9
©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 Knowledge Web WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin 17 Nov. 2004 Nom de la tâche 1 WP1.1: Industrial Needs Analysis 2 Industry Board Set up (Task 1.1) 3 Board and MoU (D 1.1.1 v1) 4 Board updated (D 1.1.1 v2) 5 Systems Requirements (Task 1.1.2) 6 Prototypical Use Cases (D 1.1.2 v1) 7 Knowledge processing Requirements (Task 1.1.3 8 Ontology based processing (D 1.1.3 v1) 9 Knowledge System requirements for Business Ca D J F M A M J J A S O N D J F M A M J J A e 1er Semestre 2nd Semestre 1er Semestre 2nd S

Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin

Embed Size (px)

Citation preview

Page 1: Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin

©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1

Knowledge Web

WP 1.1 (FT) Applications needs

Progress to dateand Conclusions

Berlin 17 Nov. 2004

Nº Nom de la tâche

1 WP1.1: Industrial Needs Analysis

2 Industry Board Set up (Task 1.1)

3 Board and MoU (D 1.1.1 v1)

4 Board updated (D 1.1.1 v2)

5 Systems Requirements (Task 1.1.2)

6 Prototypical Use Cases (D 1.1.2 v1)

7 Knowledge processing Requirements (Task 1.1.3)

8 Ontology based processing (D 1.1.3 v1)

9 Knowledge System requirements for Business Cases (D1.1.4)

D J F M A M J J A S O N D J F M A M J J A S2nd Semestre 1er Semestre 2nd Semestre 1er Semestre 2nd Semestre

Page 2: Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin

©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 2

Knowledge Web

Industry Board and Policy FT task 1

• Task 1: Establishment of an industrial Board (FT)– Industry board expansion underway

• 28 as Berlin meeting, 50 by end of 2004– CA & Policy for final approval by EPMB 17.09.2004 - signature by KW partners nearly

completed – Early access Policy to be sent to IB members for signature

• rules in case of remarks on content– New Industry partners Invitation on O2I KW portal

Annex 2 Application Form

for accession to the

Knowledge Web Early Access Policy

[full name and legal form of the Panellist], represented for the purposes hereof by [name of authorised representative], hereby applies for becoming a Panellist within the Panel of industrial corporations set up by the Contractors to the Project entitled Knowledge Web, for which Project the Contract n° 507482 has been concluded between the Commission of the European Community and Universität Innsbruck (UIBK), the latter acting for the purposes of the Contract on its behalf and for its account but also on behalf and for the account of the Contractors, a list of which is given in the Knowledge Web Early Access Policy, and, in the event that this application is accepted, accepts in accordance with the provisions of the Knowledge Web Early Access Policy all the rights and obligations of a Panellist as defined in that Knowledge Web Early Access Policy, which, from the date of acceptance by the Knowledge Web Contractors, will become legally binding. AS WITNESS thereof, this Application Form has been signed in counterparts by the undersigned authorised representatives the day and year first above written. Authorised to sign on behalf of Vrije Universiteit Amsterdam (VUA), The Netherlands, acting for the purposes hereof on its behalf and for its account, but also on behalf and for the account of the Knowledge Web Contractors, Signature: __________________________ Name: Guus Schreiber Title : Prof. Dr. Name of Legal Entity: [full name of the Panellist] Name of legally authorised representative: (written out in full) Title of legally authorised representative: [title] Signature of legally authorised representative:

Kno

wle

dge

Kno

wle

dge W

ebW

eb

HomeHome Industrial PartnersIndustrial Partners

ObjectivesObjectives

NewsletterNewsletter

Enter your e-mail OKOK

NewsletterNewsletter

Enter your e-mail OKOK

Join usJoin us

Complete the form

Join usJoin us

Complete the form

Your code OKOK

Industrial Private Industrial Private PartnersPartners

Your code OKOK

Industrial Private Industrial Private PartnersPartners

Page 3: Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin

©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 3

Knowledge Web

Use Cases FUBerlin Task 2

• Task 2 : System Requirements Analysis (FUB)– Populating each economical sector with Business Cases underway on KW portal– Recruiting Cases: F2F industry board meetings get started Q3/2004

• F2F meeting are progressing well• The Use Case format is well accepted• Communication channel through the Industry portal

– Number of Cases in D 1.1.2: 10-15 – Proposition to get an excellent description on max 10-15 Use Cases (D1.1.2 v1)– To be continued over 2005 to fill the gap

• Industry domains and applications scenarios

Business Case:

1. Overview

Challenge In a geographically distributed and complex organizations coordinate the buying and managing processes of real estate is a relevant and strategic asset. Solution Matching information among description of designing, maintenance techniques, estate descriptions etc. All these information are emerging from different communities of workers: Order Managing, Research and Technology, Testing, Maintenance and Plant Engineering groups. Why a Semantic solution Semantic supports a richer matching among concurrent description of rolling stocks and railway materials. Semantics allow an effective design, maintenance, and dismission of Train estate and materials during their whole life cycles. Key Business Benefits Coordinate 5.000 employees, according to their skills, over ten workshops (called Business Units, each is specialized on a different kind of rolling stock) which are geographically distributed in Italy and in charge of periodical maintenance of Trenitalia’s rolling stock and materials. Business Partners Trenitalia and all the complex organizations that need to share knowledge among autonomous units, aimed at estate managing and buying.

Keys components Existing Software 1. GAD (Gestione Archivio Disegni): the repository of the official projects’ designs. It is accessed by some communities of the firm that are

allowed to write, check, validate and review new Maintenance Technical Procedure (MTP) referring to train’s components. 2. SICUESE: it is an Access database, dedicated to the storage of documents dealing with maintenance activities, including MTPs. 3. RFI web site: RFI (Rete Ferroviaria Italiana) is the Trenitalia’s web site in which the railway infrastructure is managed 4. RSMS: it is a SAP system where all the operations performed on each rolling stock item are recorded. Research and Development Peer to peer document sharing and reviewing systems; semantic information retrieval tools; Expert maps; Social technologies that allow communities exchanging processes; Documents upload on official repositories Technology locks Query engines; Semantic matching; System for social creation and reviewing of documents, MTP, ecc. Coherency of distributed storage and retrieval systems

Page 4: Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin

©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 4

Knowledge Web

Knowledge Processing Uni Trento Task 3

• Task 3 : Knowledge Processing needs and components– Knowledge processing needs already detailed on few (4) Use Cases

• from D1.1.2 Use Case Portfolio

– A simplified RUP methodology was used in order to identify KP tasks– Needs “walk-through” illustrative examples

• for presentation and test

– Needs concrete and focused sub-scenario • with data to explicit the critical K components

– Proposition to get an excellent KP analysis examples • (10 from D1.1.2) to issue a D 1.1.3 v1

– Worry: Size of the document if 10-20 analyzed Use Cases. • The bottom line for incusion of a use case should be its added value, i.e., new

knowledge processing tasks with respect to the already included use cases.

: System Administrator

: ModelingDomain : OrchestrationWebServices

UpdateModel

OrchestrationWorkflow

Page 5: Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin

Knowledge Web

Discussions and ResolutionsBerlin 17-19 November

Page 6: Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin

©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 6

Knowledge Web

WP 1.1 Hot Topics (discussed in Berlin)

• WP 1.1 Self-assessment (see EPMB schedule)

– Draft (sent 15 Nov to WP1.1) and refined during Berlin meeting (Drafted revised)– Area manager summary submission EPMB conf 25 Nov

• New JPA (see EPMB schedule)

– In formal review (Brian Macklin) : less paper work and focus on 3 key Use Cases– Needs to focus on what directly matters industry

• also get the Industry Board advice on new JPA before the pre-review meeting (17 Dec)

• KW – Industry communication channel improvements– Web site (newsletter, contents,

• Use Cases collection and Analysis– F2F, mails, …– « D 1.1.2 » will move to the O2I web site (all new Business Cases will be on site only)– D 1.1.3 v1 (~10 analysed Use Cases) then Analysis should be pursued till « saturation »

• KW – Industry board growth– 50 end of 2004, 100 end of 2005 … Each O2I member must contribute !!

– FT must be the editor of the members list• To avoid mis-alignments

• Early Access Policy– To be sent by FT

• WP1.1 internal web site – FT will open it very soon

Page 7: Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin

©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 7

Knowledge WebWP 1.1 Decisions (Berlin 17 Nov)

• D1.1.2 Business Cases – Latest version sent Monday 15 Nov, new version by end of November– 11 BCs …. 20 BCs foreseen by 15 Dec (DIP scenarios, Obelix, Biovista, SNCF, Daimler, BT)

– Methodology to recruit BCs is now stable• Send the form style and example prior to the F2F meeting• Complete/Interpret the content of the form with the Industry during the F2F meeting

– Note wherever possible where the semweb technology does not make sense at all

– Defense applications needs further approval from EPMB

– Introduction on Business/Market related info (World dev. Report, etc.)

• D 1.1.3 Knowledge processing components– Latest version sent Wednesday 10, new version end of November

– 10 Analysis foreseen by 15 Dec

– Scenarios reviewed and detailed• AceMedia scenario detailed by CERTH-ITI (Guus stressed the importance Multimedia cases!)

• Also FT, FUB

Page 8: Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin

©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 8

Knowledge WebIndustry Portal documents list (Berlin 17 Nov.)

http://knowledgeweb.semanticweb.org/ (open 10 November 2004)

• Look and feel of the Industry portal– KW O2I partners comments?– Industry Board comments?

• Business Cases in each economic sector– Add the number of available Business Cases

• Newsletter• Personalized login/password for each Industry Board member• « Become a member »:

– Invitation letter (ok)– Statement of interest (ok) – Early Access policy – Submit the statement of interest– Correct the « Membership in industry board » on left column

• Update the Industrial board members list• Technology evaluation• Technology recommendation

– Best Practices: invitation to contribute to the questionnaire (Luigi Lancieri)– Démos / applications (see Ellen Shulten for possible link to W3C)

• « Application needs » top menu– Business Case Analysis– Knowledge Processing and system requirements (D1.1.3 and D 1.1.4) – classified by economic sectors

Page 9: Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin

©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 9

Knowledge Web

Industry portal documents list (2)

• Network cooperations– See WP 1.5 Ying Ding

• Technology evaluation and recommendations– See WP 1.2 1.3 Mustafa Jarrar

• Events/Industrial WS– Slides and main documents– ESWC’05 Heraklion May/June 2005– Industry event, RW-KW, Munchen October 2005 – Mistakes to be corrected

• Events/Knowledge meetings– O2I KW meetings

• Deliverables– Draft only for comments from Industry– Access to D 1.1.2 ?

• Links – To be removed and put Network cooperations instead

• Contacts– Homepage AL missing