Upload
lytuyen
View
264
Download
8
Embed Size (px)
Citation preview
BRIEFING ON
KHARIAN - SIALKOT - LAHORE MOTORWAY PROJECT
Chairman (P&D)Chairman (P&D)
23- Aikman Road GOR-I Lahore, PakistanPh: +92-42 99205201-6 5, Fax # +92-42-99205179
Email: [email protected]
February 22, 2011
1
LOCATION PLAN
SIALKOT - LAHOREMOTORAY PROJECT
Khunjrab Pass
Karimabad
GILGIT
ChilasSazin
Mansehra
Dasu
Malakand
Dir
Drosh
Chitral
Landi Kotal
Nowshera
RawalpindiISLAMABAD
Kharian
LAHORE
Okara
Multan
Chamman Qila Saifullah
Zhob
Dera Ismail Khan
Skardu
Jalkhad
Naran
Bannu
Mianchann
Mughal Kot
Retra
Malana
Kashmir(Disputed Territory)
Muzaffarabad
Murree
N-75M-1
M-3
Pindi Bhattian
Faisalabad
Kuchlak D. G.
Sarai Gambila
Wahgah
INDIA
CHINA
M-4
BadhabherDara Adam Khel
PESHAWAR
SIALKOTKHARIAN
KHARIAN(KSLM)
2
National Highway
Motorway (Operational)
Motorway (Under construction)
National Capital
Provincial Capital
City/Town
Provincial Boundary
International Boundary
Legend
Multan
Bahawalpur
Rahimyar Khan
Hyderabad
KARACHI
Liari
Bela
Wad
Mastung
Kalat
Surab
Khuzdar
Uthal
JiwaniGwadar Ormara
Pasni
TaftanNok Kundi Dalbandin
Nushki
QUETTA
DadharSibi
Ratodero
Jacobabad
Sukkur
Loralai
Kotri
Dadu
Rajanpur
Kotri Kabir
Moro
Hala
Ubauro
Mianchannu
ThattaN-5
M-9
ARABIAN SEA
Awaran
Turbat
Kuchlak D. G. Khan
HoshabSehwan
IRAN
M-7
M-6
M-5
Jamshoro
• Project Cost = Rs. 57 (B)
(US$ 700 (M))
• Motorway = 155.00 Km
• Daska Byepass = 11.85 Km
• M-2 Link = 8.20 Km
• Interchanges = 10 No
• Flyovers = 4 No
PROJECT OUTLINE
• Bridges = 50 No
• Bridge over Rivers = 2 No
• Underpasses
� Vehicular = 46 No
� Pedestrian = 44 No
• Drainage Culverts Single / Multi Cell
= 140 No
• Watercourse Culverts = 120 No
• Construction Period = 3 ~ 4 Years
PASRUR
CHAWINDA
SIALKOT
RIVER
CHENAB
GUJRANWALA
ZAFARWAL
GUJRAT
WAZIRABAD
SIALKOTAIRPORT
NAROWAL
LENGTH = 155 Km
06 Lanes with provision of adding
02 additional lanes in median.
Ten (10) Interchanges
M-2 Link = 8.20 Km (04 Lanes)
Daska bye-pass = 11.85 Kms (04 Lanes)
KHARIAN - SIALKOT - LAHORE
MOTORWAY
Sambrial
KHARIAN
4
LAHORE AIRPORT
RAILWAY STATION
GT ROAD
LAHORE CANALSAGIA N BRIDGE
SHAHDA RA BRIDGE
B.R
.B LIN
K
CA
NA
L
RAVI RI V
ER
DARUGHAWALA
LAKHUDAIR
HARBUNS PURA
AZ
AD
I C
HO
WK
BA
BU S
ABU
NI
AZ
I C
HO
WK
LAH
OR
E R
ING
RO
AD
LAHORE CANAL
LA
HO
RE
BY
PA
SS
LAHORE
SHEIKHUPURA
MOTORWAY M-2
WAGHA
MURIDKE
KALASHAH KAKU
GT ROAD
I N D I ARIVER
RAVI
AMRITSAR
KAMOKE
KALA
KHATAI
Three (03) Industrial Zones
Four (04) Flyovers
Bridge Over River Ravi
Underpasses
Bridge Over River Chenab
5
6
7
8
9
Alig
nm
ent
10
11
Lahore Ring Road
Interchange
Allam Iqbal
Typical Interchanges
12
Allam Iqbal International Airport
13
MOTORWAY X-SECTION
14
X-SECTION
MOTORWAY
7000 200
24001000
10800 1800
EARTH FILL
FE
NC
E
HR.O.W
MARKERS
RESERVED FOR TREES
RO
UN
DIN
GFILL SLOPE MEDIAN
FE
NC
E
EARTHEN TRACK
7400 1800 10800 200
2400 1000
ROW = 120m
VARIES w VARIESw 7000
2000
N.S.L
RESERVED FOR TREES
EARTHEN TRACK 50
0
INN
ER
SH
OU
LD
ER
INN
ER
SH
OU
LD
ER
OU
TE
RS
HO
UL
DE
R
OU
TE
RS
HO
UL
DE
R
RO
UN
DIN
G FILL SLOPE3LANES 3 x 3600 3LANES 3 x 3600
OU
TE
RE
DG
E M
AR
KIN
G
OU
TE
RE
DG
E M
AR
KIN
G
TYPICAL CROSS SECTION
15
MOTORWAY
7000 2400
500 7200 7200VARIES w VARIESw 70001000 1200 1200 2400 1000
EARTH FILL
EARTHEN TRACK
RESERVED FOR TREES
FILL SLOPE
500
500
EARTHEN TRACK
RESERVED FOR TREES
FILL SLOPE
INN
ER
SH
OU
LD
ER IN
NE
RS
HO
UL
DE
R
EARTH FILL
M-2 LINK & DASKA BYPASS ROAD
16
TECHNICAL PARAMETERSDESCRIPTION MOTORWAY EXPRESSWAY
� DESIGN SPEED 120 Km/hr 100 Km/hr
� ROAD CROSS SECTION
� Lane Width 3.6m 3.6m
� No. of Lanes 3 x 2 2 x 2
� Paved Shoulders
17
� Paved Shoulders
Outer
Inner
2.4m
1.8m
2.4
1.2m
� Median 7.4m 0.6m (NJB)
� Right Of Way (ROW) 120m 85m
18
Assumptions of Proposed PPP Regime
� Construction of KSLMPConstruction of KSLMPConstruction of KSLMPConstruction of KSLMP Estimated civil Estimated civil Estimated civil Estimated civil works costworks costworks costworks cost
Rs. 60 BillionRs. 60 BillionRs. 60 BillionRs. 60 Billion
Alternate : Alternate : Alternate : Alternate : 1111
6 6 6 6 Lanes Motorway [Lanes Motorway [Lanes Motorway [Lanes Motorway [2222xxxx3333] ] ] ] from from from from KharianKharianKharianKharian ~~~~ Lahore Lahore Lahore Lahore Length = Length = Length = Length = 155 155 155 155 KmsKmsKmsKms
Toll Rates Toll Rates Toll Rates Toll Rates EscalationEscalationEscalationEscalation
25% Every 525% Every 525% Every 525% Every 5thththth
YearYearYearYear
Concession Concession Concession Concession PeriodPeriodPeriodPeriod
25 Years25 Years25 Years25 Years
FIRR FIRR FIRR FIRR 2.79%2.79%2.79%2.79%
19
GOPbShare
InvestorShare
Concessionaire FIRR(25 years)Equity Soft Loan markup
10%Rs. 6 B(Land)
90%54B
30%Rs. 16.2 B
70%Rs. 37.8 B
6% 2.79%
0% 100%60B
30%18B
70%42B
6% 2%
Assumptions of Proposed PPP Regime
� Construction Alternate 2Construction Alternate 2Construction Alternate 2Construction Alternate 2 Estimated CostEstimated CostEstimated CostEstimated Cost Rs. 52 BillionRs. 52 BillionRs. 52 BillionRs. 52 Billion
4 4 4 4 Lane Limited Excess Lane Limited Excess Lane Limited Excess Lane Limited Excess Divided Expressway from Divided Expressway from Divided Expressway from Divided Expressway from Kharian ~ Daska Kharian ~ Daska Kharian ~ Daska Kharian ~ Daska 75757575....236 236 236 236 KmKmKmKm
Toll Rates Toll Rates Toll Rates Toll Rates EscalationEscalationEscalationEscalation
25% Every 525% Every 525% Every 525% Every 5thththth YearYearYearYear
6 6 6 6 Lanes Motorway [Lanes Motorway [Lanes Motorway [Lanes Motorway [2222xxxx3333]+]+]+]+2222* * * * from Daska ~ Lahore from Daska ~ Lahore from Daska ~ Lahore from Daska ~ Lahore 79797979....764 764 764 764 KmKmKmKm
Concession Concession Concession Concession PeriodPeriodPeriodPeriod
25 Years25 Years25 Years25 Years
FIRR FIRR FIRR FIRR 5.62%5.62%5.62%5.62%
20
GOPbShare
Investor Share
ConcessionaireFIRR
(25 years)EquitySoft Loan
6% markup
11.5%
Rs. 6 Billion(Land)
88.5%
Rs. 46 Billion
30%
Rs. 13.8 Billion
70%
Rs. 32.2 Billion
5.62%
0% 100%52B
30%15.6B
70%36.4B
4.66%
Assumptions of Proposed Loan Regime
� Construction of KSLMPConstruction of KSLMPConstruction of KSLMPConstruction of KSLMP Estimated civil Estimated civil Estimated civil Estimated civil works costworks costworks costworks cost
Rs. 60 BillionRs. 60 BillionRs. 60 BillionRs. 60 Billion
Alternate : 1Alternate : 1Alternate : 1Alternate : 1
6 Lanes Motorway [2x3] 6 Lanes Motorway [2x3] 6 Lanes Motorway [2x3] 6 Lanes Motorway [2x3] from from from from KharianKharianKharianKharian ~ Lahore ~ Lahore ~ Lahore ~ Lahore Length = 155 Length = 155 Length = 155 Length = 155 KmsKmsKmsKms
Toll Rates Toll Rates Toll Rates Toll Rates EscalationEscalationEscalationEscalation
25% Every 525% Every 525% Every 525% Every 5thththth
YearYearYearYear
Length = 155 Length = 155 Length = 155 Length = 155 KmsKmsKmsKms
Soft Loan Amount : 60 BSoft Loan Amount : 60 BSoft Loan Amount : 60 BSoft Loan Amount : 60 BLoan Payback Loan Payback Loan Payback Loan Payback periodperiodperiodperiod
25 25 25 25 YearsYearsYearsYears
FIRR FIRR FIRR FIRR 0.31%0.31%0.31%0.31%
21
Assumptions of Proposed Loan Regime
� Construction Alternate 2Construction Alternate 2Construction Alternate 2Construction Alternate 2 Estimated CostEstimated CostEstimated CostEstimated Cost Rs. 52 BillionRs. 52 BillionRs. 52 BillionRs. 52 Billion
4 Lane Limited Excess 4 Lane Limited Excess 4 Lane Limited Excess 4 Lane Limited Excess Divided Expressway from Divided Expressway from Divided Expressway from Divided Expressway from Kharian ~ Daska 75.236 KmKharian ~ Daska 75.236 KmKharian ~ Daska 75.236 KmKharian ~ Daska 75.236 Km
Toll Rates Toll Rates Toll Rates Toll Rates EscalationEscalationEscalationEscalation
25% Every 525% Every 525% Every 525% Every 5thththth YearYearYearYear
6 6 6 6 Lanes Motorway [Lanes Motorway [Lanes Motorway [Lanes Motorway [2222xxxx3333]+]+]+]+2222* * * * from from DaskaDaska ~~ Lahore Lahore 7979..764 764
Loan Payback Loan Payback Loan Payback Loan Payback PeriodPeriod
25 Years25 Years25 Years25 Yearsfrom from from from DaskaDaskaDaskaDaska ~~~~ Lahore Lahore Lahore Lahore 79797979....764 764 764 764 KmKmKmKm
PeriodPeriodPeriodPeriod
Soft Loan Amount : 52 BillionSoft Loan Amount : 52 BillionSoft Loan Amount : 52 BillionSoft Loan Amount : 52 Billion FIRR FIRR FIRR FIRR 2.01%2.01%2.01%2.01%
22
Sr. No.
Name of Firm / JV
1. M/s NEIE – KRC – HRL (JV)
RECOMMENDATIONSRECOMMENDATIONS PQ
Six international companies / JVs were short listed. However, furtherprocess was stopped on advice of Steering Committee on February26, 2008. It is recommended that all these six short listed firms maybe invited to bid on the project after approval of the competentauthority
23
1. M/s NEIE – KRC – HRL (JV)
2. M/s China Overseas Engineering Co., (COVEC)
3. M/s CCPG – HRL – GRC (JV)
4. M/s China Gezhouba
5. M/s NEIE – KRC (JV)
6. M/s CWE – DESCON – IZHAR (JV)
24
FOR GERMAN
UNIVERSITY800 ACRES
SIALKOT-LAHORE
MOTORWAY
PROPOSED
INDUSTRIAL ZONE - 1
25
FOR INDUSTRIAL3000 ACRES
UNIVERSITY
ZONE LA
HO
RE
SIALKOT-LAHORE
MOTORWAY
PROPOSED
INDUSTRIAL ZONE - 2WADALA
SINDHU
26
FOR INDUSTRIAL ZONE3000 ACRES
LA
HO
RE
500 AC
RES
AC
CE
SS
R
OA
D FOR
SWED
ISH
UN
IVERSITY
SIALKOT-LAHORE
MOTORWAY
27
FOR INDUSTRIAL ZONE3000 ACRES
500 AC
RES
FOR
SWED
ISH
UN
IVERSITY
PROPOSED
INDUSTRIAL ZONE - 3
Proposed Commercial & Housing Zone 3000 Acres-Near Kala Shah
28
Kala Shah Kaku
EXISTING TOLL PLAZA
Proposed Housing & Commercial Zone 3000
Acres
29
� Travel time from Lahore to PunjabEngineering Triangle of Gujranwala, Gujratand Sialkot will reduce to half.
� Travel time from Lahore to Capital ofPakistan (Islamabad) on GT Road corridorwill reduce by 1½ hours (from 5 hrs to 3½
KSLM OFFERS !
will reduce by 1½ hours (from 5 hrs to 3½hrs)
� Link to Pakistan Motorway System (M-II)
� Direct access to three industrial zoneslocated on KSL Motorway.
� A new economic corridor
30
KSLM OFFERS !
� City of Lahore has spread more than 30kilometers towards south. Main trafficcorridors are under tremendous pressure. Inrush hours long queues and traffic jams arecommon phenomenon.
� KSLM provides an opportunity for:-� KSLM provides an opportunity for:-
� Development of Industrial Zones alongthe project Alignment
� Developing a Housing colony &Commercial Zone at Kalashah Kaku
� Developing a new city across river Ravi ata 20 minutes distance from city centre.
31
Comparison of Toll Rates /Km (no significant difference)
Traffic Type KSLM - Toll Rate M2/M3 - Toll Rate
Car Rs. 0.60 Rs. 0.53
Mini Bus Rs. 1.10 Rs. 1.06
KHARIAN-SIALKOT-LAHORE MOTORWAY
32
Wagon Rs. 0.80 Rs. 0.80
Bus Rs. 1.60 Rs. 1.59
Loader, Delivery Van
Rs. 1.60 Rs. 1.59
Truck Rs. 2.20 Rs. 2.12
Trailer Unit Rs. 2.70 Rs. 2.65