KnowledgeWebOutreach to Industry

KnowledgeWeb O2I Plenary Report

Heraklion, 14 May 2004

Industrial Applications and PromotionKnowledge Web

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 2

Knowledge Web

O2I Tasks dependencies

Application Needs• Prototypical Use Cases• Knowledge processes• Knowledge components

Evaluation of Technology

• Utility of Ontology tools• Interoperability of tools• Ontology content

Recommandations to deploy• Best Practices• Ontology repository• OntoMetadata standards• Onto outreach authority

Task 1

Ind

us

try

Bo

ard

Task 2 Task 3

Cross-Network cooperation – partners, joint education, program activities Task 5

Portal - Ontologies, first prototype, maintenance KW and SWSATask 6

Promotion – Technology RoadMaps, Success stories, Technology show casesTask 4

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 3

Knowledge Web

WP1.1 Industrial application needs

(Started, FT)

WP1.2 Evaluation for technology selection

(Start in 6, VUB)

WP1.3 Technology recommendations

(Started, VUB)

WP1.4 Promotion of ontology technologies

(Start in 6, UIBk)

WP1.5 Cross-network cooperation

(Started, UIBK)

WP1.6 Semantic portal infrastructure

(Started, UPM)

O2I PlanNº Nom de la tâche

1 WP1.1: Industrial Needs Analysis

2 Industry Board Set up (Task 1.1)

3 Board and MoU (D 1.1.1 v1)

4 Board updated (D 1.1.1 v2)

5 Systems Requirements (Task 1.1.2)

6 Prototypical Use Cases (D 1.1.2 v1)

7 Knowledge processing Requirements (Task 1.1.3)

8 Ontology based processing (D 1.1.3 v1)

9 Knowledge System requirements for Business Cases (D1.1.4)

10 WP1.2: Evaluations for Technology Selection

11 Utility of Ontology based Tools (Task 1.2.1)

12 Utility of Ontology Tools suite (D 1.2.1 v1)

13 Interoperabilty of Tools (Task 1.2.2)

14 Report on SWF requirements (D 1.2.2)

15 Ontology Content Evaluation (Task 1.2.3)

16 Method for Ontology evaluation v1 (D 1.2.3)

17 WP1.3: Technology Recommendations

18 Best Practices and Guidelines (Task 1.3.1)

19 Best Practices v1 (D 1.3.1)

20 Ontology Repository (Task 1.3.2)

21 Standards (Task 1.3.3)

22 Standards report V1 (D 1.3.2)

23 Ontology Registration Authority (Task 1.3.4)

24 Report on OOA v1 (D 1.3.3)

25 WP1.4: Promotion of Technology

26 Technology Roadmap (Task 1. 4.1)

27 Roadmap v1 (D 1.4.1)

28 Success Stories (Task 1.4.2)

29 Success Stories v1 (D 1.4.2)

30 International Technology Show (Task 1.4.3)

31 Report on International Shows v1 (D 1.4.3)

32 WP1.5: Cross-field activity

33 Potential co-operators (Task 1.5.1)

34 Project presentation and show case (D 1.5.1)

35 Joint Education and Training co-operations (Task 1.5.2)

36 Joint Education and Training activities (D 1.5.2)

37 Co-operation KW - REWERSE Graduate education (DE-D2)

38 Co-operation KW-REWERSE Industrial competence (DT-D2)

39 WP1.6: Semantic Portal Infrastructure

40 Portal Requirements and Design (Task and D 1.6.1)

41 Portal Requirements (D 1.6.1)

42 Portal Ontology (D 1.6.2)

43 Portal Development (Task 1.6.3)

44 First Prototype Portal (D 1.6.3)

45 Content and maintenance activities (Task 1.6.4)

46 Portal Releases KnowledgeWeb and SWSA (D 1.6.4)

D J F M A M J J A S O N D J F M A M J J A S2nd Semestre 1er Semestre 2nd Semestre 1er Semestre 2nd Semestre

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 4

Knowledge Web

O2I Progress towards the objectives

KnowledgeWeb O2I Plenary Report

Heraklio, 14 May 2004

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 5

Knowledge Web

Executive Summary (1) Heraklion Board of industrial partners (WP 1.1)

– Business sectorial domains (Automotive, bank, telecom, … ) In building– Pull-Push Technology balance (Pull search first) In building– Invitation letter and sent to potential Industry partners (DONE) – Starting and Sharing the F2F meeting (to get business scenarios) June 2004

– All O2I partners are strongly invited to contact potential Industry partners

Industrial Board MoU (WP 1.1)– Drafted and circulated by FT Done 16 April 2004

– Main structure of the Operational charter Agreed by EPMB– Final version to be sent end of May 2004 EPMB (for signature by Industry partners)

Systems Requirements (D 1.1.2)

– First draft initiated by FUB (April 2004)– Needs to organize selected ad-hoc F2F meetings with industry partners – F2F - Form for describing prototypical Use Cases UML style could be used (actors, sequences, classes)

– Intermediate version of Use Cases should be delivered Month 6 to KW-Research

Knowledge Processing needs (D 1.1.3)

– Univ of Trento is leading the task– First draft to start in June 2004

Benchmarking (WP 1.2)

– Clarify the needs in relation to industry needs– Set a network of close collaboration between Research and Industry

Next main focus !!

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 6

Knowledge Web

Executive Summary (2) Heraklion

Ontology Registration Authority (WP 1.3)– Set up the requirements for The ORA for the first KW phase (M18)– Leverage the effort with identify Standardization bodies– MetaData for Ontology repositories (UPM) Leveraging with W3C WG BPD

Best Practices : cooperation with W3C (WP 1.3)

– VUA, INRIA, UPM, FT are active members of WG Best Practices for Deployment Promotion (WP 1.4)

– Roadmap and technology show– ESWS'04 and SemWeb Challenge

Industrial Workshops / Conferences (WP 1.4)

– Knowledgeweb O2I meeting with Industry board (specific needs or PMB event)– Best promotional vectors (Advise from Industrial Board)– SIGIR’04, ISWC’04, OTM’04 …

Cooperation with NoE Rewerse (WP1.5)

– Technology transfer Started 5 May DONE (minutes circulated)

Portal O2I Web site (WP 1.6) – Strong request from UPM to populate and make suggestions for improvements– FT propose a look and feel for "business oriented" access to O2I related contents

It is your portal !!

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 7

Knowledge Web

Kno

wle

dge

Kno

wle

dge W

ebW

eb

http://…

realizing the semantic web

WP 1. Outreach to Industry

HomeHome Industrial PartnersIndustrial Partners ParticipantsParticipants EventsEvents DocumentsDocuments LinksLinks ContactsContacts

ObjectivesObjectives

NewsletterNewsletter

Enter your e-mail OKOK

Join usJoin us

Complete the form

The next generation of the Web (the Semantic WebSemantic Web) is a huge information space, where machines can easily participate and help in a more meaningful way. There is, however, still a long way to go transfer the Semantic Web from an academic adventure into a technology provided by software industry. Supporting this transition process of Ontology technology from Academia to Industry is the main and major goal of Knowledge Web, the Network of Excellence under European Commission 6th FP.

In particular, the Work Package Outreach to IndustryOutreach to Industry focuses its efforts on promoting greater awareness and faster take-up of Semantic Web technology by industry.

Your code OKOK

Industrial Private Industrial Private PartnersPartners

SECTORS BASED BUSINESS CASES SCENARIOSSECTORS BASED BUSINESS CASES SCENARIOS

Automobile Industry

Banking and finance

Computer and electronics

Consumer goods

Distribution

Energy, Public services

Food industry

Industry and construction

Internet

Luxury goods, fashion, beauty

Media and communications

Pharmaceuticals and health

Service industry

Sports

Telecommunications

Transport and logistics

O2I Proposal for the Web Site

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 8

Knowledge Web

WP 1.1 Applications needs

FT

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 9

Knowledge Web

1 – Industrial Board•Industrial sectors benefactors census•Categorization (using, be-using, would-benefit)•MoU signed

D1.1.1

2 – System Requirements•Prototypical Use Cases•Typology of Ontology processing•Knowledge Components Architecture

D1.1.2

3 – Industrial Board 2•Partners Consolidation•Business areas•Top Best Applications

D1.1.4

4 – Concrete transfert results•Solutions•Evaluations•Further directions

June 2004

January 2004

January 2005 June 2005

Knowledgeweb

The End

2nd Phase

June 2005

Main Task 1.1 Milestones

D1.1.3 D1.1.1 Rev1

36 months 48 months

We are here

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 10

Knowledge Web

Progress• Task 1: Establishment of an industrial Board (FT)

– Invitation letter and organizational charter (MoU) (DONE)– Organization in economical sectors and start populating (DONE)– D1.1.1 on schedule

• Task 2: System Requirements Analysis (FUB)– Prototypical Business Use Cases and migration needs– First draft of the skeleton of the prototypical Use Cases– One illustration– D 1.1.2 on schedule

• Task 3: Knowledge processing requirements analysis (UniTrento)– Knowledge processing needs and architectural components– Leadership decided : Uni Trento– D 1.1.3 will start next week– D 1.1.4 will follow

Nº Nom de la tâche

1 WP1.1: Industrial Needs Analysis

2 Industry Board Set up (Task 1.1)

3 Board and MoU (D 1.1.1 v1)

4 Board updated (D 1.1.1 v2)

5 Systems Requirements (Task 1.1.2)

6 Prototypical Use Cases (D 1.1.2 v1)

7 Knowledge processing Requirements (Task 1.1.3)

8 Ontology based processing (D 1.1.3 v1)

9 Knowledge System requirements for Business Cases (D1.1.4)

D J F M A M J J A S O N D J F M A M J J A S2nd Semestre 1er Semestre 2nd Semestre 1er Semestre 2nd Semestre

No difficulty

To report

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 11

Knowledge Web

The Industrial Board

Number of partnersContractual Targets

2004 : 50

2005 : 100

2006 : 150

2007 : 200

Mid-2004 : 15 - 50

We need to master the growth

of the network !

Check of their declaration of interest

It should be a win-win cooperation

Rules for the building

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 12

Knowledge Web

Industry Board MoU• Basic principles

– No interferences with current KW contract / Consortium Agreement (CA): just supplement to CA

• Knowledge Web Early Access Policy – The aim is to have a panel of industrial corporations, working as an informal group representative of

a “laboratorial” target market where all can study industrial requirements, test the industrial value of their ideas and collect inspiration for new research opportunities.

• Setting-up and Accession– Any third parties may apply. The terms and conditions "Knowledge Web Early Access Policy" and

the Application Form are to be available on-line. – Vrije Universiteit Amsterdam (VUA) will be authorised to sign with the Acceding third party on behalf

of all contractors. Nonetheless, contractors have a two weeks term to express their opposition.

• Early Knowledge transfer– "Early Releases" ie. Results and deliverables from the KW technical committees, are to be made

available to Panellists at the respective owners' discretion; preferably in the form of executable code or such other forms as do not give immediate access to confidential Knowledge.

– Early Releases have to be treated as confidential by the Panellist, – The Panellists agree

- To test the Early Releases diligently and to communicate to the Contractors sufficient progress and error reports,- To provide inputs such as but not limited to, recommendations, or industrial requirements, feedback to the Contractors in relation to its own use of the Semantic Web services & technology,

• O2I managers responsibility– ensuring timely achievement of the Panellists' tasks,– ensuring and organizing feedback and information for the benefit of all Contractors.

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 13

Knowledge Web

Knowledge Processing Needs

Delivery of Use Cases and Knowledge

Process

D1.1.2 / D1.1.3

Delivery of Use Cases and Knowledge

Process

D1.1.2 / D1.1.3

Delivery of Board and

MOU

D1.1.1

Delivery of Board and

MOU

D1.1.1

WP 1.1 Plan

Jul Aug Sep Oct DecNovJan Feb

2004

KW 2

JuneMar Apr May

Kick-off

Industry partnership

Tasks to be sharedIndustry Board and F2FBusiness CasesPrototypical Use CaseKey Knowledge processesO2Indusdry web site

2005

Use Case

D1.1.2

Interim Version

Use Case

D1.1.2

Interim Version

Prototypical Use Cases

O2I ad-hoc

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 14

Knowledge Web

WP 1.2 Technology Evaluation

VUB

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 15

Knowledge Web

Progress

-This work package starts 1st of July-• Task 1: Utility of ontology-based tools (Uni Trento)

– A roadmap for achieving the goals of this task is established.– The main dependencies with other work packages are identified and discussed

(specially benchmarking in WP2.1 and WP2.2). – An ad hoc meeting on “benchmarking in Kweb” will be organized with the other

workpackages. • Task 2: Interoperability of tools (L3S)

– The general goals of this task were presented and discussed. – Identification of tool components and identification of requirements for interoperability is

expected in next meeting.• Task 3: Ontology content evaluation (UKARL)

– The general goals of this task were discussed. – Yet no consensus about what “ontology evaluation” means. – A clear description of methods for ontology evaluation is expected in next meeting. – Consensus should be reached - in an offline mode- before the next meeting.

Nº Nom de la tâche

10 WP1.2: Evaluations for Technology Selection

11 Utility of Ontology based Tools (Task 1.2.1)

12 Utility of Ontology Tools suite (D 1.2.1 v1)

13 Interoperabilty of Tools (Task 1.2.2)

14 Report on SWF requirements (D 1.2.2)

15 Ontology Content Evaluation (Task 1.2.3)

16 Method for Ontology evaluation v1 (D 1.2.3)

D J F M A M J J A S O N D J F M A M J J A2nd Semestre 1er Semestre 2nd Semestre 1er Semestre 2nd Semestre

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 16

Knowledge Web

WP 1.3 Technology Recommendations

VUB

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 17

Knowledge Web

Progress

• Task 1: Best Practices and Guidelines (FT) – A preliminary work and basic analyses of Best Practices. – A report is expected in the next meeting to capture the top best practices from the industry use cases – Ongoing work on best practices and guidelines for automatic metadata creation, with focus on industrial

business cases.– Ongoing work on Best practices and guidelines for ontology-based recruitment application as prototypical

business case.

• Task 2: Ontology Repository (UPM) & Task 3: Standards (UPM)– Identification of a subset of metadata for describing ontologies using the Reference Ontology. This set of

metadata will be proposed for standardization. – Adapting and extending the OntoRoadMap as the first prototype of ontology repository, this repository will be

part of the KWeb portal.

• Task 4: Ontology Outreach Authority (VUB)– Preliminary details on the goals and requirements of OOA. – A short report on the OOA goals and requirements will be presented in the next meeting and then it will be sent

to the industry board for feedback. – Expected-Problem: Person-month allocated to this task is very optimistic. Decision: the decision is to be taken

after finishing D1.3.3: reduce the goals or allocate more person-month.

Nº Nom de la tâche

17 WP1.3: Technology Recommendations

18 Best Practices and Guidelines (Task 1.3.1)

19 Best Practices v1 (D 1.3.1)

20 Ontology Repository (Task 1.3.2)

21 Standards (Task 1.3.3)

22 Standards report V1 (D 1.3.2)

23 Ontology Registration Authority (Task 1.3.4)

24 Report on OOA v1 (D 1.3.3)

D J F M A M J J A S O N D J F M A M J J A2nd Semestre 1er Semestre 2nd Semestre 1er Semestre 2nd Semestre

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 18

Knowledge Web

WP 1.4 Technology Promotion

FUB

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 19

Knowledge Web

Progress• Deliverable 1: Technology RoadMap (UIBK)

– Input from del. 3 the Report on International Semantic Technology Roadshow

• Deliverable 2: Success Stories (UIBK)– Suggestion to restrict to one Success story in order to strongly focus on

marketing elements as creative layout and industry appealing style.

• Deliverable 3: Report on International Technology Show (UIKB)– First International Semantic Technology Road Show: ESWS’04, successfully held May 12th, in Crete!!!– The collection of applications and tools will be organized in a categorization matrix – The focus will be on applications rather than tools (is more industry related and avoids overlap with other

activities)– The report will be related to the technology roadmap (D 1.4.1)

Additional identified needs and suggestions:1. Having links on the portal to the tools and applications

2. WIKI like portal for an application repository. Suggested features of such repository:

• user-driven, with a template for developers of the applications to complete. (Work out categorization matrix for the template)

• ranking system as in W3C WG BPD (See the JAVA portal (proposal from UPM))Nº Nom de la tâche

25 WP1.4: Promotion of Technology

26 Technology Roadmap (Task 1. 4.1)

27 Roadmap v1 (D 1.4.1)

28 Success Stories (Task 1.4.2)

29 Success Stories v1 (D 1.4.2)

30 International Technology Show (Task 1.4.3)

31 Report on International Shows v1 (D 1.4.3)

D J F M A M J J A S O N D J F M A M J J A2nd Semestre 1er Semestre 2nd Semestre 1er Semestre 2nd Semestre

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 20

Knowledge Web

WP 1.5 Cross-Network cooperation

UIBK

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 21

Knowledge Web

Progress

• Task 1: Potential cooperators (UIBK)– Should we just focus on our collaboration with Rewerse (the most closed NoE) or with any

other NoEs (such as: MUSCLE, Aim@Shape, KB2.0 and Agentlink III)

• Task 2: Joint Education and Training cooperations (UIBK)– DE-D2:

• Course collections (same platform for learning units)• MSc program (joint action with Rewerse) • Platform for education in industry• The KW portal will host e.Learning facilities similar to those pursued in RW education area

– DT-D2:• O2I joined the Technology transfer task of Rewerse (FT) (telecon each month planned)

• Joint collaboration on the industrial board composition and organization• KW and RW review the possible common concrete actions and right targets for promotion and

dissemination• Task 3: Programme of activities with each network (UIBK)

– Workshop organized by AceMedia http://www.acemedia.org/aceMedia/events/ewimt2004.html

• D 1.5.1 – Project presentation and showcase (DONE)

Nº Nom de la tâche

32 WP1.5: Cross-field activity

33 Potential co-operators (Task 1.5.1)

34 Project presentation and show case (D 1.5.1)

35 Joint Education and Training co-operations (Task 1.5.2)

36 Joint Education and Training activities (D 1.5.2)

37 Co-operation KW - REWERSE Graduate education (DE-D2)

38 Co-operation KW-REWERSE Industrial competence (DT-D2)

D J F M A M J J A S O N D J F M A M J J A2nd Semestre 1er Semestre 2nd Semestre 1er Semestre 2nd Semestre

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 22

Knowledge Web

WP 1.6KW Portal

UPM

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 23

Knowledge Web

Progress

• Task 1: Portal Requirements and Design (UPM)– Semantic Portal infrastructure presented– Deliverables: Ontologies (M6), Portal requirements (M12), First prototype content delivery (M18)

• Task 2: Portal Development (UPM)– Technology used for : ODESeW– 5 ontologies for the time being (Time ontology will be added)– Migration of some contents from Ontoweb– Comments from the audience– Ease for upload and annotate the content instances (report, deliverable, presentation)– WIKI facility– Download facility

• Task 3: Content and maintenance activities (UPM)

Nº Nom de la tâche

39 WP1.6: Semantic Portal Infrastructure

40 Portal Requirements and Design (Task and D 1.6.1)

41 Portal Requirements (D 1.6.1)

42 Portal Ontology (D 1.6.2)

43 Portal Development (Task 1.6.3)

44 First Prototype Portal (D 1.6.3)

45 Content and maintenance activities (Task 1.6.4)

46 Portal Releases KnowledgeWeb and SWSA (D 1.6.4)

D J F M A M J J A S O N D J F M A M J J A2nd Semestre 1er Semestre 2nd Semestre 1er Semestre 2nd Semestre

©KnowledgeWeb – KnowledgeWeb O2I, Heraklio, 13-14 May 2004, Page 24

Knowledge Web

Location: University of Trento Local organizer: UniTn

Date: 9-10 September

Agenda: to be sent later

Next O2I Meeting