3 Steps Approach :
KHNP’s Implementation of Post Fukushima Actions
ST(Sung-Tae) Yang
General Manager Corporate Safety Department
KHNP
3 Steps Approach
Post Fukushima Safety Review Stress Test New Accident Management Plan
* Securing Coping Capability to Extreme External Hazards
* Reviewer : Regulator-University- Institute Collaboration
* 6 Area * Short Period Evaluation (’11.3.21 ~ 4.30)
* Introducing as one of presidential election pledge * Develop our own guideline by Regulator (WENRA reference) * Reviewer : Vendor (KEPCO E&C) * First Application : License Renewal Plant (Kori-1, Wolsong1) , to be continued to all NPP
* Systematic Approach for
Effective Accident Management with MACST strategy (Similar to US FLEX)
* 3 phases accident coping strategy
• Integration of MACST Facilities,
Procedures and Emergency Plan
* Mandatory Requirement
1 2 3
Prompt Remedy to SSC
Applying International Standard Review Method
Establishing Total Accident Response System
Composed of 14 member countries and 20 regulatory experts Reviewed the Korean regulatory system (July 10- 22, 2011)
’11.3.16 ~ ’11.3.18 Composed of 44 internal & external experts Integrity of 4 critical areas of the plant
’11.3.21 ~ ’11.5.3 Composed of 73 external experts and regulatory body Inspectors for 21 nuclear units in operation Overall plant status Check
* IRRS : Integrated Regulatory Review Service
Safety Review
Earthquakes and Tsunamis
Electrical Power and
Cooling Ability
Severe Accidents
Emergency Response
* ASTS : Automatic Seismic Trip System, SAMG : Severe Accident Management Guideline, SFP : Spent Fuel Pond
Additional radiation protective
equipment for the sake of residents 11
ASTS
height extension of NPP sea wall 20
Passive hydrogen removal
equipment or ventilation facilities in
the CV
Reinforcement of the SAMGs 10
Mobile generator vehicles Injection loop for SFP emergency cooling water 15
Action Items
Major Improvement
Sea Wall Water
proof
door
Diesel driven
pump
PAR
CFVS
reactor emergency cooling
SFP Emergency cooling
Mobile
generator
REACTOR
Building
REACTOR
Steam
Generator
EDG
SEA
① Height extension of the seawall at NPP ② Installation of waterproof doors ③ Installation of waterproof drain pumps (diesel-driven) ④ Securing mobile generator vehicles
⑤ Installation of external injection loop for emergency cooling water of reactor ⑥ Installation of injection loop for SFP ⑦ Installation of passive hydrogen removal equipment ⑧ Installation of vent or depressurizing facilities in the CV
Stress Tests Conducted in Korea
Areas
Guideline
①Earthquake ②Tsunami ③Loss of Safety
Functions(SBO+LUHS)
④Severe accident Management ⑤Emergency response
Stress Test Specifications of NSSC (2013.04.30)
Operator Self-Assessment
① Adequacy Reviews (including plant walk-down)
② Detailed Reviews (regulator + private experts)
NSSC
Reviews
Step 1 Step 2 Step 3
‘13.5.1
‘13.9.1
Step 2 Step 1 Step 3
Step 1 Step 2
11
‘13.7.12 ‘14.12.12 ‘15.2.27
‘13.12.20 In progress
WOLSONG-1
KORI-1
License Renewal
(Area 1) Safety of SSCs against Earthquakes(EU)
Assessment Area in Stress Test
(Area 2) Safety of SSCs against Tsunami, Storm surge
and other natural disasters(EU)
(Area 3) Plant Response to loss of electrical power
and/or loss of the ultimate heat sink(EU)
(Area 4) Severe accident management(EU)
(Area 5) Emergency preparedness and response
(Common) Assessment of operational aspects 12
Natural Hazards Fire
Safety Function
Failure
Severe Accidents
Managements
Emergency Response Operational Performance
-Installation of On-site Emergency Response Facility
- Strengthen of Man-Power and Organization against
Extreme Hazards 6
- Re-ensuring the Site Stability due to Seismic Event ( ~ 2019)
- Increasing the Resistivity for Seismic Induced Fire (~ 2017)
- Strengthen the Secondary Control Room( ~ 2015) 3
- Increasing SAMG Effectiveness from Steam Explosion, etc.
-Feasibility Study for Dual Operation of PAR and Igniter
- Increasing Operability of CFVS, e.g Open Pressure Assessment 7
- Installation of 8-hour Seismic Battery(~ 2017) -Securing Essential Function from Multi-unit Accident - Securing Long-term Cooling Capability(2016) 3
Wolson #1 Action Items
Natural Hazards Fire
Safety Function
Failure
Severe Accidents
Managements
Emergency Response Operational Performance
- EP enhancement for SFP Accident
- Supplement the habitability of ERF 8
- Re-review Seismic Performance of SFP Cooling Sys
- Increasing the Resistivity for Seismic Induced Fire 2
- Securing On-site Communication measures between MCR and
Field Operators 1
- Installation of 8-hour Seismic Battery - Securing Essential Function from Multi-unit Accident
• mobile DG for single Rx, etc. - Maintenance of Mobile DG 3
Kori #1 Action Items
Kori #1 is planned to permanently defueling in 2017 for decommissioning
Stress Test
for All Operational Nuclear Power Plants in Korea
1st Step : Select representative-type reactors, Sequential Evaluation
Divided into 4 Reactor Type for a total of 24 nuclear plants under operation
Westinghouse 2-loop, PHWR, Westinghouse 3-loop, Framatom,
KSNP(Korean Standard Nuclear Power Plant)
2nd Step : Applying the evaluation result
Applying the evaluation result to the other nuclear power plants,
taking into account the coverage
Stress tests carried out once while operational period
(for domestic operating power plants 24 unit)
• Nuclear law revision (Jun 2016)
“…all operating NPPs should submit accident management plans…”
• Target Plants All operating NPPs and under construction NPPs
• Schedule : Jan 2017 ~ Jun 2019
• Contents of Accident Management Plan - AMP Strategies
- Accident Management Implementation Structure
- Accident Management Capability Evaluation
- Emergency Operating Procedure Guideline
- Extreme Disaster Mitigation Guideline
- Severe Accident Mitigation Guideline
- Accident Management Education and Training Plan
19
Phase Responding Facility Electric Power Coolant
Phase 1 (0 ~ 8hr) Installed Facilities Battery CST
Phase 2 ( ~ 72hr)
Onsite Portable Facilities
* SAFE-T
Portable DG
① CST ② DWST
③ RST ④ RWF
Phase 3 (72hr~ )
Offsite supplemental Resource
* SAFE-T + Outside support
DG +
(EDG)
① CST ② DWST
③ RST ④ RWF
SAFE-T (30) Accident Strategy
Support (16) Facilities O&M Support (12)
WEC Type (4) OPR1000 (4) CANDU (4)
APR1400 (2) Framatone (2)
Mechanical (4) Electrical (4)
I&C (4)