Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment The First Carbon Exhibition in North Africa and Middle East Region Djerba, 22-24 September 2004 Moroccan CDM projects Moroccan CDM projects Renewable energy projects Renewable energy projects M’hammed EL MERINI M’hammed EL MERINI SCET Maroc SCET Maroc [email protected] CD4CDM Project

Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

  • Upload
    jennis

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment. Moroccan CDM projects Renewable energy projects. The First Carbon Exhibition in North Africa and Middle East Region Djerba, 22-24 September 2004. M’hammed EL MERINI SCET Maroc [email protected]. CD4CDM Project. - PowerPoint PPT Presentation

Citation preview

Page 1: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

Kingdom of Morocco

Ministry of Land-Use Management, Water and the Environment

The First Carbon Exhibition in North Africa and Middle East Region

Djerba, 22-24 September 2004

Moroccan CDM projectsMoroccan CDM projectsRenewable energy projectsRenewable energy projects

M’hammed EL M’hammed EL MERINIMERINI

SCET MarocSCET Maroc

[email protected]

CD4CDM Project

Page 2: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

Renewable energy projectsRenewable energy projects

7 renewable energy projects:• Essaouira 60 MW wind farm (ONE)

• Tangiers 140 MW wind farm (ONE)

• A. Torres 50 MW wind farm (ONE)

• Tan Tan 10 MW wind farm (ONEP)

• Tetouan 10 MW wind farm (LAFARGE)

• Tanafnit 41 MW Hydropower dam (ONE)

• 105,000 photovoltaic kits in rural area (ONE)

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

SummarySummary

Page 3: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

Renewable energy projectsRenewable energy projects

Renewable energy projects represent a potential of 9.7 million CER, that is 60% of the total CER of Moroccan approved CDM projects.

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Description and distributionDescription and distribution

• Wind power is for 81% of the CER (7.85 million), then Hydro with 16% (1.59 million), and solar with 3% (0.27 million).

• The projects promoters are ONE (National Office of Electricity) with 94% of the CER (9.19 million), then LAFARGE (private cement factory) with 4% (345,000) and ONEP (National Office of Drinking Water) with 2% (172,400).

Page 4: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

Renewable energy projectsRenewable energy projects

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

LocationLocation

Photovoltaic kits

Page 5: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

Wind power projects3 full size projects

2 small scale projects

Wind power projects3 full size projects

2 small scale projects

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Page 6: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Essaouira 60 MW wind farmEssaouira 60 MW wind farm

• Full name : Power generation at Essaouira 60 MW wind farm;

• Location : At Cap Sim, 15 km far from Essaouira;

• Category : Renewable energy – Grid connected power generation;

• Project promoter : Office National d’Electricité (ONE), public office;

• Project status : PDD approved;

• Date of operation : 2006;

• First year of CER delivery : 2006;

• Crediting period : 2006-2015;

• Expected CER : 1.5 million.

Project summaryProject summary

Page 7: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Essaouira 60 MW wind farmEssaouira 60 MW wind farm

• Technical features :

– Installed capacity : 60 MW using the wind power technology;

– Expected production : 210 GWh per year;

– Components : 71 horizontal axis wind turbines of 850 kW each, electronic

devices for regulation and protection, LV/MV and MV/HV transformers, to

supply the national grid at 60 kV.

• Financial issues :

– Total cost of the project : US $ 82.5 million

• Timing :

– Starting of works : end of 2004 ;

– Operation : 2006.

Project descriptionProject description

Page 8: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Tangiers 140 MW wind farmTangiers 140 MW wind farm

• Full name : Power generation at Tangiers 140 MW wind farm;

• Location : At Beni Mejmel, 12 km to the east of Tangiers and Dhar Saadane, 22 km to the south-east of Tangiers;

• Category : Renewable energy – Grid connected power generation;

• Project promoter : Office National d’Electricité (ONE), public office;

• Project status : PIN approved;

• Date of operation : 2007;

• First year of CER delivery : 2007;

• Crediting period : 2007-2016;

• Expected CER : 4 million.

Project summaryProject summary

Page 9: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Tangiers 140 MW wind farmTangiers 140 MW wind farm

• Technical features :

– Installed capacity : 140 MW using the wind power technology;

– Expected production : 510 GWh per year;

– Components : 165 horizontal axis wind turbines of 850 kW each, electronic

devices for regulation and protection, LV/MV and MV/HV transformers, to

supply the national grid at 225 kV.

• Financial issues :

– Total cost of the project : US $ 170 million (Euro 148 million)

• Timing :

– Starting of works : May 2004 ;

– Operation : 2007.

Project descriptionProject description

Page 10: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

A. Torres 50 MW wind farmA. Torres 50 MW wind farm

• Full name : Power generation at A. Torres 50 MW wind farm;

• Location : At Taghramt, 10 km far from Tetouan city;

• Category : Renewable energy – Grid connected power generation;

• Project promoter : Office National d’Electricité (ONE), public office;

• Project status : PIN approved;

• Date of operation : 2007;

• First year of CER delivery : 2007;

• Crediting period : 2007-2016;

• Expected CER : 1.83 million.

Project summaryProject summary

Page 11: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

A. Torres 50 MW wind farmA. Torres 50 MW wind farm

• Technical features :

– Installed capacity : 50.4 MW using the wind power technology;

– Expected production : 225 GWh per year;

– Components : 84 horizontal axis wind turbines of 600 kW each, electronic

devices for regulation and protection, LV/MV and MV/HV transformers, to

supply the national grid at 225 kV.

• Financial issues :

– Total cost of the project : US $ 62 million

• Timing :

– Starting of works : June 2005 ;

– Operation : 2007.

Project descriptionProject description

Page 12: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Full size wind farm projectsFull size wind farm projects

• Methodology :

– Used in “Wigton wind farm in Jamaica” and submitted to CDM EB.

– New consolidated methodology ACM0002 will be used in new PDD version.

• Approach :

– Demonstrate that the project is not BAU;

– Determine the most likely scenario in absence of the project;

– Determine the avoided emissions by calculating the Projected Operating

Margin with weighted CEF of the national power plants ;

• Calculations :

– Through the crediting period, the weighted CEF moves down from 0.805

(2006) up to 0.729 (2009) and then increases to 0.777 (2015);

Baseline methodologyBaseline methodology

Page 13: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

Tan Tan 10 MW wind farmTan Tan 10 MW wind farm

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

• Full name : 10 MW wind farm for the Tan Tan SWDP;

• Location : At Sidi El Gran, 12 km to the north of Tan Tan city;

• Category : 1-D : Renewable energy production for the grid;

• Project promoter : ONEP – public agency;

• Project status : PIN approved – PDD completed;

• Date of operation : 2007;

• First year of CER delivery : 2007;

• Crediting period : 2007-2016;

• Expected CER : 194,500.

Project summaryProject summary

Page 14: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Tan Tan 10 MW wind farmTan Tan 10 MW wind farm

• Technical features :

– Installed capacity : 10 MW using the wind power technology;

– Expected production : 22.5 GWh per year;

– Components : 20 horizontal axis wind turbines of 500 kW each, electronic

devices for regulation and protection, LV/MV transformers, to supply the

national grid at 22 kV.

• Financial issues :

– Total cost of the project : US $ 36 million (including the SWDP).

• Timing :

– Starting of works : 2005 ;

– Operation : 2007.

Project descriptionProject description

Page 15: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

Tetouan 10 MW wind farmTetouan 10 MW wind farm

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

• Full name : 10.2 MW wind farm for the Lafarge cement factory;

• Location : At Semsa site, to the north-west of Tetouan city;

• Category : 1-D : Renewable energy production for the grid;

• Project promoter : LAFARGE – private company;

• Project status : PIN approved – PDD completed;

• Date of operation : 2007;

• First year of CER delivery : 2007;

• Crediting period : 2007-2016;

• Expected CER : 345,000.

Project summaryProject summary

Page 16: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Tan Tan 10 MW wind farmTan Tan 10 MW wind farm

• Technical features :

– Installed capacity : 10.2 MW using the wind power technology;

– Expected production : 42.3 GWh per year;

– Components : 12 horizontal axis wind turbines of 850 kW each, electronic

devices for regulation and protection, LV/MV transformers, to supply the

national grid at 22 kV.

• Financial issues :

– Total cost of the project : US $ 10 million.

• Timing :

– Starting of works : 2005 ;

– Operation : 2007.

Project descriptionProject description

Page 17: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Small scale wind farm projectsSmall scale wind farm projects

• Methodology :

– Described in paragraph 29 of Appendix B of the simplified M&P.

• Approach :

– Demonstrate that the project is not BAU;

– Determine the most likely scenario in absence of the project;

– Determine the avoided emissions by calculating the Combined Operating

Margin with recent additions weighted CEF of the national power plants ;

• Calculations :

– Through the crediting period, the CEF moves down from 0.896 (OM) to

0.836 (RA);

Baseline methodologyBaseline methodology

Page 18: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

Other projectsHydropower station

Photovoltaic kits

Other projectsHydropower station

Photovoltaic kits

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Page 19: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Tanafnit hydropower stationTanafnit hydropower station

• Full name : Tanafnit / El Borj 41 MW hydropower station;

• Location : At Tanafit, 40 km to the north-east of Khenifra city;

• Category : Renewable energy – Grid connected power generation;

• Project promoter : Office National d’Electricité (ONE), public office;

• Project status : PIN approved;

• Date of operation : 2007;

• First year of CER delivery : 2007;

• Crediting period : 2007-2016;

• Expected CER : 1.6 million.

Project summaryProject summary

Page 20: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Tanafnit hydropower stationTanafnit hydropower station

• Technical features :

– Installed power : 41.4 MW;

– Expected production : 206 GWh per year;

– Components : Derivation from dam through a 3 m diameter pipe over 3 km

to Tanafit hydropower station and through a 3.5 m diameter pipe over 10.6

km to El Borj hydropower station.

• Financial issues :

– Total cost of the project : US $ 102.5 million

• Timing :

– Starting of works : end of 2004;

– Operation : 2007.

Project descriptionProject description

Page 21: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Tanafnit hydropower stationTanafnit hydropower station

• Methodology :

– Projected Operating Margin (as in the wind farm projects).

– New consolidated methodology ACM0002 will be used in new PDD version.

• Approach :

– Demonstrate that the project is not BAU;

– Determine the most likely scenario in absence of the project;

– Determine the avoided emissions by calculating the Projected Operating

Margin with weighted CEF of the national power plants;

• Calculations :

– Through the crediting period, the weighted CEF moves down from 0.809

(2007) up to 0.729 (2009) and then increases to 0.782 (2016);

Baseline methodologyBaseline methodology

Page 22: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

Photovoltaic kits in rural areasPhotovoltaic kits in rural areas

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

• Full name : Electricity supply of 105,000 rural houses by photovoltaic kits;

• Location : Around 50 different rural regions in Morocco;

• Category : 1-A : Electrical energy production by the user with no connection to the national grid;

• Project promoter : ONE – public agency;

• Project status : PIN approved – PDD on progress;• Date of operation :

– Phase 1 : 16.000 kits (2.000 in 2003 – 5.000 in 2004 – 7.000 in 2005 – 2.000 in 2006);

– Phase 2 : 12.000 kits (6.000 in 2005 – 6.000 in 2006);

– Phase 3 : 37.000 kits (10.000 in 2005 – 14.000 in 2006 – 13.000 in 2007);

– Phase 4 : 40.000 kits (10.000 per year, from 2006 to 2009).

• First year of CER delivery : 2007;

• Crediting period : 2007-2016;

• Expected CER : 268,000.

Project summaryProject summary

Page 23: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Photovoltaic kits in rural areasPhotovoltaic kits in rural areas

• Technical features :

– Installed capacity : 14 MW using the solar power technology;

– Expected production : 30.7 GWh per year;

– Components : 105,000 photovoltaic kits of 133 W, operating 6 hrs/d, with

domestic circuits supplying 4 lamps and a plug.

• Financial issues :

– Total cost of the project : US $ 180 million.

• Timing :

– Starting of works : 2003 ;

– Operation : 2006 (phase 1 & 2) – 2007 (phase 3) – 2009 (phase 4).

Project descriptionProject description

Page 24: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Photovoltaic kits in rural areasPhotovoltaic kits in rural areas

• Methodology :

– Described in paragraphs 4 & 6 of Appendix B of the simplified M&P.

• Approach :

– Demonstrate that the project is not BAU;

– The scenario in absence of the project is Diesel generation units;

– Determine the avoided emissions by calculating the Combined Operating

Margin with recent additions weighted CEF of the national power plants ;

• Calculations :

– Through the crediting period, the CEF moves down from 0.896 (OM) to

0.836 (RA);

Baseline methodologyBaseline methodology

Page 25: Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

For more informations :

Permanent Secretariat of CDM National Council

Climate Change Unit

Directorate of Partnership, Communication and Cooperation

Ministry of Land-Use Management, Water and the Environment

36 Avenue Al Abtal –Rabat –Morocco

Tel/Fax : +212 37 68 17 59 Tel/Fax : +212 37 77 47 88

[email protected]

[email protected]

www.mdpmaroc.com