km km
Ministry of Public Works MPWMPW
MPW
JICA
Kabul Constrnction Machinery Center KCMC
Minutes of Meeting M/MConstruction Technology Training Institute CTTI
JICA
JICA
JICA
MPW IRDKCMC
MPW
PCM
ADB WB EU
MPW
JICA
MPW MPWKCMC
MPW KROJICA
MPW PDM POPCM JICA
JICA
MPW M/MM/M
JICA
Dr. Sohrab Ali Saffary Minister of Public Works (MPW)Dr. Wali Mohammad Rasolli Deputy Minister (MPW)Mr. Abdul Basir Habibi General Director (DRM, MPW)Mr. Dilbar Abdi Adviser and Vice President for policy of coordinator (DRM, MPW)Mr. M. S. Beedya Director of Policy and Coordination (DRM, MPW)Ms. Dalia Akbarmir Donor Adviser (DRM, MPW)Ms. Adol Shoh Head of Private Sector (DRM, MPW)Mr. Ali-Moh-Norri Evaluation Planning Dept. (DRM, MPW)Mr. S. Enuyllha Engineer (DRM, MPW)Mr. Ghulam Haidar General Director KRO, MPWMr. Faz Lulhag Nasimi General Director KCMC, MPW
Asian Development Bank ADBMr. GUl Ahmed Kamali Project Implementation Officer Transport
World Bank:WBMr. Mohammad Qahir Haidari Operation Officer
European Union:EUMr. Giorgio Kirchmayr Program Manager Infrastructure SectorMr. Bashir Ahmad Project Officer - InfrastructureMr. V Monteleone MPW Maintenance Team Leader
United Status Agency for International Development USAIDMr. Terrence Kramer, P.E Head of Transportation/Roads Group Mr. James Franckiewicz, P.E Office DirectorMr. Sayed Israr Torak Senior Engineer
International Security Assistance Force ISAFMr. Jason Le Blanc Air/Infra officer
United Nations Office for Project Services UNOPSMr. Karma Jimba Program Manager (NRAP, MPW)
International Relief and Development IRDMr. Mohammad Eshaaq Aman Secretariat, CG-TS Mr. M. Sohail Kaakar System Analyst Mr. Pafyal Gharzong Program Coordinator
JICA
CTTI
JICAJICAJICA
CTTIMr. Abdol Wahid DirectorMr. Muhammad Ejaz Head of Mechanic DepartmentMr. Ahmer Training officeMr. Amir Hadea
RegionalHighway National Highway
EUMPW
US$ US$
Civil Service Commission CSCPublic Administration Reform PAR
Priority Reform Restructuring PRR MPW
MPW ForceAccount FA
CSCUS$
NGO
PRRMPW IRD
JICA
M/M IThe Project for Capacity Development and Establishment of Road Maintenance
and Management System M/M
PDM PO M/M IIM/M ANNEX II PDM III PO MPW PDM
FAMPW
trainingMPW M/M
VIII-FA
Contract-out
M/M IIIJoint Coordinating Committee JCC
Executive Committee M/MM/M ANNEX IV Committee Record of Discussion R/D
ANNEX VI VII
M/M IVM/M
M/M VCounterpart C/P M/M C/P
R/D ANNEX IVKRO
FAKRO
C/PPRR Region Finance
SectionKRO
MPW M/M VIII-
Terms of Reference TOR
M/M VIM/M
NGOPRR
NGO PRRUS$ US$ NGO
US$MPW
ActivityPRR
NGOMPW
MPW Kabul Province Regional Highway NationalHighway
Kabul-GazniMPW
kmkm US$
CTTIConstruction Technology Training Institute
MPW
CTTI
JICA
R/D M/M VIIR/D M/M ANNEX V JICA MPW-JICA
M/M VIIIM/M
MPW CG-TS Working Group WGM/M VIII-5
CTTI
KCMCCTTI
CTTICMTC CMTI
kmADB
Interim Road and Highway Standards - MPW,21 March 2005
MPW Ministry Rehabilitation and RuralDevelopment MRRD
EUWB ADB
Consultative Group-Transport Sector CG-TSMPW Capacity Development CD
km
Regional Highways
National Highways
Provincial Roads
Rural Roads
Total
Regional Highway
km
NDFNational Development Framework
NDF MPW
NPP
Rebuilding Our Nationkm
km km
TSR
Securing Afghanistan's Future
Mater Plan for Road Improvement Project
Road Classification
Regional Highway
National Highway
Provincial Road
Subtotal
TotalLength(km)
3,242
4,884
9,656
17,782
Under Constructionor CommittedLength(km)
3,134
3,049
1,000
7,183
RemainingLength(km)
108
1,835
8,656
10,599
Major AssistingCountries and/or
Donors
USA, Japan, EC, WB, ADB, IDB, etc.
USA, WB, ADB, etc.
USA, WB, etc.
Rural Road (estimated) 17,000
Total 34,782
Afghanistan Millennium Development Goal Country Report 2005 - Vision 2020
Afghanistan Compact/ Afghanistan National Development Strategy ANDS
CompactANDS
MPW Strategy
MPW
MPWPriority Reform and Restructuring PRR MPW
PRR
WB KRO
EC
USAID KK
PRRMPW
KPOMPW
MPW MPWUS$ US$
US$
MPW
FA
NGO
MPW Office for Project Services UNOPS
JICAMPW
EC
CG-TS
CG
MPW
CG-TS
CG-TS
CG-TS MPWADB
CG-TS ADBCG-TS WG
JICA
CD
WBWB
CG-TS
TAT
TAT
TAT
TAT
TAT CD
TAT CD
CG-TS ADB USAID
WG
CG-TS
MPW CD CG-TS WG
CD
CG-TS WG
Donor Assisted Improvement & Maintenance ProjectNational Rural Access Program (NRAP)
Emergency Transport Rehabilitation Project (ETRAP)Donor Assisted Capacity Development Plans MPW & MOT TA Technical
Assistance TOR Swedish Intenational DevelopmentCooperation Agency SIDA
UNOPS USAID-Canadian SIDA EU
National Emergency Rural Access Program NERAP
Interim Strategy Note for Islamic Republic of Afghanistan for The Period FY07-FY08
Building the capacity of the state and its accountability to its citizens to ensure the provision ofservices that are affordable, accessible and of adequate quality.
Promoting growth of the rural economy and improving rural livelihoods.Supporting growth of a formal, modern and competitive private sector.
USAID
Donor Assisted Improvement & Maintenance Project Secondary and District Center RoadProject US CD UNOPS
Donor Assisted Capacity Development Plans MPW Capacity Building for Road Designand Construction Service in the Public & Private Sector UNOPS
Road Maintenance Project USeast-south regions 13provinces Provincial road
km KK Routine MaintenanceCD TOR Luis Barger General Consultant
Sub-Con. Afghan
Afghanistan Strategic Plan TransportSector Strategy
IRD MPW Strategy Final Report
EC
Donor Assisted Improvement & Maintenance ProjectMPW Staff
m
RMU
Standard documentSupervising MPW
JICA
JICA Contract-outJICA
ADBADB
Make a data base on National Road Network MPW
Kabul Polytechnics University assistance(capacity building for the field of road)
Kabul University
km Rehabilitation US$
C/P KPO
C/P
MPW
MPW
TOR
USAID EC WB ADBUN SIDA
USAID IRD International Relief and Development MPWCDEC
USAID SIDA WB MPW
MPWIRD
CD CD
MPW
MPWJICA
IRD MPW
C/P
NGOPRR Priority Reform Restructuring
NGOPRR US$ US$
NGO US$ MPW
ActivityPRR
NGOMPW
KROFA
PRRRegion Finance Section
KROC/P MPW M/M
確認した。
地域事務所の将来像の実現に向けた組織改革に、本プロジェクトと平行して継続して取り組ん
でいく必要があることから、これを計画局配属予定の長期専門家の TOR に付加する予定。
3-8-6 「ア」国公用語の使用について
「ア」国の公用語はダリ語とパシュトー語であり、十分な英語力を有する人材はごく少数であ
ることから、C/P の十分な理解を得るために、「第9条 成果品等」に記述の成果品等はダリ語及
びパシュトー語による報告の作成を行う。同様の目的のために、これに限らず、委員会等での配
布資料についても適宜両言語版を用意し、また両言語の通訳を入れるなどの工夫をする必要があ
る。
3-8-7 体制モデルの作成について
プロジェクト目標のとおり、本プロジェクトは「カブール地区における道路維持管理体制」の
構築を目的とするものであるが、ゆくゆくは本プロジェクトで作成した体制を「維持管理体制モ
デル」として、各地方事務所と本省との関係に適用していくことを想定している。
プロジェクト実施期間中に、他地域事務所の現状、他地域事務所に展開していくにあたっての
留意点などを取りまとめておくことが望まれる。
3-8-8 パイロットプロジェクトの実施について
「ア」国における支援活動は、ようやく戦後の緊急援助期から復興期に入った段階であり、組
織の構築や人材の CD とともに、基本的なインフラの整備事業も同時に進めていく必要性が高い。
道路維持管理分野においても、「ア」国政府による現状維持管理は全く実施されていない状況であ
り、ドナーの支援によってこれまでに建設された道路も、ドナーによる維持管理がなされない限
り日に日に傷んでいく状況である。また、長期間にわたる戦争を経験してきたアフガニスタン人
にとって、自らのキャパシティを向上するためのモチベーションの維持においても、目にみえる
形の成果は重要である。かかる状況下、「ア」国における技術協力プロジェクトでは、パイロット
プロジェクトの規模を一般的なものに比して大きく設定する効果が認められており、本プロジェ
クトもこれに倣っている。
一方で、パイロットプロジェクトはあくまで職員及び組織の CD を目的とした研修の一環とし
て実施するものであり、この点に益するよう配慮する。また反省会ワークショップを通じて、研
修者自身が仕事の仕方について考えて気付きを得、情報が共有されることで「ア」国にあった仕
事の仕方が構築されるとともに、MPW 組織として知見が集積されることが望ましい。
また、今回は FA による実施と外注による実施との両方を計画しているが、効果をより高める
ために、例えば両者に隣接する区間の維持管理業務を実施させ、成果を競わせるなどの工夫も一
案である。
なお、パイロットプロジェクトの実施区間選定にあたっては、MPW の道路整備計画との整合
性をとるとともに、実施区間の治安状況にも十分に配慮すること。
-22-