8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report
http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 1/7
PEMBUATAN FRONT END ENGINEERING DESIGN (FEED)
TOTAL PROJECT KAMOJANG UNIT 5 (1 x 30 MW) - JAWA BARAT
WEEKLY PROGRESS REPORT
0 June 6, 2012 Issued for use OOK GIB MDC TJA WDR
PREPARED CHECKED APPROVED CHECKED APPROVED
REV DATE DESCRIPTIONPT. LAPI ITB PT. PGE
STATUS CODE : IFR = Issued for Review, IFA = Issued for Approval, IFU = Issued for Use
Total or Partial Reproduction and / or utilization of this document are forbidden without priorwritten authorization of PT. PGE
DOCUMENT NUMBER REVISION STATUS
KMJ5-00-MN-WRP-003 0 IFU
8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report
http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 2/7
PEMBUATAN FRONT END ENGINEERING DESIGN(FEED) TOTAL PROJECT KAMOJANG UNIT 5 (1 x 30
MW) - JAWA BARAT
TITLE DOCUMENT NUMBER PAGE
WEEKLY PROGRESSREPORT
KMJ5-00-MN-WRP-003 2 of 6
TABULATION OF REVISED PAGE
Page REVISION Page REVISION
A B C 0 1 2 3 4 5 A B C 0 1 2 3 4 5
1 X 36
2 X 37
3 X 38
4 X 39
5 X 40
6 X 41
7 X 42
8 43
9 4410 45
11 46
12 47
13 48
14 49
15 50
16 51
17 52
18 53
19 54
20 55
21 56
22 57
23 58
24 59
25 60
26 61
27 62
28 63
29 64
30 65
31 66
32 6733 68
34 69
35 70
8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report
http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 3/7
PEMBUATAN FRONT END ENGINEERING DESIGN(FEED) TOTAL PROJECT KAMOJANG UNIT 5 (1 x 30
MW) - JAWA BARAT
TITLE DOCUMENT NUMBER PAGE
WEEKLY PROGRESSREPORT
KMJ5-00-MN-WRP-003 3 of 6
COMMENT SHEET
COMMENT:
NO
REFERENCE,
PARAGRAPH,
OR CHAPTER
COMMENT OF PT. PGE RESPONSE OF PT. LAPI ITB
COMPANY PT. PGE PT. LAPI ITB - ELC
BY
POSITION
DATE
DOCUMENT
STATUS:IFR IFA IFU
8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report
http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 4/7
PEMBUATAN FRONT END ENGINEERING DESIGN(FEED) TOTAL PROJECT KAMOJANG UNIT 5 (1 x 30
MW) - JAWA BARAT
TITLE DOCUMENT NUMBER PAGE
WEEKLY PROGRESSREPORT
KMJ5-00-MN-WRP-003 4 of 6
TABLE OF CONTENTS
1 INTRODUCTION ........................................................................................................ 5 1.1 GENERAL ...................................................................................................... 5 1.2 SCOPE OF DOCUMENT ................................................................................ 5
2 PROGRESS OF WORKS .......................................................................................... 5 2.1 IMPORTANT DATE ........................................................................................ 5 2.2 KEY PROGRESS ........................................................................................... 6
8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report
http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 5/7
8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report
http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 6/7
PEMBUATAN FRONT END ENGINEERING DESIGN(FEED) TOTAL PROJECT KAMOJANG UNIT 5 (1 x 30
MW) - JAWA BARAT
TITLE DOCUMENT NUMBER PAGE
WEEKLY PROGRESSREPORT
KMJ5-00-MN-WRP-003 6 of 6
5. 4th Meeting : June 6, 2012
Subject : Technical meeting. Draft PFD, Pipeline Layout, Plot Plan.
Venue : GPP Kamojang Unit-4, Garut
6. 5th Meeting : June 26, 2012
Subject : Technical meeting. Final PFD, P&ID, Line Sizing (FCRS), Final
PFD, P&ID (GPP).
Venue : PT.LAPI ITB - Palma One Building, Jakarta
2.2 Key Progress
1. Pipeline survey (Steam Pipe from Cluster to GPP, Steam pipe from GPP to
Rockmuffler and Condensate Pipe from GPP to WPS Cikaro)
2. Soil investigation survey (Deep well Hydrolic Drill, Sondir)
List of documents delivered and its status is as follows:
8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report
http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 7/7
1 MANAGEMENT
1.2
1 KMJ5 -00 -MN -PCD -001 INTEGRATED PROJECT MANAGEMENT PLAN A IFA
2 KMJ5 -00 -MN -WRP -003 Biweekly progress report 3 A IFA
3 KMJ5 -00 -MN -WRP -004 Biweekly progress report 4 A IFA
2 FIELD SURVEY & SECONDARY DATA COLLECTING
1 KMJ5 -00 -TN -REP -002 Input Document Collection & Document Review Report A IFA
3,2 Pr oc ess Wo rk
1 KMJ5 -FC -PR -PFD -001 Process Flow Diagrams - SGS A IFA
2 KMJ5 -FC -PR -PFD -002 Process Flow Diagrams/Reinjection System
1 KMJ5 -FG -PR -PID -003 P&I Diagram Re-Injection Line A IFA
3,3 Piping & Pipe line Work
1 KMJ5 -FC -PI -CSH -004 Pipe Stress & Flexibility Analysis A IFA
1 KMJ5 -FC -PI -DWG -005 Piping Layout Drawing - Cluster A A IFA
2 KMJ5 -FC -PI -DWG -006 Piping Layout Drawing - Cluster C A IFA
3 KMJ5 -FC -PI -DWG -007 Piping Layout Drawing - Tie in GPP A IFA
1 KMJ5 -FC -PI -SSH -002 Insulasi Specification A IFA
3,4 Mec han ic al Wo rk
1 KMJ5 -FC -ME -CSH -001 Silencer Calculation A IFA
1 KMJ5 -FC -ME -SSH -003 Reinjection Pump Specification A IFA
1 KMJ5 -FC -ME -DSH -001 Silencer Datasheet A IFA
3,5 Civil Work
1 KMJ5 -FC -CI -DTN -003 Subsidence Analysis A IFA
2 KMJ5 -FC -CI -DTN -004 Foundation and Silencer Support Structure A IFA
3 KMJ5 -FC -CI -DTN -006 Foundation and Reinjection Pump Support Structure A IFA
1 KMJ5 -PP -CI -DWG -001 Rough Grading Plan (Power Plant) A IFA
2 KMJ5 -PP -CI -DWG -002 Power Plant Retaining Wall Plan & Section A IFA
3 KMJ5 -PP -CI -DWG -003 Power Plant Internal Fencing Layout A IFA
4 KMJ5 -PP -CI -DWG -004 Power House Building Architectural Plan view A IFA
5 KMJ5 -PP -CI -DWG -005 Power House Building Architectural Elevations A IFA
6 KMJ5 -PP -CI -DWG -006 Power House Plot Plan-Ground Floor-Steam Receiving Station A IFA
7 KMJ5 -PP -CI -DWG -007 Power House Plot Plan-Ground Floor-Gas Extraction System A IFA
3,7 Inst rument & Cont ro l Work
1 KMJ5 -FC -IC -SSH -002 Pneumatic Control Valve Regulator Specification A IFA
1 KMJ5 -FC -IC -DSH -001 Datasheet control valve A IFA
3,8 HSE
1 KMJ5 -PP -HS -DTN -001 HazOp Analysis - GPP A IFA
CALCULATION
Drawing
SPECIFICATION
DATASHEET
Specification
Data Sheet
Calculation
PROCESS FLOW DIAGRAM
PIPING & INSTRUMENTATION DIAGRAM
Calculation
Drawing
Specification
ANALYSIS & CALCULA TION
NO DOCUMENT NUMBER DOCUMENT NAME Rev Status
MANAGEMENT PROCEDURE