Track Roof

F03

F06

F07

F08

F09

F14

F15

F16

F17

F18

F19

F20

F21

F22

F27

F29

F30

F31

F32

F33

F34

F35

F36

F38

F39

F10

F11

F12

F37

F28

F13

P01

P02

P03

P04

F02

F01

P05

P06

F04

F05

P07

R1

P08

P09

MECH 02

MECH 01

R2

•Distribution diagram

• LED FIXTURES

A. B.

A. Simulation for performance

B. DistributiondiagramSystem: ETA

Nodes number:

C. FixturesNumber: 8200eaBL-1BL-2BL-3BL-4

C.

Representative Project.

Project.

Layout.

Evaluation.

Process.

The objective of Media façade for Bay gate located near business bay in Dubai promoted

identity as differing from others, In addition, Client expected that this building became

Landmark in Dubai

In processing this project , It was so important to attach fixtures with structure materials harmoniously because LED fixtures is aligned through inner frames of curtain walls in indoor

Page 7: Kook_ Portfolio_Rev 01

•Processing in site

Representative Project.

A.

B.

C.

D.

E.

F.

G.

A. Sample installationof BL-3

b. SB BOXSpilter

C..BL-1 attached oninside frame

D. Location of BL-4

E. 3D/ Drawing

F. Checking site

G. Processing ofconstruction

Process.

Page 8: Kook_ Portfolio_Rev 01

•Media façade in Tripoli

Cap

Cover

LED Oval

Housing

M6

Duct

LED FIXTURE

Vertical alignment of LED fixtures along with the pattern of window’s glass. This project was a prominent Landmark in Tripoli

•Installing LED fixtures on surface of window glass frame should be harmonious because finishing should not give damage the outline image of architecture.

• It was difficult to connect outsidecable with inside cable

A. B.

C.

A. InstallationAssembly

B. LEDIVA on curtain wallSystem: ETA

C. Completed work

Representative Project.

Project.

Layout.

Evaluation.

Process.

Page 9: Kook_ Portfolio_Rev 01

OverseaProject.

Project in USA

Columbus Plazalighting design 2008

1800 3800 4000 3000 4100 6600 2950 3900 3250

LED 적용범위

1750 3750 4000 3000 4000 6500 2750 3750 3250

LEDModule 수량

1M+ 0.75M

3M+ 0.75M

4M 3M 4M 6M+ 0.5M

2M+ 0.75M

3M+ 0.75M

3M+ 0.25M

Saint Louis Big wheel2009

Las Vegas(2007)

A. B.

C.

D. E.

A. Simulation for Sales

B. Assembly 3D Promotion item

C. ETA_SystemNumberby Lightpia

D. Wheel Drawing

E. Distribution diagram

Page 10: Kook_ Portfolio_Rev 01

OverseaProject.

Project in Dubai

platinum tower in Dubai 2009

HHHR Tower in Dubai 2009 AL AMERI TOWER AL AMERI TOWER 2009

Donna Towers in Dubai2009

A.

B.

C. D.

E.

A. Simulation for Sales

B. Checking site

C. Simulation for Sales

D. Simulation for Sales

E. Simulation for Sales

Page 11: Kook_ Portfolio_Rev 01

•Planning Fork village Outdoor Performance lighting

FineTechnixProcessing

• It was difficult to remove existing concrete bottom for cabling.This project focused on Installation because at completion it should be

harmonious around facilities and environment

A. Concept

B. Simulation for Sales

A.

B.

Project.

Layout.

Evaluation.

Process.

Creating new night image to existing Landmark. Planning for images of tradition and modern in harmony

Page 12: Kook_ Portfolio_Rev 01

•Planning water proof lighting (RGB) in Suwon (2010)

• Paldalgu office planned to provide the citizens with an enjoyable night sene in Suwon

master plan included installation of water proof Performance fixtures.

•Specification: LED Liner Flood lighting

•It happen to output partial performance because aiming point was deep inside.

Processing _Project FineTechnix

A. Completed work

B. Section view

A.

B.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

Page 13: Kook_ Portfolio_Rev 01

•Planning & managing the project of interactive room lighting & shelter (2010)

This project focused on Landmark of IT street, specially Media Column symbolize the image of hi-tech region of Kumcheongu.

The project is similar to installation art.

Processing _Project

•Completion is even not matched with the initial concept because the direction of the touch screens were toward inside. However, Kumcheon citizens can experience media directly.

A. Plan drawing for location ofmedia column

B. 3D

C. Media columnInteractive medai

D. Completed work

A. B.

C. D.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

Page 14: Kook_ Portfolio_Rev 01

•Processing the project of a bridge in Daegu (2010)

Processing _Project

•This project with Daegu international festival supply visitors to enjoyable and beautiful scenes.

•In addition, Daegu identity will rise up through outdoor performance lighting and Media column plan

•Even awarding in competition, because Finetechnix did not hold its items,It could not supply it to Daegu government. In processing this project, the performance scenes and specification of fixtures had been changed frequently

SafetyBeauty

Identity

안전성

아이덴티티

아름다움

야간경관의목적

감동을 주는야간경관 연출

도시의 개성을 표현

안전하고 쾌적한시민생활환경 만들기

Background Media column A. Concept

B. 3D of media column

C. Simulation for competition

A.

B.

C.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

Page 15: Kook_ Portfolio_Rev 01

•Planning Landscape lighting in Il San(2009~2010)

• Performance focus on color changes of top of canopy by color temperature.

• It had been Checking the clarity of cabling completion with the wall of top floors

supervisor keenly

Project.

Layout.

Evaluation.

Process.

Processing _Project

• Installing the lighting scenes at canopy on top floor.

• media façade installed on the surface of the middle level of the elevation for

advertising.

A. Simulation for biding

B. Elevation ofart media

C. Completed work

B.

A. B.

C.

FineTechnix.

Page 16: Kook_ Portfolio_Rev 01

•CONSULTING for master plan of landscape performance lighting plan in Iksan

•Planning for promoting regional economic condition.

•Rejecting this project due to being hard to secure budget.

Processing _Project

A. Simulation

B. Simulation

A.

B.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

Page 17: Kook_ Portfolio_Rev 01

•Replacing High bay lighting (GS caltex) in Slovakia (2012)

•This objective maximize energy saving though replacing LED high bay lighting in interior of factory (GS caltex) in Slovakia.

• it was necessary to obtain certification of EU (CE)• Construction of sales network in EURO zone

•Finetechnix won contract in sales network of Philips or Oslram in Slovakia•The success point was to manage rapidly regarding certification.• Cooperation with local branch

•Dimensions Ø374 × 306(H)

•Weight(Kg) 6.3

•Base Lead wire

•Input Voltage(V) AC 100~277

•Power Consumption(W) 180

•Luminous Flux(Lumen) 14,000<

•Luminaire Efficiency(Lm/W)

75<

•Color Temperature(K) 5,700

•CRI 75<

•Beam Angle()〬 70

•Lifespan(H) 30,000~50,000

Processing _Project

A. FinetechnixHigh bay lightingHL-150_Series

B. Simulation of illumination

A.

B.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

Page 18: Kook_ Portfolio_Rev 01

•Vietnam JV (Joint venture) (2011~2012)

• JV for establishing manufacturing factory.• Construction of sales network in ASEAN Country• Installation of Flood lighting in KHAI VY factory• Feasibility study for localization.

JV had stopped because Vietnam ‘s economic condition was serious and policy was incomplete.

Processing _Project

A. Khai VY website

B. Meeting for JV

Feasibility study

A.

B.

FineTechnix.

Page 19: Kook_ Portfolio_Rev 01

•Replacing LED street lighting to the existing street lighting (2011)

1. Wattage 510 (W)

2. Input Voltage AC 90-277 (V)

3. Beam Angle 55˚

4. Luminous Flux >42,840 lm

5. Luminaire Efficacy >83Lm/W

6. CCT 5,000 K

7. CRI Typ. 70

8. IP 66

9. Rated Life hours 50,000 hrs

10.Dimension(mm)(L)x(W)x(H)

593(L)x178(W)x486(H)

•Objective: maximizing efficiency of energy saving through replacing LED lighting.

•Construct of the network for distribution in USA

• Supplying type of flood lighting(XL_140 Series)• Constructing sales network in USA through processing of project.

Processing _Project

A. Street lightingaround parking lot

B. Sample installation

C. Night sceneFloodlightingXL-420_Series

D. Specification

E. 3D/ DrawingA. B. C.

D. E.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

Page 20: Kook_ Portfolio_Rev 01

Process.

Processing _Project

A. 3D/ Drawing

B. Parking lotDrawing

C. Simulation data

A. B.

C.

FineTechnix.

Page 21: Kook_ Portfolio_Rev 01

•Project : Planning LED Down lighting of architecture_ Paraguay

Planning on consideration with both replacing LED and ceiling design

•Because it got terrible to communicate with agent and to understand the local characteristics, the contract was only parcel items.

Processing _Project

A. FinetechnixDownlightDL_ Series 25WFL_ Series 18WXL_ Series 140w

B. Analysis in site

A. B.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

Page 22: Kook_ Portfolio_Rev 01

•Replacing LED Down lighting in slot machine branch in Nagoya, Tokyo, Japan. (2011)

• We need even lot of time to overcome the Japanese culture of vender, The number of contract have been increasing since 2012

Processing _Project

Planning on consideration with both replacing LED and ceiling design.

A. Checking site

B. Checking site

C. Downlight

A.

B.

C.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

Page 23: Kook_ Portfolio_Rev 01

•일본 빠징코 내부 조명 교체 사업 관련

Processing _Project

A. Simulation for Design

B. DL- Series by Finetechnix

C. Simulation

A.

B.C.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

Page 24: Kook_ Portfolio_Rev 01

1. Power Consumption(W)/ Power Factor

150 /0.9

2. Size (L*W*H) mm 785*394*185(H)

4. Color Temperature(K) 5,665±355K(주광색)

5. CRI 70

6. Beam Angle ( ˚ ) V:120, H:80

8. Installation Method Lead Wire

•Planning for road Illumination

• class for Motorized Traffic ( M1~ M5)• standard of illumination• Width of road• Distance of fixtures• Height of fixture

• Confirmation of illumination• Confirmation of uniformity

Processing _Project

A. Specification

B. Simulation

C. Simulation

A.

B. C.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

Page 25: Kook_ Portfolio_Rev 01

1. Power Consumption(W)/ Power Factor

420/0.9

2. Size (L*W*H) mm 593(L)x178(W)x486(H)

4. Color Temperature(K) 5,000K

5. CRI 80

6. Beam Angle ( ˚ ) 40˚ 60˚ 40˚

8. Installation Method Lead Wire

•Planning for sports facilities_ Soccer field

Processing _Project

• Confirmation of illumination (level of brightness). • Confirmation of uniformity.

A. Specification Image

B. Specification

C. SimulationA. B.

C.

FineTechnix.

Project.

Layout.

Evaluation.

Process.

• The standard of planning (KS, IESN) • Uniformity(U1 U2)• Location of lighting fixture around field• Height of lighting fixture

Page 26: Kook_ Portfolio_Rev 01

1. Power Consumption(W)/ Power Factor

280/0.9

2. Size (L*W*H) mm 593(L)x178(W)x336(H)

4. Color Temperature(K) 5,000K

5. CRI 80

6. Beam Angle ( ˚ ) 40˚ 60˚ 40˚

8. Installation Method Lead Wire

• The standard of planning (KS, IESN) • Uniformity(U1 U2)• Location of lighting fixture around field• Height of lighting fixture

• Confirmation of illumination (level of brightness). • Confirmation of uniformity.

Processing _Project

•Planning for sports facilities_ Tennis field

A. B.

C.

FineTechnix.

Project.

Layout.

Evaluation.

Process.A. Specification

Image

B. Specification

C. Simulation

Page 27: Kook_ Portfolio_Rev 01

•Planning booth in Japan exhibition

•Booth design Concept: in harmony with identity of Finetechnix

•Difference from other booths

•Booth design symbolized metal stamping that is Finetechnix advantage of manufacturing,

which is kind of press process.

• Visitors felt uncomfortable in Real completion because the circulation of visitors is so ortho-structure in process with expressing the symbolization of Finetechnix.

Processing _Project

A.

B.

FineTechnix.

Project.

Layout.

Evaluation.

Process.A. 3D OF DESIGN

B. Completed work

Page 28: Kook_ Portfolio_Rev 01

•Show room in Seoul for domestic market in Seoul

• Constructing sales network in Seoul

•Planning to promote Finetechnix’s identity of product

•Guiding information of Finetechnix & Supplying Comfortable rest space

•The space was extensively-used at one side, but left a bit empty on the other. •Organizing the high bay lighting in front of window to promote the image of

Finetechnix.

Processing _Project

A.

C.

B.

FineTechnix.

Project.

Layout.

Evaluation.

Process.A. 3D OF DESIGN

B. Products for display

C. Completed work

Page 29: Kook_ Portfolio_Rev 01

•Processing domestic and oversea exhibition.

•Planning Frankfurt exhibition in Germany. (2012) •Planning exhibition in Thailand.(2012)•Planning exhibition in Philippines.(2012)•Planning exhibition in Japan.(2011)•Domestic exhibition

•It focused on Finetechnix features and promotion•Consideration of various items

Processing _ProjectFineTechnix.

A. Booth in Thai exhibition

B. Booth in abudabi

C. Domestic

B.

A. B.

C.

Project.

Layout.

Evaluation.

Process.

Page 30: Kook_ Portfolio_Rev 01

•Management according to division

Processing_ Management FineTechnix

Page 31: Kook_ Portfolio_Rev 01

•Management of media Façade lighting installation in Song do E6 hotel (2009)

• LED media façade installation on ceiling through the upper inner frame of the curtain wall in the room

•This product is divided with drive of address.

LED RGB Linear light Dragon Bar 55W

Processing _Project

A. Elevation

B. Simulation

C. Completed work

D. Detail of installation

E. Detail drawing

A. B. C.

D. E.

B2.

Project.

Layout.

Evaluation.

Process.

Page 32: Kook_ Portfolio_Rev 01

•Management of landscape lighting Plan in Song do central park (2009)

Song-do central park is vetch marking from New York Central park.

This project focus on difference with domestic existing park.

Processing _Project

A. Completed work

B. Completed work

C. Checking site

D. Detail of installation

A. B.

C. D.

B2.

Project.

Layout.

Evaluation.

Process.

. This project had been not completed within schedule because it had gotten

terrible communicating with local worker

Because Fixtures installation sites was separated around the park, It was hard to manage

Page 33: Kook_ Portfolio_Rev 01

•광주 보훈 회관 영상 Public Office building in kwang Ju

LED (RGB 12W)

•Installing Media Façade on the surface of curtain wall window frame.

•Consideration for performance of seasons color characteristic.

•Various performance on event

•little problem happened about cabling because distribution drawing was not well applied to site during planning. The real structure of ceiling was different from ceiling plan. clarity was important for completion of cabling.

Processing _Project

A. Simulation for performance

B. Elevation drawof location of System

ETA_Systemby Lightpia

C. Completed work

A.

B. C.

Lightpia.

Project.

Layout.

Evaluation.

Process.

Page 34: Kook_ Portfolio_Rev 01

•Award of Gung hee gung performance lighting competition

•Planning lighting performance in gung hee palace.•Rental type fixtures•Consideration of both Convenience installation and safety of fixtures

Processing _Project

•Consideration of historic and conservative site, on the other hand requiring colorful scenes.

A. Completed workWhole view

B. Section view

C. Section view

A.

B.

C.

Lightpia.

Project.

Layout.

Evaluation.

Process.

Page 35: Kook_ Portfolio_Rev 01

•Planning Outdoor lighting performance at commercial complex.

•Planning performance and media façade for constructing landmark in Daegu.Installing module 8 x 8 at meddle level in elevation.

•It spent lot time to maintaining modules because heat emission is higher than calculating at beginning time.

Processing _Project

A.

Lightpia.

Project.

Layout.

Evaluation.

Process.A. Completed work

Page 36: Kook_ Portfolio_Rev 01

•Planning M-PARK project in GUJE (2006)

Processing _Project

•Planning performance and media façade for constructing landmark in Daegu.Constructing new paradigm building

•Client complained about lighting scenes because lighting size at middle level on elevation is smaller than calculating at beginning time.

A.

B. C.

Lightpia.

Project.

Layout.

Evaluation.

Process.A. Simulation panel

for performance

ETA_Systemby Lightpia

B. Completed work

Page 37: Kook_ Portfolio_Rev 01

•Planning performance of commercial complex in cross of Seoul national station.

Concept: promoting and advertising this building identity

New concept, which combined the Display with Outdoor performance lighting was applied to

this building

•Discussing closely with interior management.

Quitting the operation (Display on elevation) before passing 1 yr due to several

breakdowns (Main reason: ventilation system was not equipped inside the cabin of

display)

Processing _Project

A. Simulation

B. Completed work

A.

B.

Lightpia.

Project.

Layout.

Evaluation.

Process.

Page 38: Kook_ Portfolio_Rev 01

DomesticProject.

A. Commercial complex

Lightpia _Projects

B. Commercial complex

C. Commercial complex D. Commercial complex E. Commercial complex

F. Commercial complex G. Commercial complex

A~G .Simulationsin domestic

A. B.

C. D. E.

F. G.

Page 39: Kook_ Portfolio_Rev 01

•Award in competition performance lighting plan regarding Jeon ju Folk village(2005)

•Ranked second, hence didn’t get the contract

Processing _Project

•Landscape performance lighting for providing various lighting scenes to visitors.

• Promotion of regional identity for booming economic conditions

• emphasizing traditional city through performance.

A. B.

C.

KC Environmental

Design.

Project.

Layout.

Evaluation.

Process.A. 3D

of fixtures design

B. Simulation panelfor performance

C. Sections

Page 40: Kook_ Portfolio_Rev 01

•Planning Performance lighting of Siwha Memorial building in Ansan

• Planning lighting performance for Memorial Building for promoting K-Water in Korea

•This performance was well evaluated to express the volume of building by lighting.

Processing _Project

A. Simulation panelfor performance

B. Section

C. Completed work

A. B.

C.

KC Environmental

Design.

Project.

Layout.

Evaluation.

Process.

Page 41: Kook_ Portfolio_Rev 01

•Naissance; Planning Commercial complex lighting performance in Ansan

• Performance to mixing conventional lighting with LED lighting for expressing the volume of building and color scenes

•Consideration on stable and colorful image regarding station influence area

Processing _Project

•This performance was well evaluated good to express the volume of building by lighting. • it had been difficult to manage variouslighting type.

A. Simulation

B. Completed workWhole view

A.

B.

KC Environmental

Design.

Project.

Layout.

Evaluation.

Process.

Page 42: Kook_ Portfolio_Rev 01

•Competition about performance of big bridge in Han river.

Processing _Project

•Big bridge outdoor lighting performance competition by Seoul government’s lighting master plan.

•It failed to win the competition •Estimation had exceeded the upper limitation.

B.A.

C.

KC Environmental

Design.

Project.

Layout.

Evaluation.

Process.A. Simulation

of luminance

B. Simulationfor performance

Page 43: Kook_ Portfolio_Rev 01

Thank for attention.By Hyeung Keun Kook

Hyeung keun Kook (Male)Birth: 28th sep /1976

Phone No.: 010-8649-2569E-mail: [email protected] /

[email protected]: Enhang namu officetel 1462-42, Shinrimdong

Gwanakgu, Seoul