toronto.ca/kingstreetpilot#kingstreetpilot
KING STREET TRANSIT PILOT
September & October Update
PREVIOUS HIGHLIGHTS
Travel times have improved due in part to transit signal priority being enabled in the pilot area. In September and October, the slowest travel times during the afternoon commute were similar to the average travel times before the pilot.
SEPTEMBER & OCTOBER HIGHLIGHTS
TRANSIT TRAVEL TIMES The reliability of streetcar travel times has continued to improve since before the pilot.
Approx. 5-6 minute improvement (in each direction) during the PM commute for the slowest streetcar travel time.
King StreetTransit Pilot
Sept. & Oct.2018
PAGE 1
Data Collection Dates:TTC: September 21 to October 14, 2017 and October 30 to November 4, 2017 (Intervening period removed due to TTC track construction at Queen Street and McCaul Street).
BASELINE
Vehicles: September 21 to October 14, 2017 and October 30 to November 8, 2017 (Intervening period removed due to TTC track construction at Queen Street and McCaul Street).
ECONOMIC POINT-OF-SALE DATA
Customer spending on King Street since the pilot began has seen slight growth (0.3%) from the average rate of spending over the same months from the year before. Average year-over-year growth in the same period was 5.7% for the area surrounding the pilot and 3.8% for the City overall.
Generally, the trends in customer spending observed during the first six months of the pilot are in line with trends from the six months before the pilot began.
Last Update: May
PUBLIC SPACELast Update: June
SEPTEMBERData Collection Dates: TTC Transit Travel Times & Reliability: September 3-5 & 17-29, 2018Car Travel Times: September 4, 5, 8, 9, 15-30, 2018 Car, Pedestrian & Cycling Volumes: September 19-21, 24-27, 2018
OCTOBERData Collection Dates: TTC Transit Travel Times & Reliability: September 30 - November 3, 2018Car Travel Times: October 1, 3-31, 2018Car, Pedestrian & Cycling Volumes: October 15-19, 25-26, 30-31, 2018
Over the summer, 18 new curb lane public spaces were implemented providing space for people to sit and socialize. 45 unique public amenities were introduced into these locations, including nine curb lane cafes, ten public seating areas, eight parklets, and eight public art installations. These spaces continued to be active during September and into October.
CAR TRAVEL TIMES & VOLUMES
Average car travel times on most streets in the downtown, vary (+/-) less than a minute compared to before the pilot.
Various construction projects continue to impact travel times on downtown streets. Watermain replacement work increased travel times on both Dundas Street and Jarvis Street, while the completion of some construction work on Adelaide St improved travel times there.
Drivers on King Street continue to access local businesses or residences, conduct loading and deliveries, and pick-up/drop-off passengers. Traffic previously using King Street has generally shifted to alternative east and west routes.
The downtown traffic network has been largely able to absorb and respond to the changes in routing that drivers have made.
TRANSIT RELIABILITY
of streetcars arriving within 4 minutes eastbound and westbound during the morning commute
81%
CYCLING VOLUMES
Cycling volumes in September and October fell from summer peak season consistent with expected seasonal changes.
In October, cycling volumes at Spadina Avenue have increased by 380 riders in the afternoon peak compared to before the pilot in October 2017.
PEDESTRIAN VOLUMES
Weekday all-day pedestrian volumes indicate that mid-day and evening volumes remain relatively high, with high pedestrian volumes continuing from 6 p.m. through to 10 p.m.
Changes in the number of pedestrians from November to October show similar trends on both King Street and Queen Street.
Generally, pedestrian volumes on King Street continue to be higher than on the same sections of Queen Street.
On King Street...
EARLYEVENING
MIDDAY
October 2018TRANSIT RIDERSHIP
increase in all-day weekday ridership.
17%
increase in AM commute ridership (eastbound at Spadina Ave.).
33%increase in PM commute ridership (westbound at Spadina Ave.).
45%
SEPTEMBER & OCTOBER UPDATE King StreetTransit Pilot
PILOT BACKGROUNDThe King Street Transit Pilot is about moving people more efficiently on transit, improving public space, and supporting business and economic prosperity along King Street. The pilot aims to improve transit reliability, speed, and capacity on the busiest surface transit route in the city by giving transit priority on King Street from Bathurst Street to Jarvis Street.
The monitoring and evaluation plan involves the collection of data before and during the pilot in order to assess the impacts and benefits. Data is collected through methods such as the tracking of TTC streetcars using GPS, the monitoring of car travel times using Bluetooth sensors, and the collection of pedestrian, cycling and car volumes using video analytics. Monthly updates will be provided reflecting the latest data and information available to the City. This update provides an overview of the results of monitoring through the month of September and October.
COMING SOONThe City will also be measuring or reviewing data on parking utilization, compliance rates, and environmental metrics, which will be made public as part of the final report.
PAGE 2
https://www.toronto.ca/city-government/data-research-maps/open-data/
Sept. & Oct.2018
Data Collection Dates:TTC: September 21 to October 14, 2017 and October 30 to November 4, 2017 (Intervening period removed due to TTC track construction at Queen Street and McCaul Street).
BASELINE
Vehicles: September 21 to October 14, 2017 and October 30 to November 8, 2017 (Intervening period removed due to TTC track construction at Queen Street and McCaul Street).
SEPTEMBERData Collection Dates: TTC Transit Travel Times & Reliability: September 3-5 & 17-29, 2018Car Travel Times: September 4, 5, 8, 9, 15-30, 2018Car, Pedestrian & Cycling Volumes: September 19-21, 24-27, 2018
OCTOBERData Collection Dates: TTC Transit Travel Times & Reliability: September 30 - November 3, 2018Car Travel Times: October 1, 3-31, 2018Car, Pedestrian & Cycling Volumes: October 15-19, 25-26, 30-31, 2018
An open data release has been posted on the City's open data catalogue, covering data from November 2017 to the end of October 2018. This release includes detailed and summarized cartravel times and car, pedestrian and bicycle volumes. The catalogue can be accessed at:
OCTOBER TRANSIT RIDERSHIP King StreetTransit Pilot
October2018
BASELINE OCTOBERData Collection Dates:TTC: Counts Completed September 2017
Data Collection Dates: TTC: Counts Completed September 30 - November 3, 2018
OCTOBER SUMMARY
PEDESTRIANS AT STOPS
BASELINE OCTOBER BASELINE OCTOBER BASELINE OCTOBER BASELINE OCTOBER% CHANGE % CHANGE % CHANGE % CHANGE
Bathurst Street
Portland Street
Spadina Avenue
Blue Jays Way/Peter Street
John Street
University Avenue
Bay Street
Yonge Street
Church Street
Jarvis Street
TOTAL, ALL PILOT AREA STOPS
1,150 1,270 650 530
860 1,280 500 540
1,970 2,670 930 990
800 1,640 460 550
850 1,120 520 710
3,360 3,770 1,390 1,430
1,310 1,550 400 610
3,630 5,410 1,560 1,380
640 770 310 310
990 1,280 330 370
1,280 1,590 1,170 1,360
1,010 610 890 930
1,500 1,550 1,610 2,310
1,010 1,140 800 1,030
920 1,220 1,160 1,230
4,240 5,960 2,880 3,890
2,010 2,270 1,210 1,660
4,400 4,550 4,240 5,000
480 330 820 700
1,350 1,400 1,970 2,030
18,200 20,620 16,750 20,140 15,560 20,760 7,050 7,420
(+24%) (+16%) (+10%) (-18%)
(-40%) (+4%) (+49%) (+8%)
(+3%) (+43%) (+36%) (+6%)
(+13%) (+29%) (+105%) (+20%)
(+33%) (+6%) (+32%) (+37%)
(+41%) (+35%) (+12%) (+3%)
(+13%) (+37%) (+18%) (+53%)
(+3%) (+18%) (+49%) (-12%)
(-31%) (-15%) (+20%) (+0%)
(+4%) (+3%) (+29%) (+12%)
(+13%) (+20%) (+33%) (+5%)
A.M. PEAK(7-10a.m.)
KING STREET AT... MIDDAY(10a.m.-4p.m.)
P.M. PEAK(4p.m-7p.m.)
EARLY EVENING(7p.m.-10p.m.)
PAGE 3
• All-day ridership on the 504/514 routes has increased from 80,000 in March to 84,000 in October, an increase of 12,000 daily riders from before the pilot.
• Morning peak hour demand, eastbound at Spadina Avenue was approximately 2,900 passengers per direction, 33% higher than before the pilot. Afternoon peak hour demand, westbound at Spadina Avenue was 2,400 passengers per direction, 45% higher than before the pilot. Additional capacity for passengers has been provided through the conversion to new streetcars.
• The additional capacity in the peak hours means that more customers are able to use the service when they need it, and less customers are being left behind at stops resulting in a delay to their trip.
• The number of pedestrians at stops remains greater compared to before the pilot. Most of the increase relative to June has occurred during the afternoon peak period which may be attributed to a return to more normal work and school commuter trip patterns in the Fall.
• Transit ridership is compiled by the TTC on an approximately quarterly basis. This update reflects counts conducted during the month of October only.
TRANSIT RIDERSHIP
BASELINE OCTOBER OCTOBER GROWTH (%)
72,000 84,0002014
65,000
BASELINE OCTOBER
2,200 2,910BASELINE OCTOBER
1,650 2,400
(+17%)
ALL DAY WEEKDAY RIDERSHIP(BOARDINGS)
MORNING PEAK DEMANDBUSIEST HOUR EASTBOUND @ SPADINA
AFTERNOON PEAK DEMANDBUSIEST HOUR WESTBOUND @ SPADINA
FROM BASELINE
SEPTEMBER & OCTOBER TRANSIT TRAVEL TIMES & RELIABILITY King StreetTransit Pilot
Sept. & Oct.2018
EASTBOUND WESTBOUND EASTBOUND WESTBOUND
WEEKDAYA.M. PEAK PERIOD (7-10A.M.)
WEEKDAYP.M. PEAK PERIOD (4-7P.M.)
10.0
20.0
30.0
11.312.0
19.0
11.7
18.7
15.3 15.2
12.0
18.0
15.0
14.0
24.0
13.0
25.0
18.9
15.415.7
12.3
19.3
12.3
18.319.0
TR
AV
EL
TIM
E (
MIN
)
STREETCAR TRAVEL TIME RANGE (MIN)(BATHURST - JARVIS)
AVG.
RA
NG
E*
*90% of trips fall within this range
*Wait Time Reliability: The value shown represents the percentage of streetcars in each peak period that arrive within 4 minutes of the previous vehicle and an indicator of service regularity and reliability. A higher value reflects more reliable wait times with fewer gaps in service, important components of overall journey time.
17.0
14.4
EASTBOUND
BASELINE
SEPTEMBER
SEPTEMBER CHANGE
A.M. PEAK(7-10a.m.)
15.3
15.0
(-0.3)
14.4
(-0.8)
15.2
MIDDAY(10a.m.-4p.m)
16.8
14.6
OCTOBER
OCTOBER CHANGE
15.0
(-0.3)
14.0
(-2.8)
15.7
(-3.2)
13.7
(-2.1)
13.4
(-1.7)
(-2.2)
14.3
(-1.8)
16.1
P.M. PEAK(4p.m-7p.m.)
18.9
15.7
(-3.2)
15.4
(-3.6)
19.0
EARLY EVENING(7p.m.-10p.m)
15.8
14.2
(-1.6)
14.1
(-2.3)
16.4
LATE EVENING(10p.m.-3a.m)
15.1
13.1
(-2.0)
12.7
(-1.9)
14.6
AVERAGE STREETCAR TRAVEL TIME (MIN) (BATHURST - JARVIS)
WESTBOUND
BASELINE
SEPTEMBER
SEPTEMBER CHANGE
14.5
(-0.7)
13.9
(-2.2)
15.7
(-3.3)
13.7
(-2.7)
12.8
(-1.8)
OCTOBER
OCTOBER CHANGE
BASELINEData Collection Dates:TTC: September 21 to October 14, 2017 and October 30 to November 4, 2017 (Intervening period removed due to TTC track construction at Queen Street and McCaul Street).
SEPTEMBERData Collection Dates: TTC: September 3-5 & 17-29, 2018
PAGE 4
RE
LIA
BIL
ITY
%
RE
LIA
BIL
ITY
%
EASTBOUND WESTBOUND EASTBOUND WESTBOUND
WEEKDAYA.M. PEAK PERIOD (7-10A.M.)
WEEKDAYP.M. PEAK PERIOD (4-7P.M.)
84% 85%79%
77%
84%77% 75%
WAIT TIME RELIABILITY* % streetcars arriving within 4 minutes
78%
SEPTEMBER & OCTOBER SUMMARY• Dates corresponding to the Toronto International Film Festival (TIFF) were excluded from the September reporting due to service disruptions
and route diversions.
• Improvements to the reliability of streetcar travel times observed in previous reporting periods have continued through September and October in both the morning peak (7-10 a.m.) and afternoon peak (4-7 p.m.).
o The greatest improvement continues to be during the afternoon peak, where the slowest streetcar travel times have improved by approximately 5-6 minutes in each direction. Eastbound travel times have improved from 25 minutes to 19 minutes and westbound travel times have improved from 24 to 19 minutes when comparing October to before the pilot.
o In the morning peak, travel times have shown some improvements even as ridership has dramatically increased (which requires increased time for passenger boarding).
• Average streetcar travel times mid-day (10 a.m. – 4 p.m.) have improved by about 2.5 minutes eastbound and 2 minutes westbound in both September and October compared to before the pilot.
• Early evening (7–10 p.m.) trips have improved by about 1.5-3.0 minutes for both directions in both September and October compared to before the pilot.
• Staff will continue to monitor travel times and reliability for streetcars and identify opportunities for improvements.
OCTOBERData Collection Dates: TTC: September 30 - November 3, 2018
12.0
18.3
15.0
11.7
17.3
14.5
12.0
19.0
12.7
19.0
81% 77%81% 77%
15.7 15.7
EAST-WEST STREETS
King StreetTransit PilotSEPTEMBER & OCTOBER CAR TRAVEL TIMES Sept. & Oct.
2018
9.4
10.5
8.8
8.4
9.0
WEEKDAY | A.M. PEAK PERIOD (7-10A.M.) WEEKDAY | P.M. PEAK PERIOD (4-7P.M.)
EASTBOUND (BATHURST - JARVIS) WESTBOUND (JARVIS - BATHURST)
FRONT
ADELAIDE RICHMOND
QUEEN
DUNDAS
CHANGE FROMBASELINE (MIN)
CHANGE FROMBASELINE (MIN)
CHANGE FROMBASELINE (MIN)
CHANGE FROMBASELINE (MIN)
QUEEN
DUNDAS
10.6
11.3
10.2
11.9
WELLINGTON*
FRONT*
FRONT
ADELAIDE RICHMOND
QUEEN
DUNDAS
QUEEN
DUNDAS
WELLINGTON*
FRONT*
*Wellington WB - Jarvis to Blue Jays | *Front WB - Yonge to Bathurst
EASTBOUND (BATHURST - JARVIS) WESTBOUND (JARVIS - BATHURST)
AVERAGE CAR TRAVEL TIMES (MIN)
13.7
16.4
17.5
17.3
15.1
15.3
14.5
10.9
14.3
BASELINE SEPTEMBERData Collection Dates: Car Travel Times: September 4, 5, 8, 9, 15-30, 2018
Data Collection Dates:Vehicles: September 21 to October 14, 2017 and October 30 to November 8, 2017 (Intervening period removed due to TTC track construction at Queen Street and McCaul Street). PAGE 5
SEPTEMBER & OCTOBER SUMMARY• In September and October, average car travel times on most streets in the downtown, vary (+/-) less than a minute compared to before the pilot.
• Travel times improved significantly on Adelaide Street eastbound in the afternoon because of the completion of some of construction activities.
• Dundas Street travel times increased significantly in October due to the watermain replacement taking place between Spadina Avenue and Bay Street.
• Jarvis Street in both directions continues to be slower than baseline in the afternoon peak due to the watermain replacement on Jarvis Street from Queen Street to Dundas Street.
• Staff will continue to monitor travel times for vehicles during the pilot, and will identify opportunities for improvements as required.
OCTOBERData Collection Dates: Car Travel Times: October 1, 3-31, 2018
11.5
12.7
9.7
11.6
+0.9
+1.4
-0.5
-0.3
11.6
11.2
9.4
+2.2
+0.7
+0.3
+1.0
+0.79.7
9.1
+2.7
-0.5
-3.8
-0.2
+6.6
+2.3
+1.1
+0.8
+1.7
17.1
15.6
11.7
16.0
16.4
15.9
13.7
21.7
17.6
10.8
10.9
9.1
10.7
12.4
10.1
11.8
+0.1
+1.1
-0.1
-0.1
+1.4
+0.4
+1.1
+0.7
-0.18.9
+1.2
-0.8
-3.6
+0.5
+1.5
+1.8
+0.6
+1.1
+1.1
17.8
15.1
12.0
15.4
14.9
15.6
13.9
16.6
17.1
9.9
King StreetTransit Pilot
WEEKDAY | P.M. PEAK PERIOD (4-7P.M.)
WEEKDAY | A.M PEAK PERIOD (7-10A.M.)
5.3 5.8
8.46.9
4.7
NORTHBOUND (FRONT - DUNDAS) SOUTHBOUND (DUNDAS - FRONT)
YONGE JARVISBATHURST SPADINA UNIVERSTIYYONGE JARVISBATHURST SPADINA UNIVERSTIY
YONGE JARVISBATHURST SPADINA UNIVERSTIYYONGE JARVISBATHURST SPADINA UNIVERSTIY
5.1 5.4
3.0
5.44.1
6.1
7.8
5.1
8.1
4.8
7.0
12.1
9.8 9.88.5
NORTH-SOUTH STREETSAVERAGE CAR TRAVEL TIMES (MIN)
CHANGE FROM BASELINE (MIN)
SEPT.
OCT.
SEPT.
OCT.
SEPT.
OCT.
SEPT.
OCT.
CHANGE FROM BASELINE (MIN)
NORTHBOUND (FRONT - DUNDAS) SOUTHBOUND (DUNDAS - FRONT)
CHANGE FROM BASELINE (MIN) CHANGE FROM BASELINE (MIN)
BASELINEData Collection Dates:Vehicles: September 21 to October 14, 2017 and October 30 to November 8, 2017 (Intervening period removed due to TTC track construction at Queen Street and McCaul Street). PAGE 6
+0.4 +0.5+0.3 +0.1 -0.6 +0.3 +0.3 +0.9 +0.4+1.0
+0.4 -1.1+0.5 +1.0 +1.7 +3.9 +0.5 +2.0 +2.3-0.2
5.7 5.4 5.9
8.3
4.0
6.5
6.1
8.5
6.1
6.35.0
8.7
6.5
11.09.6
6.3
11.810.8
4.5
9.8
5.3 4.85.7
8.5
3.9
6.1
6.0
8.4
6.2
6.9
5.2
8.4
6.8
11.310.6
6.3
12.5
10.5
4.5
9.6
+0.0 +0.3+0.2 +0.0 +0.0 +0.5 -0.3 +0.9 +0.4+0.9
+0.0 -0.8+0.7 +1.1 +1.5 +3.6 -0.2 +2.7 +2.0+0.8
SEPTEMBER & OCTOBER CAR TRAVEL TIMES Sept. & Oct.2018
SEPTEMBERData Collection Dates: Car Travel Times: September 4, 5, 8, 9, 15-30, 2018
OCTOBERData Collection Dates: Car Travel Times: October 1, 3-31, 2018
SEPTEMBER & OCTOBER CAR VOLUMES King StreetTransit Pilot
Sept. & Oct.2018
KING
QUEEN
BATHURST
WEEKDAY | A.M. PEAK PERIOD (7-10A.M.) SEPTEMBER & OCTOBER SUMMARY
810
790
930
610
FRONT
800
1,810
790
1,250
BAYSPADINA
1,250
1,130
620
3,120
JARVIS
1,670
3,580
1,020
2,120
1,840
1,970
1,800
1,720
2,610
1,180
1,680
1,190
1,180
1,130
3,040
770
2,220
690
770
80
WESTBOUND
WESTBOUND
EASTBOUND
WESTBOUND
EASTBOUND
WESTBOUND
EASTBOUND
EASTBOUND
PAGE 7
RICHMOND
ADELAIDE
• Drivers on King Street continue to access local businesses or residences, conduct loading and deliveries, and pick-up/drop-off passengers. Traffic previously using King Street has generally shifted to alternative east and west routes.
• There has been an approximately 10% overall reduction in the total number of cars in the area surrounding King Street in both September and October. It may indicate that some people have shifted to transit, cycling, or walking.
.
BASELINEData Collection Dates:October 3, 2017 to November 9, 2017
1,120
2,180
1,100
2,260
160
150
620
1,550
1,080 1,240 1,680
1,930 1,250 920
2,130 3,090 3,750
2,750 3,470 2,270
90 270 100
230 460 80
1,280 660 1,940
1,370 1,100 860
1,040
990
180
630
990
2,080
2,610
90
1,280
1,270
3,140
280
670
1,660
3,630
100
2,270
2,000
2,300
1,450
120
1,590
1,830
220
1,370
1,240
3,400
440
1,110
860
2,140
940
SEPTEMBERData Collection Dates: Car Volumes: September 19-21, 24-27, 2018
OCTOBERData Collection Dates: Car Volumes: October 15-19, 25-26, 30-31, 2018
King StreetTransit PilotSEPTEMBER & OCTOBER CAR VOLUMES Sept. & Oct.
2018
BATHURST
2,020
1,620
1,690
1,350
3,100
1,660
1,270
2,050
BAY
1,110
1,320
960
2,720
JARVIS
1,140
940
1,720
3,070
1,140
1,630
1,110
790
1,130
2,510
1,010
1,030
1,520
1,540
1,220
3,250
1,480
3,800
1,360
1,700
WEEKDAY | P.M. PEAK PERIOD (4-7P.M.)
SPADINA
PAGE 8
BASELINEData Collection Dates:October 3, 2017 to November 9, 2017
KING
QUEEN
FRONT
WESTBOUND
WESTBOUND
EASTBOUND
WESTBOUND
EASTBOUND
WESTBOUND
EASTBOUND
EASTBOUND
RICHMOND
ADELAIDE
2,370 1,930 1,070 1,010
1,240 1,250 1,710 1,750
1,890 3,280 2,750 3,230
2,4901,800 3,640 3,260
350 210 480 100
200 360 560 260
1,400 2,010 1,640
910 1,220 1,230 1,660
410
2,270
2,110
1,310
3,530
2,340
1,800
210
1,980
1,060
2,610
400
1,100
1,080
1,070
100
1,710
3,180
1,200
1,720
200
950
1,230
350
1,210
1,620
3,540
540
1,210
1,700
3,320
280
1,740
SEPTEMBERData Collection Dates: Car Volumes: September 19-21, 24-27, 2018
OCTOBERData Collection Dates: Car Volumes: October 15-19, 25-26, 30-31, 2018
SEPTEMBER & OCTOBER PEDESTRIAN VOLUMES King StreetTransit Pilot
KING
QUEEN
BATHURST JARVIS
WEEKDAY A.M. PEAK PERIOD (7-10A.M.) TOTAL VOLUMES
WEEKDAY | P.M. PEAK PERIOD (4-7P.M.) TOTAL VOLUMES
1,810
2,820
SPADINA
1,990
4,150
800
BAY
2,840
4,760
KING
QUEEN
KING
QUEEN
BATHURST
JARVIS
3,700
3,590
SPADINA
4,760
6,180
1,320
3,370
BAY
5,400
5,960
PAGE 9
BASELINE SEPTEMBER Data Collection Dates: Pedestrian Volumes: September 19-21, 24-27, 2018
• Changes in the number of pedestrians from October 2017 to October 2018 show similar trends on both King Street and Queen Street.
• While the volume of pedestrians decreased from September to October at some locations along King Street (but not along Queen Street), this was generally the case where September volumes along King Street had already increased substantially from the October 2017 baseline before the pilot. Generally, pedestrian volumes on King Street continue to be higher than on the same sections of Queen Street.
Data Collection Dates:Pedestrians: October 3, 2017 to November 9, 2017
2,270
OCTOBERData Collection Dates: Pedestrian Volumes: October 15-19, 25-26, 30-31, 2018
1,660 2,100 800
2,510 3,520 2,7504,390
4,180 5,940
1,3606,530
4,5606,450
3,600 6,580
1,760
2,610
1,970
3,630
2,540
2,900 810
3,0305,260
3,960
3,960
5,730
7,000
1,340
4,900
6,420
7,460
SEPTEMBER & OCTOBER SUMMARY
Sept. & Oct.2018
King StreetTransit Pilot
PAGE 10
BASELINEData Collection Dates:Pedestrians: October 3, 2017 to November 9, 2017
TOTAL WEEKDAY P.M. PEAK PERIOD (4-7P.M.) PEDESTRIAN VOLUMES AT KING/QUEEN AND SPADINA
TOTAL WEEKDAY PEDESTRIAN VOLUMES AT KING AND SPADINATOTAL HOURLY EAST-WEST VOLUMES, SEPTEMBER & OCTOBER 2018
TOTAL MONTHLY EAST-WEST VOLUMES, SEPTEMBER & OCTOBER 2018
BASELINE
SEPTEMBER
OCTOBER
0
500
1,000
1,500
2,000
2,500
3,000
6a.m. 7a.m. 8a.m. 9a.m. 10a.m. 11a.m. 12p.m. 1p.m. 2p.m. 3p.m. 4p.m. 5p.m. 6p.m. 7p.m. 8p.m. 9p.m. 10p.m.
SEPTEMBER & OCTOBER PEDESTRIAN VOLUMES
SEPTEMBER Data Collection Dates: Pedestrian Volumes: September 19-21, 24-27, 2018
OCTOBERData Collection Dates: Pedestrian Volumes: October 15-19, 25-26, 30-31, 2018
Sept. & Oct.2018
4,760
4,910
4,270
4,920
4,860
5,090
6,090
6970
7,570
6,840
5,730
5,940QUEEN
6,180
6,590
5,980
6,550
6,500 6,510
7,370
7,610
7,1207,070
7,000
6,580KING
4,000
4,500
5,000
5,500
6,000
6,500
7,000
7,500
8,000
Baseline Dec 2017 Jan 2018 Feb 2018 Mar 2018 Apr 2018 May 2018 Jun 2018 Jul 2018 Aug 2018 Sept 2018 Oct 2018
PE
DE
ST
RIA
N V
OL
UM
E
PE
DE
ST
RIA
N V
OL
UM
E
TIME OF DAY
King StreetTransit Pilot
PAGE 11
SEPTEMBER & OCTOBER CYCLING VOLUMES
BASELINEData Collection Dates:Cycling: October 3, 2017 to November 9, 2017
TOTAL WEEKDAY P.M. PEAK PERIOD (4-7P.M.) CYCLING VOLUMES AT SPADINAMONTHLY TRENDS
SEPTEMBER & OCTOBER SUMMARY
• Cycling volumes in September and October dropped from the summer time due to expected seasonal changes.
• In October, cycling volumes at Spadina Avenue have increased by 380 riders in the afternoon peak compared to before the pilot in October 2017.
• Overall cycling volumes in October across all streets at Spadina Avenue have increased by 23% compared to the baseline counted in October 2017.
• Seasonal changes have most directly impacted Richmond Street and Adelaide Street, where dedicated cycle tracks are present. Other corridors without dedicated cycling facilities (e.g. Queen Street and Front Street) have generally seen more moderate change. This suggests that seasonal cyclists have generally been attracted to the dedicated facilities on Richmond Street and Adelaide Street, whereas all-weather cyclists maybe more comfortable on routes without dedicated facilities.
SEPTEMBERData Collection Dates: Cycling Volumes: September 19-21, 24-27, 2018
OCTOBERData Collection Dates: Cycling Volumes: October 15-19, 25-26, 30-31, 2018
KING ST.
RICHMOND/ADELAIDE ST.
QUEEN ST.
FRONT ST.0
500
1,000
1,500
2,000
2,500
Baseline Dec 2017 Jan 2018 Feb 2018 Mar 2018 Apr 2018 May 2018 Jun 2018 Jul 2018 Aug 2018 Sept 2018 Oct 2018
MAY & JUNE SUMMARY
• Cycling volumes in May and June showed a significant increase from those in April, which is consistent with expected seasonal changes.
• Cycling volumes on King Street (PM Peak at Spadina Avenue) increased by +550 in May and +520 in June compared to the baseline.
• Seasonal changes have most directly impacted Richmond Street and Adelaide Street, where dedicated cycle tracks are present. Other corridors without dedicated cycling facilities (e.g. Queen Street and Front Street) have generally seen more moderate change. This suggests that seasonal cyclists have generally been attracted to the dedicated facilities on Richmond Street and Adelaide Street, whereas all-weather cyclists maybe more comfortable on routes without dedicated facilities.
Sept. & Oct.2018
King StreetTransit Pilot
SPADINA
120
1,310
1,010
60
BAY
100
70
80
100
WEEKDAY | A.M. PEAK PERIOD (7-10A.M.) TOTAL VOLUMES
PAGE 12
BASELINEData Collection Dates:Cycling: October 3, 2017 to November 9, 2017
BATHURST
120
920
100
30
JARVIS
90
700
1,170 700
80
240 250
90
100 60
130149
1,1501,080
300220
4020
90 100
KING
RICHMOND/ADELAIDE
QUEEN
FRONT
KING
RICHMOND/ADELAIDE
QUEEN
FRONT
SEPTEMBER & OCTOBER CYCLING VOLUMES
SEPTEMBERData Collection Dates: Cycling Volumes: September 19-21, 24-27, 2018
OCTOBERData Collection Dates: Cycling Volumes: October 15-19, 25-26, 30-31, 2018
180
1,440
420
100
970
310
60
110
180
1,490
320
30
130
840
340
90
Sept. & Oct.2018
340
1,570
610
80
190
1,250
380
140
210
980
360
160
330
1,510
480
50
King StreetTransit Pilot
130
1,296
960
100
50
120
90
60
680
160
180 160
1,030 730
90
330 320
100
110 130
200
260260
1,310
150
40
WEEKDAY | P.M. PEAK PERIOD (4-7P.M.) TOTAL VOLUMES
PAGE 13
BASELINEData Collection Dates:Cycling: October 3, 2017 to November 9, 2017
SPADINA
BAY
BATHURST
JARVIS
1,2701,090
480370
5040
KING
RICHMOND/ADELAIDE
QUEEN
FRONT
KING
RICHMOND/ADELAIDE
QUEEN
FRONT
SEPTEMBERData Collection Dates: Cycling Volumes: September 19-21, 24-27, 2018
OCTOBERData Collection Dates: Cycling Volumes: October 15-19, 25-26, 30-31, 2018
SEPTEMBER & OCTOBER CYCLING VOLUMES Sept. & Oct.2018