www.TakeChargeVA.com/business Appalachian Power Virginia Kicking off Commercial and Industrial Program

Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

www.TakeChargeVA.com/business

Appalachian Power Virginia

Kicking off Commercial and

Industrial Program

Page 2: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Welcome!

• Explain C&I program offering and rules

• Showcase lighting technology upgrades

• Describe how to participate and apply

• Answer your questions!

Page 3: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Appalachian Power Virginia C&I Program

• Incentives of 5¢ per kWh saved for qualifying energy efficiency projects on or before 12/31/2018

• Helps businesses offset the costs of making cost-effective improvements:

Better ROI

Faster payback

Lower utility bills for years to come

Page 4: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

C&I Program Rules

Contingent on project review

and acceptance of savings.

Submit complete application within

60 days of installation. Or

reserve funds for up to 90 days

prior to expected completion date.

Rebate check paid within 4-6 weeks

of final application’s

verification and approval.

The limit per account is

$150,000 per program year. The

rebate amount may not exceed 50% of project

total costs

Page 5: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

C&I Program Rules (cont.)

• The rebate can be assigned by the customer to the contractor.

• AEP Appalachian Power customers that are not eligible to participate:

Customers with a peak demand of more than 10MW

Customers served under the Public Authority and

Commonwealth of Virginia tariffs

Residential Customers

Page 6: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeWV.com/business

Appalachian Power Service Area

• Customers of municipal and cooperative electric utilities do

not qualify for the program: Danville

Bedford (& parts of Bedford Co.)

Martinsville

Salem

Radford

Bristol

• If you are not sure whether a customer qualifies, please call us.

Page 7: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

ELIGIBLE PROJECTS

Page 8: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeWV.com/business

Eligible Projects

Replacing existing equipment to high energy efficiency models:

Lighting Systems VFDs on HVAC Pumps

Page 9: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Lighting Rebates

• Savings depend on business sector, building type, interior or exterior and lighting replacement

• Free Flipbook (ask us for one!)

• Example of lighting projects:

Existing linear fluorescent fixture retrofits

T12 or T8 to LED

HID lamp replacements

Metal Halide to LED

Page 10: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Interior HID Retrofits

Page 11: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

T12 & T8 Retrofits

Page 12: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

HID Lamp Retrofits:

Page 13: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

CFL Retrofits:

Page 14: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

VFD Rebates

Variable Frequency Drives (VFDs) on cold and hot water pumps:

• New VFD installed on new or existing equipment

• Mounted on chilled or hot water systems replacing a primary pump in a

single or duplex configuration -- secondary or back-up configurations do

not qualify

• Limited to motors of 200 HP or less

• Pre-inspected by program staff for

any applications involving over

100 HP (on one or multiple motors)

For example:

Page 15: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

CASE STUDIES

Page 16: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Kroger (VA)

• 13 fuels centers in VA evaluated for LED upgrades

• 1st facility Valley Gateway Blvd, Roanoke:

• Replaced 36 single lamp metal halide units

with 36 LEDs

• Benefits from 1st facility:

• Saves 22,900 kWh annual energy use = $1,832

• Reducing maintenance costs

• $1,145 rebate reduced payback

“LED lighting upgrades will save us on both energy use and maintenance costs, so we’re rolling them out across all Kroger facilities in WV, VA, NC, OH, KY and TN. Plus, Appalachian Power’s program team really helped make our participation easy with all the support they gave us filling out forms and more. “ - Jim Cooper, Kroger, Facility Engineer – Energy

Page 17: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Camrett Logistics (VA)

• Program team evaluated facility and estimated

rebate, and helped Camrett’s contractors with

paperwork

• Upgrades to warehouse:

• Replaced over 4,500 8’ T12 110W HO fixtures

with 546 49W LEDs

• Benefits:

• Saves 2,384,143 kWh annual energy use =

$178,810

• $119,207 rebate with payback of 1.6 years

Page 18: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

HOW TO APPLY

Page 19: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

How to Apply

• Applications and required documents are due within 60 days of installation.

• Final application package must include:

Rebate Application Form

Rebate Worksheet(s) with project implementation details

Project Documentation (as required) itemized invoices, equipment

specifications, engineering reports, modeling output, photographs

W-9 (LLC, individual, partnership, property management companies)

Page 20: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Rebate Application + Worksheet(s)

1 2

Page 21: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Rebate Application Form

Page 22: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Rebate Worksheet(s)

Page 23: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Additional Information Needed

1. W-9

2. Invoice

3. Data

sheet(s)

1 2

3

Page 24: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

RESOURCES

Page 25: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

TakechargeVA.com/business

Resources online:

Fact sheet & FAQs

Rebate application & worksheets

Brochures

e-newsletter

Need help? Contact us.

Page 26: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

TakechargeVA.com/business

Contact Us Call: 877-428-5427

Visit: TakechargeVA.com/business

E-mail: [email protected]

Don Nichols, Appalachian Power Program Manager, 540.985.2602

[email protected]

Todd Ewald, Outreach Specialist, 540.397.8633, [email protected]

Bill Willis, Program Manager, 877-428-5427, [email protected]

Page 27: Kicking off Commercial and Industrial Program VA CI Kick... · 2019-06-24 · PowerPoint Presentation Author: Laura Worker Created Date: 6/14/2016 5:18:46 PM

QUESTIONS?