1 Mindaugas Aleška Head of Business Development Klaipėda LNG Terminal: Gateway for the Baltic Gas Market Photo A. Kubaitis

Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

  • Upload
    doduong

  • View
    224

  • Download
    5

Embed Size (px)

Citation preview

Page 1: Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

1

Mindaugas Aleška

Head of Business Development

Klaipėda LNG Terminal: Gateway for the Baltic Gas Market

Photo A. Kubaitis

Page 2: Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

2

Project Status

FSRU Independence

Arrived on the 27th of October

Jetty

• Construction works are done

• Tested and commissioned

Commissioning cargo

Arrived on the 28th of

October

Foundation capacities

LITGAS reserved capacities starting

the 1st of January Connecting pipeline

• Finalizing HDD

• On-shore pipeline finished

• Tested and commissioned

Page 3: Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

3

Major achievements

On-timeStart-up and

operations

Minimum

Impact on

the environment

Energy

Security

Savings up to

30 mln.

EUR

Professional

Project

Team

Positive

Public

Opinion

Record implementation

time

EIB, NIB financing

EU

compliantregulation

Public

procurement

N-1

standard

12 audits and

positive

conclusions

European

Commissi

on support

Page 4: Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

4

Business model

Unused

capacity

Third Party Access

infrastructure

Terminal User

Unused

capacity

Unused

capacity

-

2.000.000

4.000.000

6.000.000

8.000.000

10.000.000

Sau Vas Kov Bal Geg Bir Lie Rug Rugs Spa Lap Gru

Terminal User

Terminal User

Terminal User

Terminal capacities are available via open booking procedure

(Nm3/day)

• First trader in the terminal is a state owned company LITGAS

• Reserved capacities starting from the 1st of January, 2015

• Signed LNG supply contract with Statoil (0,54bcm/annum)

Capacity available for traders

Ensured minimum operational send-out

Page 5: Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

5

LNG terminal services

• Continued regulated minimum send-out – ensuring that the Terminal is

constantly cooled-down and ready for service.

• Terminal capacities are available on the regulated Third Party Access via open

capacity allocation procedure.

LNG ship reloading

• Seasonal capacities

• Spot capacities

LNG regasification

• Foundation capacities

• Seasonal capacities

• Spot capacities

Services

Starting from the 1st of January, 2015 Planning to start by the end of 2016

LNG auto-trailer reloading

LNG reloading station

• On-shore LNG reloading station

will constitute to break-bulking

large LNG cargoes.

Security supplement (regasification

tariff) – 2,73 EUR/MWh

LNG reloading service – 1,14

EUR/MWh

Page 6: Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

6

Gas supply security in Europe

Supply disruption (cold spell scenario)

After pipeline Klaipėda-Kuršėnai is finished

> 50%

25 – 50%

10 – 25%

5 – 10%

< 5%

full supply

After completing Klaipėda LNG terminal

Source: ENTSOG

Page 7: Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

7

Access to new markets

LNG regasification markets

Baltic-connector

GIPL

LNG ship reloading markets LNG auto-trailer reloading markets

Markets accessible starting the 1st of January, 2015

Markets accessible after regional interconnections are finished

Markets accessible after on-shore LNG reloading station is finished (expected by the end of 2016)

Page 8: Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

8

Next step – regional expansion

Regasification services for the Baltic states

New terminal users

Break-bulking into smaller LNGC

On-shore infrastructure for auto-trailer reloading

The European Commission (from the stress test report):

• <...>An example is the envisaged agreement between Estonia and Lithuania on the basis of which the protected

customers of both countries will be served ahead of the non-protected customers in either country. <...>

• <...> The Commission welcomes the forthcoming commissioning of the Klaipeda LNG terminal in Lithuania. The existence

of such infrastructure enabling supply diversification is vital both in order to diversify supply but also to ensure a more

flexible gas network.<...>

Page 9: Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

9

LNG Reloading station

Received EU financing for design

Started FEED, risk analysis and EIA

Started market consultation to estimate demand

Initiation of pilot-projects

Preliminary location of the

new LNG reloading station

LNG terminalSC Klaipėdos nafta oil

transshipment terminal

• LNG auto-trailer reloading

• LNG rail-car reloading

• LNG bunkering solutions

Page 10: Klaipėda LNG Terminal: Gateway for the Baltic Gas Market LNG Terminal... · Klaipėda LNG Terminal: Gateway for the Baltic Gas Market ... FSRU Independence Arrived on the 27th of

10

Thank you.