The Right to Information Act, 2005 of Government of India. The Right to Information Act, 2005 of the Government of India has come into force on 15th June, 2005. As per Section 4(b) of these Acts, every public authority/competent authority has to publish the information on the points specified therein. Accordingly, the information pertaining to the organisation, functions and duties of Mumbai Metropolitan Region Development Authority (MMRDA) is given below: - (1) Particulars of the organisation, functions and duties: -
1.1 The Mumbai Metropolitan Region Development Authority is constituted and established under the law of the State Legislature called the Mumbai Metropolitan Region Development Authority Act, 1974 (Maharashtra Act IV of 1975). The Act is intended as spelt in the preamble as follows:- An Act for forming Brihan Mumbai and certain areas round about into a Mumbai Metropolitan Region, to provide for the establishment of an Authority for the purpose of planning, co-ordinating and supervising the proper, orderly and rapid development of the areas in that Region and of executing plans, projects and schemes for such development, and to provide for matters connected therewith.
1.2 The Authority is declared in sub-section (2) of Section 3 of the said Act to be a body corporate, having perpetual succession and a common seal with power, subject to the provisions of the Act, to acquire, hold and dispose of property, both moveable and immovable and to contact and to sue and be sued in its corporate name. The Authority has a three-tired organisation, as depicted in Sections 3, 4A and 7 of the said Act. At the apex is the Authority presided by the Minister of Urban Development, presently the Chief Minister. At the second and intervening tier is the Executive Committee presided by the Chief Secretary to the State Government. The third tier is occupied by the Metropolitan Commissioner assisted by the Joint Metropolitan Commissioner and other officers.
1.3 The main object of the Authority as ordained in Section 12 is to secure the
development of the Mumbai Metropolitan Region (MMR) as defined in the Act. The functions devolving upon the Authority are stated as follows:-
a. review any physical, financial and economical plan; b. review any project or scheme for development which may be proposed or
may be in the course of execution or may be completed in the Metropolitan Region;
c. formulate and sanction for the development of the Metropolitan Region or any part thereof;
d. execute projects and schemes ; e. recommend to the State Government any matter or proposal requiring action
by the State Government or any other authority for the overall development of the Metropolitan Region;
f. participate with any other authority for inter-regional development;
g. finance any project or scheme for the development of the Metropolitan Region;
h. co-ordinate execution of the projects or schemes for the development of the Metropolitan Region.
i. supervise or otherwise ensure adequate supervision over the planning and execution of any project or scheme, the expenses of which, in whole or in part, are to be met from the Mumbai Metropolitan Region Development Fund;
j. prepare schemes and advise the concerned authorities in formulating and undertaking schemes for development of agriculture, horticulture, floriculture, forestry, dairy development, poultry farming, piggery, cattle breeding, fisheries and other similar activities.
k. prepare and implement schemes for providing alternative accommodation and for rehabilitation of persons displaced by projects and schemes which provide for such requirements;
l. do all such other acts and things as may be necessary for, or incidental or conducive to, any matters which arise on account of its activity and which are necessary for furtherance of the objects for which the Authority is established.
1.4 These functions are intended to provide for planned and balanced development of the MMR, with co-ordination being woven by the Authority at both the vertical and horizontal levels amongst the local authorities in the Region and the State Government.
1.5 The State Government has, in exercise of its power under Section 40 of the Maharashtra Regional and Town Planning Act, 1966, appointed the Authority to be the Special Planning Authority for four notified areas in Brihan Mumbai (Bandra-Kurla Complex, Backbay Reclamation, Oshiware District Centre, and Uttan-Gorai-Manori area) and one notified area in Kalyan ( Ambernath, Kulgaon-Badlapur and surrounding notified area). The Special Planning Authority propounds the land-use plan geared to the renewal or redevelopment of the notified area and upgrades the urban infrastructure.
1.6 The Govt. of Maharashtra has amended MMRDA Act, 1974 in accordance with Maharashtra Act No.(IV) 1975, on 9th January, 2003, enabling MMRDA to execute the main infrastructure development projects within the territorial limits of Brihanmumbai Municipal Corporation, and to prepare and execute the projects in accordance with Maharashtra Slum Areas (Improvements, Clearance and Redevelopment) Act, 1971. In accordance with these amendments, MMRDA have been conferred some powers.
1.7 The Authority has powers to sanction creation of posts of other officers and servants
subordinate to the Authority.
1.8 Powers and functions of the Executive Committee are as under :-
i. Appointment of the staff; ii. Planning and implementation of projects and schemes of the authority,
including approval or rejection of such projects and schemes; iii. Approval or rejection of tenders for projects and schemes of the Authority; iv. Grant of permission or refusal of permission, on behalf of the Authority, under
sub-section (3) of Section 13; v. Investment of surplus moneys of the Mumbai Metropolitan Region
Development Fund; vi. Institution, conduct and withdrawal of any legal proceedings on behalf of the
Authority; vii. The powers (except the power to make regulations) delegated or the
functions or duties imposed, from time to time, on the Executive Committee by the Authority.
(2) Powers and Duties of officers and employees of MMRDA.
2.1 As per Section 4A of the MMRDA Act, the Metropolitan Commissioner is the Chief Executive Officer of the Authority and exercises such powers and performs such functions or duties as the Authority may, by the Resolution passed in this behalf, determine. The Metropolitan Commissioner supervises and controls all its officers and servants, including any officers of Govt. appointed from time to time, on deputation to the Authority or any Committee or body thereof. The Metropolitan Commissioner is responsible for collection of all sums due to the Authority and payment of all sums payable by the Authority. He ensures adequate security of all assets, including cash balances, of the Authority. He is also responsible for performing all executive functions in connection with the works of the Authority.
2.2 As per the amendments made to the MMRDA Act, 1974 in accordance with Maharashtra Act No.(IV), 1975 on 9th January, 2003, for the purpose of preparation and execution of a project or scheme within the territorial limits of Brihanmumbai Municipal Corporation and in accordance with the Maharashtra Slum Areas (Improvements, Clearance and Redevelopment) Act, 1971, the Metropolitan Commissioner is deemed to be the ‘Municipal Commissioner’ and ‘Slum Rehabilitation Authority’.
2.3 Next in the hierarchy is the Joint Metropolitan Commissionerand Project Director,
Mumbai Urban Transport Project. Thereafter there are various Divisions in MMRDA as given below which are headed by the respective Chiefs –
1. Finance and Accounts Division headed by the Chief Accounts Officer and Financial Adviser;
2. Engineering Division headed by the Chief Engineer; 3. Transport and Communications Division headed by the Chief, Transport and
Communications Division; 4. Town and Country Planning Division headed by the Chief, Town and Country
Planning Division; 5. Planning Division headed by the Chief, Planning Division.
2.4 As mentioned above, the Metropolitan Commissioner is the Chief Executive Officer of the Authority. In the administrative matters the Metropolitan Commissioner is assisted by the Secretary, Executive Committee and the Personnel Officer. The Chief, Town and Country Planning Division is assisted by Lands Manager, Estate Manager and Marketing Manager.
2.5 MMRDA has taken up two major infrastructure projects viz.(a) the World Bank aided Mumbai Urban Transport Project (MUTP), and (b) the Mumbai Urban Infrastructure Project (MUIP). For MUTP, a Project Management/Monitoring Unit (PMU) has been set up in MMRDA to implement and monitor the resettlement and rehabilitation activities along with co-ordination and monitoring of the transport investment programme under MUTP. The PMU is headed by the Joint Metropolitan Commissioner and Project Director, MUTP, who is assisted by the Chief (R&R), Project Managers and the Joint Project Directors. For implementing the Mumbai Urban Infrastructure Project the funds are provided by MMRDA, Brihanmumbai Municipal Corporation and the Government of Maharashtra.
2.6 The Chiefs of the Division and PMU is assisted by various other senior officers and
staff members. 2.7 Certain administrative powers delegated by the Authority and Executivestate Manager. (3) Procedure followed in the decision making process, including channels of supervision
and accountability.
The projects, schemes and studies to be taken up during the year are included in the Annual Works Programme and Annual Budget, which is submitted to the Authority for approval. If any additional projects/ schemes/studies are required to be taken up during the year, they are taken up and implemented after approval of the Authority/ Executive Committee, and revised budget estimates are submitted to the Authority for approval at year end. For the engineering works, tenders are invited and put up to the Executive Committee for approval if the estimated cost of the work exceeds Rs.50.0 lakhs. Also for the project consultancies approval of the Executive Committee is obtained. After approval of the Authority/Executive Committee further
action is taken by the Metropolitan Commissioner according to the authorisation by the Authority/Executive Committee. As mentioned above, certain administrative powers have been delegated by the Authority and the Executive Committee to the Metropolitan Commissioner. In such cases the proposals are submitted to the Metropolitan Commissioner for taking decision in such matters. Further as mentioned in para.2.1 above, the Metropolitan Commissioner supervises and controls all its officers and staff members. The Joint Metropolitan Commissioner as well as Chiefs of respective Division also supervise the work carried out by the respective Division.
(4) Norms set for the discharge of functions.
The schemes and projects incorporated in the Annual Works Programme which are approved by the Authority and Government, are implemented during the year.
(5) Rules, regulations, instructions, manuals and records, held by MMRDA or under
MMRDA’s control or used by its employees for discharging its functions.
The following Rules and Regulations have been made under the provisions of the MMRDA Act –
(a) Constitution –
1. The Mumbai Metropolitan Region Development Authority (Conduct of Business at Meetings) Regulations, 1975.
2. The Mumbai Metropolitan Region Development Authority (Conduct of Business at the Meetings of the Committees) Regulations, 1977.
3. The Mumbai Metropolitan Region Development Authority (Allowances to Members) Regulations, 1979.
(b) Service Matters –
1. The Mumbai Metropolitan Region Development Authority (Travelling Allowance) Regulations, 1975.
2. The Mumbai Metropolitan Region Development Authority (Reimbursement of Medical Expenses) Regulations, 1975.
3. The Mumbai Metropolitan Region Development Authority (Leave) Regulations, 1976.
4. The Mumbai Metropolitan Region Development Authority (Conditions of Service) Regulations, 1977.
5. The Mumbai Metropolitan Region Development Authority (Employees’ Contributory Provident Fund) Regulations, 1979.
6. The Mumbai Metropolitan Region Development Authority Employees’ (Housing Loans) Regulations, 1981.
7. The Mumbai Metropolitan Region Development Authority (Grant of Loans to Co-operative Housing Societies) Regulations, 1983.
8. The Mumbai Metropolitan Region Development Authority (Employees’ Payment of Gratuity) Regulations, 1983.
9. The Mumbai Metropolitan Region Development Authority (Officers and
Employees) Marathi Language Examination Rules, 1983. 10. The Mumbai Metropolitan Region Development Authority Staff Appointment
Guidelines, 1984.
(c) Finance and Accounts Matters –
1. The Mumbai Metropolitan Region Development Fund (Operation of Bank Accounts) Regulations, 1976.
2. Regulations for the Establishment and Operation of the Loans Fund Authorised under Section 18A of the Mumbai Metropolitan Region Development Authority Act, 1976.
3. The Mumbai Metropolitan Region Development Authority (Financial) Regulations, 1976.
(d) Miscellaneous –
1. The Mumbai Metropolitan Region Development Authority (Staff Car) Regulations, 1977.
2. The Mumbai Metropolitan Region Development Authority Immovable Property Committee (Constitution and Powers) Regulations, 1977.
3. The Mumbai Metropolitan Region Development Authority (Disposal of Lands) Regulations, 1977.
4. The Mumbai Metropolitan Region Development Authority Truck Terminal Immovable Property Committee (Constitution, Powers and Functions) Regulations, 1986.
(e) Rules –
1. The Mumbai Metropolitan Region Development Authority (Service of Notice) Rules, 1975.
2. The Mumbai Metropolitan Region Development Authority Rules, 1976.
(6) A statement of the categories of documents that are held by MMRDA or under its
control.
The following documents are held by MMRDA –
a. MMRDA Act, 1974; b. Regional Plan for MMR: 1996-2011 c. Development Plans for –
i. Bandra-Kurla Complex ii. Backbay Reclamation Area iii. Oshiware District Centre iv. Ambernath, Kulgaon-Badlapur and surrounding Notified Area.
d. Resettlement & Rehabilitation Policy for Mumbai Urban Transport Project, formulated
by Government of Maharashtra. e. Rules and Regulations of MMRDA; f. Agenda Notes and Minutes of the meetings of the Authority and Executive Committee; g. Annual Report; h. Annual Financial Budget; i. Annual Works Programme; j. Basic Transport & Communications Statistics for MMR; k. Reports on various projects and studies carried out by MMRDA .
(7) Particulars of any arrangement that exists for consultation with or representation
by, the members of the public in relation to the formulation of its policy or administration thereof.
7.1 The MMRDA is a “Special Planning Authority” for Bandra-Kurla Complex, Backbay Reclamation Area, Oshiware District Centre and Ulhasnagar, Ambernath, Kulgaon-Badlapur and surrounding Notified Area. MMRDA has prepared Development Plans for these areas. Prior to carrying out any modification to these Development Plans, as per the Maharashtra Regional & Town Planning Act, 1966, a notice is published in the official gazette as well as in the newspapers inviting objections and suggestions with respect to the proposed modification, and after giving a hearing, the proposed modification is submitted to the State Government for sanction.
7.2 MMRDA has taken up Mumbai Urban Transport Project (MUTP) with a view to improve traffic and transportation situation in the Mumbai Metropolitan Region. This project has been taken up with loan assistance from World Bank. MMRDA is responsible for implementation and monitoring of the resettlement and rehabilitation activities under the MUTP along with co-ordination and monitoring of the transport investment programme under the MUTP. All the eligible families have to be rehabilitated as per the R&R Policy formulated by Govt. of Maharashtra for MUTP. The Non-Governmental Organizations have been appointed for carrying out Baseline Socio-Economic Surveys of the project affected persons (PAPs), preparation of Rehabilitation Action Plans (RAPs) and Community Environmental Management Plans (CEMPs) and providing implementation support. The preparation and implementation of RAPs and CEMPs is done with active participation of the eligible PAPs.
7.3 MMRDA has carried out various studies for project preparation. Public consultation
workshops are held to discuss the findings of the study and to hear to the suggestions of the public in respect of the proposed project.
(8) A statement of the boards, councils, committees and other bodies consisting of two
or more persons constituted as its part or for the purpose of its advise, and as to whether meetings of those boards, councils, committees and other bodies are open to the public, or the minutes of such meetings are accessible for public.
8.1 As per Section 4 of the MMRDA Act, the Metropolitan Authority consists of the
following members :-
(i) The Minister for Urban Development; (ii) The Minister for Housing; (iii) The Minister of State for Urban Development; (iv) The Mayor of Mumbai; (v) The Chairman, Standing Committee, Municipal Corporation of Brihan Mumbai; (vi), (vii) and (viii) Three Councillors of the Municipal Corporation of Brihan Mumbai, elected by the Corporation, the election being held by ballot according to the system of proportional representation by means of the single transferable vote. (ix) and (x) Two members of the Maharashtra Legislative Assembly, representing constituencies falling, wholly or partly, within the limits of the Mumbai Metropolitan Region to be nominated by the State Government. (xi) One member of the Maharashtra Legislative Council, to be nominated by the State Government; (xii) The Chief Secretary to the Government of Maharashtra; (xiii) The Municipal Commissioner of the Municipal Corporation of Greater Mumbai; (xiv) The Secretary to the Government of Maharashtra, Urban Development Department; (xv) The Secretary to the Government of Maharashtra, Housing Department; (xvi) The Managing Director, City and Industrial Development Corporation of Maharashtra; (xvii) The Metropolitan Commissioner.
The Minister for Urban Development is the Chairman, and the Metropolitan Commissioner is the Member-Secretary of the Authority.
8.2 As per Section 7 of the MMRDA Act, the Executive Committee of MMRDA consists of the following members :-
(i) The Chief Secretary to Government; (ii) The Metropolitan Commissioner; (iii) The Secretary to Government, Urban Development Department; (iv) The Secretary to Government, Housing Department; (v) The Municipal Commissioner, Mumbai Municipal Corporation; (vi)The Managing Director, City and Industrial Development Corporation of Maharashtra; (vii), (viii) and (ix) Three members who are experts in the field of urban planning and development, to be appointed by the State Government.
The Chief Secretary is the Chairman of the Executive Committee.
8.3 The Authority or the Executive Committee may invite any officer of Government or
local authority to attend its meeting or meetings as a special or permanent invitee for the purpose of assisting or advising it on any matter or matters.
8.4 The meetings of the Authority and the Executive Committee are not open to the
public. The minutes of the meetings of the Authority and Executive Committee are also not accessible to public.
8.5 Independent Monitoring Panel for MUTP :-
Independent Monitoring Panel has been set up by the Government of Maharashtra to review the progress of resettlement and rehabilitation activities under Mumbai Urban Transport Project. The composition of the panel is as under:-
1. Shri Ajit Nimbalkar - Chairman (At present this is vacant)
2. Shri Chandrashekhar Prabhu - Member 3. Shri D’Chuna - Member 4. Shri Balkrishnan - Member 5. Advocate Mahabaleshwar Morje - Member
8.6 For the projects/studies taken up by MMRDA, certain Committees are set up for advising on technical matters and reviewing the progress. However, such Committees are project-specific and cease to exist after the project/study is completed.
(9) A directory of officers and employees of MMRDA. 9.1 The directory of the senior officers of the MMRDA is given below :-
Sr.No. Name & Designation Office Telephone No.
1. Shri Ratnakar Gaikwad Metropolitan Commissioner 26591234
2. Shri S V R Srinivas, Additional Metropolitan Commissioner and Project Director
26591235
3. Dr Satish Bagal, Chief Accounts Officer and Financial Adviser 26591238
4. Shri. S.R. Nandargikar, Chief Engineer 26591239
5. Shri P.R.K. Murthy, Chief, Transport and Communications Division
26591240
6. Shri U.V. Luktuke, Chief, Town and Country Planning Division 26591236
7. Kum. Uma Adusumilli, Chief, Planning Division 26591237
8. Mr A R Bidarkar, Chief (R & R) 26590735
9. Shri P.S. Tayade, Secretary, Executive Committee 26590330
10. Shri Sameer Unhale, Dy. Metropolitan Commissioner (Adm.) 26591244
11. Shri A.R. Wankhade, Deputy Metropolitan Commissioner (Lands and Estate)
26591241
12. Shri T.M. Sohani, Marketing Manager 24036432
13. Shri S W Palwe, Sr.Planner, Sub-Regional Office, Kalyan 95251-2202129
9.2 The general telephone numbers and fax number of MMRDA are as under :- Tel.Nos. 26590001-08 (8 Lines) Fax No. 022-26591264 E-mail : [email protected] Web Site : http://www.mmrdamumba i.org
(10) The monthly remuneration received by each of MMRDA’s officers and employees,
including the system of compensation as provided in its regulations.
10.1 The pay-scales and allowances of the employees of MMRDA are as per the pay-scales
and allowances of the State Government employees. The pay scales of the senior officers of the MMRDA are as under: -
Designation Pay-scale
(a) Metropolitan Commissioner Rs. 22400 – 24500
(b) Additional Metropolitan Commissioner/ Project Director
Rs. 18400 – 22400
(c) Joint Metropolitan Commisioner Rs. 14300- 18300
(d) Financial Adviser,Chief Engineer,Chiefs of the other Divisions
Rs. 16400 – 20000
(e) Chief Accounts Officer,Addn. Chief Engineer,Jt. Project Director(Town Planning),Dy. Metropolitan Commissioner(Lands & Estate),Dy. Metropolitan Commissioner(Admin) ,Jt. Project Direcor (Publicity),Addnl. Chief (Transportation and Planning)
Rs. 14300-18300
(f) Senior Planner, Sub-Regional Office, Kalyan, Senior Transportation Planner,Dy. Chief Accounts Officer, Superintending Engineer (Transportation), Sr. Architect
Rs. 12000 – 16500
(g) Secretary, Executive Committee Rs. 10650 – 15850
(h) Personnel Officer,Marketing Manager, Administrative Officer
Rs. 10650 – 15850
(i) Lands Manager, Asst. Legal Advisor Rs. 10650 – 15850
Advisor
10.2 The abstract of Annual Budget for the year 2008-09 and 2008-09 is as under:-
Sr. No.
Details Estimated expndr. 2009-
10
Revised estimate 2008-09
Estimated expndr. 2008-
09
1 Administration & Establishment 282.45 242.91 216.80
Expenditure
(11) The budget allocated to each of its agency, indicating the particulars of all plans,
proposed expenditures and reports on disbursements made.
(Rupees in crores)
Sr.No Particulars Budget Estimate 2009-10
Revised Estimate 2008-09
Budget Estimate 2008-09
1 Loan to the MSRDC and other institutions for fly overs.
300.00 300.00 500.00
2 Loan to the local bodies Maharashtra Jeevan Pradhikaran (Surya Project)
30.00 30.00 60.00
3. MUDP Revolving Fund 68.00 68.00 100.00
4. Mega City Revolving Fund 28.47 26.71 126.71
5. MCGM Mumbai III A - - -
6.
Maharashtra Urban Infrastructure Fund
-
-
-
7. Loans from Reserve Fund for Road Development Scheme
10.00 17.00 22.00
8. Financial Assistant to infrastructure for urban weaker section
- - 20.00
9. Loan to New Projects 300.00 - 200.00
Total 736.47 441.71 1028.71
Surveys and studies during the year 2009-10.
(Rupees in crores)
Sr.No Particulars Budget Estimate 2009-10
Revised Estimate 2008-09
Budget Estimate 2008-09
1
T&C Division Transport Surveys & Studies
0.05
0.03
5.00
2 ISBT at Wadala 1.00 1.50 1.00
3 Metro Railway Project; (Technical, Feasibility Surveys and Studies).
20.00 1.40 66.95
4 Mumbai Trans- Harbour dispersallink - 1.50 10.00
5 Monorail Project 2.00 2.35 -
6 BRTS 0.50 1.35 -
7 Technical & Financial Study-Harbour Dispersal Link
10.00 - -
Total 33.55 8.13 82.95
(Rupees in crores)
Sr.No Particulars Budget Estimate 2009-10
Revised Estimate 2008-09
Budget Estimate 2008-09
Town & Country Planning Division
1. Implementation of development schemes in Bhiwandi Region
0.50 1.00 1.50
2. Implementation of development schemes in Outer Areas of KDMC
0.50 1.00 1.50
Total 1.00 2.00 3.00
Planning Division
1. Regional Information System 1.00 1.65 1.00
2 Implementation of the Regional Plan 1.00 0.50 0.20
3 Environment Management in MMR 1.00 1.00 2.00
4 Tourism Development of Uttan Gorai & Manori as SPA
0.50 0.05 1.00
5 Rgional Additional Project 0.05 0.01 0.05
6 Implementation of Information Technology System
1.00 1.25 2.00
Total 4.55 4.46 6.25
1. Engineering Division Set up of Hydrology Unit
3.00
0.10
1.92
Total 3.00 0.10 1.92
Grants (Rupees in crores)
1. Urban Improvement in MM Region 0.00 0.00 0.00
2 Integrated Village Development Scheme 18.91 5.50 16.43
3. Development of Elephanta Caves & other projects in MMR
10.00 0.01 10.00
4. Development of roads in outer areas of MMR 10.00 6.75 6.50
5. Development of Mahim Nature Park 1.50 1.20 0.85
6. J.N.N.U.R.M. (Nodal Agency) 0.30 0.30 0.30
7. Renovation of J J Hospital 0.00 0.00 0.00
8. Consultancy Services to Urban Local Bodies 1.00 0.00 1.00
9. Development of Innovation Center-Ulhas Nagar Muncipal Corpo.
0.25 0.75 -
10. Renovation of Public hospital Bhivandi Nijampur Muncipal Corpo
7.00 3.00 -
11. Basic Infrastructure for Urban Poor 120.00 15.00 39.00
12. MUIDCL 50 - -
TOTAL 218.96 32.51 74.08
Projects/Schemes undertaken during the Financial Year 2009-10
(Rupees in crores)
Sr.No Particulars Budget Estimate 2009-10
Revised Estimate 2008-09
Budget Estimate 2008-09
Transport & Communications Division
1 Versova-Andheri -Ghatkopar Mass Transport System
518.20 184.74 401.25
2 Road Marking, Sign Board in Mumbai - 21.00 5.00
3 Beautification & facilities for pedestrians and Bus passengers through Pvt. Participation
- - 5.00
4. ISBT,Tollest Tower 4.00 0.00 4.00
5. Construction of bridges under MUIP 170.00 125.00 150.00
6. MRTS – Charkop-Bandra-Mankhurd 28.20 1.18 57.00
7. MRTS Kulaba-Bandra 4.00 10.00 10.00
8. Monorail Project 935.00 266.00 501.00
9. DEPMC - - 6.00
10. Construction at WTT 50.00 14.50 50.00
11. BRTS 19.00 - -
12.
Road safety traffic management
5.00
-
-
13. UMMTA 10.00 - -
14. Marketing and Management-WTT 0.10 - -
15. Monorail in BKC 10.00 - -
Total 1753.50 622.42 1189.25
Town & Country Planning Division
(Rupees in crores)
Sr.No Particulars Budget Estimate 2009-10
Revised Estimate 2008-09
Budget Estimate 2008-09
1. Conversion of Vikrant into Museum 5.00 1.00 1.00
2. Acquisition of land for various projects 100.00 20.00 610.00
3. Innovation Park 1.00 - -
4. Participation in Electricity area with CIDCO 10.00 - -
Total 116.00 21.00 611.00
Engineering Division (Rupees in crores)
1. Development of BKC 150.00 97.20 180.60
2. Construction of wall at Backbay and development/beautification of Marine Drive
10.00 0.20 -
3. Development of Oshiware District Centre 2.00 10.00 20.00
4. Mumbai Urban Infrastructure Project 830.00 400.00 500.00
5. Mithi River Development 100.00 149.93 300.00
6. Extended MUIP 300.00 25.00 750.00
7. Construction of Rental Housing 100.00 0.10 100.00
8. Development of Land fill sites. 30.00 1.05 20.00
9. Sky Walk - STATIS 600.00 300.00 600.00
10. Building at Maharashtra Maritime board 12.00 0.00 0.00
11. MTHL 500.00 0.00 200.00
12. Water irrigation at Regional Level 10.00 - -
Total 2644.00 983.48 2670.60
Mumbai Urban Transport Project 728.86 440.91 700.31
Chief R&R
1. Nirmal Abhiyan in MMR 184.00 200.00 250.00
2. Post R&R facilities 35.00 2.00 50.00
Total 219.00 202.00 300.00
Urban basic amenities & training cell
1. Training to Urban local bodies employees 8.50 0.33 5.00
Grand Total 5469.86 2270.14 5476.16
(12) The manner of execution of subsidy programmes, including the amounts allocated
and the details of beneficiaries of such programmes.
No subsidy programme is executed by MMRDA. (13) Particulars of recipients of concessions, permits or authorisations granted.
No concessions, permits or authorisations have been granted by MMRDA, (14) Details in respect of the information, available to or held by it, reduced in an
electronic form.
As part of the MMRDA website, the following information is available in electronic form:
i. Organisation Structure. A brief note about the MMRDA, Authority, Executive Committee, Office of the Metropolitan Commissioner, Organisation Chart and a list of Officers upto the Executive Engineer level.
ii. Basic Statistics. This Section includes a map of the Mumbai Metropolitan Region (MMR), basic information about the MMR.
iii. Planning Tasks and Projects. The sanctioned Regional Plan for MMR: 1996-2011 (all the chapters are uploaded on
our website), Bandra-Kurla Complex, Backbay Reclamation Scheme, Oshiware District Centre, Regional Information System, Bombay Urban Transport Project (BUTP), Shifting of Wholesale Markets from South Mumbai, Mumbai Urban Development Project (MUDP), Wadala Truck Terminal, Mahim Nature Park as completed projects. The ongoing projects viz, Mumbai Urban Transport Project, Mumbai Urban Infrastructure Project.
iv. Tenders. A separate Section as tenders and all the latest MMRDA tenders.
v. Development Finance. MMRD Fund (Reserve Fund), MUDP-RF, Infrastructure Finance in MMR, Megacity Scheme.
vi. Achievements. Implemented projects and landmark projects
vii. What’s New. A Section called “What’s New” contains the Executive Summary of MRTS, MUTP projects and other latest developments on projects.
viii. Publications. Recent publications of MMRDA.
ix. Right to Information. A list of Officer-in-Charge of Right to Information and the Appellant Officer
(15) The particulars of facilities available to citizens for obtaining information, including
the working hours of a library or reading room, if maintained for public use.
15.1 Citizens can contact the Metropolitan Commissioner, Joint Metropolitan Commissioner,
Chiefs of the various Divisions of MMRDA and other officers for obtaining information.
15.2 MMRDA has established Public Information Centres (PIC) at the following places to
enable citizens to obtain information pertaining to MUTP.
Sr.No. Location of PIC PIC Timings
1 MMRDA Mumbai Urban Transport Project, 3rd Floor, Bandra-Kurla Complex, Bandra (East), Mumbai: Phone : 26594133
10.00 am – 1.00 p.m. &
2.00 p.m. – 6.00 p.m.
2 Public Information Centre, Building No.98, PMGP Colony, Mankhurd (West), Mumbai
10.00 am – 1.00 p.m. &
2.00 p.m. – 6.00 p.m.
3 Santacruz-Chembur:Link Road Project, Project Management Consultant, Near Duramix Compound, Opp. Dhirubhai Ambani International School, Bandra-Kurla Complex,
10.00 am – 1.00 p.m. &
2.00 p.m. – 6.00 p.m.
Bandra (East), Mumbai.
4. Public Information Centre, S.V. Patel Site, Lallubhai Compound, Mankhurd (West), Mumbai. Phone : 25488159
10.00 am – 1.00 p.m. &
2.00 p.m. – 6.00 p.m.
5 Jogeshwari-Vikhroli Link Road Project, MAJAS-R&R site, Majas, Western Express Highway, Jogeshwari (East), Mumbai. Phone: 557 19435
10.00 am – 1.00 p.m. &
2.00 p.m. – 6.00 p.m.
6 Public Information Centre, Jogeshwari ROB (South), R1, A-Wing, Ajgaonkar Plot, Jogeshwari (East), Mumbai – 400 060. Phone: 562 37962
10.00 am – 1.00 p.m. &
2.00 p.m. – 6.00 p.m.
7. Public Information Centre, Kanjurmarg, J.V.L.R. Road, Kanjurmarg, Mumbai. Phone : 2577 8965
10.00 am – 1.00 p.m. &
0 p.m. – 6.00 p.m.
15.3 Senior Level and Field Level Grievance Redressel Committees have been set up to hear and decide grievances/complaints or appeals of the aggrieved Project Affected Persons pertaining to various Projects under MUTP. The compositions of these Committees are as under :-
A. Senior Level Grievance Redressel Committee :- This Committee will hear the appeal matters over Field Level Grievance Redressel Committee and comprise the following:-
1. Shri D.D.Jadhav, Retired Dy.Municipal Commissioner .......... (Head) 2. Representative of the implementing agency under MUTP or PMC
........ (Member) 3. Shri A. Jockin, SPARC ......... (Member) 4. Shri Sharma, Community Development Officer, MMRDA ..........
(Member)
B. The Field Level Committee:- will hear grievances of PAPs at the first instance and comprise the following :
1. Shri D.C. Patil, Retired Estate Manager (MHADA) now re-appointed in MMRDA ........ (Head)
2. Representative of the implementing agency under MUTP or PMU ......
(Member) 3. Representative of SPARC 4. Shri Waghmare, Dy. Community Development Officer, MMRDA ........
(Member) The Senior Level Grievance Redressal Committee will meet every Friday at 3.00 p.m. in the office of MMRDA, MUTP Unit and the Field Level Committee will meet every Tuesday at 10.00 a.m. in the office of MMRDA or as may be required as per requirement.
15.4 A quarterly newsletter on Mumbai Urban Transport Project is published. (16) Names, designations and other particulars of the Public Information Officers.
Public Information Officer (P.I.O)
Appellate Authority Department Phone No.
Shri. P M Kolte Chief Accounts Officer
Dr Satish Bagal, Financial Adviser
Finance & Accounts 26594022
Shri. Sampath Kumar, Sr. Planner
Miss. Uma Adusumilli Chief, Planning
Division.
Planning Division 26594062
Shri. R. Ramanna Addl. Chief (TP)
Shri P.R.K. Murthy, Chief T &C Division
T &C Division 26594112
Smt K Vijayalakshmi Addl. Chief (UMMTA)
Shri P.R.K. Murthy, Chief, T &C Division
T &C Division 26594111
Shri. T. M. Sohani Marketing Manager
Shri. P.R.K. Murthy Chief, T&C Division
T &C Division 26594147
Smt. Yerkuntwar Administrative Officer
Shri Sameer Unhale Dy. Metropolitan
Commissioner (Adm.)
Administration Division
26594013
Shri. S.K.Desai Asst. Lands Manager
Shri.A.R.Wankhede, Dy. Metropolitan Commissioner
(Lands and Estate)
Lands Cell 26594102
Shri N M Gambhir E E. SRA
Shri.A.R.Wankhede Dy. Metropolitan Commissioner
SRA Cell 26594096
Shri P S Sharma CDO
Shri A.S. Bidarkar Chief (R&R)
MUTP, JVLR, and MRVC Project
26594131
Shri. P.H. Warwadekar Planner
Shri A.S. Bidarkar Chief (R&R)
MUTP and SCLR Project- Tilak Nagar
26594088
Shri R Wachche Estate Manager
Shri A.S. Bidarkar Chief (R&R)
MUTP and Mithi River Project
26594159
Ms. Vidya Kanhere, Dy.Town Planner
Shri S.C. Deshpande, JPD (TP)
Rental Housing Project
26594169
Mr. Sumeet Kulkarni, Dy.Town Planner
Shri S.C. Deshpande, JPD (TP)
Rental Housing Project
26595903
Town and Country Planning Division:
Public Information Officer (P.I.O)
Assistant Public Information Officer
(APIO)
Appellate Authority
Works
Shri. Sanmukh M. Desai
Planner
Smt. Jyoti Kawade Jr. Planner
Shri. C.Y. Khandare
Sr. Planner
Bandra-Kurla Complex & other
Smt. Radha R. Shroff Architect
- - Bandra Kurla Complex (Building Permission)
Smt. Manisha Kale Dy. Planner
Miss Radhika C. Narurkar Jr. Architect
Shri. P.M. Yadav Sr. Planner
1. Bandra-Kurla Complex. 2. Oshiware District Centre. 3. Back-Bay Reclamation.
Smt. Renuka P. Pachpor
Dy. Planner
Smt. Anagha Barve Dy. Planner
- Shri. N.B. Gadkari
Sr. Planner
1. Bandra Kurla Complex 2. Gorai Manori Uttan Recreation and Tourism Development Zone Area. 3. (Building Permission)
Shri. N.S. Bowlekar Urban
Designer/Architect
Miss. Rashmi N. Kurhekar Jr. Planner
Shri. N.B. Gadkari Sr. Planner
‘G’ block BKC Exhibitions work
Miss. Pranaya Navalkar
Jr. Planner
- Shri. N.B. Gadkari
Sr. Planner
Wadala Truck Terminal Phase I (Building Permission)
Shri. M.D. Mane Planner
Shri. O.A. Momen Dy.Planner
Shri. S.D. Palwe Sr. Planner
Ambernath, Kulgaon-Badlapur and surrounding notified area, and other S.P.A. Notified Area.
Engineering Division:
Public Information Officer (PIO)
Asst. Public Information
Officer (APIO)
Appellate Officer Works
Shri. S.S.Varaskar, Executive Engineer
Shri. S.B.Patil, Asst. Executive Engineer - II
Addl. Chief Engineer (Shri. A.K.Pahal)
Skywalks
1. Boriwali (W.) 2. Virar (E & W) 3. Dahisar (E & W)
Shri. Baviskar, Asst. Executive
Engineer
-
1. Dadar (E)
Shri. J.R.Dhane, Executive Engineer
Shri. S.M.Kambale, Asst. Executive
Engineer - I
Addl. Chief Engineer (Shri.A.K.Pahal)
Skywalks
1. Mahalakshmi 2. Khada Parsi 3. Sion 4. CST - Churchgate 5. Churchgate Mantralaya 6. VidhanBhavan Regal Cinema 7. Regal Cinema-CST 8. Matheran 9. Ushanagar, Marinelines
Shri. P.J.Bhangare Executive Engineer
Shri. H.R.Chaugule, Asst. Executive
Engineer - I
Addl. Chief Engineer (Shri. A.K.Pahal)
Skywalks
Eastern Suburban 1. Kurla (E & W) 2. Chembur (E & W)
Western Suburban 1. Santacruz (W) 2. Mahim (E & W) 3. Dadar (Khodada Circle to Plaza Cinema)
Shri. N.S.Dabholkar, Executive Engineer
Shri. A.R.Bhisikar, Dy. Engineer - I
Shri. M.W.Salve, Superintending
Engineer
1. Dombivali - Bhiwandi linkroad (K-1) 2. Dombivali - Mumbra linkroad (K-2) 3. Oshiwara District Centre
Shri. C.B.Dhokle Patil,
Dy. Engineer - I
-
1. Files in respect of Loan/Grant received from other department of Raigad District. 2. Delisting work of H & I Block 3. Dharavi Sports, Sankul 4. Mahim Nature Park 5. Bankbee Chaupati
Shri. G.J.Bhagat, Shri. G.J.Sonavane, Shri. M.W.Salve, Superintending
1. Badlapur Railway Station (E & W)
Executive Engineer
Executive Engineer
Engineer
Shri. A.S.Devgade, Executive Engineer
Shri. M.B.Kabure, Dy. Divisional
Engineer
Shri. M.W.Salve, Superintending
Engineer
Skywalks
1. Vikroli Railway Station (E & W) 2. Ambarnath Railway Station (E & W) 3. Thane Belapur bypass Road, Construction of Bridge 4. Sahad Railway Station E & W 5. Vithalwadi Railway station E & W. 6. Thane Ghodbunder Bypass Road. 7. Khopoli Market 8. Thane Nashik Bypass Road
Shri. A.N.Bhasme, Executive Engineer
Shri. S.S.Lokre, Dy. Engineer, Grade
- I
Shri. J.C.Gandhi, Superintending
Engineer
1. Dahisar R.O.B/ - Main Link Road 2. Marve – IN Hamla – Development of Road (B/4) 3. Andheri (E) & Santacruz (E) Skywalk
Shri. M.Y.Patil, Executive Engineer
Shri. Rajesh Patil, (Part time)
Dy. Engineer, Grade - I
Shri. P.V. Pandit, Dy. Engineer,
Shri. J.C.Gandhi, Superintending
Engineer
1. N.S.Phadke Marg 2. Main Link Road Part - IV 3. West coast Road 4. Link Road from fisheries institute to Malad Mudh Road in Versova. 5. Road works in GN & G-text block in Bandra Kurla Complex and Box drain works in G-text. 6. Western Express Highway to Kolekalyan (University Campus Road) 7. Bridge in Saiwadi chawk.
Shri. S.S.Borse, Shri. Vishal Shri. J.C.Gandhi, 1. Office Building, Officers
Executive Engineer
Jambhale, Dy. Engineer, Grade
- I
Superintending Engineer
Quarters of Bandra Kurla Complex 2. State fire training center 3. Bandra Kurla Complex G, E, Block and BKC link road. 4. New Mithi Bridge 5. Office Building Maintenance etc.
Shri. N.M.Gambhir, Executive Engineer
- Shri. J.C.Gandhi, Superintending
Engineer
1. S.V.Road (Main Link Road from Goregao to Dahisar Part- 5) 2. Eite Bhatti Road
Shri. G.J.Bhagat, Executive Engineer
Shri.R.N.Vankhade, Dy. Engineer, Grade
- I
Shri. G.R.Duseja, Superintending
Engineer
1. Ulhasnagar Station Skywalk (E & W)
Shri. M.H.Paranjpe, Executive Engineer
Shri. G.G. Sonavane, Dy. Divisional
Engineer.
Shri. G.R.Duseja, Superintending
Engineer
1. Vidyavihar (E & W) Skywalk
Shri. S.C. Odhekar, Dy. Engineer Grade –
I
- 1. Lal Bahadur Shastri Marg 2. Bhandup (E) 3. Ghatkopar (E & W) Skywalk
Shri. P.S.Nimje, Executive Engineer
Shri.A.G.Korgaokar Dy. Engineer Grade -
I
Shri. G.R.Duseja, Superintending
Engineer
Work related Jogeshwari Vikroli link road Part - 3
Shri. B.H.Chavhan Dy. Engineer Grade –
I
- Vashi Naka, Kokari Agar - Wadala, Borla, Govandi
Shri. N.R.Virkar, Executive Engineer
Shri. Satayjeet Salve
Dy. Engineer Grade - I
Shri. G.R.Duseja, Superintending
Engineer
1. Jogeshwari Vikroli link road 1 & 3 Santacruz -Kurla link road 1 & 2.
Shri. A.S.Titre Dy. Engineer Grade -
I
- -
Shri. S.G.Deshmukh, Executive Engineer
Shri. S.V.Curpe Dy. Engineer
Shri. S.B.Muchandi Dy.Engineer
Shri. D.P.Deshmukh, Superintending
Engineer
1. Foot over Bridges & flyovers on Eastern & Western Express Highway. 2. Vasai Satiwali - - Range Office to Chinchoti Phata -
Gokhiware to Pelhar Phata 3. Arnala - Virar - Shirsaid - Ambadi - (Virar Phata to Arnala) 4. Skywalk - Thane, Mulund
Shri. R.K.Wadhwani, Executive Engineer
Shri. Arwind B. Dhabhe
Dy.Engineer - I
Shri. D.P.Deshmukh, Superintending
Engineer
1. Eastern Freeway
Shri. D.U.Mahajan, Executive Engineer (Additional Charge)
Shri. P.R.Biliye Dy.Engineer - I
Shri. A.M.Pawar, Superintending
Engineer
1. Western Express Highway
Shri. P.D.Jamadar Dy.Engineer - I
- 1. Sahar Elevated Road 2. Milan R.O.B.
Shri. J.U.Deshpande, Executive Engineer
Smt. Padmashree Rajendra,
Sectional Engineer
Shri. A.M.Pawar, Superintending
Engineer
Skywalks
1. Mira Road 2. Bhayandar (E & W) 3. Kashimira-Bhayandar-Gorai Manori Road 4. Manori Creek Bridge
Shri. V.M.Shewale, Executive Engineer
Shri.P.R.Billye Dy.Engineer
Shri. A.M.Pawar, Superintending
Engineer
1. Vasai Satiwali Road 2. Bridge work of Vasai Rail 3. Tahsil Office to Nanasehab Gore Chawk 4. Panchvati Chawk to Range Office 5. Naigaon Juichandra -Bopane Road.
Shri. S.I.Dhumale, Executive Engineer
Shri.Vijay Kumar Shri. M.S.Sawant,
Dy.Engineer
Shri. H.A.Shrimal, Superintending
Engineer
1. Panjarpole to Ghatkopar 2. Anik Panjarpole link road
Shri. M.V.Jaitpal, Executive Engineer
Shri.G.D.Rathod Dy.Engineer
Shri. A.P.Athawale, Superintending
Engineer
1. Andheri Ghatkopar Link Road Asalpha to L.B.S. Marg.
Shri. A.M.Ghan, Executive Engineer
Shri.N.M.Kamble Dy.Engineer - I
Shri. A.P.Athawale, Superintending
Engineer
1. Andheri Ghatkopar Link Road
Shri.M.N.Ghatghe Dy.Engineer - I
Shri. R.A.Patil, Dy. Engineer -I
1. Andheri Kurla Link Road 2. Mahakali Caves Road 3. Sahar Road 4. Marole Maroshi Road
5. B.D. Sawant Marg 6. These Roads are already handed over to MCGM on 18/11/2008.
Shri. G.J.Bhagat, Executive Engineer
Shri. G.J.Sonavane, Dy. Engineer
Shri. D.V.Acherakar, Superintending
Engineer
1. Maintenance of Building & construction of building MUTP & M.U.I.P. at Mankhurd 2. Maintenance of building construction of Building at Kanjoormarg (R & R) 3. New Repairs & Rehabilitation at Nahur (Mulund) 4. Legal matters related to Kanjoormarg (R & R)
Shri. S.L.Gundala Shri. B.R.Tokle Dy. Engineer
Shri. D.V.Acherakar, Superintending
Engineer
Narlon, Nesko, Dahisar, Ajgaokar Plot, Jogeshwari (E), Oshiwara District Centre [Goregaon (W)]
Shri. M.P.Sinh Smt. Vidyalakshmi Keni
Dy. Engineer
Shri. A.V.Patil Dy. Engineer -I
Shri. D.V.Acherakar, Superintending
Engineer
R & R work at Majas, Punamnagar, tungava, (Powai) Piramal Holding [(Kanjurmarg (W.)] Marathoan, Kanjurmarg (E), Ajanikumar (Nahoor), Middle Tunt, Mulund.
Shri. D.V.Acherakar, Executive Engineer
Shri. B.H.Chavhan Dy. Engineer
Shri. D.V.Acherakar, Superintending
Engineer (Additional Charge)
1. Construction of social welfare centre and toilet at Lallubhai compound. 2. Maintenance of permanent building at Dharavi & Antop Hill Wadala (operation C) through developer. 3. Action for demolition of Transit units at Mankurdh & Kokari Agar.
Shri. M.S.Narkar, Executive Engineer
Shri. S.D.Shirsad, Jr. Engineer
Shri. Shrinivasan Dy. Engineer
Shri. D.U.Gajbhiye, Superintending
Engineer
1. Mithi River Work 2. Mahim Kawjwe to CST Bridge 3. Vakola Nala
Transport & Communications Division
Sr. No.
Name of Assistant P.I.O
Name of P.I.O Name of Applellate
Authority Name of Work
1 Shri Shashikant Damse Dy. Eng. II
Shri. M. R. Kharat, Executive Engineer
Shri. S.P. Khade Director(Technical),
Metro Line – I
2 Shri. Swapnil Pawar, Dy. Engineer – I
Shri. Manoj Dandare, Transportation Planner
Shri. M. S. Devaru Superintending Engineer,
Metro Line – II
3 Shri. Virag Mishra Dy. Engineer - I
Shri. Manoj Dandare, Transportation Planner
Smt. Vijayalakshmi Kandala Additional Chief (UMMTA)
Metro Line – III
4 Shri. Shantanu Wagh D.T.P.
Shri. S. R. Patil, Executive Engineer
Shri. P. L. Kadu, Superintending Engineer
Mono Rail Line I
5 Shri. Dinesh Parimala D.T.P.
Shri. D. M. Binner Transportation Planner
Shri. R. Ramnna Additional Chief (T.P.)
Mono Rail Line - II
6 Smt Asmita Jilthe Dy. Eng. I
Shri. D. M. Binner Transportation Planner
Shri. R. Ramnna Additional Chief (T.P.)
B.R.T.S.
7 Shri. Ashok Singh Dy. Engineer -I
Shri. S. D. Madake, Executive Engineer
Shri. S.V.Arlikar, Superintending Engineer
Dr. B. A. Road I
8 Shri. Manish Amode, D.T.P.
Shri. V. B. Naik Executive Engineer
Shri. C.M. Jadhav Superintending Engineer
Dr. B. A. Road II
9 Shri. Vinay Surve, Dy. Engineer - I
Shri. Milind Wani, Executive Engineer
Shri. H.N. Nimsarkar Superintending Engineer
Skywalk
10 Shri. Rrajendra Deore, Dy. Engineer – II
Shri. Sanjeev Madake Executive Engineer
Shri. R. Ramnna Additional Chief (T.P.)
Outer Area Roads
11 Shri S. Chinta D.T.P.
Shri. Nilesh Gaikwad Town Planner
Shri. C.Y. Khandare Sr. Planner
Iconic Tower (Toll Tower)
12 Shri. P N. Shinde Assistant
Shri. G. O. Kotwani Assit. Marketing Mag.
Shri. T. M . Sohani, Marketing Manager
Wadala T. T. Marketing
13 Shri Rajesh Patil Dy. Engineer I
Shri. M. S. Raikar Executive Engineer
Shri. S. V. Arlikar Superintending Engineer
WTT Works
14 Shri S. Chinta D.T.P.
Shri. L.M. Bisen Executive Engineer
1)Shri. R. Ramnna Additional Chief (T.P.)
ISBT Project
15 Shri. K. V. Nijapkar Section Officer
Shri. Sanjay Dani Protocol Officer/ Staff Officer (Addl.)
Shri. R. Ramnna Additional Chief (T.P.)
Administration Work
(17) Such other information as may be prescribed.