    KING POST WALL

    LUAS TERMINUS, DUBLIN

    Title: Luas Terminus, Dublin

    Contractor: Siac Construction

    Description:

    This project involved the construction of a

    King Post Wall for a Luas Terminus in close

    proximity to the Luas tramway.

    Holes were bored in the granite bedrock at

    400mm diameter. The hole was then part

    filled with concrete and a steel column was

    set in place to allow the main contractor,

    Siac Construction, to excavate and place in

    precast concrete panels to support a deep

    excavation and install a new water main.