Upload
amit-rajput
View
221
Download
5
Embed Size (px)
DESCRIPTION
ad
Citation preview
Beam Knotting Time & WasteDATE
LOOM NO.
SECTION
SHIFT
SORT NO
SET NO
BEAM NO
WARP COUNT
WEFT COUNT
NO OF ENDS
TYPE OF KNOTTING/GAITING
ACTIVITY Start Time End Time Duration Remark
BEAM FINISH AT(hh:MM)
BEAM DOFFING(MIN)
WAITING FOR BEAM DOFFING(MIN)
LOOM CLEANNING(MIN)
WAITTING FOR LOOM CLEANNING(MIN)
OILING &GREASING(MIN)
WAITTING FOR OILING &GREASING(MIN)
REAPAIRING(MIN)
WAITTING FOR REAPAIRING(MIN)
BEAM LOADING(MIN)
WAITTING FOR BEAM LOADING(MIN)
DRESSING(MIN)
WAITTING FOR DRESSING(MIN)
KNOTTING(MIN)
WAITTING FOR KNOTTING(MIN)
KNOTTING PASS(MIN)
WAITTING FOR KNOTTING PASS(MIN)
OTHER ACTIVITY(MIN)
LOOM STARTED AT(hh:MM)
STANDARD TIME (hh:mm)
TOTAL TIME (hh:mm)
DIFFERENCE TIME (hh:mm)
KNOTTING WASTE (MTR)
Remark
Selection Criteria
Date
Section
Loom No.
Remark:
Catalog Require for Type of Knotting & Gaiting
Cummulative Report Require
Standard Knotiing Waste is 8~10 Meters
Standard Knotiing Time will be as per Type of Knotting & Gaiting