8/14/2019 KM BOB Proposal
1/15
8/14/2019 KM BOB Proposal
2/15
8/14/2019 KM BOB Proposal
3/15
8/14/2019 KM BOB Proposal
4/15
Intro duc tionFor BOB PT. Bumi Siak Pusako, to survive and sustain its growth itneeds to develop and nurture new knowledge , stimulatinginnovation, sharing existing tacit knowledge within its organization. One of the concern at BOB PSK During the construction phase of aproject, most project-related problems, solutions, experiences andknow-how are in the minds of individual engineers and expert.
The tacit Knowledge & experience are still exists in the head of engineers and experts. Therefore, this situation represents a major loss for BOB PSK who do not preserve the know-how and
experiences of senior engineers and experts.
Experiences and knowledge should be preserved and managed.They should be captured, modeled, stored, retrieved, adapted,evaluated and maintained.
KM in oil & gas phase deals primarily with the process of creatingvalue from knowledge about drilling ops, organization andcompanies.
In a dynamic oil & gas business environment, the ability toexchange information from various source and the different formatsbecomes crucial to reusing and updating knowledge.
When individual learns together, they will grow more rapidly thancould have occurred otherwise
Knowledge entry
Stored knowledge
Personal knowledge
Organizational knowledge
Knowledge retrieval
Knowledge managementinfrastructure
8/14/2019 KM BOB Proposal
5/15
8/14/2019 KM BOB Proposal
6/15
The end state of Knowledge Management at BOB PSK is a transformation to become a learning organization, where Knowledge
Management will be embedded within organizational culture.
In this way , BOB PSK can constantly adapt to dynamic and drastic environmental business change by aligning knowledgeprocesses with company objective.
The implication of this Knowledge Management project at BOB PSK will result in :
Ob jec tives
8/14/2019 KM BOB Proposal
7/15
8/14/2019 KM BOB Proposal
8/15
Approach
Our approach to implement Knowledge Management at BOBPSK are
01. Top down
The overall strategic direction of the organization is used toidentify the focus of the knowledge management initiative.This is reflected in a series of activities designed to meet thisbroad goal.
02. Bottom up
Research is conducted into the activities of staff involved inkey business processes. The findings of this researchhighlights key staff needs and issues, which are then tackledthrough a range of knowledge management initiatives.
8/14/2019 KM BOB Proposal
9/15
RJRJ
8/14/2019 KM BOB Proposal
10/15high level map - 10
RJRJ ccstrivingfor vibrant solutions
Diagnostic KM readiness
End StateTransition State
KM Implementation KM Nurturing
Objective:
o Audit organizationstructure & attributesthat encouraging ordiscouraging the turnover rate of geologistin BOB
o Review how organizationmanage its explicitknowledge
Target:
People
Culture
Content
Process
Output:o Information regarding
explicit knowledge &tacit knowledgestructure
o Identified System needto be resolved, toflourish the condition
Output:o Well-documented of
explicit knowledgethrough re-engineering ofbusiness process and SOP
o Well established systemto encourage the sharingculture
Output:o Actions needed to
strengthening the sharingculture, in order to makeit as part of daily work,a working habit
o Technology to helporganization store and
Output:o A sharing habit that
enable learning culture
o Well-documented of tacitknowledge
o Well established system inutilizing and evolving
ci kn le e
Objective:
o Restructuring the wayorganization store andutilize the explicitknowledge
o Restructuring theattributes in order toencourage the sharingculture for tacitknowledge
Objective:
o Implement the systemneeded to build the KMculture, to transformtacit knowledge intoexplicit knowledge thatcan be well-documented andutilized by organization
Objective:
o Perpetuating the sharingculture, make sharingthing as a habit, part ofdaily work, embedded inbusiness process
Process:
Restructuring Planning
Re-engineering process
Review
Socialization
Implementation
Target:
Community of Practice
Leadership Actions
Company Policy
Daily Routine
Target:
Working Culture
Enabling LearningEnvironment
Informal Meeting, work &play
Problem
Technology Enabler
Restructuring ExplicitKnowledge
Transforming TacitKnowledge
Explicit
Knowledge
TacitKnowled
ge
S y s
t e m
V e r i
f i c a
t i o n
8/14/2019 KM BOB Proposal
11/15
RJRJ
8/14/2019 KM BOB Proposal
12/15high level map - 12
RJRJ ccstrivingfor vibrant solutions
People
Assess how peoplecharacteristic in BOBare ready for KMimplementation
Recommendation onexisting and should-be condition ofpeople, gap analysis
Necessary action tobe taken (in the formaction plan forphase 2)
Survey questionnaire(web-based)
Qualitative survey(manual)
2 weeks
(1 senior consultant)
USD 15,000
Culture
Assess how BOB culturewillencourage/discourage
the KM implementation
Recommendation onexisting and should-be condition ofculture, gap analysis
Necessary action tobe taken (in the formaction plan forphase 2)
Survey questionaire(web-based)
Qualitative survey(manual)
2 weeks
(1 senior consultant)
Content
Assess how BOBstructured the explicitknowledge,characteristic of tacitknowledge to becaptured that will
impact to complexitiesrelated in transformingthe tacit knowledgeinto explicit knowledge
Recommendation onexisting and should-be condition ofcontent, gap analysis
Necessary action tobe taken (in the formaction plan for
phase 2)
Survey questionaire(web-based)
Qualitative survey(manual)
2 weeks
(1 senior consultant)
Process
Assess how organizationstructure, attributes,and process willencourage/discouragethe KM purpose
Recommendation onexisting and should-be condition of BOBprocess, gap analysis
Necessary action tobe taken (in the formaction plan forphase 2)
Survey questionaire(web-based)
Qualitative survey(manual)
Organization manualanalysis
Process analysis
3 weeks
(2 senior consultant)
Activity Output Timeline & ManPower CostTools & Method
Diagnostic
RJRJ c
8/14/2019 KM BOB Proposal
13/15
high level map - 13
RJRJ ccstrivingfor vibrant solutionsKM Readiness
Restructuring Planning :
Identify needs of
enhancement inorganizationstructure & system
Modify organizationstructure andselected system
Modified organizationstructure that fit with
the KM purpose:Collaborative
structure
Learning-basedstructure
Fit organizationsystem to
endorse the neededculture for
KM implementation
Process-based 3 weeks
(1 senior consultant)
USD 25,000
Re-engineering Process:
Identify needs in howorganization processshould structuringits explicit
knowledge & tacitknowledge
Modify process inorder to re-arrangeexplicit knowledge insuitable way & readyfor transforming thetacit knowledge
Modified system instructuring explicitknowledge properly:
Efficient & effectiveprocess
Complete & systematicSOP
Collaborative workingculture
Proper work mechanismto
capture tacitknowledge
Business ProcessAnalysis
Meeting Taxonomy
After Action Review
8 weeks
(2 senior consultant)
Review:
Evaluate allinitiatives in thisphase to ensure thewell-behaved ofexplicit knowledge inorganization process;to ensure organizationsystem appropriatelypromote the sharingculture so as tosupport learningorganization
Well-adjusted oforganization structureand process, accordingto the need of BOB andthe structure ofexplicit knowledge &tacit knowledge
Business ProcessAnalysis
1 week
(1 senior consultant)
Implementation Roll-Out:
Develop implementationblueprint, assistrealization of theblueprint, find problemareas develo solution
Increased propercoordination betweendifferent areas oforganization(cultivating sharingculture for thelearning
Socialization
Close monitoring
Coordination measure
4 week
(1 senior consultant)
Activity Output Timeline & ManPower CostTools & Method
Diagnostic
RJRJ cc
8/14/2019 KM BOB Proposal
14/15
high level map - 14
RJRJ ccstrivingfor vibrant solutionsKM ImplementationKM Readiness
Community of Practice
Create & join
community in relatedsubject, profession
Evaluate effectivityof community to thelearning activity
Quantity of communitypractices within BOB
Effectivity of tacitknowledge capturing(growth of knowledgein system)
Analysis &Recommendation
3 weeks
(1 senior consultant)
USD 30,000
Leadership Actions
Implement coaching &mentoring systembetween supervisor &subordinate
Regular and accurateperformance review
Achieved KPI
Effectivity of tacitknowledge capturing(growth of knowledgein system)
Analysis &Recommendation
3 weeks
(2 senior consultant)
Company Policy
Policies related tolearning organizationenforcement
Procedures to forcethe learning habit
Formal enforcementupon learning culture
Increased activity oflearning throughsharing
Analysis &Recommendation
1 week
(1 senior consultant)
Daily Routine
Implant all learningactivities in daillyworking process(meeting, coordination,information sharing,cross-functionactivities, etc)
Learning throughsharing as a routine-based activity
Effectivity of tacitknowledge capturing(growth of knowledgein system)
Processs AnalysisRecommendation
4 week
(1 senior consultant)
Technology Enabler
Install system toenable tacit knowledgecapturing
Good system tocapture tacitknowledge andtransform it intoexplicit knowledge
Good system to ensure
System dynamic
Knowledge portal
Data mining
4 week
(1 senior consultant)
Diagnostic
Activity Output Timeline & ManPower CostTools & Method
RJRJ cc
8/14/2019 KM BOB Proposal
15/15
high level map - 15
RJRJ ccstrivingfor vibrant solutionsKM NurturingKM ImplementationKM Readiness
Working Culture
Appraise the sharing
habit, sharing cultureand working culture inBOB
Analyze and proposerecommendations tomaintain and increasesharing behavior in arequired level
To understand andmeasure the sharing
behavior index andworking culture in orderto monitor and maintainsharing behavior in BOB
Survey Questionnaire(web-based)
Process analysis
4 Weeks USD 15,000
Enabling LearningEnvironment
Work & Play
Ensure learningactivity become habitwithin organization,represent by manyinformal meetingwithin BOB
Strengtheningleadership action toperpetuate the habit
Quantity of informalmeeting inside theorganization
Quantity of (informal)meeting acrossindustry
Index level ofknowledge growth
Percentage of workinghours spend forlearning throughknowledge sharing(per-individu)
Survey Questionnaire(web-based)
Depth observation
Interview
Process Analysis
4 weeks
Diagnostic
Activity Output Timeline & ManPower CostTools & Method