Key Points Discussion of the Heating Furnace HAZOP Analysis Li Qiandeng 1,2 1 SINOPEC Research Institute of Safety Engineering, Qingdao Shandong 266071China 2 State Key Laboratory of Safety and Control for Chemicals, Qingdao Shandong 266071China [email protected] Keywords Heating furnace; HAZOP analysis Abstract Heating furnace is the key and core equipment in the petrochemical production plant, therefore using risk assessment method to effectively identify and control the possible risk is very important. In this paper, how to consider the heating furnace danger and operational problems in the HAZOP analysis were introduced. Through using delayed coking furnace HAZOP analysis as an example, combined with the key points that need to be concerned and analyzed in heating furnace HAZOP analysis, the author provided the heating furnace HAZOP analysis results under these key points, and a meaningful reference for the personnel engaged in HAZOP analysis and safety management. Introduction For decades, the technical innovation brought enormous changes to the petrochemical industry, new products constantly emerging, unit scale gradually expanding, process systems are becoming more and more complex, operating conditions are becoming more and more severe. Followed by a series of major process safety accidents, which make the whole industry gradually realized that system methods and techniques are in urgent need to prevent process safety accidents. Due to the advantage of comprehensive, systematic and meticulous, hazard and operability analysis (HAZOP) analysis has been widely applied to the process hazard analysis of petroleum and petrochemical, etc [1][2] , and recommended by many international safety standards [3] . In addition, HAZOP analysis has also been widely spread and applied by the global petroleum and petrochemical companies, chemical production enterprises, design and construction companies. During the process of HAZOP application abroad, in order to guarantee the analysis quality and guide the enterprise personnel to do the HAZOP analysis better, many large-scale petrochemical enterprises have established the HAZOP analysis methods and main points suitable for their own enterprise. Heating furnace is the high temperature reaction and heating equipment in the process of chemical production. With the development of chemical industry, there are more and more types and kinds of chemical industry heating furnace, many furnaces are key and core equipment among the production facilities. Therefore, how to consider the risk and operability, make the focus points clear, seize the key points of the heating furnace HAZOP analysis, play a key role in identifying and controlling the possible risk, preventing the accidents, protecting the environment, and saving resources. Based on the heating furnace HAZOP analysis, through using examples, this paper will study and discuss the HAZOP analysis key points of the heating furnace combustion side and process side, and give the HAZOP analysis results and effects. International Forum on Energy, Environment Science and Materials (IFEESM 2017) Copyright © 2018, the Authors. Published by Atlantis Press. This is an open access article under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/). Advances in Engineering Research, volume 120 705

Key Points Discussion of the Heating Furnace HAZOP AnalysisHeating furnace HAZOP analysis Select a delayed coking unit heating furnace as an example, the heating furnace is double

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Key Points Discussion of the Heating Furnace HAZOP AnalysisHeating furnace HAZOP analysis Select a delayed coking unit heating furnace as an example, the heating furnace is double

Key Points Discussion of the Heating Furnace HAZOP Analysis

Li Qiandeng1,2

1SINOPEC Research Institute of Safety Engineering, Qingdao Shandong 266071,China 2State Key Laboratory of Safety and Control for Chemicals, Qingdao Shandong 266071,China

[email protected]

Keywords Heating furnace; HAZOP analysis Abstract Heating furnace is the key and core equipment in the petrochemical production plant, therefore using risk assessment method to effectively identify and control the possible risk is very important. In this paper, how to consider the heating furnace danger and operational problems in the HAZOP analysis were introduced. Through using delayed coking furnace HAZOP analysis as an example, combined with the key points that need to be concerned and analyzed in heating furnace HAZOP analysis, the author provided the heating furnace HAZOP analysis results under these key points, and a meaningful reference for the personnel engaged in HAZOP analysis and safety management.

Introduction

For decades, the technical innovation brought enormous changes to the petrochemical industry, new products constantly emerging, unit scale gradually expanding, process systems are becoming more and more complex, operating conditions are becoming more and more severe. Followed by a series of major process safety accidents, which make the whole industry gradually realized that system methods and techniques are in urgent need to prevent process safety accidents.

Due to the advantage of comprehensive, systematic and meticulous, hazard and operability analysis (HAZOP) analysis has been widely applied to the process hazard analysis of petroleum and petrochemical, etc [1][2], and recommended by many international safety standards [3]. In addition, HAZOP analysis has also been widely spread and applied by the global petroleum and petrochemical companies, chemical production enterprises, design and construction companies. During the process of HAZOP application abroad, in order to guarantee the analysis quality and guide the enterprise personnel to do the HAZOP analysis better, many large-scale petrochemical enterprises have established the HAZOP analysis methods and main points suitable for their own enterprise. Heating furnace is the high temperature reaction and heating equipment in the process of chemical production. With the development of chemical industry, there are more and more types and kinds of chemical industry heating furnace, many furnaces are key and core equipment among the production facilities. Therefore, how to consider the risk and operability, make the focus points clear, seize the key points of the heating furnace HAZOP analysis, play a key role in identifying and controlling the possible risk, preventing the accidents, protecting the environment, and saving resources.

Based on the heating furnace HAZOP analysis, through using examples, this paper will study and discuss the HAZOP analysis key points of the heating furnace combustion side and process side, and give the HAZOP analysis results and effects.

International Forum on Energy, Environment Science and Materials (IFEESM 2017)

Copyright © 2018, the Authors. Published by Atlantis Press. This is an open access article under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Advances in Engineering Research, volume 120

705

Page 2: Key Points Discussion of the Heating Furnace HAZOP AnalysisHeating furnace HAZOP analysis Select a delayed coking unit heating furnace as an example, the heating furnace is double

Heating furnace HAZOP analysis

Select a delayed coking unit heating furnace as an example, the heating furnace is double side radiant, the furnace tube is placed in the middle of the chamber, combustors are placed on both sides of the tube rows, flame and hot flue gas is double side radiant to the furnace tube. All the parameters and date of the heating furnace system, including the equipment, pipeline and control system is known, but with no specification due to the space limitation. Choose the piping and instruments diagram (P&ID diagram) of the heating furnace system, and divide into four nodes as shown in Figure 1.

Figure 1 Heating furnace node partition Using the “parameter precedence” form from the 《Hazard and operability studies (HAZOP

studies) —Application guide》(BS IEC 61882:2001)[4] and 《the Hazard and operability analysis (HAZOP analysis) —Application guide》(AQ/T3049-2013) [5], and part of the deviations from the “description of the commonly deviations” [1] in the 《the Hazard and operability analysis (HAZOP analysis) —Application guide》 as shown in Table 1.

Advances in Engineering Research, volume 120

706

Page 3: Key Points Discussion of the Heating Furnace HAZOP AnalysisHeating furnace HAZOP analysis Select a delayed coking unit heating furnace as an example, the heating furnace is double

Table 1 Description of the chosen deviations Deviation description

Flow rate is too low/no flow rate Flow rate is lower than design/operation requirement/ no flow rate Flow rate is too high Flow rate is higher than design/operation requirements

Reverse flow Flow toward to the opposite direction of the design or operation target Pressure is too low Pressure is lower than design/operation requirements Pressure is too high Pressure is higher than design/operation requirements

Temperature is too low Temperature is lower than design/operation requirements Temperature is too high Temperature is higher than design/operation requirements

Fire/explosion External fire/explosion effect Concentration is too low Concentration is lower than design/operation requirements Concentration is too high Concentration is higher than design/operation requirements

Empty tank Container liquid level loss Liquid level is too low Liquid level is lower than design/operation requirements Liquid level is too high Liquid level is higher than design/operation requirements

Corrosion Excessively reduce the operation life period Sampling/test/maintenance May cause harm, production delay and property loss

Production startup May cause harm, production delay and property loss Production stop May cause harm, production delay and property loss

Human factor Effect on human from design/operation requirement (such as Continuous working time,

labor intensity and ergonomics )

For each analysis node, select the key equipment in the node, make it collocate with the chosen deviations to form detailed deviation, and then according to the detailed deviation to analyze the causes, consequences, existing protection measure, acceptable risk and suggested measures, then complete the heating furnace HAZOP analysis. Combined with the practical application in the HAZOP analysis process, the HAZOP analysis key points of the heating furnace will be discussed next.

The heating furnace combustion chamber side

Node 1, the fuel gas separate tank For the PID figure of the heating furnace combustion chamber side as shown in Figure 1, node

1 is the fuel gas separate tank. Through general deviation, detailed deviation was generated, the reason of the deviation was analyzed, and serious safety consequences that lead by the detailed deviation without consideration of protection were analyzed (the following node analysis was according to the same idea). Part of the HAZOP analysis record form of node 1 was shown as follow.

Advances in Engineering Research, volume 120

707

Page 4: Key Points Discussion of the Heating Furnace HAZOP AnalysisHeating furnace HAZOP analysis Select a delayed coking unit heating furnace as an example, the heating furnace is double

Table 2. The HAZOP analysis record form of node 1 Number Detailed deviation Consequence Available

protection measures

Recommended measures

1 Liquid level of the fuel gas separate tank is too high

May lead to the fuel gas mixed with liquid, the furnace temperature rise sharply; positive pressure in the furnace, fire squirt from the fire window; emit black smoke, burn out of the furnace bottom, flash fire and explosion.

2 Corrosion of the fuel gas separate tank

May lead to leakage of the fuel gas separate tank, flammable gas cloud will be formed, fire explosion will happen when meet ignition source.

3 Temperature of the fuel gas separate tank is too low

1、 May cause too much condensate, and easily lead to the fuel gas mix with liquid.

2、 May cause water contained in condensate, and lead to frozen when temperature is low.

4 Drainage operation of the fuel gas separate tank

May cause fuel gas straightly drain to the floor drain, risk of fire and explosion may exist.

Key point 1: can liquids enter into the fuel gas system? If so, whether corresponding measures were being taken [6]. Consideration and analysis needed: (1)whether fuel gas separate tank was set in front of the fuel gas main pipeline of the heating

furnace burner, and whether cut-off valve was set in the entrance of the fuel gas separate tank. (2)whether pilot gas and exhaust gas system could with liquid, if so, whether fuel gas

separate tank was set. (3)whether high liquid level alarm was set, whether steam heating coils were set in the cold

region. (4)whether necessary insulation or heating measures of the pipeline between the fuel gas

separate tank were taken according to the local climate condition. (5)whether the condensate of the fuel gas separate tank was discharged into the closed

system; Whether the reverse flow risk of the condensate discharge system and reverse current protection were. Through the consideration and analysis of the key point 1, the HAZOP analytical records of node 1 is shown in the figure as bellow.

Table 3. The HAZOP analytical records of node 1 Number Detailed

deviation Consequence Available protection

measures Recommended measures

1

Liquid level of the fuel gas separate tank is too high

May lead to the fuel gas mixed with liquid, the furnace temperature rise sharply; positive pressure in the furnace, fire squirt from the fire window; emit black smoke, burn out of the furnace bottom, flash fire and explosion.

Be equipped with on-site liquid indicator

Consider adding remote transmitting liquid level indicator, and set high liquid level alarm

2

Corrosion of the fuel gas separate tank

May lead to leakage of the fuel gas separate tank, flammable gas cloud will be formed, fire explosion will happen when meet ignition source.

Be equipped with regulating valve and stop valve before the entrance of the fuel gas separate tank

Consider adding shut-off valve at the entrance of the fuel gas separate tank on the main fuel gas pipeline, so that when fuel gas is leaked, the main air valve can be shut down automatically to cut off the gas supply and prevent the serious accidents.

3 Temperature of the fuel

3、 May cause too much condensate, and easily lead to

Fuel gas separate tank is equipped with

Consider adding thermal insulation or heat tracing

Advances in Engineering Research, volume 120

708

Page 5: Key Points Discussion of the Heating Furnace HAZOP AnalysisHeating furnace HAZOP analysis Select a delayed coking unit heating furnace as an example, the heating furnace is double

gas separate tank is too low

the fuel gas mix with liquid. 4、 May cause water contained in

condensate, and lead to frozen when temperature is low.

steam heating coils. measures to the pipeline between

4

Drainage operation of the fuel gas separate tank

May cause fuel gas straightly drain to the floor drain, risk of fire and explosion may exist.

Consider discharging fuel gas condensate into the closed system.

Node 2, the main burner system Node 2 is the main burner system, the same as node 1, part of the HAZOP analysis record form

of node 2 was shown as follow. Table 4. The HAZOP analysis record form of node 2

Number Detailed deviation

Consequence Available protection measures

Recommended measures

1 Pressure of the fuel gas is too low

1、 When serious, the deviation may lead to flameout. If there is fuel gas pressure fluctuation at this time, the furnace may in the danger of secondary flash explosion.

2、 May lead to temper.

Key point 2: whether necessary safety measures were set in the fuel gas pipeline[7][8]. The following content need to consider and analyze: (1)When the pipeline pressure before the heating furnace fuel gas regulating valve is equal to

or less than 0.4 Mpa, and there is no low pressure automatic protection instrument, whether back-fire relief valve are set between each fuel gas regulating valve and heating furnace. (2)Whether pressure regulating valve and remote controlled stop valve are set in the main

fuel gas pipeline. The distance between the stop valve and burner must be longer than 15m. (3)Whether cock or ball valve are used as shut-off valve in the fuel gas system. Through the consideration and analysis of the key point 2, the HAZOP analytical records of

node 2 is shown in the figure as bellow.

Table 5. The HAZOP analytical records of node 2 Number Detailed

deviation Consequence Available protection measures Recommended measures

1

Pressure of the fuel gas is too low

1、 When serious, the deviation may lead to flameout. If there is fuel gas pressure fluctuation at this time, the furnace may in the danger of secondary flash explosion.

2、 May lead to temper.

1、 Each by-pass main pipeline of the fuel gas system are set with shut-off valve UV32101, and temperature regulating valve TV32133/32134. The shut-off valve are set with magnetic ball valve.

2、 Flame arrester are set between the fuel gas and regulating valve.

1、 Confirm the rationality of the main pipeline temperature regulating valve group, whether pressure control need to replaced.

2、 Confirm the distance between the shut-off valve on-site location and burner block are longer than 15m.

Node 3, the pilot burner system

Node 3 is the pilot burner system, according to the HAZOP analysis procedure, part of the HAZOP analysis record form of node 3 was shown as follow.

Advances in Engineering Research, volume 120

709

Page 6: Key Points Discussion of the Heating Furnace HAZOP AnalysisHeating furnace HAZOP analysis Select a delayed coking unit heating furnace as an example, the heating furnace is double

Table 6. The HAZOP analysis record form of node 3 Number Detailed deviation Consequence Available

protection measures Recommended measures

1 Main burner is extinct

The heating furnace is extinct, the fuel gas may be smoldering in the hearth, and major risk of secondary explosion exists in the heating furnace hearth.

2 Pressure of the fuel gas pipeline in the pilot burner system is too low

1、when serious, may lead to flameout, if the fuel gas pressure fluctuates at this time, may lead to the risk of secondary explosion of the hearth.

2、may lead to temper.

Key point 3: whether the pilot burner settings can meet the safety requirements [9]. The following content need to consider and analyze: (1)Each burner need to set up pilot burner system. (2)The fuel gas used by the pilot burner should be delivered from the upstream of the fuel

gas regulating valve, and flame arrester need to be set up. (3)Under any operating conditions, even when the main burner are extinct, air need to be

continuously provided into the pilot burner system. (4)Measures need to be provided to observe the burner and pilot burner flame during ignition

and burner operation adjustment. (5)Whether accident cut-off valve and self-reliance pressure regulating valve are set up in

the pilot burner pipeline. Whether local pressure gauge, low pressure alarm and low pressure interlock are set up in the downstream of regulating valve.

Through the consideration and analysis of the key point 3, the HAZOP analytical records of node 3 is shown in the figure as bellow.

Table 7. The HAZOP analytical records of node 3

Number Detailed deviation

Consequence Available protection measures Recommended measures

1 Main burner is extinct

The heating furnace is extinct, the fuel gas may be smoldering in the hearth, and major risk of secondary explosion exists in the heating furnace hearth.

Each burner sets up pilot burner system.

1、confirm that when the main burner stop burning, whether air need to be provided into the pilot burner continuously by the blower. 2、confirm that whether fire windows are set up in the heating burner, so that we could observe the burner and pilot burner flame during ignition and burner operation adjustment

2

Pressure of the fuel gas pipeline in the pilot burner system is too low

1、when serious, may lead to flameout, if the fuel gas pressure fluctuates at this time, may lead to the risk of secondary explosion of the hearth.

2、may lead to temper.

1、Accident cut-off valve UV 32104 and self-reliance pressure regulating valve PCV32121 are set up in the pilot burner pipeline. Local pressure gauge PG32159, low pressure alarm PIAL32120 and low pressure interlock PIALL32110 are set up in the downstream of regulating valve 2、The fuel gas used by the pilot burner is delivered from the upstream of the fuel gas regulating valve, and flame arrester is set up.

1、Set the position of the low pressure alarm PIAL32120 and low pressure interlock PIALL32110 in the downstream of regulating valve after the flame arrester. 2、In the PID figure, low pressure interlock cut-off valve UV32104 are set up in the pilot burner, but the actual interlock logic was cancelled. We suggest that the pilot burner low pressure interlock logic need to be re-confirmed and re-applied.

Advances in Engineering Research, volume 120

710

Page 7: Key Points Discussion of the Heating Furnace HAZOP AnalysisHeating furnace HAZOP analysis Select a delayed coking unit heating furnace as an example, the heating furnace is double

Node 4, the heating furnace combustion chamber Node 4 is the heating furnace combustion chamber, according to the HAZOP analysis

procedure, part of the HAZOP analysis record form of node 4 was shown as follow. Table 8. The HAZOP analysis record form of node

Number Detailed deviation Consequence Available protection measures

Recommended measures

1 Pressure of the fuel gas is too low

1、when serious, may lead to flameout, if the fuel gas pressure fluctuates at this time, may lead to the risk of secondary explosion of the hearth.

2、may lead to temper.

2 Pressure of the combustion chamber is too high

May lead to poor combustion, and black smoke produced from the hearth. When serious, may lead to hearth extinction, and explosion.

3

Oxygen content of the fuel gas in the combustion chamber is too low

When serious, may lead to heating furnace extinction, flammable gas accumulation into the heating furnace, and explosion.

4 The heating furnace start and stop procedure

The operability of the heating furnace start and stop procedures.

Key point 4: whether enough protection measures are set up to prevent the combustion chamber explosion [10]. The following content need to consider and analyze:

(1)Whether all the combustion chambers are set up with the pilot burner system or flame monitoring system. (2)Whether the pilot burner are set up with safety interlock system when the pilot burner

quench. (3)Whether low pressure of the pilot burner fuel gas or the flame detector could interlock to

cut off all the fuel supply. (4)Whether all the fuel supply could be cut off inside the control room. (5)Whether the interlock cut-off system are independent of the DCS control and monitoring

system, and set up with the cut-off valve. (6)Whether the interlock cut-off system could be test online, whether measures need to be

taken to prevent wrong operation or allow test interruption. (7)Whether the interlock cut-off system are equipped with alarm to display failure state. (8)Whether the pilot burner fuel gas is stable and reliable, and could be monitored. (9)Whether safety and sufficient air or ventilator are provided for the combustion chamber to

prevent flameout and out of control of the combustion chamber. (10)Whether high and low pressure alarms are set up in the downstream of the pipeline

control valve of the pilot burner and heating furnace fuel gas. (11)Whether enough steam purging connectors are set up for the unit start-up. (12)Whether high pressure alarm is set up for the combustion chamber. (13)Whether oxygen analyzer are set up in each room of the chimney and multicellular flame

heater. (14)Whether extra alarm and cut-off equipment are set up for the forced air heating furnace

to prevent interruption of the combustion air or high pressure in the combustion room(such as the orifice plate ).

Through the consideration and analysis of the key point 4, the HAZOP analytical records of node 4 is shown in the figure as bellow.

Advances in Engineering Research, volume 120

711

Page 8: Key Points Discussion of the Heating Furnace HAZOP AnalysisHeating furnace HAZOP analysis Select a delayed coking unit heating furnace as an example, the heating furnace is double

Table 9. The HAZOP analytical records of node 4 Number Detailed

deviation Consequence Available protection

measures Recommended measures

1 Pressure of the fuel gas is too low

1、when serious, may lead to flameout, if the fuel gas pressure fluctuates at this time, may lead to the risk of secondary explosion of the hearth.

2、may lead to temper.

1、Pilot burner is set up in each combustion chamber. 2 、 Low pressure indicator, and low pressure interlock to cut-off the pilot burner fuel gas supply are set up after the pilot burner and main fuel gas pipeline control valve. 3、Use blower to ventilate in the combustion chamber.

1、Confirm whether flame detector are set up in the pilot burner. 2、Consider setting up low pressure interlock to cut off all the fuel gas supply on the pilot burner main fuel gas pipeline. 3 、 Confirm whether manual fuel gas cutting-off button are set up in the central control room. 4、Whether the interlock cut-off system are independent of the DCS control and monitoring system, and set up with the cut-off valve. 5、Whether the interlock cut-off system could be test online, whether measures need to be taken to prevent wrong operation or allow test interruption 6、Whether the interlock cut-off system are equipped with alarm to display failure state.

2

Pressure of the combustion chamber is too high

May lead to poor combustion, and black smoke produced from the hearth. When serious, may lead to hearth extinction, and explosion.

Pressure indicator PIC32119 are set up in the combustion chamber

1 、 Add high pressure alarm in the combustion chamber pressure display PIC32119 2、Confirm whether combustion chamber high pressure interlock are set up in the heating furnace to cut off the fuel gas supply.

3

Oxygen content of the fuel gas in the combustion chamber is too low

When serious, may lead to heating furnace extinction, flammable gas accumulation into the heating furnace, and explosion.

1、Set up fuel gas oxygen content monitoring and controlling system AIC32103 in the heating furnace, adjust and control the blower orifice plate(in another PID figure). 2、Set up stop interlock in the blower (in another PID figure)

Confirm whether combustion air interruption interlock are set up in the heating furnace to cut off the fuel gas supply.

4

The heating furnace start and stop procedure

The operability of the heating furnace start and stop procedures.

Confirm whether enough steam purging connectors are set up for the heating furnace start-up.

Conclusion

Above all, part of the HAZOP analysis key points were enumerated. To complete and improve the heating furnace HAZOP analysis, and improve the safety production level of installations, on the premise of fully understanding normative, and common-sense principles, the HAZOP analysis personnel are required to master scientific analysis concepts, process intention and production requirements, combine previous working experience, design experience, and design specifications, focus on heating furnace HAZOP analysis key points and features,

Advances in Engineering Research, volume 120

712

Page 9: Key Points Discussion of the Heating Furnace HAZOP AnalysisHeating furnace HAZOP analysis Select a delayed coking unit heating furnace as an example, the heating furnace is double

References

[1] Hazard and Operability Analysis (HAZOP) Application Guide [M]. Beijing: China Petrochemical Press, 2012

[2] T. Kletz, HAZOP & HAZAN, Identtifying and Assessing Process Industry Hazards, fourth edition, 1999

[3] Hazard and Operability Analysis (HAZOP) Fundamentals and Applications [M] .Beijing: China Petrochemical Press, 2012

[4] IEC 61882, Hazard and Operability Studies (HAZOP Studies) Application Guide, 2001

[5] Hazard and Operability Analysis (HAZOP Analysis) Application Guidelines [S]

[6] HAZOP Manual ExxonMobil Chemicals and Refining HAZOP Method [S]

[7] Refining Equipment Process Pipe Flow Design Specification [S]

[8] Petrochemical Design Fire Code [S]

[9] Petrochemical Design Manual [M] Beijing: Chemical Industry Press, 2001

[10] Chemical Technology Design Manual [M]. Beijing: Chemical Industry Press, 2009

Advances in Engineering Research, volume 120

713