Keys to Success Floating LNG Power Vessel Technology ... · PDF fileSix Keys to Floating Projects Success Keys to Success Keys to Success The realization of FLNG has been drawing attention

Embed Size (px)

Citation preview

Page 1: Keys to Success Floating LNG Power Vessel Technology ... · PDF fileSix Keys to Floating Projects Success Keys to Success Keys to Success The realization of FLNG has been drawing attention

Dryer

PMRCompressr

MRCompressr

PMR

GT

GT

EL

FeedGas

N2

Reject

ToFuel

LNGto storage

31m39m

36m 30m

Y(m)

130

120

110

100

90

80

70

150 200 250 300

Z(m)170

160

150

140

130

120

110

100

150 200 250 300

Job=030506 War=PMAX(barg) Time=2.998(s) XY Plane. Z=300003 m

Power plant

Gas Pipe

line

FSRU

Nearshore FLNG

Open Sea FLNG

City

City

Power ship

RemoteOil/Gas Field

Small-ScaleLNG

Small-ScaleLNG

ReceivingTerminal

OffshoreGas Platform

Chiyoda CorporationMinatomirai Grand Central Tower4-6-2, Minatomirai, Nishi-ku,Yokohama 220-8765, Japanhttp://www.chiyoda-corp.com/en

Ⓒ Chiyoda Corporation, 2018. All Rights Reserved.

Design Optimization from the Initial Stage

Since liquefaction, storage and offloading facilities need to be mounted on a vessel of limited size, FLNG facilities tend to become congested. Compared to an on-shore plant, there is a higher risk of major accident hazards (fire, explosion, cryogenic spill, etc.).Therefore, it is important to review all aspects of FLNG projects from the initial stage including operational safety, LNG production rates, facilities costs, operating costs, and facility maintenance, to enhance the total project value.

Chiyoda’s advanced engineering capabilities and extensive LNG experience enable it to provide economical, reliable and operable FLNG facilities suitable for diverse gas fields, locations, client requirements and environmental and technical considerations.

Chiyoda will work with the marine consultant/contractor, shipyard fabricator and topsides fabrication contractor from the initial stage to establish optimum and competitive design and execution plans for the topsides, hull, and turret, if necessary and to provide a fully integrated and reliable execution plan for the FLNG project.

Keys to Success…

Contact us about FLNG : [email protected]

Topside design “Optimization” from the initial stage is essential for the successful realization of FLNG facilities as it improves total economic efficiency.

Floating LNG Power Vessel Technology

Keys to Success…

By leveraging its vast LNG experience, which covers 40% of worldwide LNG production on a capacity basis together with our broad based LNG capabilities, Chiyoda is ready to provide customers with the most viable solution to create an LNG Value Chain for offshore gas resources all over the world.

Gas/LNG value chain creation is one of Chiyoda’s core values, and this enhances project viability for Customers.

Creating an LNG Value ChainKeys to Success…

Based on Chiyoda’s experience, the following optimizations can be achieved:

● Approximately 10% increase from original LNG production rate through extensive process studies● Optimal equipment arrangement and compact layout● A production cost of less than US$1,000 USD/LNG ton with for large capacity FLNG● Approximately 20% topside weight reduction due to compact module design concept● Contributing to EPC schedule reduction through close collaboration with topside fabrication contractor

OptimumProcessDesign

ExtensiveSafetyDesign

Compact&

LighterModuleDesign

YardSupervision

&Management

As a leading EPC contractor, Chiyoda has the number one share in the construction of LNG receiving terminals in Japan. In recent years Chiyoda has actively developed Floating LNG (FLNG) technology. Based on these technologies and well proven experiences, Chiyoda has successfully completed the conceptual design of Floating LNG Power Vessels.

14 offices: Aberdeen, Abu Dhabi, Doha(Chiyoda Corporation), Dubai, Edinburgh, Glasgow, Houston, London, Stromness, Olso, Perth, Southhampton, Yokohama (Chiyoda Corporation)

Key features of Chiyoda’s Floating LNG Power Vessels are:

1. The Floating LNG Power Vessel has 4 functions which are berth facility, LNG storage, regasification and thermal power plant, in one floating unit.2. By converting the surplus of LNG Carriers to Floating LNG Power Vessels with small scale (~72 MW) to medium scale (~400 MW)

power generation systems, Chiyoda offers Power Generation facilities at significantly “lower CAPEX” and with “shorter delivery times”.3. By supplying electricity directly to land via heavy duty electrical cable, Chiyoda offers LNG Power Generation facilities in remote areas,

including islands, by eliminating infrastructures such as LNG receiving facilities and onshore Power Generation facilities.

In May 2017, Chiyoda received Approval In Principle (AIP) on the Floating LNG Power Vessel concept from the American Bureau of Shipping (ABS).

The demand for Natural Gas as a source of environmentally friendly clean energy has expanded rapidly in recent years. Chiyoda offers the Floating LNG Power Vessel with its inherent high reliability as one of Chiyoda’s LNG Value Chain solutions.

Total Floater Development Solution Provider

Keys to Success…

Through our subsidiary company, Xodus Group (Holdings), Chiyoda can provide Integrated Optimum Solutions combining Subsurface / SURF / Floater as a total development master plan and execute such plans as an EPCIC contractor.

4 million man-hours 14 strategically placed offices

8,500 projects 50,000 hours on largest project

300+ technical personnel

500+ clients70+ MSAs

Optimization can improve the Total Project Value.

Concept of Chiyoda’s FLPV (Floating LNG Power Vessel)

LNG CarrierLNG Electric Power

LAND(Demand

Area)

FLPVLNG Supply

https://ja.wikipedia.org/wiki/%E3%82%BF%E3%83%BC%E3%83%93%E3%83%B3 (Power Generation)

Berth LNGStorage Regasification Power

Generation

Unit(1)

abt.280m

20m 35m 42m 42m 42m 42m

Unit(2)

Unit(3)

Unit(4)

Makingnew

structuralblocks

Typical 1st ~2nd Generation LNGC

Utilizingparts ofexistingLNGC

Project experience

Page 2: Keys to Success Floating LNG Power Vessel Technology ... · PDF fileSix Keys to Floating Projects Success Keys to Success Keys to Success The realization of FLNG has been drawing attention

Six Keys to Floating ProjectsSuccess

Keys to Success…

Keys to Success…The realization of FLNG has been drawing attention as a means of developing undeveloped marine gas fields and providing a liquefaction plant at sea. The realization of FLNG requires the development of a whole system including safety and related peripheral technology. Chiyoda has been engaged in projects aimed at meeting present-day needs by using advanced technology. With a uniquely skilled and experience workforce, Chiyoda offers global engineering, procurement and construction services for realizing FLNG facility through the integration of all kinds of technology. Please see five major key issues that would bring to success for the realization of FLNG.

LNG Project ExperiencesRas Laffan, Qatar■ RasGas Train 1&2  RasGas 1995■ Qatargas Train 1&2  Qatargas 1996■ Qatargas Train 3  Qatargas 1998■ RasGas Train 3/4  RasGas (II) 2000, 2003, 2005■ Qatargas Debottlenecking Train 1/2/3  Qatargas 2003, 2004, 2005■ RasGas Train 5  RasGas (II) 2004, 2006

■ Qatargas II Train 4&5  Qatargas (II) 2004, 2008, 2009■ RasGas Train 6/7  RasGas (3) 2004, 2009■ Qatargas 3/4 Train 6&7  Qatar Petroleum &   ConocoPhillips Qatar Ltd. 2005,  Qatargas 2010■ Qatargas Plateau Maintenance  Qatargas 2014

Das Island, U.A.E. ■ ADGAS Train 1&2  ADGAS 1972, 1976■ ADGAS Train 3  ADGAS 1991, 1994

Qalhat, Oman■ Oman Train 1&2  Oman LNG 2000■ Oman Train 3  Shell Global Solutions 2001, 2002■ Qalhat LNG  Qalhat LNG 2005

Sabetta, Russia■ Yamal LNG  Yamal LNG 2013★

Bintulu, Malaysia■ Petronas Train 9  Petronas 2013

Arun, Indonesia■ Arun LNG Train 4&5  PERTAMINA 1983

Tangguh, Indonesia■ Tangguh LNG  PERTAMINA 2001■ Tangguh LNG Train 3 BP 2016★

Port Moresby, PNG■ PNG LNG Train 1&2  ExxonMobil 2009  ExxonMobil PNG 2014

Darwin, Australia■ Ichthys Train 1&2  INPEX Browse 2011  INPEX Operations★

James Price Point, Australia■ Browse LNG  Woodside Energy 2013

Scarborough, Australia■ Scarborough FLNG  Esso Australia Resources 2013, 2015

Gladstone, Australia■ Arrow Energy LNG  Shell Global Solutions 2012

Masela, Indonesia■ Abadi Floating LNG  INPEX Masela 2014

Bontang, Indonesia■ Bontang LNG Train-E  PERTAMINA 1989■ Bontang LNG Train-F  PERTAMINA 1993■ Bontang LNG Train-G  PERTAMINA 1997■ Bontang LNG Train-I  PERTAMINA 2001

Sakhalin Island, Russia■ Sakhalin Train 1&2  Shell Global Solutions 2001  Sakhalin Energy 2008■ Sakhalin Train 3  Shell Global Solutions★

Kitimat, Canada■ LNG Canada  LNG Canada 2015

Hackberry, USA■ Cameron LNG  Cameron LNG★

Sabine Pass, USA

Freeport, USA■ Freeport Train 1&2  FLNG Liquefaction  FLNG Liquefaction2★■ Freeport Train3  FLNG Liquefaction3★

■ Golden Pass LNG  Golden Pass Products★

Arzew, Algeria

La Brea, Trinidad Tobago■ Trinidad LNG  Atlantic LNG 1995

Santos Basin, Brazil■ Petrobras FLNG  Petrobras 2010

■ Gassi Touil LNG  Sonatrach 2015

Damietta, Egypt■ Egypt LNG  Union Fenosa 2001

Bonny Island, Nigeria■ Nigeria Train 1  Nigeria LNG 1994■ Nigeria Train 7  Nigeria LNG 2006

Cabo Delgado, Mozambique■ Mozambique LNG  Anadarko★■ Mozambique FLNG  Eni 201535 FEED/PS projects

26 EPC projects★ Ongoing Projects

over 40%*Plant capacity awarded  since 2005

** 43 trains, 172 million tons of LNG

**

Floating LNG Power Vessel Technology

Chiyoda’s Unique LNG Value Chain Solutions for Expanding Natural Gas Demand

Design Optimizationfrom the Initial StageImprovement of the Total Project Value

Creating an LNG Value Chain

Most Viable Solution to Create an LNG Value Chain for Offshore Gas Resources

Total FloaterDevelopmentSolution ProviderIntegrated Optimum Solutions Combining Subsurface / SURF / Floater with Chiyoda Affiliate

CAPEX Minimization SolutionsConversion FLNG/ Non-Liquid HC Refrigerant / Compact Module Design

Extensive Track RecordAccumulation of Extensive Know-how on LNG/Floaters

Jangkrik Floating Production Unit ProjectSource : http://skkmigas.go.id/

Papua New Guinea LNG ProjectCourtesy of ExxonMobil Corporation

Module Size & Weight Reduction!

45m

30m

30m

30m

Large module carried into the onshore LNG facilities of the Ichthys project (Australia Northern Territory Darwin, Bray Din point)

Courtesy of Yamal LNG

Non-Liquid Hydrocarbon Refrigerant Process for Small to Medium Sized FLNG projects offering CAPEX, process efficiency and safety

Wide Variety of Floating Applications: Non-Liquid HC Refrigerant

Keys to Success…

Wide Variety of Floating Applications: Conversion FLNG

CAPEX Minimization Solutions

*for above 2.0 mtpa production capacity*compared with New Build FLNG

Extensive Track Record

Chiyoda has a No.1 Rich FEED / EPC track record relating to its onshore LNG plants as well as extensive experience in Concept Studies and Pre-FEED and FEED work on many floating projects since 1998.

In 2012 it launched a professional department that deals with the FPSO in general including FLNG in order to accumulate more extensive know-how. Since then, as part of its portfolio of experience, Chiyoda has conducted FEED/Pre-EPC for Petrobras FLNG in Brazil, FEED for Abadi Gas Field Development FLNG in Indonesia, Pre-FEED/Optimization Study for SFLNG in Australia and FEED for Coral FLNG in Mozambique.

In February 2014 Chiyoda was awarded its first offshore EPCI project for Eni Muara Bakau's Floating Production Unit (FPU) offshore Gas Processing Facility, as a consortium member. It was successfully handed over to the client in 2017 and the first ‘gas in’ was achieved just one month after the FPU arrived at site.

Through these projects, Chiyoda has accumulated optimization ideas not only for topsides but also for hull, turret & mooring, offloading, towing and installation, and offshore commissioning.

Floating LNG (FLNG) refers to LNG plants in marine environments. To ensure operable and successful FLNG facilities, FLNG EPCI contractors should have extensive experience in LNG EPC projects.

Wide Variety of Floating Applications: Compact Module Design

Compact and Lightweight Topsides enabling optimum hull and marine concept.Hull and Marine are the key and major cost components of FLNG plants. Chiyoda’s “Compact Topside Design” concept, based on extensive LNG modular experience, enables us to propose several hull and marine concepts for various site conditions.

● Total of 167 modular construction projects implemented worldwide   since 1972.● 6,200 ton module for onshore LNG project in 2017

Chiyoda’s areas of expertise include outstanding engineering execution quality and design quality. This means we can reduce or avoid redoing design work and associated delayed engineering deliverables. Chiyoda will develop design and project execution strategies based on past lessons learn on Pre-FEED / FEED module projects.

“CAPEX reduction of 30 - 40%” for Open Sea“CAPEX reduction of 50 - 60%” for Nearshore

Chiyoda can offer CAPEX minimization solutions with :

Refrigerant storage facility

Multi-Refrigerant

Non-Liquid HC Refrigerant

Hull Size & Weight Reduction!

Chiyoda can provide a wide variety of solutions from small size to large sizeFLNG and Gas FPSO/ FPU.

FLNG FLNG

SFLNG - Ship Shaped FLNG(ExxonMobil Affiliate)> 6.0 mtpa, APCI SMRAustralia2012 ~2015: Pre-FEED/Optimization Study (Post Pre-FEED Work)

Petrobras FLNG(Petrobras Netherlands B.V.)2.7 mtpa , APCI DMR Brazil2009~2011: FEED/Pre-EPC

Abadi FLNG(INPEX Masela, Ltd.)2.5 mtpa , APCI DMR Indonesia2013~2014: FEED

FLNG(Confidential)Australia, 2015~2016: Pre-FEED

FLNG(Confidential)Australia,2016~2017: Concept Study

CFLNG- Cylindrical Hull FLNG�(ExxonMobil Affiliate)3-5 mtpa, EM ProprietaryAustralia, 2016~2017: Pre-FEED

Lowest Unit Cost FLNG(Esso Guyana)1.0 mtpa, EM ProprietaryOffshore Guyana�2017: Concept Study

Coral FLNG(Eni East Africa S.p.A)3.2 mtpa , APCI DMR Mozambique2014~2015: FEED

Jangkrik Floating Production Unit(Eni Muara Bakau B.V.)150MMSCFD x 3Indonesia2014~2017: EPCI (Completed)2012~2013: FEED

Large

Small

2009 2012 2013 2014 2015 2016 2017

6.0

5.0

4.0

3.0

2.0

1.0

FPU FLNG

FLNG

FLNG

FLNG FLNG

FLNG

SAFER&

LOWERCAPEX

Benefits compared to Liquid Refrigerant:● No refrigerant storage requirement● Less hydrocarbon inventory on board● Less exposure to cryogenic spill● Smaller and Lighter● No import of refrigerant or on board generation

Page 3: Keys to Success Floating LNG Power Vessel Technology ... · PDF fileSix Keys to Floating Projects Success Keys to Success Keys to Success The realization of FLNG has been drawing attention

Six Keys to Floating ProjectsSuccess

Keys to Success…

Keys to Success…The realization of FLNG has been drawing attention as a means of developing undeveloped marine gas fields and providing a liquefaction plant at sea. The realization of FLNG requires the development of a whole system including safety and related peripheral technology. Chiyoda has been engaged in projects aimed at meeting present-day needs by using advanced technology. With a uniquely skilled and experience workforce, Chiyoda offers global engineering, procurement and construction services for realizing FLNG facility through the integration of all kinds of technology. Please see five major key issues that would bring to success for the realization of FLNG.

LNG Project ExperiencesRas Laffan, Qatar■ RasGas Train 1&2  RasGas 1995■ Qatargas Train 1&2  Qatargas 1996■ Qatargas Train 3  Qatargas 1998■ RasGas Train 3/4  RasGas (II) 2000, 2003, 2005■ Qatargas Debottlenecking Train 1/2/3  Qatargas 2003, 2004, 2005■ RasGas Train 5  RasGas (II) 2004, 2006

■ Qatargas II Train 4&5  Qatargas (II) 2004, 2008, 2009■ RasGas Train 6/7  RasGas (3) 2004, 2009■ Qatargas 3/4 Train 6&7  Qatar Petroleum &   ConocoPhillips Qatar Ltd. 2005,  Qatargas 2010■ Qatargas Plateau Maintenance  Qatargas 2014

Das Island, U.A.E. ■ ADGAS Train 1&2  ADGAS 1972, 1976■ ADGAS Train 3  ADGAS 1991, 1994

Qalhat, Oman■ Oman Train 1&2  Oman LNG 2000■ Oman Train 3  Shell Global Solutions 2001, 2002■ Qalhat LNG  Qalhat LNG 2005

Sabetta, Russia■ Yamal LNG  Yamal LNG 2013★

Bintulu, Malaysia■ Petronas Train 9  Petronas 2013

Arun, Indonesia■ Arun LNG Train 4&5  PERTAMINA 1983

Tangguh, Indonesia■ Tangguh LNG  PERTAMINA 2001■ Tangguh LNG Train 3 BP 2016★

Port Moresby, PNG■ PNG LNG Train 1&2  ExxonMobil 2009  ExxonMobil PNG 2014

Darwin, Australia■ Ichthys Train 1&2  INPEX Browse 2011  INPEX Operations★

James Price Point, Australia■ Browse LNG  Woodside Energy 2013

Scarborough, Australia■ Scarborough FLNG  Esso Australia Resources 2013, 2015

Gladstone, Australia■ Arrow Energy LNG  Shell Global Solutions 2012

Masela, Indonesia■ Abadi Floating LNG  INPEX Masela 2014

Bontang, Indonesia■ Bontang LNG Train-E  PERTAMINA 1989■ Bontang LNG Train-F  PERTAMINA 1993■ Bontang LNG Train-G  PERTAMINA 1997■ Bontang LNG Train-I  PERTAMINA 2001

Sakhalin Island, Russia■ Sakhalin Train 1&2  Shell Global Solutions 2001  Sakhalin Energy 2008■ Sakhalin Train 3  Shell Global Solutions★

Kitimat, Canada■ LNG Canada  LNG Canada 2015

Hackberry, USA■ Cameron LNG  Cameron LNG★

Sabine Pass, USA

Freeport, USA■ Freeport Train 1&2  FLNG Liquefaction  FLNG Liquefaction2★■ Freeport Train3  FLNG Liquefaction3★

■ Golden Pass LNG  Golden Pass Products★

Arzew, Algeria

La Brea, Trinidad Tobago■ Trinidad LNG  Atlantic LNG 1995

Santos Basin, Brazil■ Petrobras FLNG  Petrobras 2010

■ Gassi Touil LNG  Sonatrach 2015

Damietta, Egypt■ Egypt LNG  Union Fenosa 2001

Bonny Island, Nigeria■ Nigeria Train 1  Nigeria LNG 1994■ Nigeria Train 7  Nigeria LNG 2006

Cabo Delgado, Mozambique■ Mozambique LNG  Anadarko★■ Mozambique FLNG  Eni 201535 FEED/PS projects

26 EPC projects★ Ongoing Projects

over 40%*Plant capacity awarded  since 2005

** 43 trains, 172 million tons of LNG

**

Floating LNG Power Vessel Technology

Chiyoda’s Unique LNG Value Chain Solutions for Expanding Natural Gas Demand

Design Optimizationfrom the Initial StageImprovement of the Total Project Value

Creating an LNG Value Chain

Most Viable Solution to Create an LNG Value Chain for Offshore Gas Resources

Total FloaterDevelopmentSolution ProviderIntegrated Optimum Solutions Combining Subsurface / SURF / Floater with Chiyoda Affiliate

CAPEX Minimization SolutionsConversion FLNG/ Non-Liquid HC Refrigerant / Compact Module Design

Extensive Track RecordAccumulation of Extensive Know-how on LNG/Floaters

Jangkrik Floating Production Unit ProjectSource : http://skkmigas.go.id/

Papua New Guinea LNG ProjectCourtesy of ExxonMobil Corporation

Module Size & Weight Reduction!

45m

30m

30m

30m

Large module carried into the onshore LNG facilities of the Ichthys project (Australia Northern Territory Darwin, Bray Din point)

Courtesy of Yamal LNG

Non-Liquid Hydrocarbon Refrigerant Process for Small to Medium Sized FLNG projects offering CAPEX, process efficiency and safety

Wide Variety of Floating Applications: Non-Liquid HC Refrigerant

Keys to Success…

Wide Variety of Floating Applications: Conversion FLNG

CAPEX Minimization Solutions

*for above 2.0 mtpa production capacity*compared with New Build FLNG

Extensive Track Record

Chiyoda has a No.1 Rich FEED / EPC track record relating to its onshore LNG plants as well as extensive experience in Concept Studies and Pre-FEED and FEED work on many floating projects since 1998.

In 2012 it launched a professional department that deals with the FPSO in general including FLNG in order to accumulate more extensive know-how. Since then, as part of its portfolio of experience, Chiyoda has conducted FEED/Pre-EPC for Petrobras FLNG in Brazil, FEED for Abadi Gas Field Development FLNG in Indonesia, Pre-FEED/Optimization Study for SFLNG in Australia and FEED for Coral FLNG in Mozambique.

In February 2014 Chiyoda was awarded its first offshore EPCI project for Eni Muara Bakau's Floating Production Unit (FPU) offshore Gas Processing Facility, as a consortium member. It was successfully handed over to the client in 2017 and the first ‘gas in’ was achieved just one month after the FPU arrived at site.

Through these projects, Chiyoda has accumulated optimization ideas not only for topsides but also for hull, turret & mooring, offloading, towing and installation, and offshore commissioning.

Floating LNG (FLNG) refers to LNG plants in marine environments. To ensure operable and successful FLNG facilities, FLNG EPCI contractors should have extensive experience in LNG EPC projects.

Wide Variety of Floating Applications: Compact Module Design

Compact and Lightweight Topsides enabling optimum hull and marine concept.Hull and Marine are the key and major cost components of FLNG plants. Chiyoda’s “Compact Topside Design” concept, based on extensive LNG modular experience, enables us to propose several hull and marine concepts for various site conditions.

● Total of 167 modular construction projects implemented worldwide   since 1972.● 6,200 ton module for onshore LNG project in 2017

Chiyoda’s areas of expertise include outstanding engineering execution quality and design quality. This means we can reduce or avoid redoing design work and associated delayed engineering deliverables. Chiyoda will develop design and project execution strategies based on past lessons learn on Pre-FEED / FEED module projects.

“CAPEX reduction of 30 - 40%” for Open Sea“CAPEX reduction of 50 - 60%” for Nearshore

Chiyoda can offer CAPEX minimization solutions with :

Refrigerant storage facility

Multi-Refrigerant

Non-Liquid HC Refrigerant

Hull Size & Weight Reduction!

Chiyoda can provide a wide variety of solutions from small size to large sizeFLNG and Gas FPSO/ FPU.

FLNG FLNG

SFLNG - Ship Shaped FLNG(ExxonMobil Affiliate)> 6.0 mtpa, APCI SMRAustralia2012 ~2015: Pre-FEED/Optimization Study (Post Pre-FEED Work)

Petrobras FLNG(Petrobras Netherlands B.V.)2.7 mtpa , APCI DMR Brazil2009~2011: FEED/Pre-EPC

Abadi FLNG(INPEX Masela, Ltd.)2.5 mtpa , APCI DMR Indonesia2013~2014: FEED

FLNG(Confidential)Australia, 2015~2016: Pre-FEED

FLNG(Confidential)Australia,2016~2017: Concept Study

CFLNG- Cylindrical Hull FLNG�(ExxonMobil Affiliate)3-5 mtpa, EM ProprietaryAustralia, 2016~2017: Pre-FEED

Lowest Unit Cost FLNG(Esso Guyana)1.0 mtpa, EM ProprietaryOffshore Guyana�2017: Concept Study

Coral FLNG(Eni East Africa S.p.A)3.2 mtpa , APCI DMR Mozambique2014~2015: FEED

Jangkrik Floating Production Unit(Eni Muara Bakau B.V.)150MMSCFD x 3Indonesia2014~2017: EPCI (Completed)2012~2013: FEED

Large

Small

2009 2012 2013 2014 2015 2016 2017

6.0

5.0

4.0

3.0

2.0

1.0

FPU FLNG

FLNG

FLNG

FLNG FLNG

FLNG

SAFER&

LOWERCAPEX

Benefits compared to Liquid Refrigerant:● No refrigerant storage requirement● Less hydrocarbon inventory on board● Less exposure to cryogenic spill● Smaller and Lighter● No import of refrigerant or on board generation

Page 4: Keys to Success Floating LNG Power Vessel Technology ... · PDF fileSix Keys to Floating Projects Success Keys to Success Keys to Success The realization of FLNG has been drawing attention

Six Keys to Floating ProjectsSuccess

Keys to Success…

Keys to Success…The realization of FLNG has been drawing attention as a means of developing undeveloped marine gas fields and providing a liquefaction plant at sea. The realization of FLNG requires the development of a whole system including safety and related peripheral technology. Chiyoda has been engaged in projects aimed at meeting present-day needs by using advanced technology. With a uniquely skilled and experience workforce, Chiyoda offers global engineering, procurement and construction services for realizing FLNG facility through the integration of all kinds of technology. Please see five major key issues that would bring to success for the realization of FLNG.

LNG Project ExperiencesRas Laffan, Qatar■ RasGas Train 1&2  RasGas 1995■ Qatargas Train 1&2  Qatargas 1996■ Qatargas Train 3  Qatargas 1998■ RasGas Train 3/4  RasGas (II) 2000, 2003, 2005■ Qatargas Debottlenecking Train 1/2/3  Qatargas 2003, 2004, 2005■ RasGas Train 5  RasGas (II) 2004, 2006

■ Qatargas II Train 4&5  Qatargas (II) 2004, 2008, 2009■ RasGas Train 6/7  RasGas (3) 2004, 2009■ Qatargas 3/4 Train 6&7  Qatar Petroleum &   ConocoPhillips Qatar Ltd. 2005,  Qatargas 2010■ Qatargas Plateau Maintenance  Qatargas 2014

Das Island, U.A.E. ■ ADGAS Train 1&2  ADGAS 1972, 1976■ ADGAS Train 3  ADGAS 1991, 1994

Qalhat, Oman■ Oman Train 1&2  Oman LNG 2000■ Oman Train 3  Shell Global Solutions 2001, 2002■ Qalhat LNG  Qalhat LNG 2005

Sabetta, Russia■ Yamal LNG  Yamal LNG 2013★

Bintulu, Malaysia■ Petronas Train 9  Petronas 2013

Arun, Indonesia■ Arun LNG Train 4&5  PERTAMINA 1983

Tangguh, Indonesia■ Tangguh LNG  PERTAMINA 2001■ Tangguh LNG Train 3 BP 2016★

Port Moresby, PNG■ PNG LNG Train 1&2  ExxonMobil 2009  ExxonMobil PNG 2014

Darwin, Australia■ Ichthys Train 1&2  INPEX Browse 2011  INPEX Operations★

James Price Point, Australia■ Browse LNG  Woodside Energy 2013

Scarborough, Australia■ Scarborough FLNG  Esso Australia Resources 2013, 2015

Gladstone, Australia■ Arrow Energy LNG  Shell Global Solutions 2012

Masela, Indonesia■ Abadi Floating LNG  INPEX Masela 2014

Bontang, Indonesia■ Bontang LNG Train-E  PERTAMINA 1989■ Bontang LNG Train-F  PERTAMINA 1993■ Bontang LNG Train-G  PERTAMINA 1997■ Bontang LNG Train-I  PERTAMINA 2001

Sakhalin Island, Russia■ Sakhalin Train 1&2  Shell Global Solutions 2001  Sakhalin Energy 2008■ Sakhalin Train 3  Shell Global Solutions★

Kitimat, Canada■ LNG Canada  LNG Canada 2015

Hackberry, USA■ Cameron LNG  Cameron LNG★

Sabine Pass, USA

Freeport, USA■ Freeport Train 1&2  FLNG Liquefaction  FLNG Liquefaction2★■ Freeport Train3  FLNG Liquefaction3★

■ Golden Pass LNG  Golden Pass Products★

Arzew, Algeria

La Brea, Trinidad Tobago■ Trinidad LNG  Atlantic LNG 1995

Santos Basin, Brazil■ Petrobras FLNG  Petrobras 2010

■ Gassi Touil LNG  Sonatrach 2015

Damietta, Egypt■ Egypt LNG  Union Fenosa 2001

Bonny Island, Nigeria■ Nigeria Train 1  Nigeria LNG 1994■ Nigeria Train 7  Nigeria LNG 2006

Cabo Delgado, Mozambique■ Mozambique LNG  Anadarko★■ Mozambique FLNG  Eni 201535 FEED/PS projects

26 EPC projects★ Ongoing Projects

over 40%*Plant capacity awarded  since 2005

** 43 trains, 172 million tons of LNG

**

Floating LNG Power Vessel TechnologyChiyoda’s Unique LNG Value Chain Solutions for Expanding Natural Gas Demand

Design Optimizationfrom the Initial StageImprovement of the Total Project Value

Creating an LNG Value Chain

Most Viable Solution to Create an LNG Value Chain for Offshore Gas Resources

Total FloaterDevelopmentSolution ProviderIntegrated Optimum Solutions Combining Subsurface / SURF / Floater with Chiyoda Affiliate

CAPEX Minimization SolutionsConversion FLNG/ Non-Liquid HC Refrigerant / Compact Module Design

Extensive Track RecordAccumulation of Extensive Know-how on LNG/Floaters

Jangkrik Floating Production Unit ProjectSource : http://skkmigas.go.id/

Papua New Guinea LNG ProjectCourtesy of ExxonMobil Corporation

Module Size & Weight Reduction!

45m

30m

30m

30m

Large module carried into the onshore LNG facilities of the Ichthys project (Australia Northern Territory Darwin, Bray Din point)

Courtesy of Yamal LNG

Courtesy of ExxonMobil Development Company

Non-Liquid Hydrocarbon Refrigerant Process for Small to Medium Sized FLNG projects offering CAPEX, process efficiency and safety

Wide Variety of Floating Applications: Non-Liquid HC Refrigerant

Keys to Success…

*for above 2.0 mtpaproduction capacity*compared withNew Build FLNG

Extensive Track Record

Chiyoda has a No.1 Rich FEED / EPC track record relating to its onshore LNG plants as well as extensive experience in Concept Studies and Pre-FEED and FEED work on many floating projects since 1998.

In 2012 it launched a professional department that deals with the FPSO in general including FLNG in order to accumulate more extensive know-how. Since then, as part of its portfolio of experience, Chiyoda has conducted FEED/Pre-EPC for Petrobras FLNG in Brazil, FEED for Abadi Gas Field Development FLNG in Indonesia, Pre-FEED/Optimization Study for SFLNG in Australia and FEED for Coral FLNG in Mozambique.

In February 2014 Chiyoda was awarded its first offshore EPCI project for Eni Muara Bakau's Floating Production Unit (FPU) offshore Gas Processing Facility, as a consortium member. It was successfully handed over to the client in 2017 and the first ‘gas in’ was achieved just one month after the FPU arrived at site.

Through these projects, Chiyoda has accumulated optimization ideas not only for topsides but also for hull, turret & mooring, offloading, towing and installation, and offshore commissioning.

Floating LNG (FLNG) refers to LNG plants in marine environments. To ensure operable and successful FLNG facilities, FLNG EPCI contractors should have extensive experience in LNG EPC projects.

Wide Variety of Floating Applications: Compact Module Design

Compact and Lightweight Topsides enabling optimum hull and marine concept.Hull and Marine are the key and major cost components of FLNG plants. Chiyoda’s “Compact Topside Design” concept, based on extensive LNG modular experience, enables us to propose several hull and marine concepts for various site conditions.

● Total of 167 modular construction projects implemented worldwide   since 1972.● 6,200 ton module for onshore LNG project in 2017

Chiyoda’s areas of expertise include outstanding engineering execution quality and design quality. This means we can reduce or avoid redoing design work and associated delayed engineering deliverables. Chiyoda will develop design and project execution strategies based on past lessons learn on Pre-FEED / FEED module projects.

Chiyoda can offer CAPEX minimization solutions with :

Refrigerant storage facility

Multi-Refrigerant

Non-Liquid HC Refrigerant

Hull Size & Weight Reduction!

Chiyoda can provide a wide variety of solutions from small size to large sizeFLNG and Gas FPSO/ FPU.

FLNG FLNG

SFLNG - Ship Shaped FLNG(ExxonMobil Affiliate)> 6.0 mtpa, APCI SMRAustralia2012 ~2015: Pre-FEED/Optimization Study (Post Pre-FEED Work)

Petrobras FLNG(Petrobras Netherlands B.V.)2.7 mtpa , APCI DMR Brazil2009~2011: FEED/Pre-EPC

Abadi FLNG(INPEX Masela, Ltd.)2.5 mtpa , APCI DMR Indonesia2013~2014: FEED

FLNG(Confidential)Australia, 2015~2016: Pre-FEED

FLNG(Confidential)Australia,2016~2017: Concept Study

CFLNG- Cylindrical Hull FLNG�(ExxonMobil Affiliate)3-5 mtpa, EM ProprietaryAustralia, 2016~2017: Pre-FEED

Lowest Unit Cost FLNG(Esso Guyana)1.0 mtpa, EM ProprietaryOffshore Guyana�2017: Concept Study

Coral FLNG(Eni East Africa S.p.A)3.2 mtpa , APCI DMR Mozambique2014~2015: FEED

Jangkrik Floating Production Unit(Eni Muara Bakau B.V.)150MMSCFD x 3Indonesia2014~2017: EPCI (Completed)2012~2013: FEED

Large

Small

2009 2012 2013 2014 2015 2016 2017

6.0

5.0

4.0

3.0

2.0

1.0

FPU FLNG

FLNG

FLNG

FLNG FLNG

FLNG

SAFER&

LOWERCAPEX

Benefits compared to Liquid Refrigerant:● No refrigerant storage requirement● Less hydrocarbon inventory on board● Less exposure to cryogenic spill● Smaller and Lighter● No import of refrigerant or on board generation

Wide Variety of Floating Applications: Conversion FLNG

CAPEX Minimization Solutions

“CAPEX reduction of 30-40%”for Open Sea

“CAPEX reduction of 50-60%”for Nearshore

Wide Variety of Floating Applications:New Build FLNG Solution-Cylindrical Hull

Client Country Year Field Capacity Project phase Hull Storage Mooring Offloading Shipyard Liquefaction

ExxonMobil Affiliate Offshore Western Australia 2016, 2017 Offshore Western Australia 3-5 mtpa Pre-FEEDCylindrical SPB tank or Membrane Spread mooring Tandem Floating Hose Not yet selected ExxonMobil Proprietary

Page 5: Keys to Success Floating LNG Power Vessel Technology ... · PDF fileSix Keys to Floating Projects Success Keys to Success Keys to Success The realization of FLNG has been drawing attention

Dryer

PMRCompressr

MRCompressr

PMR

GT

GT

EL

FeedGas

N2

Reject

ToFuel

LNGto storage

31m39m

36m 30m

Y(m)

130

120

110

100

90

80

70

150 200 250 300

Z(m)170

160

150

140

130

120

110

100

150 200 250 300

Job=030506 War=PMAX(barg) Time=2.998(s) XY Plane. Z=300003 m

Power plant

Gas Pipe

line

FSRU

Nearshore FLNG

Open Sea FLNG

City

City

Power ship

RemoteOil/Gas Field

Small-ScaleLNG

Small-ScaleLNG

ReceivingTerminal

OffshoreGas Platform

Chiyoda CorporationMinatomirai Grand Central Tower4-6-2, Minatomirai, Nishi-ku,Yokohama 220-8765, Japanhttp://www.chiyoda-corp.com/en

Ⓒ Chiyoda Corporation, 2018. All Rights Reserved.

Design Optimization from the Initial Stage

Since liquefaction, storage and offloading facilities need to be mounted on a vessel of limited size, FLNG facilities tend to become congested. Compared to an on-shore plant, there is a higher risk of major accident hazards (fire, explosion, cryogenic spill, etc.).Therefore, it is important to review all aspects of FLNG projects from the initial stage including operational safety, LNG production rates, facilities costs, operating costs, and facility maintenance, to enhance the total project value.

Chiyoda’s advanced engineering capabilities and extensive LNG experience enable it to provide economical, reliable and operable FLNG facilities suitable for diverse gas fields, locations, client requirements and environmental and technical considerations.

Chiyoda will work with the marine consultant/contractor, shipyard fabricator and topsides fabrication contractor from the initial stage to establish optimum and competitive design and execution plans for the topsides, hull, and turret, if necessary and to provide a fully integrated and reliable execution plan for the FLNG project.

Keys to Success…

Contact us about FLNG : [email protected]

Topside design “Optimization” from the initial stage is essential for the successful realization of FLNG facilities as it improves total economic efficiency.

Floating LNG Power Vessel Technology

Keys to Success…

By leveraging its vast LNG experience, which covers 40% of worldwide LNG production on a capacity basis together with our broad based LNG capabilities, Chiyoda is ready to provide customers with the most viable solution to create an LNG Value Chain for offshore gas resources all over the world.

Gas/LNG value chain creation is one of Chiyoda’s core values, and this enhances project viability for Customers.

Creating an LNG Value ChainKeys to Success…

Based on Chiyoda’s experience, the following optimizations can be achieved:

● Approximately 10% increase from original LNG production rate through extensive process studies● Optimal equipment arrangement and compact layout● A production cost of less than US$1,000 USD/LNG ton with for large capacity FLNG● Approximately 20% topside weight reduction due to compact module design concept● Contributing to EPC schedule reduction through close collaboration with topside fabrication contractor

OptimumProcessDesign

ExtensiveSafetyDesign

Compact&

LighterModuleDesign

YardSupervision

&Management

As a leading EPC contractor, Chiyoda has the number one share in the construction of LNG receiving terminals in Japan. In recent years Chiyoda has actively developed Floating LNG (FLNG) technology. Based on these technologies and well proven experiences, Chiyoda has successfully completed the conceptual design of Floating LNG Power Vessels.

14 offices: Aberdeen, Abu Dhabi, Doha(Chiyoda Corporation), Dubai, Edinburgh, Glasgow, Houston, London, Stromness, Olso, Perth, Southhampton, Yokohama (Chiyoda Corporation)

Key features of Chiyoda’s Floating LNG Power Vessels are:

1. The Floating LNG Power Vessel has 4 functions which are berth facility, LNG storage, regasification and thermal power plant, in one floating unit.2. By converting the surplus of LNG Carriers to Floating LNG Power Vessels with small scale (~72 MW) to medium scale (~400 MW)

power generation systems, Chiyoda offers Power Generation facilities at significantly “lower CAPEX” and with “shorter delivery times”.3. By supplying electricity directly to land via heavy duty electrical cable, Chiyoda offers LNG Power Generation facilities in remote areas,

including islands, by eliminating infrastructures such as LNG receiving facilities and onshore Power Generation facilities.

In May 2017, Chiyoda received Approval In Principle (AIP) on the Floating LNG Power Vessel concept from the American Bureau of Shipping (ABS).

The demand for Natural Gas as a source of environmentally friendly clean energy has expanded rapidly in recent years. Chiyoda offers the Floating LNG Power Vessel with its inherent high reliability as one of Chiyoda’s LNG Value Chain solutions.

Total Floater Development Solution Provider

Keys to Success…

Through our subsidiary company, Xodus Group (Holdings), Chiyoda can provide Integrated Optimum Solutions combining Subsurface / SURF / Floater as a total development master plan and execute such plans as an EPCIC contractor.

4 million man-hours 14 strategically placed offices

8,500 projects 50,000 hours on largest project

300+ technical personnel

500+ clients70+ MSAs

Optimization can improve the Total Project Value.

Concept of Chiyoda’s FLPV (Floating LNG Power Vessel)

LNG CarrierLNG Electric Power

LAND(Demand

Area)

FLPVLNG Supply

https://ja.wikipedia.org/wiki/%E3%82%BF%E3%83%BC%E3%83%93%E3%83%B3 (Power Generation)

Berth LNGStorage Regasification Power

Generation

Unit(1)

abt.280m

20m 35m 42m 42m 42m 42m

Unit(2)

Unit(3)

Unit(4)

Makingnew

structuralblocks

Typical 1st ~2nd Generation LNGC

Utilizingparts ofexistingLNGC

Project experience

Page 6: Keys to Success Floating LNG Power Vessel Technology ... · PDF fileSix Keys to Floating Projects Success Keys to Success Keys to Success The realization of FLNG has been drawing attention

Dryer

PMRCompressr

MRCompressr

PMR

GT

GT

EL

FeedGas

N2 Reject

ToFuel

LNGto storage

31m39m

36m 30m

Y(m)

130

120

110

100

90

80

70

150 200 250 300

Z(m)170

160

150

140

130

120

110

100

150 200 250 300

Job=030506 War=PMAX(barg) Time=2.998(s) XY Plane. Z=300003 m

Power plant

Gas Pipe line

FSRU

Nearshore FLNG

Open Sea FLNG

City

City

Power ship

RemoteOil/Gas Field

Small-ScaleLNG

Small-ScaleLNG

ReceivingTerminal

OffshoreGas Platform

Chiyoda CorporationMinatomirai Grand Central Tower4-6-2, Minatomirai, Nishi-ku,Yokohama 220-8765, Japanwww.chiyodacorp.com

Ⓒ Chiyoda Corporation, 2018. All Rights Reserved.

Design Optimization from the Initial Stage

Since liquefaction, storage and offloading facilities need to be mounted on a vessel of limited size, FLNG facilities tend to become congested. Compared to an on-shore plant, there is a higher risk of major accident hazards (fire, explosion, cryogenic spill, etc.).Therefore, it is important to review all aspects of FLNG projects from the initial stage including operational safety, LNG production rates, facilities costs, operating costs, and facility maintenance, to enhance the total project value.

Chiyoda’s advanced engineering capabilities and extensive LNG experience enable it to provide economical, reliable and operable FLNG facilities suitable for diverse gas fields, locations, client requirements and environmental and technical considerations.

Chiyoda will work with the marine consultant/contractor, shipyard fabricator and topsides fabrication contractor from the initial stage to establish optimum and competitive design and execution plans for the topsides, hull, and turret, if necessary and to provide a fully integrated and reliable execution plan for the FLNG project.

Keys to Success…

Contact us about FLNG : [email protected]

Topside design “Optimization” from the initial stage is essential for the successful realization of FLNG facilities as it improves total economic efficiency.

Floating LNG Power Vessel Technology

Keys to Success…

By leveraging its vast LNG experience, which covers 40% of worldwide LNG production on a capacity basis together with our broad based LNG capabilities, Chiyoda is ready to provide customers with the most viable solution to create an LNG Value Chain for offshore gas resources all over the world.

Gas/LNG value chain creation is one of Chiyoda’s core values, and this enhances project viability for Customers.

Creating an LNG Value ChainKeys to Success…

Based on Chiyoda’s experience, the following optimizations can be achieved:

● Approximately 10% increase from original LNG production rate through extensive process studies● Optimal equipment arrangement and compact layout● A production cost of less than US$1,000 USD/LNG ton with for large capacity FLNG● Approximately 20% topside weight reduction due to compact module design concept● Contributing to EPC schedule reduction through close collaboration with topside fabrication contractor

OptimumProcessDesign

ExtensiveSafetyDesign

Compact&

LighterModuleDesign

YardSupervision

&Management

As a leading EPC contractor, Chiyoda has the number one share in the construction of LNG receiving terminals in Japan. In recent years Chiyoda has actively developed Floating LNG (FLNG) technology. Based on these technologies and well proven experiences, Chiyoda has successfully completed the conceptual design of Floating LNG Power Vessels.

14 offices: Aberdeen, Abu Dhabi, Doha(Chiyoda Corporation), Dubai, Edinburgh, Glasgow, Houston, London, Stromness, Olso, Perth, Southhampton, Yokohama (Chiyoda Corporation)

Key features of Chiyoda’s Floating LNG Power Vessels are:

1. The Floating LNG Power Vessel has 4 functions which are berth facility, LNG storage, regasification and thermal power plant, in one floating unit.2. By converting the surplus of LNG Carriers to Floating LNG Power Vessels with small scale (~72 MW) to medium scale (~400 MW) power generation systems, Chiyoda offers Power Generation facilities at significantly “lower CAPEX” and with “shorter delivery times”.

3. By supplying electricity directly to land via heavy duty electrical cable, Chiyoda offers LNG Power Generation facilities in remote areas, including islands, by eliminating infrastructures such as LNG receiving facilities and onshore Power Generation facilities.

In May 2017, Chiyoda received Approval In Principle (AIP) on the Floating LNG Power Vessel concept from the American Bureau of Shipping (ABS).

The demand for Natural Gas as a source of environmentally friendly clean energy has expanded rapidly in recent years. Chiyoda offers the Floating LNG Power Vessel with its inherent high reliability as one of Chiyoda’s LNG Value Chain solutions.

Total Floater Development Solution Provider

Keys to Success…

Through our subsidiary company, Xodus Group (Holdings), Chiyoda can provide Integrated Optimum Solutions combining Subsurface / SURF / Floater as a total development master plan and execute such plans as an EPCIC contractor.

4 million man-hours 14 strategically placed offices

8,500 projects 50,000 hours on largest project

300+ technical personnel

500+ clients70+ MSAs

Optimization can improve the Total Project Value.

Concept of Chiyoda’s FLPV (Floating LNG Power Vessel)

LNG CarrierLNG Electric Power

LAND(Demand Area)

FLPVLNG Supply

https://ja.wikipedia.org/wiki/%E3%82%BF%E3%83%BC%E3%83%93%E3%83%B3 (Power Generation)

Berth LNGStorage Regasification Power

Generation

Unit(1)

abt.280m

20m 35m 42m 42m 42m 42m

Unit(2)

Unit(3)

Unit(4)

Makingnew

structuralblocks

Typical 1st ~2nd Generation LNGC

Utilizingparts ofexistingLNGC

Project experience