Client: Kimberly Clark Corporation Locaon: Hat Yai, Thailand Compleon Date: January 2008 Project Summary: ESI was the engineer for this 30 TPH (78,000 pph) stoker coal-fired boiler installed in Hat Yai, Thailand. The facility includes a field-erected coal- fired boiler designed to provide 90 psig steam to an existing latex glove manufacturing facility. The facility also includes a complete material storage and handling system, ash handling system, water treatment system, deaerator, boiler feedwater pumps, baghouse and PLC based control system. 30 TPH Stoker Coal-Fired Facility KIMBERLY CLARK - HAT YAI Design/Build Engineers & Contractors, Specialist in Steam and Cogeneration Systems ESI Inc. of Tennessee 770.427.6200

KIMBERLY CLARK - HAT YAI

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KIMBERLY CLARK - HAT YAI

Client:Kimberly Clark CorporationLocation: Hat Yai, ThailandCompletion Date:January 2008

Project Summary:ESI was the engineer for this 30 TPH (78,000 pph) stoker coal-fired boiler installed in Hat Yai, Thailand. The facility includes a field-erected coal-fired boiler designed to provide 90 psig steam to an existing latex glove manufacturing facility. The facility also includes a complete material storage and handling system, ash handling system, water treatment system, deaerator, boiler feedwater pumps, baghouse and PLC based control system.

30 TPH Stoker Coal-Fired Facility

KIMBERLY CLARK - HAT YAI

Design/Build Engineers & Contractors, Specialist in Steam and Cogeneration SystemsESI Inc. of Tennessee 770.427.6200