QUARTERLY REPORT: JUNE 2012 Navigator Resources Limited ABN: 82 063 366 487 Registered Address: Ground Floor, 45 Richardson Street WEST PERTH WA 6005 PO Box 276 WEST PERTH WA 6872 Phone: (08) 9226 5311 Fax: (08) 9226 5411 Email: [email protected] Website: www.navigatorresources.com.au Board of Directors: Allan Trench Chairman Andy Tudor Managing Director Ian Macpherson NonExecutive Director John Shipp NonExecutive Director Guy Walker NonExecutive Director Gerry Kaczmarek Company Secretary Share Registry: Advanced Share Registry Services 150 Stirling Highway NEDLANDS WA 6009 PO Box 1156 NEDLANDS WA 6909 Phone: (08) 9389 8033 Fax: (08) 9389 7871 Email: [email protected] Website: www.advancedshare.com.au ASX: NAV www.navigatorresources.com.au KEY POINTS Bronzewing Operations Quarterly gold production of 14,780oz Gold production for 2011/12 year of 55,128oz Mine planning review nearly completed Bronzewing Exploration Intersection of 34m @ 3.98 g/t Au using a top cut of 10g/t Au in Cockburn Pit BowerHarrier heritage survey was completed in April with clearance being given for the planned drilling program That drilling program will be delayed until funds are available Leonora Discussions continuing with interested parties Auger and soil sampling programs are in progress on a number of tenements at Leonora Corporate Gold sales revenue of $24.9 million for the quarter, with an average selling price of $1,564 per ounce Execution of $10 million finance facility with Au Mining Limited which was subsequently increased to $16 million Commencement of a 7.2 for 1 prorata renounceable rights issue to raise $16 million at an issue price of 0.1 cents Andy Tudor appointed as Managing Director Figure 1: Mining Fleet on the West Wall of the Cockburn Pit For personal use only

KEY POINTS Bronzewing Operations For personal use only

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122   

 

Navigator Resources Limited 

ABN: 82 063 366 487   

Registered Address: 

Ground Floor, 45 Richardson Street  WEST PERTH  WA  6005  

PO Box 276 

WEST PERTH  WA  6872  

Phone:  (08) 9226 5311 

Fax:  (08) 9226 5411  

Email:  [email protected] 

Website: www.navigatorresources.com.au   

Board of Directors: 

Allan Trench      Chairman 

Andy Tudor      Managing Director 

Ian Macpherson    Non‐Executive Director 

John Shipp      Non‐Executive Director 

Guy Walker      Non‐Executive Director  

Gerry Kaczmarek   Company Secretary   

Share Registry: Advanced Share Registry Services 150 Stirling Highway 

NEDLANDS  WA  6009  

PO Box 1156  

NEDLANDS  WA  6909  

Phone:   (08) 9389 8033 

Fax:  (08) 9389 7871  

Email:  [email protected] 

Website: www.advancedshare.com.au   

  ASX: NAV 

www.navigatorresources.com.au 

KKEEYY  PPOOIINNTTSS   

Bronzewing Operations  Quarterly gold production of 14,780oz  Gold production for 2011/12 year of 55,128oz  Mine planning review nearly completed  

Bronzewing Exploration  Intersection of 34m @ 3.98 g/t Au using a top cut of 10g/t Au  in 

Cockburn Pit  Bower‐Harrier  heritage  survey  was  completed  in  April  with 

clearance being given for the planned drilling program   That drilling program will be delayed until funds are available  

Leonora  Discussions continuing with interested parties  Auger and soil sampling programs are in progress on a number of 

tenements at Leonora  

Corporate  Gold  sales  revenue  of  $24.9  million  for  the  quarter,  with  an 

average selling price of $1,564 per ounce  Execution of $10 million  finance  facility with Au Mining  Limited 

which was subsequently increased to $16 million  Commencement of a 7.2 for 1 pro‐rata renounceable rights issue 

to raise $16 million at an issue price of 0.1 cents  Andy Tudor appointed as Managing Director   

  

Figure 1: Mining Fleet on the West Wall of the Cockburn Pit

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  2 

OOPPEERRAATTIIOONNSS  RREEPPOORRTT   

BBRROONNZZEEWWIINNGG   

Project Overview  The Bronzewing Gold Project  (BGP)  is  located 80km northeast of Leinster  in Western Australia and 

comprises  the  Bronzewing  and McClure  group  of mines within  a  semi‐contiguous  landholding  of 

approximately 1,000km2.   Open pit mineral resources at BGP (as at 30 June 2011) total 18.42Mt @ 

1.6g/t  for  940,000oz  of  contained  gold  (which  comprises  13.42Mt @1.6g/t  for  698,000oz  in  the 

Indicated category and 5.00Mt @ 1.5g/t for 242,000oz in the Inferred category). 

 

Operations Update  Gold  production  for  the  June  2012  quarter was  14,780oz, which was  a marginal  increase  on  the 

14,541oz produced in the March 2012 quarter. 

 

As has been the case in previous quarters, the non‐availability of sufficient quantities of higher grade 

ore meant  that ore  feed  to the processing plant had to be supplemented with  low grade material.  

This  resulted  in a  lowering of  the average grade of material milled, hence  lower gold production.  

Continuing  high  in‐pit  strip  ratios  and  the  underperformance  of mining  due  to  a  combination  of 

weather, equipment availabilities and operator turnover affected the delivery of the scheduled high 

grade ore and hence the performance of the BGP during the quarter. 

 

Safety and Training  

Navigator’s  safety  record  has  continued  to  improve  throughout  the  financial  year.    The  BGP 

experienced no Lost Time Injuries (LTI) during the June 2012 quarter and one in the previous quarter 

out of a total of eight for the full year.  Bronzewing had recorded 110 LTI free days to the end of the 

quarter.   The Lost Time Injury Frequency Rate (LTIFR)  is at 11.8 at the end of the quarter being  less 

than half of the LTIFR of 23.8 at the same time last year. 

 

Mining   Total material movement for the quarter was 2.08 million BCMs, which was on par with the previous 

quarter.    Ore mined was  310,209  tonnes which was  down  on  the  previous  quarter.    Ore  grade 

increased to 1.35g/t Au (previous quarter 1.23g/t Au). 

 

Mining  was  below  forecast  due  to  weather  conditions,  machine  availability  and  an  increase  in 

turnover of experienced operators.  Excavator availability was an issue with significant down periods 

during April and June due to breakdowns.  In late June the Liebherr 994 excavator was changed out 

for a Komatsu PC1800 in order to increase fleet productivity. 

 

There were three wall slips  in different areas of the pit during the  latter part of the quarter.   While 

individually  they  were  localised  and  not  overly  significant,  each  caused  interruption  to  mining 

activities while the slip area was monitored, cleaned up and stabilised.   This took management and 

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  3 

machine‐power  away  from  normal mining  activities  resulting  in minor  drops  in  production.    The 

Company’s  geotechnical  consultant  and  representatives  from  the  Department  of  Mines  and 

Petroleum  visited  site  and  reviewed  the  slip  areas  and  additional  monitoring,  planning  and 

geotechnical procedures have been implemented.  

 

The  affect of  the  above events was  that  scheduled waste movements were not  achieved,  in  turn 

delaying access to the required ore zones.   By the end of the quarter the pit was set up to ensure 

efficient movement and access  to better grade material  in  the September 2012 quarter.   As work 

continues there has been a noticeable  increase  in head grade as mining nears the better ore zones 

deeper in the pit. 

 

Mining  is now encountering mainly  fresh  rock with a  reduction of  transitional material.   Drill and 

blast is now a routine part of the mining cycle with five blasthole rigs operating full time in the pit to 

provide enough broken material to satisfy the scheduled mining rate.  The extra drilling and blasting 

has been costed into the operational budgets. During the quarter a trial was undertaken to compare 

Reverse  Circulation  (RC)  grade  control  with  blasthole  sampling  to  determine  if  there  was  any 

significant difference in results between the two methods.  The  intention is to move away from the 

more expensive RC drilling and utilise  the blastholes  for both grade control and blasting.   This will 

reduce grade control costs  in 2012/13 and partially offset  the extra drill and blast costs.   The  trial 

showed no significant difference  in ore body definition and the decision was made to phase out RC 

drilling. 

 

During the quarter, following a review and recommendation by external consultants, cut‐off grades 

for the ore definition were altered.  Previously ore was defined as High Grade +1.2g/t Au, Low Grade 

0.7g/t to 1.2g/t and Mineralised Waste 0.5g/t to 0.7g/t.  As both High Grade and Low Grade material 

was  needed  to  fill  the mill  it was  decided  to  combine  these  two  sources  to  form  one Mill  Feed 

category, and cut‐off grade was  lifted to 0.9g/t to provide a better tonnes and grade combination, 

thus maximising  available ounces.    Low Grade ore  is  currently  defined  as  0.5g/t  to  0.9g/t,  and  is 

stockpiled for required mill “top‐up” and for processing at the end of mine life. 

 

 Figure 2: Cockburn Pit 

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  4 

Mine Planning   During April, the mine plan for the BGP was substantially remodelled and rescheduled and this work continued during the quarter with the aim of developing a plan that will deliver more high grade ore earlier  than  had  been  forecast  under  the  previous  model.    Part  of  this  rescheduling  involved investigating dividing the pit into several sections which can be mined sequentially rather than taking the whole pit down on  a uniform  level development.   The  intention of  this  revision was  to bring forward  production  from  higher  grade  zones  and  defer  waste  removal  therefore  increasing production and reducing costs over the next six months.   The plan confirms that the bulk of the remaining mine development work will be completed during the September 2012 quarter and it is planned to reduce the size of the mining fleet in October 2012 which will also result in a decrease in mining costs.  This review has been completed and checking of the new mine schedule and budget derived from the plan was ongoing at the end of the quarter prior to being presented to the Board for approval and formal adoption.  As noted in the March 2012 Quarterly Report, the Company will be reviewing the current published Cockburn Open  Pit Ore  Reserves  to  take  into  account  the  new mine  plan which  is  based  on  an A$1,350/oz  gold price.    This  review  and  the  revised  estimate will be  released  in October 2012  in conjunction with the release of the annual review of all of the Company’s Resources and Reserves.  

Ore Processing  Total ore milled  for  the  June 2012 quarter  increased  to 506,720  tonnes at  an estimated grade of 1.02g/t Au.  Because the mine was unable to supply the scheduled amount of ore, a significant amount of Low Grade material was used to supplement mill feed.  Despite this there was still a marginal increase in quarterly gold production  (from 14,541oz  to 14,780oz). Mill  recovery  rate  fell  to 88.9% during  the quarter as the change from predominantly oxide ore to a higher level of transitional and sulphide ore resulted in a shift in the metallurgical properties of the material presented to the mill. The change of ore  type  resulted  in  increased  reagents consumption and a slight  reduction  in  throughput.   By  the end of the quarter metallurgical test work had been carried out and recovery rates returned to the 90% to 92% range. 

 

 Figure 3: BGP gold production by month 

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

Gold Produced (oz)

2011/12 Monthly Gold Production

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  5 

Overall Performance  

Key performance indicators for the June 2012 quarter are shown below. 

 Table 1: 2011/12 Production Statistics 

  Unit  Sept 2011

 Quarter

Dec 2011

Quarter

Mar 2012

Quarter

Jun 2012 Quarter 

2011/12

 

Mining Physicals 

BCMs  Ore Mined  Ore Grade  Total Ounces Mined 

 

BCM 

g/t 

oz 

3,012,392

238,880

1.34

10,318

2,580,649

425,028

0.94

12,880

2,090,763

360,451

1.23

14,244

 

2,080,362 

310,209 

1.35 

13,524 

9,764,166

1,334,568

1.19

50,966

Processing Physicals 

Ore Milled#  Grade Reconciled  Recovery  Gold  Produced  (incl. 

GIC) 

 

dt 

g/t 

oz 

318,399

1.24

94.2

11,949

486,179

0.94

93.9

13,858

491,860

0.99

94.2

14,541

 

506,720 

1.02 

88.7 

14,780 

1,803,158

1.03

92.5

55,128

Costs 

Unit Operating Cost* 

 

$/oz  1,466 1,593 1,579

 

1,511  1,540 

# Note: Mine production was supplemented by the addition of low grade stockpiled ore. * Cash costs represent the costs for mining, processing and site administration including accounting for movements in stockpile and gold‐in‐circuit.  They do not include exploration, mine development or capital costs.  They include by‐product credits but do not include the cost of royalties, depreciation and amortisation. 

 

Production Forecasts  

The Investor Presentation of May 2012 as released to the ASX and posted on the Company’s website 

contained  information  on  the  then  current  2012/13  and  2103/14  Year Mine  Plan  Forecasts.    As 

outlined  above,  the mine  schedule  and  plans  are  currently  under  review  and will  be  different  to 

those outlined in the aforementioned Investor Presentation.  It is not possible to fully update those 

forecasts until the revised plans have been finalised and approved by the Company’s Board however 

the Company can advise that gold production for the September 2012 quarter is forecast to be in the 

range of 17,000‐20,000oz, which will be at least a 15% increase on the June 2012 quarter. 

 

 

LLEEOONNOORRAA   

Project Overview  

The  320km2  Leonora  Gold  Project  (LGP)  is  located  35km  northeast  of  the  town  of  Leonora,  and 

approximately 250km north of Kalgoorlie, Western Australia.   A pre‐feasibility study was completed 

in March 2009 and these outcomes consolidated with an open pit ore mining and milling trial during 

the first half of 2010, during which a total of 114,000 tonnes of ore was processed.  The last parcels 

of ore were milled  in  July 2010 and  the  trial  successfully confirmed materials handling, grade and 

recovery aspects and generated net cashflow in excess of $2 million from gold sales. 

 

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  6 

Mineral  resources  at  LGP  (after depletion  for  the  trial mining  conducted  in 2010)  total 12.3Mt  at 1.9g/t  for  745,000oz  of  contained  gold  (which  comprises  8.16Mt @  2.0g/t  for  533,000oz  in  the Indicated category and 4.13Mt @ 1.6g/t for 212,000oz in the Inferred category)~.    

Leonora Project Advancement  The internal review of the Leonora 2009 pre‐feasibility study (PFS) has been placed on hold with the operational issues at Bronzewing having taken priority for management.    The  PCF  Capital  process  to  source  third  party  interest  in  a  sale  or  joint  venture  of  the  LGP  has continued during the quarter.  Discussions are ongoing with a number of interested parties but none have produced  a proposal  that has been  capable of  consideration by  the Company  as  a  firm  and adequate offer to date.    

EEXXPPLLOORRAATTIIOONN  RREEPPOORRTT   The Company’s primary exploration objective at the BGP is to increase mine life through exploration activities aimed at discovering higher quality resource and reserve ounces.  Due to the lack of funds in  recent  quarters,  this  activity  has  not  been  able  to  be  pursued  through  new  drilling  but  soil sampling programs and  in house work has still progressed via  the evaluation and  interpretation of previous exploration results and activities.  

Cockburn Pit  Navigator  recently  completed  three  42m,  vertical  RC  probe  holes  in  various  locations  on  the Cockburn  pit  floor.    One  of  these  holes,  COBRC10622,  intersected  better  than  expected mineralisation as shown in Figure 4 with all assay data detailed in Table 3.  The other holes shown in Figure 4 are historic holes drilled in the mid 1990s and were part of the Cockburn Resource estimate as of 30 June 2011.  Drill hole COBRC10622 was an RC hole with samples collected over 1 metre  intervals via a cyclone splitter.    The  samples  were  assayed  by  both  pulp  and  acid  leach  (PAL)  and  normal  fire  assay techniques.   The PAL assays, a partial gold assay, are processed at the Company’s onsite  laboratory whilst  the  fire assays, which are a  total gold assay, are  carried out at a  commercial,  independent laboratory.   The first 3m of the hole were not sampled, whilst the next 6m yielded an average grade of 0.32g/t Au.  The remainder of the hole averaged 34m @ 3.98g/t Au which included 23m @ 5.03g/t Au from 9m – 32m.   The estimated true width of the 34m  interval  is ~20m.   These average assay results are from  the  final  fire assay  results  from  the  independent  laboratory with a 10g/t Au  top cut applied.  The  onsite  PAL  laboratory  gave  results which  on  average were  less  than  2%  lower  than  the  fire assays.  

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  7 

 Figure 4: Cockburn Pit Cross Section 

 

Bower‐Harrier Heritage Survey  An Aboriginal heritage survey was completed at Bower‐Harrier during April with a clearance being given.  The 9,000m aircore drilling program, along with a small 1,000m aircore program to test a soil anomaly  in  the  Eagle  East  area, which were  noted  in  the March  2012 Quarterly  Report  as  being planned  to  be  completed  early  in  the  September  2012  quarter  have  both  been  deferred  until adequate  funds  are  available.    It  is  unlikely  this  program  will  occur  before  the  December  2012 quarter. 

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  8 

LLEEOONNOORRAA   Programs of  auger  and  soil  sampling  are being  carried out on  a number of Prospecting  Licences  at Leonora.  The programs are still in progress with results pending.   

CCUUMMMMIINNSS  RRAANNGGEE  (Navigator 75%, KRE 25%)  Navigator (75%) has a  joint venture arrangement  in place with Kimberley Rare Earths Limited (KRE) (25%) over the Cummins Range Rare Earths Project where KRE has the ability to earn an additional 30% in the project by expending $10 million over four years.  KRE is the JV manager and responsible for all exploration activities.  No  field exploration was  carried out  in  the  June 2012 quarter.  Further drilling  is on hold whilst a Preliminary Evaluation Study is being completed.  A pit optimisation study has been completed using Whittle 4x software. The results of the study have been  incorporated  into  a  conceptual mine  schedule  to  inform  the  Preliminary  Evaluation  Study financial model.  A  conceptual  rare  earth  separation  flow  sheet  has  been  developed  using  a  proprietary  flotation reagent scheme and wet high intensity magnetic separation (WHIMS). The flow sheet was optimised through the application of  locked‐cycle testing which confirmed the beneficiation process  is able to achieve a concentrate grade of >15% TREO and a  recovery of >59% TREO. Based on  these  results, three options for downstream processing and rare earth separation flow sheets using conventional technologies were identified and have been subjected to economic assessment as a key component of the Preliminary Evaluation Study.  Further information regarding KRE is available on their website at www.kimberleyrareearths.com.au.   

LLAAUURRAA  RRIIVVEERR  (Magma 70%, Navigator 30% free carried to decision to mine)  An  auger  sampling  program  commenced  in  June  with  sampling  on  E80/2523  being  about  75% complete.  The program on E80/2552 will commence shortly.  Results are awaited.    The Company notes that Magma Metals  is now a wholly owned subsidiary of Panoramic Resources Limited.   

     For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  9 

CCOORRPPOORRAATTEE  RREEPPOORRTT   

FFIINNAANNCCIIAALLSS   

Cash Position  As at 30  June 2012, Navigator held $3.39 million  in  free  cash, $3.44 million of gold  in  transit and $7.08 million in environmental bonds.  

Gold Sales  Gold sales from the BGP for the quarter were 15,927oz at an average sale price of $1,564/oz for total revenue of $24.9 million.  The cash operating cost for the quarter was $1,511/oz.  

Hedging  

Navigator currently has no hedging in place.  

Expenditure  

During  the  quarter,  exploration  expenditure  incurred  was  $397,000,  of  which  $196,000  was 

expended on the BGP and $201,000 on LGP.  

Capital expenditure during the quarter was $198,000. 

 

Debt  Au Mining Finance Facility 

 

During  the quarter  the Company negotiated and executed a binding Heads of Agreement with  its 

largest shareholder, Au Mining Limited (Au Mining), whereby Au Mining would provide a short term 

finance facility of $10 million.  The key terms of the unsecured finance facility were:  

available  for drawdown until 31  July 2012 and  to be  repaid  in a  lump sum on completion of a 

rights issue or by 31 August 2012, whichever is the earlier; 

all amounts drawn down to be repaid from the rights issue proceeds or if repaid by other means, 

a $2 million early repayment fee will apply; and 

interest charged on all drawn amounts at a rate of 15% per annum due  in one  lump sum upon 

principal repayment.  

The first drawdown of $3 million took place in early June, and the second of $2 million was scheduled 

for mid‐June and conditional upon deferral of royalty payments until October 2013.  On 15 June 2012 

it was announced that this condition had been waived for the second drawdown however remained 

to be fulfilled for any further drawdowns. 

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  10 

Subsequently, this condition was amended and completed with the signing of an agreement with a 

private royalty holder for the deferral of the payment of their royalty over the BGP until 31 October 

2013.  The deferred amount will earn interest at a rate of 12% per annum, calculated monthly and to 

be paid in a lump sum at the time of the royalty payment.  At the election of the holder, the interest 

can be  taken  in either cash or shares  (issued at  the same price as  the  rights  issue  (see below) but 

subject to adjustment necessary for any reconstruction of capital).  

A further drawdown of $4.5 million was made on 29 June 2012.   On 9 July 2012  it was announced 

that  the  finance  facility  quantum  had  increased  from  $10 million  to  $13  million,  all  conditions 

precedent  had  been  satisfied  and  the  early  repayment  fee  amended  to  $2.6 million  reflect  the 

increase in the facility. 

 

Additional amendments to the finance facility were announced on 27 July 2012 including:  

an increase in the quantum available from $13 million to $16 million; 

an extension of the repayment date to 31 October 2012 or such later date as required to ensure 

all required approvals obtained; 

an extension of the drawdown date until 30 September 2012; and 

increase of the early repayment fee to $3.2 million, reflecting the increase in the facility amount.  

Waterton Loan Facility & Gold Supply Agreement  

As part of the Au Mining finance facility, the Company has agreed amended terms to the debt facility with Waterton Global Value LP.  The loan repayments, which were originally scheduled to comprise 10  equal  instalments of US$1.2 million  commencing  in December 2012 will now be made on  the basis  of  gradually  increasing  instalment  amounts  ranging  from  US$90,000  in  December  2012  to US$2.01  million  in  January  2014.    The  revised  repayment  scheduled  more  closely  matches  the Company’s  cash generation profile.   During  the quarter, Navigator drew down  the balance of  the US$12 million facility.  In  addition  to  the  changes  to  the  debt  facility,  adjustment was  also  agreed  to  the  Gold  Supply 

Agreement between the Company and Waterton.  The discount on the settlement price of gold sold 

to Waterton has  increased from 0.75% to 2% with the difference (ie. 1.25%) payable  in three equal 

instalments over the three months from November 2013. 

 

Rights Issue  On 1 June 2012 the Company announced that it was intending to undertake a rights issue to fund the repayment of  the  finance  facility with Au Mining.   Details of  the  structure and  terms of  the  rights issue were  finalised during the month and announced on 9  July 2012.   The key terms of the rights issue are:   renounceable rights issue to raise approximately $16 million before costs;   conditional  underwriting  of  the  full  amount  by  Au Mining  &  associate  D&A  Income  Limited 

(together the Underwriters);   issue price of 0.1 cents with a pro‐rata entitlement of 7.2 new shares for every 1 share held; and  available to eligible shareholders with registered addresses in Australia and New Zealand.     

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  11 

The  obligations  of  Au Mining  and D&A  Income  Limited  to  subscribe  for  the  rights  issue  shortfall arising  from  the  underwriting  agreement  are  conditional  upon  approval  being  received  for  the transaction  under  the  Foreign  Acquisitions  and  Takeovers  Act  1975  (Cth).    A  response  to  the submitted application  is expected  in early August 2012.   Should approval not be received, then the rights issue will not proceed.  Subsequent to the announcement of the rights issue and lodgement of the prospectus with ASIC, the Company  was  requested  by  ASIC  to  provide  additional  information  regarding  various  matters including, but not limited to, the relationship of Au Mining and D&A Income Limited to the Company and the possible control implications arising from the financing and underwriting arrangements.  On 27 July 2012 the Company announced that ASIC had advised that  it considers the Underwriters are related parties of Navigator and therefore requires the Company to:   obtain an independent expert report in relation to the fairness and reasonableness of the rights 

issue (and the underwriting arrangements) on all shareholders of the Company; and  issue a replacement prospectus with sufficient disclosure of the findings of the expert report.     Given  ASIC’s  requirement  to  obtain  the  expert  report,  the  Company  advised  that  the  previously announced timetable for the rights issue would be amended to:  

Event  Date 

Record date for determining Entitlements  18 July 2012 

Replacement prospectus and Entitlement and Acceptance Forms despatched to Eligible Shareholders 

24 August 2012 

Rights trading ends  31 August 2012 

Closing Date  7 September 2012 

Notification of Shortfall  12 September 2012 

Anticipated date for allotment of New Shares  13 September 2012 

Anticipated date for despatch of holder statements (and last day for the Company to confirm to ASX all information required by Appendix 3B) 

14 September 2012 

Anticipated date for commencement of trading of New Shares  17 September 2012 

 In  line with  the Company’s  announcement of 30  July 2012  regarding  amendments  to  the  finance 

facility with Au Mining, the Underwriters agreed to extend the terms of the underwriting agreement 

to reflect the terms and timing of the finance facility as noted above. 

  

OOTTHHEERR   

Board and Management Changes  On 5 June 2012, the Company announced that Managing Director David Hatch had resigned from his role,  effective  immediately.   Andy  Tudor  joined Navigator  as Managing Director  on  23  July  2012.  Andy has a Bachelor of Applied Science (Geology) from the University of Southern Queensland and extensive management experience within the mining industry.    Navigator  also  announced  the  resignation  of  Company  Secretary/Chief  Financial  Officer  Gerry Kaczmarek and retirement of Exploration Manager Bernie Kirkpatrick, both effective 31 August 2012. 

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  12 

Extraordinary General Meeting  

An extraordinary general meeting of shareholders was held on 5 June 2012 to consider resolutions relating  to  the  ratification of previous  share  issues,  together with  the election of Guy Walker as a Non‐Executive Director of the Company.  All resolutions were passed on a show of hands.  

ASIC Infringement Notice  

On 15 June 2012 the Company announced that it had complied with an infringement notice issued by the Australian Securities & Investment Commission relating to a market announcement made on 20 June 2011 entitled “Equity Raising and Operational Update”.  The infringement notice was based on an allegation that statements in the announcement gave rise to implications which did not reflect the status of the underwriting agreement associated with the rights  issue that was being conducted at the time.  Whilst  not  agreeing  with  the  allegations,  the  Company  complied  with  the  notice  by  paying  the penalty  of  $33,000  in  order  to  conclude  the  investigation  and  avoid  additional  legal  costs.  Compliance with the infringement notice does not constitute an admission of guilt or liability, nor a finding of any contravention of law.   

Trading Halts & Suspension of Shares  

The  Company  requested  a  halt  in  the  trading  of  its  securities  on  25 May  2012  and  a  voluntary suspension effective from 29 May 2012.  Shares remained suspended until details of the rights issue were  announced  on  9  July  2012.   A  further  trading  halt  request was  submitted  on  20  July  2012, pending an update regarding the rights  issue, with the Company’s securities moving  into voluntary suspension  on  24  July  2012  and  expected  to  remain  so  until  completion  of  the  experts  report required for the rights issue.      

  Andy Tudor Managing Director NAVIGATOR RESOURCES LIMITED   

   

For

per

sona

l use

onl

y

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  13 

Table 2: Cockburn, 1m RC Riffle Split Samples  

Hole ID  Northing Local 

Easting � ocal 

Maximum Depth ‐ m 

Interval m 

Grade g/t Au 

COBRC10622  51509.27  12465.11  42  03‐04 04‐05 05‐06 06‐07 07‐08 08‐09 09‐10 10‐11 11‐12 12‐13 13‐14 14‐15 15‐16 16‐17 17‐18 18‐19 19‐20 20‐21 21‐22 22‐23 23‐24 24‐25 25‐26 26‐27 27‐28 28‐29 29‐30 30‐31 31‐32 32‐33 33‐34 34‐35 35‐36 36‐37 37‐38 38‐39 39‐40 40‐41 41‐42 

0.43 0.07 0.37 0.30 0.15 0.44 15.46 45.74 22.21 24.49 1.80 1.82 0.65 0.64 9.62 13.50 19.80 10.96 11.40 5.23 3.32 0.41 0.99 0.73 1.75 0.41 1.52 1.45 5.37 0.22 0.55 0.23 0.76 0.59 0.46 0.26 1.47 0.70 0.51 

 Note: COBRC10622 was drilled at ‐90°.  The hole was collared at an RL of 431.6m, some 83m below the natural surface which is at 515m RL approximately.  All samples are riffle split over 1m  intervals.   All assay  results are  fire assays on a 40g charge by a  registered  independent laboratory. 

    F

or p

erso

nal u

se o

nly

QQUUAARRTTEERRLLYY  RREEPPOORRTT::  JJUUNNEE  22001122  

 

 www.navigatorresources.com.au  14 

~Table 3: Leonora Gold Project Mineral Resources – 30 June 2012 

Project 

Area 

Lower cutoff grade 

Indicated Resources  Inferred Resources  Total Resources 

g/t Au  Mt  g/t Au  koz  Mt  g/t Au  koz  Mt  g/t Au  koz 

Mertondale*                     

Mertondale 3_4  0.7  0.87  2.3  65  0.66  2.1  45  1.53  2.2  110 

Merton’s Reward  0.7  1.01  2.7  87  0.07  1.7  4  1.08  2.6  91 

Tonto  0.7  0.97  1.9  60        0.97  1.9  60 

Eclipse (Tonto North)  0.7  0.62  1.8  35  0.25  1.7  14  0.87  1.8  49 

Mertondale 5  0.7  0.32  3.2  33  0.16  2.7  13  0.48  3.0  46 

Quicksilver (Tonto South)  0.7  0.55  1.8  31  0.11  2.1  8  0.66  1.8  39 

Subtotal Mertondale    4.34  2.2  311  1.25  2.1  84  5.59  2.2  395 

Cardinia**                     

Bruno‐Lewis Exploration  0.7  1.04  1.1  37  1.52  1.3  63  2.56  1.2  100 

Helen’s North  0.7  0.63  1.2  24  0.13  1.1  5  0.76  1.2  29 

Kyte  0.7        0.31  1.6  16  0.31  1.6  16 

Rangoon  0.7  0.09  1.8  5  0.23  1.3  9  0.31  1.4  14 

Lewis Grade Control  0.7  0.29  1.4  13        0.29  1.4  13 

Bruno Grade Control  0.7  0.11  1.4  5  0.03  1.1  1  0.15  1.3  6 

Helen’s South  0.7  0.19  1.8  11  0.01  1.3  0  0.20  1.7  11 

Lewis South  0.7        0.10  1.3  4  0.10  1.3  4 

Black Chief***  0.7        0.12  1.6  6  0.12  1.6  6 

Subtotal Cardinia    2.35  1.3  95  2.44  1.3  104  4.79  1.3  199 

Raeside                     

Michelangelo‐Leonardo  0.7  1.28  2.7  111        1.28  2.7  111 

Forgotten Four  0.7  0.07  3.0  7  0.10  2.1  7  0.17  2.5  14 

Krang  0.7  0.11  2.6  9        0.11  2.6  9 

Subtotal Raeside    1.47  2.7  127  0.10  2.1  7  1.57  2.6  134 

Gambier Lass***  0.7        0.34  1.6  17  0.34  1.5  17 

TOTAL    8.16  2.0  533  4.13  1.6  212  12.29  1.9  745 

 *  Resource estimate by McDonald Speijers, 2009 with Merton’s Reward depleted by McDonald Speijers 

in 2010. 

**  Resource estimate by Runge Limited, 2009 with Bruno Grade Control depleted by Runge in 2010. 

***  Resource estimate by Navigator, 2009. 

Notes:   Assay  top cuts  for Mertondale and Raeside are variable but generally between 10‐20g/t Au and are 15g/t Au at Cardinia with no top cuts at Black Chief and Gambier Lass.  No allowance has been made for dilution or ore loss.  All resources (except Black Chief and Gambier Lass) are constrained by open pit shells optimised at A$2,000/oz. 

 

 All $ amounts noted in this report are Australian dollars, unless otherwise stated.  Sections of information contained within this report that relate to Mineral Resources and Exploration Results are based on information  reviewed or compiled by Bernie Kirkpatrick who  is a  full‐time employee of Navigator Resources Ltd and  is a Member  of  the  Australasian  Institute  of Mining  and Metallurgy.    Bernie  Kirkpatrick  has  sufficient  experience which  is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined  in  the 2004 Edition of  the  “Australasian Code  for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.   Bernie Kirkpatrick consents  to  the  inclusion  in  this  report of  the matters based on his information in the form and context in which it appears. 