~ FPWH CAN WASH FPWH 3/4" HW UP 2" CW & 3/4" HW UP 1-1/2"CW, 1-1/2"HW & 3/4" HWR 1-1/2"HW 1-1/4"HW 1-1/2"HW 1-1/4"CW 1-1/4" HW DOWN TO CRAWL SPACE 2"CW TO REMAIN 1-1/4"CW UP TO REMAIN 3/4"CW 1-1/4"HW 1"HW 1"HW 3/4"HW IN CRAWL SPACE 2-1/2"CW 2"CW 2"CW 1-1/2"CW 1-1/4"CW 1"CW 3/4"CW 1-1/2"CW 1-1/2"CW 3/4"HWR EXISTING WATER HEATERS AND PIPING TO REMAIN EXISTING WATER ENTRY TO REMAIN 1/2"CW 1/2"HW 1-1/2"CW, 1-1/2"HW & 3/4" HWR DISTRIBUTION PIPING TO REMAIN 1/2"CW AND 1/2"HW TO REMAIN ALL PLUMBING FIXTURES, SUPPLY AND VENT PIPING ABOVE CEILINGS AND IN WALLS SHALL BE DEMOLISHED WITH THE EXCEPTION OF THE WATER ENTRY PIPING AND PIPING THAT SERVES THE FLOOR ABOVE. WHICH IS TO REMAIN. UNUSED SUPPLY AND WASTE PIPING 8" OR MORE BELOW TOP OF SLAB MAY BE ABANDONED WHERE NOT INTERFERING WITH NEW WORK. FPWH 3/4"HW DOWN IN WALL REMOVE 3/4"CW AND WALL HYDRANT. CAP AT MAIN. EXISTING FUEL GAS PIPING TO WATER HEATERS REMOVE FUEL GAS PIPING TO OUTSIDE OF ROOM TO ALLOW INSTALLATION OF ELECTRICAL PANELS AREA OF WORK 'C' Sheet ERWIN P0.1 P0.1 1 3/16" = 1' PLUMBING - SUPPLY DEMOLITION 11/30/18 Kitchen Renovations at Clyde A. Erwin High School Buncombe County Schools Asheville, North Carolina NORTH CONSULTING ENGINEERS LICENSE # C-0315 PROJECT #17241 SUD ASSOCIATES, P.A. KEY PLAN SUPPLY DEMOLITION PLUMBING -
DISTRIBUTION PIPING TO REMAIN1/2"CW AND 1/2"HW TO REMAIN
ALL PLUMBING FIXTURES, SUPPLY AND VENT PIPING ABOVE CEILINGS AND IN WALLSSHALL BE DEMOLISHED WITH THE EXCEPTION OF THE WATER ENTRY PIPING AND PIPINGTHAT SERVES THE FLOOR ABOVE. WHICH IS TO REMAIN. UNUSED SUPPLY AND WASTEPIPING 8" OR MORE BELOW TOP OF SLAB MAY BE ABANDONED WHERE NOT INTERFERINGWITH NEW WORK.
FPWH
3/4"HW DOWN IN WALL
REMOVE 3/4"CW
AND WALL
HYDRANT. CAP
AT MAIN.
EXISTING FUEL
GAS PIPING TO
WATER
HEATERS
REMOVE FUEL GAS PIPING
TO OUTSIDE OF ROOM TO
ALLOW INSTALLATION OF
ELECTRICAL PANELS
AREA OF WORK 'C'
Sheet
ERWIN
P0.1
P0.1
1
3/16" = 1'
PLUMBING - SUPPLY DEMOLITION
11/30/18
Kitch
en
R
en
ova
tio
ns a
t C
lyd
e A
. E
rw
in
H
ig
h S
ch
oo
l
Buncom
be C
ounty S
chools A
sheville, N
orth C
arolina
NORTH
CO
NSU
LT
ING
EN
GIN
EE
RS
LIC
EN
SE #
C-0
315
PR
OJE
CT
#17
241
SUD
ASS
OCI
ATES
, P.A
.
KEY PLAN
SUPPLY DEMOLITION
PLUMBING -
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
CO
CO
FDFD
FD
FCO
FS
FS
FS
FS
FS
FS FS
FS FS
CO
FS
CO
FS
CO
FD
FS
4"
4"
4"
5"
3"
3"
3"
3"
3"
4"
2"
CO
ALL PLUMBING FIXTURES, SUPPLY AND VENT PIPING ABOVE CEILINGS AND INWALLS SHALL BE DEMOLISHED UNLESS OTHERWISE NOTED. UNUSED SUPPLY ANDWASTE PIPING 8" OR MORE BELOW TOP OF SLAB MAY BE ABANDONED WHERE NOTINTERFERING WITH NEW WORK. ROOF LEADERS TO REMAIN.
3" VENT UP
TO REMAIN
5" ROOF LEADER
ABOVE CEILING TO
BE RELOCATED
6" ROOF DRAIN
TO REMAIN
5" ROOF DRAIN
TO REMAIN
FCO
4" ROOF LEADER
FROM ABOVE TO
BELOW SLAB
4" ROOF LEADER
FROM ABOVE TO
ABOVE CEILING
4" ROOF LEADER
FROM ABOVE TO
BELOW SLAB
5" ROOF DRAIN
TO REMAIN
8" ROOF DRAIN
TO REMAIN
5" ROOF LEADER
TO REMAIN
10" ROOF
DRAINTO REMAIN
4" ROOF LEADER
FROM ABOVE TO
BELOW SLAB
6" ROOF DRAIN
TO REMAIN
4"
4" WASTE
FROM ABOVE
TO REMAIN
3" VENT UP
TO REMAIN
1-1/2" VENT UP
TO REMAIN
2" FROM FLOOR DRAIN
IN EQUIPMENT ROOM
TO ROOF LEADER TO
TEMPORARILY REMAIN
IN USE.
2"
FCO
FCO YCO
CAN WASH DRAIN
TO REMAIN
~~
YCO
WASTE AND VENT PIPING
OVERHEAD SERVING RESTROOMS
ABOVE TO REMAIN IN USE
THROUGHOUT THE PROJECT.
THIS SECTION OF WASTE PIPING
SHALL REMAIN IN USE THROUGHOUT
THE PROJECT WITH EXCEPTION OF
SHUTDOWN DURING SCHOOL BREAK
TO INSTALL AND CONNECT THE NEW
WASTE LINE IN THIS AREA.
AREA OF WORK 'C'
Sheet
ERWIN
P0.2
P0.2
1
3/16" = 1'
PLUMBING - DWV DEMOLITION
11/30/18
Kitch
en
R
en
ova
tio
ns a
t C
lyd
e A
. E
rw
in
H
ig
h S
ch
oo
l
Buncom
be C
ounty S
chools A
sheville, N
orth C
arolina
NORTH
CO
NSU
LT
ING
EN
GIN
EE
RS
LIC
EN
SE #
C-0
315
PR
OJE
CT
#17
241
SUD
ASS
OCI
ATES
, P.A
.
KEY PLAN
DWV DEMOLITION
PLUMBING -
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
105
DINING
104
ELECTRICAL
102
OCS CLASSROOM
103
OCS OFFICE
101
HALLWAY
100
LOBBY
WHWH
EXISTING
1-1/2"CW
PROVIDE CONDENSATE PUMP
FOR ICE MAKER DRAIN. ROUTE
3/4" PVC LINE TO CAN WASH.
2" CW & 3/4" HW UP
2"CW
TO REMAIN
1-1/4"CW UP
TO REMAIN
~
~
PROVIDE 1/2" CW PEX PIPING FOR
TEMPORARY CONNECTION TO
EXISTING SYSTEM AND ICE MAKER.
1/2" CW PEX
1/2" CW PEX
ICE MAKER
AREA OF WORK 'C'
Sheet
ERWIN
P1.0
P1.0
1
3/16" = 1'
PLUMBING - INTERIM PLAN
11/30/18
Kitch
en
R
en
ova
tio
ns a
t C
lyd
e A
. E
rw
in
H
ig
h S
ch
oo
l
Buncom
be C
ounty S
chools A
sheville, N
orth C
arolina
NORTH
CO
NSU
LT
ING
EN
GIN
EE
RS
LIC
EN
SE #
C-0
315
PR
OJE
CT
#17
241
SUD
ASS
OCI
ATES
, P.A
.
KEY PLAN
INTERIM PLAN
PLUMBING -
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
FCO
5"RD
4"
6" ROOF DRAIN
TO REMAIN
5" ROOF DRAIN
TO REMAIN
FCO
4" ROOF LEADER
FROM ABOVE.
ROUTE ABOVE
CEILING
4" ROOF LEADER
FROM ABOVE TO
BELOW SLAB
5" ROOF DRAIN
TO REMAIN
8" ROOF DRAIN
TO REMAIN
5" ROOF DRAIN
TO REMAIN
10" ROOF DRAIN
TO REMAIN
4" ROOF LEADER
FROM ABOVE TO
BELOW SLAB
6" ROOF DRAIN
TO REMAIN
1-1/2" VENT UP
TO REMAIN
2" FROM FLOOR DRAIN IN
EQUIPMENT ROOM TO
ROOF LEADER TO REMAIN
2"
FCO
FCO YCO
WCO
FCO
3"
4"
4"
4"
4"
3"
4"
3" VENT UP TO
REMAIN
P-1 P-1
P-1 P-1P-1P-1
P-2 P-2H
P-3 P-3
P-3 P-3
P-1
P-3
P-4
P-4
P-4
P-5
P-6
P-6
P-7
FD
FD
EXISTING 4" GREASE WASTE
EXISTING
GREASE TRAP
EXISTING 4" WASTE
EXISTING CAN
WASH DRAIN TO
REMAIN
4"GW
4"GW
4"GW
4"GW
EXISTING 4" WASTE
FROM ABOVE TO REMAIN1
1
1
1
1
1
1
FS2
FS2
FS1
FS1
FS1
FS1
4"W
4"W
4"W
4"W
FS3
FS3
FS3
FD
FS2
4"W
FS1
FS1
FS2
FS2
FS2
4"GW
4"GW
FS1
FS1
FS2
4"GW
FCO
FS1
4"
FS1
FS1
~~
4"
ABOVE CEILING
4"
COORDINATE PLUMBING SUPPLY
AND WASTE PIPING WITH NEW MAU-1
DUCTING. RELOCATE PIPING AS
REQUIRED. COORDINATE WITH MC.
~
~
1
1
4"V
4"V
3"V
4"V
3"V
~
1 2"V
~
1 2"V
~
~
1
3"V
3"V
4" WASTE DOWN
IN NEW WALL TO
UNDERSLAB
FS1
105
DINING
102
OCS CLASSROOM
ELECTRICAL
104
DRY GOODS
108
109
MECHANICAL
112
LOCKERS
111
CAN WASH
113
TOILET
114
JANITOR
106
DISHROOM
118
SERVING
110
KITCHEN
115
OFFICE
117
TOILET
116
TOILET
107
COLD STORAGE
2"V
FD-TP
3"
AREA OF WORK 'C'AREA OF WORK 'C'
Sheet
ERWIN
P1.2
P1.2
1
3/16" = 1'
PLUMBING - DWV
KEYED NOTES
1 LOCATE AND REUSE EXISTING VENT RISERS TO FLOOR ABOVE.
11/30/18
Kitch
en
R
en
ova
tio
ns a
t C
lyd
e A
. E
rw
in
H
ig
h S
ch
oo
l
Buncom
be C
ounty S
chools A
sheville, N
orth C
arolina
NORTH
CO
NSU
LT
ING
EN
GIN
EE
RS
LIC
EN
SE #
C-0
315
PR
OJE
CT
#17
241
SUD
ASS
OCI
ATES
, P.A
.
KEY PLAN
PLUMBING - DWV
AutoCAD SHX Text
EP
AutoCAD SHX Text
1
AutoCAD SHX Text
Utility
AutoCAD SHX Text
Cabinet
AutoCAD SHX Text
FLOOR DRAIN/SINK SCHEDULE
AutoCAD SHX Text
FD ZURN 415S FS1 8x8x6 ZURN MODEL Z1910 FS2 12x12x10 ZURN MODEL Z1902 FS3 12x30x6 MIFAB MODEL P5002
AutoCAD SHX Text
NOTES: 1. PROVIDE FULL OR PARTIAL PROVIDE FULL OR PARTIAL GRATES AS REQUIRED BY KITCHEN EQUIPMENT SUPPLIER. 2. COORDINATE FLOOR SINK COORDINATE FLOOR SINK LOCATIONS AND QUANTITIES WITH KITCHEN EQUIPMENT SUPPLIER AND EQUIPMENT LEGS.
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
Sheet
ERWIN
P2.1
11/30/18
Kitch
en
R
en
ova
tio
ns a
t C
lyd
e A
. E
rw
in
H
ig
h S
ch
oo
l
Buncom
be C
ounty S
chools A
sheville, N
orth C
arolina
CO
NSU
LT
ING
EN
GIN
EE
RS
LIC
EN
SE #
C-0
315
PR
OJE
CT
#17
241
SUD
ASS
OCI
ATES
, P.A
.
SCHEDULES & DETAILS
PLUMBING - LEGEND, NOTES
AutoCAD SHX Text
TYPICAL GAS CONNECTION DETAIL
AutoCAD SHX Text
TYPICAL UNION
AutoCAD SHX Text
CONNECT TO EQUIPMENT
AutoCAD SHX Text
DIRT LEG - 12'' LONG
AutoCAD SHX Text
CAP
AutoCAD SHX Text
PLAN FOR SIZE
AutoCAD SHX Text
GAS MAIN - SEE
AutoCAD SHX Text
GAS COCK
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
YARD CLEANOUT
AutoCAD SHX Text
YCO
AutoCAD SHX Text
FPWH
AutoCAD SHX Text
FROST PROOF WALL HYDRANT
AutoCAD SHX Text
FS
AutoCAD SHX Text
FLOOR SINK
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PLUMBING LEGEND
AutoCAD SHX Text
FIXTURE IDENTIFICATION (SEE SPECIFICATIONS)
AutoCAD SHX Text
P-1
AutoCAD SHX Text
VTR
AutoCAD SHX Text
G
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
FLOOR CLEAN-OUT
AutoCAD SHX Text
VENT THROUGH THE ROOF
AutoCAD SHX Text
NATURAL GAS
AutoCAD SHX Text
RISER CLEANOUT
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
EXISTING VENT
AutoCAD SHX Text
EXISTING COLD WATER
AutoCAD SHX Text
EXISTING SANITARY WASTE
AutoCAD SHX Text
EXISTING HOT WATER
AutoCAD SHX Text
FCO
AutoCAD SHX Text
HOSE BIBB
AutoCAD SHX Text
HB
AutoCAD SHX Text
WCO
AutoCAD SHX Text
WALL CLEANOUT
AutoCAD SHX Text
SHOCK ABSORBER
AutoCAD SHX Text
FD-TP
AutoCAD SHX Text
FLOOR DRAIN WITH TRAP PRIMER
AutoCAD SHX Text
CO
AutoCAD SHX Text
VTR
AutoCAD SHX Text
VENT THROUGH ROOF
AutoCAD SHX Text
1-1/2"
AutoCAD SHX Text
1/2"
AutoCAD SHX Text
1/2"
AutoCAD SHX Text
1-1/2"
AutoCAD SHX Text
116.594.AB.1
AutoCAD SHX Text
ELVW022191
AutoCAD SHX Text
WALL RIM @ 32" AFF
AutoCAD SHX Text
STAINLESS STEEL
AutoCAD SHX Text
CHROME
AutoCAD SHX Text
KITCHEN HAND WASH
AutoCAD SHX Text
FAUCET
AutoCAD SHX Text
CHICAGO
AutoCAD SHX Text
ELKAY
AutoCAD SHX Text
16" x 12" x 5.5" BOWL, 18 GAUGE STAINLESS STEEL LAVATORY WITH BACKSPLASH. REAR CENTER DRAIN WITH OVERFLOW, STAINLESS STEEL SUPPORT BRACKETS AND WALL HANGER. SINGLE HOLE PUNCH. 1 1/4" CAST BRASS P-TRAP WITH C.O. PLUG, GRID DRAIN. ADA/NC ACCESIBILITY CODE COMPLIANCE
WASTE AND VENT PIPING ABOVE GRADE SHALL BE SERVICE WEIGHT CAST IRON. WASTE PIPING BELOW GRADE SHALL BE EXTRA HEAVY CAST IRON.
AutoCAD SHX Text
ALL SHUTDOWNS OF THE EXISTING UTILITIES SHALL BE SCHEDULED IN ADVANCE WITH OWNER.
AutoCAD SHX Text
15.
AutoCAD SHX Text
PLUMBER SHALL PROVIDE ALL ACCESSORIES REQUIRED FOR A COMPLETE AND PROPERLY FUNCTIONING PROJECT INCLUDING BUT NOT LIMITED TO; STOP VALVES, SUPPLY HOSES, AND P-TRAPS ETC. PC SHALL INSTALL ALL FIXTURES, FAUCETS AND ACCESSORIES REQUIRED TO PROVIDE A COMPLETE AND PROPERLY FUNCTIONING PROJECT. SEE FIXTURE SCHEDULE FOR PIPE SIZES AND PC SUPPLIED FIXTURES.
AutoCAD SHX Text
WARRANT ALL MATERIALS, EQUIPMENT, AND WORKMANSHIP SHOWN OR IMPLIED BY THESE
AutoCAD SHX Text
DOCUMENTS TO BE FREE OF DEFECTS FOR A PERIOD OF ONE YEAR FROM THE TIME OF
AutoCAD SHX Text
ACCEPTANCE BY THE OWNER. IF WITHIN ONE YEAR AFTER THE OWNER'S ACCEPTANCE DATE ANY
AutoCAD SHX Text
WORK OR EQUIPMENT IS FOUND TO BE DEFECTIVE, CORRECT IT PROMPTLY AT NO COST TO THE OWNER.
AutoCAD SHX Text
A PLUMBING INSPECTION CERTIFICATE SHALL BE ISSUED BY THE INSPECTION AUTHORITIES HAVING
AutoCAD SHX Text
JURISDICTION BEFORE WORK WILL BE APPROVED FOR FINAL PAYMENT.
AutoCAD SHX Text
3.
AutoCAD SHX Text
5.
AutoCAD SHX Text
4.
AutoCAD SHX Text
6.
AutoCAD SHX Text
7.
AutoCAD SHX Text
8.
AutoCAD SHX Text
9.
AutoCAD SHX Text
ALL DEMOLITION WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO PREVENT THE ARBITRARY DESTRUCTION OR INTERRUPTION OF CONCEALED UTILITIES WHICH ARE INTENDED TO REMAIN IN USE AND THE ROUTING OF WHICH COULD NOT BE PREDETERMINED UNTIL DEMOLITION WAS STARTED. ALL SUCH DISCOVERIES OF UTILITIES DURING THE DEMOLITION PROCESS WHICH ARE IN A LOCATION DIFFERENT FROM THAT INDICATED, CHANGE DIRECTION FROM FLOOR TO FLOOR, ETC., OR ARE UNIDENTIFIED, SHALL BE REPORTED TO THE ARCHITECT BEFORE REMOVAL.
AutoCAD SHX Text
VISIT THE SITE PRIOR TO BID DATE AND EXAMINE ALL AREAS TO BE DEMOLISHED AND RENOVATED. THOROUGHLY FAMILIARIZE YOURSELF WITH EXISTING CONDITIONS. NO EXTRA COMPENSATION WILL BE GIVEN FOR FAILURE TO THOROUGHLY EXAMINE EXISTING CONDITIONS TO DETERMINE THE EXACT SCOPE OF DEMOLITION WORK. "KEYED" NOTES ON THE DRAWINGS. ARE PROVIDED TO ASSIST BIDDERS TO DETERMINE THE SCOPE OF DEMOLITION WORK.ASSIST BIDDERS TO DETERMINE THE SCOPE OF DEMOLITION WORK. BIDDERS TO DETERMINE THE SCOPE OF DEMOLITION WORK.
AutoCAD SHX Text
THE OWNER HAS THE RIGHT TO FIRST REFUSAL ON ALL ITEMS REMOVED DURING THE DEMOLITION PHASE OF THIS PROJECT. ITEMS NOT TURNED OVER TO THE OWNER SHALL BECOME THE PROPERTY OF THE CONTRACTOR, AND SHALL BE REMOVED FROM THE PREMISES ON A DAILY BASIS.
AutoCAD SHX Text
EXISTING AREAS WHETHER WITHIN OR WITHOUT THE "GENERAL LIMITS OF CONSTRUCTION", SHALL BE REPAIRED WHERE ANY DAMAGE HAS OCCURRED DUE TO CONSTRUCTION BY THE CONTRACTOR.
AutoCAD SHX Text
UNLESS OTHERWISE INDICATED PLUMBING CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, TRENCHING, CORE-DRILLING, PATCHING AND BACKFILL REQUIRED TO INSTALL PLUMBING WORK. GC IS RESPONSIBLE FOR CONCRETE REPAIR.
AutoCAD SHX Text
PLUMBING CONTRACTOR IS RESPONSIBLE FOR COORDINATING PLUMBING RELATED WORK WITH OTHER TRADES. PLUMBING CONTRACTOR IS CAUTIONED THAT IT IS TOTALLY HIS RESPONSIBILITY TO COORDINATE HANGERS AND SUPPORTS WITH OTHER TRADES.
AutoCAD SHX Text
ITEMS SHOWN TO BE DEMOLISHED MAY OR MAY NOT BE CORRECTLY LABELED OR LOCATED. EXAMINE EXISTING CONDITIONS OF ALL AREAS AND FIELD VERIFY/IDENTIFY ALL UTILITIES BEFORE STARTING DEMOLITION OR NEW CONSTRUCTION. VERIFICATION/IDENTIFICATION SHALL INCLUDE TRACING EACH UTILITY TO DETERMINE ITS EXACT ORIGIN EACH UTILITY TO DETERMINE ITS EXACT ORIGIN UTILITY TO DETERMINE ITS EXACT ORIGIN AND THE AREA OR EQUIPMENT THE UTILITY SERVES. IN ADDITION TO SPECIFICALLY NOTED PLUMBING DEMOLITION, THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF ALL PLUMBING AS REQUIRED TO ELIMINATE INTERFERENCES WITH INSTALLATION OF NEW WORK.
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
SYMBOLS AND ABBREVIATIONS MAY NOT ALL BE UTILIZED FOR THIS PROJECT.
AutoCAD SHX Text
%%uPLUMBING GENERAL NOTES:
AutoCAD SHX Text
10.
AutoCAD SHX Text
REFER TO PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO FIXTURES.
AutoCAD SHX Text
11.
AutoCAD SHX Text
12.
AutoCAD SHX Text
13.
AutoCAD SHX Text
DEMOLITION OF PLUMBING FIXTURES AND PIPING IS THE RESPONSIBILITY OF THE PC. ALL ACCESSIBLE PIPING MADE OBSOLETE BY RENOVATIONS SHALL BE REMOVED. CAP PIPING WHERE UNABLE TO REMOVE.
AutoCAD SHX Text
14.
AutoCAD SHX Text
16.
AutoCAD SHX Text
17.
AutoCAD SHX Text
20.
AutoCAD SHX Text
OBTAIN AND PAY FOR ANY AND ALL REQUIRED PERMITS, INSPECTIONS, CERTIFICATES OF INSPECTIONS AND APPROVAL. DELIVER ALL SUCH CERTIFICATES TO THE OWNER. THE ARCHITECT SHALL BE NOTIFIED OF ALL INSPECTION REQUESTS AT THE SAME TIME AS THE INSPECTION AUTHORITY.
AutoCAD SHX Text
UNLESS OTHERWISE NOTED, WASTE PIPING SHOWN ON THE PLANS IS LOCATED BELOW THE FLOOR LEVEL OF THE PLAN SHOWN. WATER AND VENT PIPING IS LOCATED IN THE CEILING LEVEL OF THE PLAN SHOWN.
AutoCAD SHX Text
19. NO DEAD LEGS ARE PERMITTED WHEN WASTE PIPE IS DEMOLISHED. REVISE AND CAP
AutoCAD SHX Text
PIPE AS NEEDED TO PREVENT THIS CONDITION.
AutoCAD SHX Text
18. ALL DOMESTIC WATER PIPING SHALL BE TYPE L COPPER WITH WROUGHT COPPER FITTINGS. JOINTS SHALL BE 95/5 TIN ANTIMONY SOLDER.
AutoCAD SHX Text
COORDINATE ALL WORK WITH GENERAL CONTRACTOR AND KITCHEN EQUIPMENT SUPPLIER. FOR ADDITIONAL SCOPE REFER TO FOOD SERVICE DRAWINGS. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK INDICATED ON THE FOOD SERVICE DRAWINGS TO BE DONE BY THE PLUMBING CONTRACTOR, INCLUDING BUT NOT LIMITED TO; FINAL CONNECTIONS TO EQUIPMENT AND EQUIPMENT DRAIN PIPING TO FLOOR SINKS.
AutoCAD SHX Text
21.
AutoCAD SHX Text
NEW VENT
AutoCAD SHX Text
NEW COLD WATER
AutoCAD SHX Text
NEW SANITARY WASTE
AutoCAD SHX Text
NEW HOT WATER
AutoCAD SHX Text
ITEMS TO BE DEMOLISHED
AutoCAD SHX Text
PLUMBING CONTRACTOR IS RESPONSIBLE FOR SEALING ALL PIPING PENETRATIONS THROUGH ALL NEW NON-RATED WALLS TO PREVENT SOUND TRANSFER. GYPSUM WALL BOARD "MUD" MAY BE USED. PLUMBING CONTRACTOR IS RESPONSIBLE FOR SEALING PIPING PENETRATIONS THROUGH ALL FIRE RATED WALLS AND/OR FLOORS.
AUTOMATIC, BATTERY OPERATED FAUCET. SOLID BRASS CONSTRUCTION, BASE PLATE FOR 4" CENTER LAVATORY OR SINGLE HOLE MOUNTING TRIM AS NEEDED FOR EACH LAVATORY. FIELD VERIFY. CHROME FINISH, 0.5 MAX. GPM VANDAL RESISTANT AERATOR. ADA/NC ACCESIBILITY CODE COMPLIANCE
AutoCAD SHX Text
26
AutoCAD SHX Text
CHROME
AutoCAD SHX Text
HOSE BIBB
AutoCAD SHX Text
WOODFORD
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL FAUCET. BRASS CONSTRUCTION. BACKFLOW PROTECTED. PROVIDE WITH OPTIONAL TEE HANDLE.
WALL BOX WITH 1/4 TURN HOT AND COLD WATER SUPPLY VALVES AND CENTER DRAIN PIPE.
AutoCAD SHX Text
WASHER DRAIN
AutoCAD SHX Text
GUY GREY
AutoCAD SHX Text
WALL
AutoCAD SHX Text
METAL
AutoCAD SHX Text
P-7
AutoCAD SHX Text
P-9
AutoCAD SHX Text
65
AutoCAD SHX Text
CHROME
AutoCAD SHX Text
FREEZE PROOF WALL HAYDRANT
AutoCAD SHX Text
WOODFORD
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL FAUCET. BRASS CONSTRUCTION. BACKFLOW PROTECTED. PROVIDE WITH OPTIONAL TEE HANDLE.
AutoCAD SHX Text
---
AutoCAD SHX Text
3/4"
AutoCAD SHX Text
---
AutoCAD SHX Text
---
AutoCAD SHX Text
P-10
AutoCAD SHX Text
CAN WASH FAUCET
AutoCAD SHX Text
WOODFORD
AutoCAD SHX Text
3/4"
AutoCAD SHX Text
3/4"
AutoCAD SHX Text
---
AutoCAD SHX Text
---
AutoCAD SHX Text
HC67
AutoCAD SHX Text
FREEZELESS HOT AND COLD MIXER WALL HYDRANT. AUTOMATIC DRAINING AND HOSE CONNECTION BACKFLOW PREVENTION. HYDRANT DRAINS WHEN SHUT OFF EVEN IF OPEN ENDED HOSE IS ATTACHED. KEY OPERATED. BRASS VALVE BODY.
AutoCAD SHX Text
CHROME
AutoCAD SHX Text
48" AFF TO C.L.
AutoCAD SHX Text
1 HOUR FIRE WALL
AutoCAD SHX Text
EXISTING WATER HEATERS
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691