PEMBUATAN FRONT END ENGINEERING DESIGN (FEED)

TOTAL PROJECT KAMOJANG UNIT 5 (1 x 30 MW) - JAWA BARAT

WEEKLY PROGRESS REPORT

0 June 6, 2012 Issued for use OOK GIB MDC TJA WDR

PREPARED CHECKED APPROVED CHECKED APPROVED

REV DATE DESCRIPTIONPT. LAPI ITB PT. PGE

STATUS CODE : IFR = Issued for Review, IFA = Issued for Approval, IFU = Issued for Use 

Total or Partial Reproduction and / or utilization of this document are forbidden without priorwritten authorization of PT. PGE 

DOCUMENT NUMBER REVISION STATUS

KMJ5-00-MN-WRP-003 0 IFU

Page 2: KMJ5 00 MN WRP 003 Weekly Progress Report

8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report

http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 2/7

 

PEMBUATAN FRONT END ENGINEERING DESIGN(FEED) TOTAL PROJECT KAMOJANG UNIT 5 (1 x 30

MW) - JAWA BARAT 

TITLE DOCUMENT NUMBER PAGE

WEEKLY PROGRESSREPORT

KMJ5-00-MN-WRP-003 2 of 6

TABULATION OF REVISED PAGE

Page REVISION Page REVISION

 A B C 0 1 2 3 4 5 A B C 0 1 2 3 4 5

1 X 36

2 X 37

3 X 38

4 X 39

5 X 40

6 X 41

7 X 42

8 43

9 4410 45

11 46

12 47

13 48

14 49

15 50

16 51

17 52

18 53

19 54

20 55

21 56

22 57

23 58

24 59

25 60

26 61

27 62

28 63

29 64

30 65

31 66

32 6733 68

34 69

35 70

Page 3: KMJ5 00 MN WRP 003 Weekly Progress Report

8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report

http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 3/7

 

PEMBUATAN FRONT END ENGINEERING DESIGN(FEED) TOTAL PROJECT KAMOJANG UNIT 5 (1 x 30

MW) - JAWA BARAT 

TITLE DOCUMENT NUMBER PAGE

WEEKLY PROGRESSREPORT

KMJ5-00-MN-WRP-003 3 of 6

COMMENT SHEET

COMMENT:

NO

REFERENCE,

PARAGRAPH,

OR CHAPTER

COMMENT OF PT. PGE RESPONSE OF PT. LAPI ITB

COMPANY PT. PGE PT. LAPI ITB - ELC

BY

POSITION

DATE

DOCUMENT

STATUS:IFR IFA IFU

Page 4: KMJ5 00 MN WRP 003 Weekly Progress Report

8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report

http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 4/7

 

PEMBUATAN FRONT END ENGINEERING DESIGN(FEED) TOTAL PROJECT KAMOJANG UNIT 5 (1 x 30

MW) - JAWA BARAT 

TITLE DOCUMENT NUMBER PAGE

WEEKLY PROGRESSREPORT

KMJ5-00-MN-WRP-003 4 of 6

TABLE OF CONTENTS

1  INTRODUCTION ........................................................................................................ 5 1.1  GENERAL ...................................................................................................... 5 1.2  SCOPE OF DOCUMENT ................................................................................ 5 

2  PROGRESS OF WORKS .......................................................................................... 5 2.1  IMPORTANT DATE ........................................................................................ 5 2.2  KEY PROGRESS ........................................................................................... 6 

Page 5: KMJ5 00 MN WRP 003 Weekly Progress Report

8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report

http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 5/7

Page 6: KMJ5 00 MN WRP 003 Weekly Progress Report

8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report

http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 6/7

 

PEMBUATAN FRONT END ENGINEERING DESIGN(FEED) TOTAL PROJECT KAMOJANG UNIT 5 (1 x 30

MW) - JAWA BARAT 

TITLE DOCUMENT NUMBER PAGE

WEEKLY PROGRESSREPORT

KMJ5-00-MN-WRP-003 6 of 6

5. 4th  Meeting : June 6, 2012

Subject : Technical meeting. Draft PFD, Pipeline Layout, Plot Plan.

Venue : GPP Kamojang Unit-4, Garut

6. 5th Meeting : June 26, 2012

Subject : Technical meeting. Final PFD, P&ID, Line Sizing (FCRS), Final

PFD, P&ID (GPP).

Venue : PT.LAPI ITB - Palma One Building, Jakarta

2.2   Key Progress

1. Pipeline survey (Steam Pipe from Cluster to GPP, Steam pipe from GPP to

Rockmuffler and Condensate Pipe from GPP to WPS Cikaro)

2. Soil investigation survey (Deep well Hydrolic Drill, Sondir)

List of documents delivered and its status is as follows:

Page 7: KMJ5 00 MN WRP 003 Weekly Progress Report

8/13/2019 KMJ5 00 MN WRP 003 Weekly Progress Report

http://slidepdf.com/reader/full/kmj5-00-mn-wrp-003-weekly-progress-report 7/7

1 MANAGEMENT

1.2

1 KMJ5 -00 -MN -PCD -001 INTEGRATED PROJECT MANAGEMENT PLAN A   IFA

2 KMJ5 -00 -MN -WRP -003 Biweekly progress report 3 A   IFA

3 KMJ5 -00 -MN -WRP -004 Biweekly progress report 4 A   IFA

2 FIELD SURVEY & SECONDARY DATA COLLECTING

1 KMJ5 -00 -TN -REP -002 Input Document Collection & Document Review Report A   IFA

3,2 Pr oc ess Wo rk

1 KMJ5 -FC -PR -PFD -001 Process Flow Diagrams - SGS A  IFA

2 KMJ5 -FC -PR -PFD -002 Process Flow Diagrams/Reinjection System

1 KMJ5 -FG -PR -PID -003 P&I Diagram Re-Injection Line A   IFA

3,3 Piping & Pipe line Work

1 KMJ5 -FC -PI -CSH -004 Pipe Stress & Flexibility Analysis A   IFA

1 KMJ5 -FC -PI -DWG -005 Piping Layout Drawing - Cluster A A   IFA

2 KMJ5 -FC -PI -DWG -006 Piping Layout Drawing - Cluster C A   IFA

3 KMJ5 -FC -PI -DWG -007 Piping Layout Drawing - Tie in GPP A   IFA

1 KMJ5 -FC -PI -SSH -002 Insulasi Specification A   IFA

3,4 Mec han ic al Wo rk

1 KMJ5 -FC -ME -CSH -001 Silencer Calculation A   IFA

1 KMJ5 -FC -ME -SSH -003 Reinjection Pump Specification A   IFA

1 KMJ5 -FC -ME -DSH -001 Silencer Datasheet A   IFA

3,5 Civil Work

1 KMJ5 -FC -CI -DTN -003 Subsidence Analysis A   IFA

2 KMJ5 -FC -CI -DTN -004 Foundation and Silencer Support Structure A   IFA

3 KMJ5 -FC -CI -DTN -006 Foundation and Reinjection Pump Support Structure A   IFA

1 KMJ5 -PP -CI -DWG -001 Rough Grading Plan (Power Plant) A   IFA

2 KMJ5 -PP -CI -DWG -002 Power Plant Retaining Wall Plan & Section A   IFA

3 KMJ5 -PP -CI -DWG -003 Power Plant Internal Fencing Layout A   IFA

4 KMJ5 -PP -CI -DWG -004 Power House Building Architectural Plan view A   IFA

5 KMJ5 -PP -CI -DWG -005 Power House Building Architectural Elevations A   IFA

6 KMJ5 -PP -CI -DWG -006 Power House Plot Plan-Ground Floor-Steam Receiving Station A   IFA

7 KMJ5 -PP -CI -DWG -007 Power House Plot Plan-Ground Floor-Gas Extraction System A   IFA

3,7 Inst rument & Cont ro l Work

1 KMJ5 -FC -IC -SSH -002 Pneumatic Control Valve Regulator Specification A   IFA

1 KMJ5 -FC -IC -DSH -001 Datasheet control valve A   IFA

3,8 HSE

1 KMJ5 -PP -HS -DTN -001 HazOp Analysis - GPP A   IFA

CALCULATION

Drawing

SPECIFICATION

DATASHEET

Specification

Data Sheet

Calculation

PROCESS FLOW DIAGRAM

PIPING & INSTRUMENTATION DIAGRAM

Calculation

Drawing

Specification

 ANALYSIS & CALCULA TION

NO DOCUMENT NUMBER DOCUMENT NAME Rev Status

MANAGEMENT PROCEDURE