Upload
truongdiep
View
220
Download
0
Embed Size (px)
Citation preview
KIEWITFOUNDATIONS
GROUP
NOBODY GETS HURTOur operations begin and end with safety.
Kiewit implemented job hazard analysis (JHA)
and mandatory personal protective equipment
(PPE) years before it was required by law.
At Kiewit, nothing is more important than safety.
Our craft-led safety programs and commitment at all
levels of our operations ensure our focus is on what
matters most: that nobody gets hurt. This commitment
to excellence extends to our quality, environmental and
compliance performance — which is how we drive
successful projects for our clients.
SAFETY FIRST
Led by craft on the front lines, Kiewit’s safety focus and engagement are SECOND TO
NONE.32
KIEWITCULTURE
COREVALUES
MARKET CAPABILITIESKiewit has the proven experience at every stage of the project development life cycle. The earlier we get involved in project development and design, the more value Kiewit can provide clients.
DELIVERY METHODSConstruction | Design-Build/EPC | CM-at-Risk | CM-for-Fee | Design-Build, Operate, Maintain
PROCUREMENT MODELSTraditional | A+B | Best Value | Negotiated
SERVICESPreconstruction | General Contracting | Building Information Modeling | Construction Management | Engineering | Self-Performed Scopes of Work | LEED
With a strong local presence and access to a vast network of
industry experts, Kiewit can quickly mobilize and help design
the best solution and value for any project. From the smallest
jobs to the multi-billion dollar projects we build, our resources
and experience ensure clients receive the highest-quality,
hands-on service they’ve come to expect.
OUR VALUES
PEOPLE We care for the well-being of our people
and help them grow in their ability to be
successful.
EXCELLENCE We commit to excellence in all we do
with a focus on quality and continuous
improvement.
INTEGRITY We conduct our business and personal
affairs with the highest levels of integrity
and take responsibility for our actions.
STEWARDSHIP We preserve Kiewit’s unique culture to
build a stronger organization for future
generations of employees.
54
OUR MARKETS
T R A N S P O R T A T I O N
P O W E R
W A T E R / W A S T E W A T E R
M I N I N G
B U I L D I N G
O I L , G A S & C H E M I C A L
Self-performing work results in
RELIABLE BUDGET AND SCHEDULE FORECASTS
WHAT SETS US APART?
Safety Record
Innovative Solutions
Depth of Expertise
ISO 9001:2008 Quality Program
Specialty Equipment
Self-Performance
Keeping safety at the forefront, the Kiewit Foundations Group self-
performs complex geotechnical projects across North America.
We deliver creative, cost-efficient solutions that are responsive to
each project’s specific site conditions. We utilize value engineering
and constructability reviews, and our depth of expertise to offer
constructible solutions that optimize budget and schedule. We
perform these operations with our fleet of specialty equipment and the
management resources of one of the top builders in the country.
OURSERVICES
CUT-OFFWALLS
STRUCTURALSLURRY WALLS
DRILLEDSHAFTS
GROUNDIMPROVEMENTS
76
Gulf Intracoastal Water Way West Closure Project, West Bank, Mississippi River, LA | Slurry-trench for 85,000 sf soil bentonite slurry cut-off wall along the WBV levee
Metro PAR 1085 Project, Denver, CO | Sheet pile and cement bentonite cut-off wall to eliminate deep excavation seepage
Lower Mattagami River Project, Kapuskasing, ON | 5,050 sf cut-off wall to support construction to repair and replace four hydroelectric generating stations
Cannelton Hydroelectric Cofferdam Cut-off Wall, Owensboro, KY | Self-hardening cement bentonite cut-off wall as part of a dewatered and excavated cofferdam
Dam Repair | Temporary and Permanent Water-Tight Enclosure
CUT-OFF WALL
Dry Dock Bund Wall for Gravity Based Structure, Newfoundland, CA
950 LF cut-off wall in the core of the dry dock bund wall for water-tight graving dock.
98
Deep Rock Tunnel Connector, Indianapolis, IN | Cement bentonite soldier pile application for three open-cut excavations totaling 69,400 sf.
World Trade Center East Bathtub Slurry Wall, New York, NY | 53 slurry wall panels of depths of 75-110 feet to form the basement of the PATH station and new World Trade Center Site
Clinton CSO, Syracuse, NY | Triple box culvert constructed using slurry wall construction and a jet grout plug with cement bentonite wall for a base groundwater cutoff
Harbor Siphon Slurry Wall, Brooklyn & Staten Island, NY | Excavation, reinforcement, and concrete for a slurry wall as part of two launch shafts for a tunnel
Tunnel Shafts | Building Foundations | Open Cut Excavation Support
STRUCTURAL SLURRY WALL
Metropolitan Transportation Authority, Long Island Rail Road East Side Access Bellmouth, New York, NY
45,000 cubic yard, open-cut excavation supported by a 28,300 sf slurry wall, 51 high-capacity tiebacks, sheet piles, concrete walers and steel bracing.
1110
Tappan Zee Bridge, Tarrytown, NY | 24 ea 48” diameter shafts w/ 42” Rock Sockets for the Westchester Abutment and initial pier
Metro-North Rail Road Embankment Stabilization, Cortland Manor, NY | Installation of 20 48” diamenter drilled shafts to stabilize the railroad embankment along the Hudson River
PSE&G Susquehanna-Roseland Transmission Line, NJ and PA | 145 mile transmission line requiring installation of large diameter reinforced concrete drilled shaft foundations
Farrington Guideway, Honolulu, HI | 500 ea 2.2m – 2.5m diameter shafts for an elevated railway
Transmission Lines | Bridge | Rail | Large Diameter Caissons | Soundwalls | Buildings
DRILLEDSHAFTS
Technical experts manage and maintain our
SPECIALTY EQUIPMENT
Cove Point LNG Export Facility, Lusby, MD
395 ea 60” diameter shafts for 70’ tall soundwall, a large piperack and five tower cranes;
283 ea 24” – 48” diameter shafts for pipe racks in a congested and live LNG plant
1312
Center Hill Dam, DeKalb County, TN | 1,643,000 gallons of cement permeation grouting for groundwater cut-off and pre-treatment for a barrier wall
Cooper Nuclear Station, Brownville, NE | Chemical grouting around pipe penetrations through a cofferdam
Dry Dock Bund Wall for Gravity Based Structure, Newfoundland, CA | Vibroflotation of hydraulically placed material to allow for cut-off wall construction
Cannelton Hydroelectric Cofferdam Vibroflotation, Owensboro, KY | Vibroflotation to densify hydraulically placed sand to ensure stability during excavation of the cut-off trench
Grouting | Soil Mixing | Vibroflotation
COST-EFFECTIVE SOLUTIONS
in challenging soil conditions.
GROUNDIMPROVEMENTS
Virboflotation operation at Cannelton Hydroelectric Cofferdam
1514
10/2015
Kiewit Infrastructure Co.
302 S. 36th Street, Suite 400
Omaha, NE 68131
(402) 346-8535