K&G Med Marinas Managament SA

Embed Size (px)

Citation preview

  • 8/10/2019 K&G Med Marinas Managament SA

    1/41

  • 8/10/2019 K&G Med Marinas Managament SA

    2/41

  • 8/10/2019 K&G Med Marinas Managament SA

    3/41

  • 8/10/2019 K&G Med Marinas Managament SA

    4/41

    What do we do?

    Is this site suitable for a marina?

    Does a market exist for this marina project?Can this marina make business sense in thislocation?

    How can the efficiency of this marina beimproved?

    How to improve the rendered services?How to maximize profits?

    Our company has the answers to all thesefrequently asked questions, providingcomprehensive operational managementand/or consultancy, by corporate staff withextensive experience in marina operation.

    Experience and knowledge of :

    Nature of the service offered

    Market trends,

    Customer needs,

    Cost efficiencies

    Broad industry prospective

    CAPABILITYOF

    MAXIMIZING

    MARINA

    EFFICIENCY

    &

    VALUE

  • 8/10/2019 K&G Med Marinas Managament SA

    5/41

    MARINA MANAGEMENT &

    ADMINISTRATION

    Personnel training and

    recruitment

    Marina management software

    Marina management systems Financial and accounting

    services

    Marketing

    Continuous assessment ofmarina condit ion

    Statistical data analysis

    Budget planning

  • 8/10/2019 K&G Med Marinas Managament SA

    6/41

    CONSULTANCY SERVICES

    Modernization and optimization

    of existing marinas

    Problem solving (Management,

    Financial, Legislative)

    Analysis of berth optimization Improving operational efficiency

    Marketing

    Branding

    Pricing Policy

    PROJECT MANAGEMENT

  • 8/10/2019 K&G Med Marinas Managament SA

    7/41

    PROJECT MANAGEMENT

    Business Plan

    Marina feasibili ty studies

    Market analysis Financial analysis

    Environmental studies(compliance with local andinternational environmental lawsand regulations)

    Evaluation of alternative sites formarina development

    Preparation of reports(Business, operational,

    statutory) Consideration of project

    financing options

    Full range of engineeringstudies, including:

    -Marit ime and Harbor works

    -Building and landscaping

    -Environmental impact

    assessment

    -Numerical modeling for

    wave climate predict ion and

    coastal dynamics analysis

  • 8/10/2019 K&G Med Marinas Managament SA

    8/41

    Analysis of the services andfacili ties to be developed

    Evaluate marina products andservices at competitive prices

    Feasibil ity study and cost benefitanalysis

    Tender documents preparation

    Project management during themarina construction stageincluding:

    -Design evaluation

    -Supervision of construction

    -Quality assurance-Time and Cost control

  • 8/10/2019 K&G Med Marinas Managament SA

    9/41

    MARKETING & SALES

    Preparation and

    implementation of marketing

    plan (Advertising, Website,

    Exhibitions/Boat Shows,

    Direct marketing)

    Customer database

    Customer service Complaint management

    Long Term berth sales/pricing

  • 8/10/2019 K&G Med Marinas Managament SA

    10/41

  • 8/10/2019 K&G Med Marinas Managament SA

    11/41

  • 8/10/2019 K&G Med Marinas Managament SA

    12/41

  • 8/10/2019 K&G Med Marinas Managament SA

    13/41

  • 8/10/2019 K&G Med Marinas Managament SA

    14/41

  • 8/10/2019 K&G Med Marinas Managament SA

    15/41

  • 8/10/2019 K&G Med Marinas Managament SA

    16/41

  • 8/10/2019 K&G Med Marinas Managament SA

    17/41

    LEFKAS MARINA

  • 8/10/2019 K&G Med Marinas Managament SA

    18/41

    A brand new and modern marina.

    Completed in 2002.

    Overtaken in 1999 by Lefkas Prefecture.

    THE PROJECT

    Construction of marine works.

    Installation of f loating pontoons.Construction of 7.000 sq. m buildings.

    Extensive site arrangements.

    Cost 26,5 mil.

    THE MARINACapacity: 620 berths

    Dry Docking: 280 boats

    Max Length: 45m.

    Max Draught: 3,5m.

    High Standard of services andfacilities.

    Full range of maintenance / repair

    Works.

    Travelift 150t

    Travelift 70tMobile Crane 60t.

  • 8/10/2019 K&G Med Marinas Managament SA

    19/41

  • 8/10/2019 K&G Med Marinas Managament SA

    20/41

  • 8/10/2019 K&G Med Marinas Managament SA

    21/41

  • 8/10/2019 K&G Med Marinas Managament SA

    22/41

  • 8/10/2019 K&G Med Marinas Managament SA

    23/41

  • 8/10/2019 K&G Med Marinas Managament SA

    24/41

  • 8/10/2019 K&G Med Marinas Managament SA

    25/41

    ZEA MARINA

  • 8/10/2019 K&G Med Marinas Managament SA

    26/41

    A marina with historic significance

    totally renovated for the 2004 Olympic

    Games.Overtaken in 2002 by the Hellenic

    Tourism Organization.

    THE PROJECT

    Upgrading and renovation of the

    exist ing installations.

    Construction of marine works.

    Installation of f loating pontoons.

    Elevation and prevention of theancient ruins.

    Extensive site arrangements.

    Renovation of building facilit ies

    Cost 10,5 mil.

    THE MARINA

    Capacity: 670 berths

    No dry docking or repair capabilit ies

    Maximum length: 80mMaximum draught: 6m

  • 8/10/2019 K&G Med Marinas Managament SA

    27/41

  • 8/10/2019 K&G Med Marinas Managament SA

    28/41

  • 8/10/2019 K&G Med Marinas Managament SA

    29/41

    KALAMATA MARINA

  • 8/10/2019 K&G Med Marinas Managament SA

    30/41

    A small but attractive marina.

    Overtaken by the Municipality in 1998.

    THE PROJECT

    Upgrading and renovation of the existing

    installations.Cost 450.000

    THE MARINA

    Capacity: 250 berthsDry docking: 150 boats

    Maximum length: 25m

    Maximum draught: 3m

    Very good services and facili ties.Satisfactory range of maintenance

    and repair works.

    Travelift 60t.

  • 8/10/2019 K&G Med Marinas Managament SA

    31/41

  • 8/10/2019 K&G Med Marinas Managament SA

    32/41

  • 8/10/2019 K&G Med Marinas Managament SA

    33/41

  • 8/10/2019 K&G Med Marinas Managament SA

    34/41

  • 8/10/2019 K&G Med Marinas Managament SA

    35/41

  • 8/10/2019 K&G Med Marinas Managament SA

    36/41

  • 8/10/2019 K&G Med Marinas Managament SA

    37/41

  • 8/10/2019 K&G Med Marinas Managament SA

    38/41

  • 8/10/2019 K&G Med Marinas Managament SA

    39/41

    Aigina Marina, Aigina island

    K&G carried out a feasibility study and modernization study of the 180 berths marina in Aeginaisland in the Saronic Gulf.

    Rafina marina, Attica

    A preliminary feasibility study as well as a financial analysis was carried out for a 150 berth marinanext to the main port of Rafina in Attica.

    Milos Marina, Milos island

    A preliminary feasibility study was carried out for the protected bay of Milos island in the AegeanSea, including berths for 80 yachts.

    Patra Marina, Peloponnesse

    A berth optimization and financial analysis was carried out for the existing marina in Patras.

    Nea Peramos, Peloponnesse

    A full range of engineering studies completed recently for a new 500 berths marina project in NeaPeramos opposite of Salamis island, close to Athens.

  • 8/10/2019 K&G Med Marinas Managament SA

    40/41

  • 8/10/2019 K&G Med Marinas Managament SA

    41/41