N.T.S.
DWG NO. TITLEGENERAL
G-01 COVER
CIVILC-01 OVERALL WMS PLAN
C-02 PRIMARY PUMPING STATION PLAN (PHASE 1)
C-03 PHASE 4 WMS PLAN
N.T.S.
DRAWING INDEX
KEY MAP
M. TOMKA
R. HANKE
30193-19028DRAW_NUM
30193-19(028)GN-WA001 MAR 4/2015
HORZ_SC
DATE
001
WAGN
G-02 LEGEND SHEET
C-04 SECONDARY PUMPING STATION PLAN (PHASE 2)
C-05 PHASE 5/6 WMS PLAN SHEET 1
C-06 PHASE 5/6 WMS PLAN SHEET 2
C-07 TYPICAL CONTROL HUT DETAIL
C-08 TYPICAL WELL DETAILS
C-09 TYPICAL DIFFUSE DISCHARGE DETAILS
C-10 TYPICAL DEWATERING SUMP DETAILS
ARCHITECTURALA-01 PRIMARY PUMPING STATION (PHASE 1) PLAN & ELEVATIONS
Approved
DRAWING STATUS
O
N
Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :
o
Date:
Report N :
o
Drawing N
o
:
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATES
ACTON QUARRY
LEGEND SHEET
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE
NOVEMBER 2014
30193-19 028 G-02
30193-19(028)GN-WA002 NOV 26/2014
N.T.S.
EXISTING LICENCE LIMIT
OTHER PROPERTY BOUNDARY
DUFFERIN OWNED PROPERTY LIMIT
PROVINCIALLY SIGNIFICANT WETLAND (MNR OCTOBER 2011)
ROAD
WATERCOURSE
PROPOSED EXTRACTION LIMIT
JESA BREEDING POND (STANTEC SEPTEMBER 2011)
WMS CONTROL HUT
LEGEND
360
EXISTING GROUND CONTOUR
PROPOSED LICENCE LIMIT
EXISTING EXTRACTION LIMIT
PBT MONITORING LOCATION (MONITORING WELL OR PIEZOMETER)
PROPOSED WATERMAINS AND FLOW DIRECTION
WM
PROPOSED LOCAL FEEDER LINE
RAILROAD
RECHARGE WELL
U.P.
UTILITY POLE
ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL JRM
PBT STAFF GAUGE
NOTES:
1. PBT REFERS TO PERFORMANCE-BASED TARGET IN ACCORDANCE WITH
PERFORMANCE-BASED ADAPTIVE MANAGEMENT PLANT (AMP), CONESTOGA-ROVERS
& ASSOCIATES (CRA), OCTOBER 2014 AS MAY BE UPDATED FROM TIME TO TIME.
11/26/2014
330
330
360
360
360
360
360
360
320
340
360
360
360
360
354
358
358
328
354
312
364
312
314
352
314
358
356
356
356
362
364
334
344
322
341
324
336
362
352
362
334
356
338
362
364
342
326
342
346
356
358
334
354 354
344
342
334
362
356
356
362
358
358
356
358
358
358
356
358
358
358
356
358
362
356
358
364
358
362
341
340
338
358
335
364
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
H10H3
U3
U17
U5
U4
U24
U23
U19
U20
U29
U6
U7
U30U8
U32
U31
PHASE 5 EAST
PHASE 5 WEST/6 WEST
PHASE 4
LOWER PLANT YARD
PHASE 1RESERVOIR
WM
WM
WMWM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WMWM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
BLACK CREEK
4TH
LIN
E
3RD LINE
22ND SIDEROAD22ND SIDEROAD
W10
W2-N
W2-S
W3
W1
W10-aW9-N
W9-X
BLACK C
REEK
4TH LIN
E TRIBU
TARY TO
TO BLACK
TRIBUTARY
FAIRY LAKE
SCOTCH BLOCK UPPER
FAIRY LAKE TRIBUTARY
WM
WMWM
WM
WM
WM
WM
WM
WM
WM
WM
WMWM
WM
WMWM
WM
WM
WM
WM
WM
WM
WM
WMWM
WMWM
WM
WM
WM WMWM WM WM
WM
WM
WM
WMWM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
OW43-07
OW83-09
OW77-09
OW90-10
MW5-II
OW39A
WM
WM
WM
PHASE 3
PHASE 2RESERVOIR
(WHEN NOT DEWATEREDFOR OPERATIONS)
LOWER SETTLING POND(OVERFLOWS TO TRIBUTARY
TO BLACK CREEK)
UPPER SETTLING PONDPRIMARY PUMPING STATION(REFER TO DWG A-01)
EXISTING CULVERT
CULVERT, PIPE OR CHANNELTO SETTLING PONDS
(AT FINAL REHABILITATION)
DEWATERING WATERMAIN(MAX 450mm Ø)
RECHARGE WATERMAIN TOPHASE 4 WMS (MAX 450mm Ø)
WATERMAIN TO BLACK CREEK(MAX 450mm Ø)
RECHARGE WATERMAINTO SEEPS (MAX 250mm Ø)
RECHARGE WATERMAINSTO PHASE 2/3/5/6(MAX 600mm Ø)
PUMP STATION INTAKES(MAX 600mm Ø)
DEWATERING WATERMAIN(MAX 450mm Ø)
DEWATERING WATERMAIN(MAX 450mm Ø)
EXTENSIONGREEN LINE
EXTENSIONGREEN LINE
EXTENSIONGREEN LINE
PHASE 5/6 WEST RECHARGE WATERMAIN(MAX 450mm Ø) (SEE NOTE 4)
RECHARGE WATERMAINTO PHASE 5 EAST
(MAX 300mm Ø)
FEEDER LINE TO PHASE 5 EAST (WETLANDU6) DISCHARGE (MAX 250mm Ø)
DEWATERING SUMP(LOCATION MAY VARY)
DEWATERING SUMP(LOCATION MAY VARY)
DEWATERINGWATERMAINS
(MAX 450mm Ø)
EXISTING SETTLING POND
EXISTING SETTLING POND
PHASE 1 RESERVOIROUTFLOW CHANNEL(AT FINAL REHABILITATIONPER ARA SITE PLANS)
GRAVITY LAKEOVERFLOW CULVERT(AT FINAL REHABILITATION)
GRAVITY LAKEOVERFLOW CULVERT
(AT FINAL REHABILITATION)
DEWATERING WATERMAIN(MAX 250mm Ø)SETTLING AREA
(SEE C-06)
GRAVITY LAKEOVERFLOW CULVERT
(AT FINAL REHABILITATION)
GRAVITY LAKE OVERFLOW CULVERT(AT FINAL REHABILITATION)
DEWATERING SUMP(LOCATION MAY VARY)
DEWATERING WATERMAIN(MAX 450mm Ø)
WASH PLANT SUPPLY SUMP(LOCATION MAY VARY)
AGGREGATE WASHING SOURCE WATER ANDSETTLING PONDS (REFER TO DRAWING C-04)
SECONDARY PUMPINGSTATION (SEE NOTE 3)
WASH PLANT SUPPLYWATERMAIN TO OPERATIONS(MAX 300mmØ)
WASH PLANT SUPPLYTO OPERATION AREAS
(MAY VARY)
WATER SUPPLY TO OPERATIONS (DUSTSUPPRESSION, WASH PROCESS TOP-UP,
VEGETATION WATERING, ETC.)
0 50 100 150m 1:5000
SCALE=1:5000
Approved
DRAWING STATUS
ON Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :o
Date:
Report N :o Drawing No :
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATES ACTON QUARRY
OVERALL WMS PLAN
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE NOVEMBER 2014
30193-19 028 C-0130193-19(028)CI-WA001 MAR 4/2015
1:5000
NOTES:
1. DRAWING DEPICTS WORKS THAT MAY BE IMPLEMENTED IN ADDITION TO, OR TOAMEND, EXISTING WORKS.
2. LOCATIONS OF WATERMAINS AND OTHER WATER MANAGEMENT SYSTEMCOMPONENTS ARE APPROXIMATE AND MAY VARY TO SUIT FIELD CONDITIONS ATTHE TIME OF CONSTRUCTION.
3. OTHER MONITORING INSTRUMENTATION WITHOUT PBT'S ARE NOT SHOWN. THESEMAY INCLUDE MONITORING WELLS, PIEZOMETERS AND STAFF GAUGES.
4. WATERMAIN MAY FOLLOW ALTERNATE ALIGNMENT ALONG RAMP TO THIRD LINE.
JRM11/26/2014ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
JRM3/3/2015ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
U.P.
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
WM
WM
WM
WM
WM
W
M
W
M
WM
WM
WM
WM
WM
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
PRIMARY PUMPING STATION
(REFER TO DWG A-01)
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
RECHARGE WATERMAIN TO PHASE 4 WMS
(MAX 450mm Ø)
TRANSFORMER AND
SWITCHGEAR
SEPTIC TREATMENT
SYSTEM
PUMP STATION
INTAKES
(MAX 600mm Ø)
RECHARGE
WATERMAINS TO
PHASE 2/3/5/6
(MAX 600mm Ø)
WATERMAIN TO BLACK CREEK
(MAX 450mm Ø)
WATER SUPPLY TO OPERATIONS (DUST
SUPPRESSION, WASH PROCESS
TOP-UP, VEGETATION WATERING, ETC.)
0 5 10 15m
2
SCALE=1:500
Approved
DRAWING STATUS
O
N
Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :
o
Date:
Report N :
o
Drawing N
o
:
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATES
ACTON QUARRY
PRIMARY PUMPING STATION PLAN
(PHASE 1)
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE
NOVEMBER 2014
30193-19 028 C-02
30193-19(028)CI-WA002 NOV 26/2014
1:500
NOTES:
1. DRAWING DEPICTS WORKS THAT MAY BE IMPLEMENTED IN ADDITION TO, OR TO
AMEND, EXISTING WORKS.
2. LOCATIONS OF WATERMAINS AND OTHER WATER MANAGEMENT SYSTEM
COMPONENTS ARE APPROXIMATE AND MAY VARY TO SUIT FIELD CONDITIONS AT
THE TIME OF CONSTRUCTION.
JRM11/26/2014ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
360
360
360
364
335
U/G
U/G
U/G
U/G
U/G
U/G
U/G
U/G
U/G
U/G
U/G
U/G
U/G
U/GU/G
U/G
U/G
U/G
U/G
U/G
U/G
SG39-07
SG18-08
SG41-07
SG25-07
SG22-10
SG80-12
WM
WM
WMWM
WM
WM
WM
WM
WM WMWM WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
U/G
RW101A
RW102A
RW102B
RW103ARW104A
RW108A
RW109BRW110A
RW111ARW111B
RW112A
RW112B
RW109A
RW107A
RW105A
RW106A
WM
OW43-07
OW83-09
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WMWM
WM
WMWM
WM
WM
WM
WM
WM
WM
WM
WM
WM PHASE 4
W1
3RD LINE
U3
U4
U5
U31
WATERMAIN DISCHARGE FOR LAKEFILLING OR FLUSHING INTO
EXCAVATION OR PIT
WATERMAIN DISCHARGE FOR LAKEFILLING OR FLUSHING INTO
EXCAVATION OR PIT
CH101
CH103CH104
CH105
CH106CH107
CH108
CH109
CH112CH111
CH110
CH113
PRIMARY PUMPING STATION
DEWATERING SUMP(LOCATION MAY VARY)
EXTENSIONGREEN LINE
DEWATERING WATERMAIN(MAX 450mm Ø) RECHARGE WATERMAIN
(MAX 450mm Ø)
GRAVITY LAKEOVERFLOW CULVERT(AT FINAL REHABILITATION)
CH102
DIFFUSE DISCHARGE
DIFFUSEDISCHARGE
DIFFUSEDISCHARGE
DIFFUSEDISCHARGE
DIFFUSEDISCHARGE
DIFFUSE DISCHARGE(SEE NOTE 5)
TEMPORARY WATER SUPPLYWELL (SEE NOTE 4)
DUFFERIN OWNEDPROPERTY LIMIT
PROPOSEDEXTRACTION LIMIT(LIMIT OF FUTUREQUARRY EXCAVATION)
PROPOSEDLICENSE LIMIT
APPROXIMATE LOCATION OF PHASE 4 ACCESS RAMP
ACCESS LANE
WATER SUPPLY TOOPERATIONS (DUST
SUPPRESSION, WASHPROCESS TOP-UP,
VEGETATIONWATERING ETC.)
0 20 40 60m 0.5
SCALE=1:2000
Approved
DRAWING STATUS
ON Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :o
Date:
Report N :o Drawing No :
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATES ACTON QUARRY
PHASE 4 WMS PLAN
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE NOVEMBER 2014
30193-19 028 C-0330193-19(028)CI-WA003 MAR 4/2015
1:2000
NOTES:
1. DIFFUSE DISCHARGE LOCATIONS, RECHARGE WELL LOCATIONS AND ASSOCIATEDWATERLINE AND COMMUNICATION CABLE ALIGNMENT ARE APPROXIMATE AND WILLBE ADJUSTED TO SUIT FIELD CONDITIONS IN ACCORDANCE WITH THE AMP.
2. FINISHED ACCESS LANE WIDTH TO BE APPROXIMATELY 4.0m. LANE TO BE GRADEDTO MERGE INTO SURROUNDING GRADE. FIELD LAYOUT OF HORIZONTAL ANDVERTICAL CURVES TO ALLOW TRAVEL BY SERVICE VEHICLE.
3. RECHARGE WELLS, MONITORING WELLS, DIFFUSE DISCHARGES, AND STAFF GAUGESMAY BE ADDED AS NECESSARY FOR PROPER OPERATION IN ACCORDANCE WITHAMP.
4. A TEMPORARY WATER SUPPLY WELL (TW3-07 OR NEW WELL) MAY BE USED FORWETLAND CONTINGENCY MITIGATION IN ACCORDANCE WITH AMP.
5. DIFFUSE DISCHARGE MAY BE CONNECTED TO GRAVITY OVERFLOW FROM LAKE ATFINAL REHABILITATION.
JRM11/26/2014ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
JRM3/3/2015ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
W
M
W
M
W
M
WM
WM
WM
WM
WM
WM
WM
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
WM
WM
WM
WM
WM
WM
WM
W
M
WM
WM
WM
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
WM
WM
WM
WM
W
M
WM
WM
WM
WM
WM
W
M
W
M
WM
WM
WM
WM
WM
W
M
W
M
W
M
W
M
W
M
W
M
W
M
WM
W
M
WM
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
WM
WM
WM
WM
WM
WM
WM
WM
WM
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
WM
WM
WM
WM
FEEDER LINE TO PHASE 5 EAST
(WETLAND U6) DISCHARGE
(MAX 250mm Ø)
GRAVITY LAKE
OVERFLOW CULVERT
(AT FINAL REHABILITATION)
DEWATERING WATERMAIN
(MAX 250mm Ø)
DEWATERING SUMP
(LOCATION MAY VARY)
DEWATERING WATERMAIN
(MAX 450mm Ø)
SECONDARY PUMPING STATION
(SEE NOTE 3)
AGGREGATE WASHING SOURCE WATER AND
SETTLING PONDS (SEE NOTE 4)
SETTLING AREA
(SEE C-06)
WASH PLANT SUPPLY TO
OPERATIONS
WASH PLANT SUPPLY SUMP
(LOCATION MAY VARY)
DEWATERING WATERMAIN
(MAX 450mm Ø)
CONTROL HUT
(SEEPS AND PHASE 5
EAST WETLAND U6)
RECHARGE WATERMAINS FROM
PRIMARY PUMPING STATION
(MAX 600mm Ø)
RECHARGE WATERMAINS FROM
PRIMARY PUMPING STATION
(MAX 600mm Ø)
DEWATERING WATERMAINS
(MAX 450mm Ø)
DISCHARGE TO
PHASE 2 RESERVOIR
0 10 20 30m
1
SCALE=1:1000
Approved
DRAWING STATUS
O
N
Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :
o
Date:
Report N :
o
Drawing N
o
:
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATES
ACTON QUARRY
SECONDARY PUMPING STATION PLAN
(PHASE 2)
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE
NOVEMBER 2014
30193-19 028 C-04
30193-19(028)CI-WA004 NOV 26/2014
1:1000
NOTES:
1. DRAWING DEPICTS WORKS THAT MAY BE IMPLEMENTED IN ADDITION TO, OR TO
AMEND, EXISTING WORKS.
2. LOCATIONS OF WATERMAINS AND OTHER WATER MANAGEMENT SYSTEM
COMPONENTS ARE APPROXIMATE AND MAY VARY TO SUIT FIELD CONDITIONS AT
THE TIME OF CONSTRUCTION.
3. SECONDARY PUMPING STATION WILL INCLUDE A BELOW GRADE CYLINDRICAL
PRE-CAST CONCRETE CHAMBER WITH BACKFILL TO INTEGRATE INTO EXISTING
TOPOGRAPHY AND ABOVE GRADE VENT AND CONTROL PANEL.
4. POND AREAS MAY BE SUBDIVIDED/SUPPORTED BY BERMS. MAXIMUM 4 METRES IN
TOTAL HEIGHT, WITH MINIMUM 0.5 METRES OF FREEBOARD AND MAXIMUM OF 2
METRES OF WATER DEPTH.
JRM11/26/2014ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
3
6
0
3
6
0
3
6
0
3
5
8
3
5
8
356
356
3
5
6
356
3
5
4
3
6
2
356
356
3
6
2
3
5
8
3
5
8
PHASE 5 WEST/ 6
PHASE 3
SCOTCH BLOCK UPPER
TRIBUTARY A
W2-S
W3
U27
H3
CH201
CH202
CH203
CH204
CH205
CH206
CH207
CH208
CH209
CH210
CH211
U
/G
U
/
G
U
/G
U
/
G
U
/G
U/G
U
/
G
U
/
G
U
/G
U/G
U/G
U/G
U
/G
U/G
U/G
U
/
G
U
/
G
U
/G
U
/
G
U
/G
U
/
G
SG70-10
SG69-10
SG34-07
DIFFUSE DISCHARGE
DIFFUSE DISCHARGE
DIFFUSE DISCHARGE
RW206A
RW205B
DIFFUSE DISCHARGE
RW205A
SG14-07
SG59-10
SG68-10
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
EXTENSION
GREEN LINE
ACCESS LANE
DEWATERING SUMP
(LOCATION MAY VARY)
PROPOSED EXTRACTION LIMIT (LIMIT
OF FUTURE QUARRY EXCAVATION)
PROPOSED LICENSE LIMIT
DEWATERING WATERMAIN
(MAX 450mm Ø)
EXISTING
SETTLING POND
W
M
W
M
W
M
W
M
W
M
WM
WM
WM
W
M
W
M
WM
WM
WM
W
M
W
M
W
M
W
M
W
M
W
M
WM
W
M
WM
WM
WM
W
M
W
M
W
M
W
M
W
M
DIFFUSE DISCHARGE
(SEE NOTE 4)
WATERMAIN DISCHARGE FOR
LAKE FILLING OR FLUSHING
INTO EXCAVATION
WATERMAIN DISCHARGE FOR LAKE
FILLING OR FLUSHING INTO
EXCAVATION OR PIT
PHASE 5/6 WEST RECHARGE
WATERMAIN (MAX 450mm Ø)
(SEE NOTE 5)
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
WM
W
M
W
M
W
M
W
M
W
M
WM
W
M
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
H3 INFLOW
H4 INFLOW
RW207A
RW208A
RW209A
RW210A
RW2011A
OW77-09
OW90-10
FOR TEMPORARY DIFFUSE
DISCHARGE SEE C-09
FOR TEMPORARY DIFFUSE
DISCHARGE SEE C-09
0 20 40 60m
0.5
SCALE=1:2000
Approved
DRAWING STATUS
O
N
Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :
o
Date:
Report N:
o
Drawing N
o
:
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATES
ACTON QUARRY
PHASE 5/6 WMS PLAN SHEET 1
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE
NOVEMBER 2014
30193-19 028 C-05
30193-19(028)CI-WA005 NOV 26/2014
1:2000
NOTES:
1. DIFFUSE DISCHARGE LOCATIONS, RECHARGE WELL LOCATIONS AND ASSOCIATED
WATERLINE AND COMMUNICATION CABLE ALIGNMENT ARE APPROXIMATE AND
WILL BE ADJUSTED TO SUIT FIELD CONDITIONS IN ACCORDANCE WITH THE AMP.
2. FINISHED ACCESS LANE WIDTH TO BE APPROXIMATELY 4.0m. LANE TO BE GRADED
TO MERGE INTO SURROUNDING GRADE. FIELD LAYOUT OF HORIZONTAL AND
VERTICAL CURVES TO ALLOW TRAVEL BY SERVICE VEHICLE.
3. RECHARGE WELLS, MONITORING WELLS, DIFFUSE DISCHARGES ,AND STAFF
GAUGES MAY BE ADDED AS NECESSARY FOR PROPER OPERATION IN
ACCORDANCE WITH AMP.
4. DIFFUSE DISCHARGE MAY BE CONNECTED TO GRAVITY OVERFLOW FROM LAKE
AT FINAL REHABILITATION.
5. WATERMAIN MAY FOLLOW ALTERNATE ALIGNMENT ALONG RAMP TO THIRD LINE.
JRM11/26/2014ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
360
354
352
344
352
362
346
354
344
342
SG75-10
SG77-11
RW214A
RW217B
RW216A
RW214B
RW213A
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
U/G
U/G
U/G
U/G
U/G
U/G
U/G
U/G
RW216B
RW217A
RW215A
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM WMWM
WMWM
SG76-10
RW212B
H10 INFLOW 1
H10 INFLOW 2
RW212A
MW5-II
OW39A
PHASE 5 EAST
PHASE 2
RESERVOIR(WHEN NOT DEWATERED
FOR OPERATIONS)
U6
U32
U19
U17
W9-X
U8
U30
U7
W9-N
H10
W10-a
U20
U29
W10
W9-S
SETTLING AREA(SEE NOTE)
CH212
CH213
CH214
CH215
CH216
CH217
DIFFUSE DISCHARGE(SEE NOTE 4)
DIFFUSE DISCHARGE(SEE NOTE 5)
DIFFUSE DISCHARGE
ACCESS LANE
LICENCE LIMIT
EXTRACTION LIMIT
DUFFERIN OWNED
DEWATERING SUMP(LOCATION MAY VARY)
DEWATERING WATERMAIN(MAX 450mm Ø)
RECHARGE WATERMAIN TO SEEPS(MAX 250mm Ø)
FEEDER LINE TO PHASE 5 EAST(WETLAND U6) DISCHARGE(MAX 250mm Ø)
EXISTINGSETTLING POND
CHANNEL IMPROVEMENT(REFER TO SEPARATEDOCUMENTATION)
DEWATERING WATERMAIN(MAX 250mm Ø)
GRAVITY LAKEOVERFLOW CULVERT(AT FINAL REHABILITATION)
RECHARGE WATERMAINTO PHASE 5 EAST(MAX 300mm Ø)
ALTERNATE ALIGNMENT
FOR TEMPORARY DIFFUSEDISCHARGE SEE C-09 AND NOTE 6
FOR TEMPORARY DIFFUSEDISCHARGE SEE C-09 AND NOTE 6
EXTENSIONGREEN LINE
350
358
352
WM
WM
WM
WM
TRIB
UTA
RY
C3RD
LIN
EH14
H15
CH210
CH211
U18
TEMPORARYWATER SUPPLYWELL (SEE NOTE 7)
RW212ARW2011ARW210A
RW212B
CH212 GRAVITY LAKEOVERFLOW CULVERT(AT FINAL REHABILITATION)
DIFFUSE DISCHARGE.(SEE NOTE 5)
FOR TEMPORARY DIFFUSEDISCHARGE SEE C-09
0 20 40 60m 0.5
SCALE=1:2000
Approved
DRAWING STATUS
ON Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :o
Date:
Report N :o Drawing No :
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATES ACTON QUARRY
PHASE 5/6 WMS PLAN SHEET 2
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE NOVEMBER 2014
30193-19 028 C-0630193-19(028)CI-WA006 MAR 4/2015
1:2000
NOTES:
1. DIFFUSE DISCHARGE LOCATIONS, RECHARGE WELL LOCATIONS AND ASSOCIATEDWATERLINE AND COMMUNICATION CABLE ALIGNMENT ARE APPROXIMATE AND WILLBE ADJUSTED TO SUIT FIELD CONDITIONS IN ACCORDANCE WITH THE AMP.
2. FINISHED ACCESS LANE WIDTH TO BE APPROXIMATELY 4.0m. LANE TO BE GRADEDTO MERGE INTO SURROUNDING GRADE. FIELD LAYOUT OF HORIZONTAL ANDVERTICAL CURVES TO ALLOW TRAVEL BY SERVICE VEHICLE.
3. RECHARGE WELLS, MONITORING WELLS, DIFFUSE DISCHARGES AND STAFF GAUGESMAY BE ADDED AS NECESSARY FOR PROPER OPERATION IN ACCORDANCE WITHAMP.
4. FOLLOWING PHASE 2 SETTLING POND REMOVAL, SETTLING TO BE PREFORMED ONPHASE 2 QUARRY FLOOR WITH LOW BERM (1-2m), AS NECESSARY, OR ALTERNATELYBY TEMPORARY TRANSFER OF WATER TO PHASE 3 OR PHASE 1. DISCHARGEWATERMAIN WILL BE CONNECTED TO DIFFUSE DISCHARGE FOR REMOVAL OFSETTLING POND.
5. DIFFUSE DISCHARGE MAY BE CONNECTED TO GRAVITY OVERFLOW FROM LAKE ATFINAL REHABILITATION.
6. A TEMPORARY WATER SUPPLY WELL OR ABOVE GRADE FEEDER LINE FROM PHASE2/5 EAST DISCHARGE LINE MAY BE USED IF NECESSARY PRIOR TO WATERMANAGEMENT SYSTEM RECHARGE WATERMAIN AVAILABILITY.
7. A TEMPORARY WATER SUPPLY WELL MAY BE USED FOR WETLAND CONTINGENCYMITIGATION IN ACCORDANCE WITH AMP.
JRM
U18 CONTINGENCY TEMPORARYMITIGATION WATER SUPPLY WELL
1:2500
11/26/2014ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
JRM1/14/2015ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
JRM3/3/2015ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
3048
A A
FLOOR OPENING
FLOOR OPENING
PRECAST CONCRETE BUILDINGC/W INSULATION AND INTERIOR WALLBOARD
100mm THK RIGIDINSULATION, TYP4 SIDES
1200
SLOPE
100mm THK RIGIDINSULATION TYP.
(PLACED PRIORTO SCREENINGS)
EXPOSEDAGGREGATE
FINISH
2380
MOTIONACTIVATED LIGHT
500mm GRANULARCOMPACTED TO 98% SMDD(SOIL TYPE A2)
SELECT NATIVE MATERIALBACKFILL COMPACTED
TO 95% SMDD(SOIL TYPE S1)
100mm SCREENINGSCOMPACTED TO 98% SMDD
(SOIL TYPE A4)
2440
Approved
DRAWING STATUS
ON Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :o
Date:
Report N :o Drawing No :
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATES ACTON QUARRY
TYPICAL CONTROL HUT DETAIL
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE NOVEMBER 2014
30193-19 028 C-0730193-19(028)CI-WA007 NOV 26/2014
N.T.S.
SECTION A
JRM
NOTES:
1. HUT DIMENSIONS ARE APPROXIMATE AND MAY VARY WITH VENDOR AVAILABILITY.
11/26/2014ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
VA
RIE
S
OV
ER
BU
RD
EN
DE
PTH
VA
RIE
S
OPEN HOLE THROUGH AMABEL
GRADE
GROUND WATER (VARIES)
GROUT
STEEL CASING
MIN. 1m INTOCOMPETENTBEDROCK
AMABEL
REYNALES
CABOT HEAD SHALE
LOCKABLE WELL CAPWITH CONDUIT CONNECTION
MIN
0.61
m
RISER PIPE
SLOTTED SCREEN ORPERFORATED PIPE
OVERBURDEN
JUNCTION BOX MOUNTED TOCASING PIPE FOR
LEVEL/TEMPERATURE SENSOR
INSTRUMENT
INSTRUMENT CABLE
WE
LL D
EP
TH V
AR
IES
(AP
PR
OX
. 20
TO 2
0m) W
ELL
DE
PTH
MA
Y E
XTE
ND
ON
LYTH
RU
PA
RTI
AL
DE
PTH
SH
OW
N P
ER
AM
P.
N.T.S.TYPICAL RECHARGE WELL DETAIL
VARIOUS
PVC WELL SCREEN ORPERFORATED PIPE
PERFORATED PIPE
DROP PIPE OR HOSE
OPEN HOLE THROUGH AMABEL
GROUND WATER (VARIES)
GROUT
DEPTH ASDIRECTED BYENGINEER
AMABEL
REYNALES
CABOT HEAD SHALE
STEEL CASINGOVERBURDEN
VA
RIE
S
OV
ER
BU
RD
EN
DE
PTH
VA
RIE
S
GRADE
MIN
0.61
m
SUPPLY LINE
LIFT PIPE
PITLESS ADAPTER
SLIP-ON FLANGEWELDED TO CASING
BLIND FLANGE WITHTHREADED HOLE AND PLUG
2m M
IN O
R A
LTE
RN
ATE
FRE
EZE
PR
OTE
CTI
ON
CONCRETE ANCHORBLOCKS, TYP
WE
LL D
EP
TH V
AR
IES
(AP
PR
OX
. 20
TO 3
0m) W
ELL
DE
PTH
MA
Y E
XTE
ND
ON
LYTH
RU
PA
RTI
AL
DE
PTH
OF
AM
AB
EL.
PRESSURE RELIEFENCLOSURE
Approved
DRAWING STATUS
ON Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :o
Date:
Report N :o Drawing No :
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATESACTON QUARRY
TYPICAL WELL DETAILS
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE NOVEMBER 2014
30193-19 028 C-0830193-19(028)CI-WA008 NOV 26/2014
N.T.S.
N.T.S.TYPICAL MONITORING WELL DETAIL
VARIOUS
JRM11/26/2014ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
2.0m MIN.
2m OR ALTERNATEFROST PROTECTION
PERFORATED/SCREENEDDISTRIBUTION PIPE
BURIED WATER SUPPLYLINE
FLOWCONTROL
VALVE ANDMETER
DIFFUSE DISCHARGE SLOPE LENGTH 1-2mTYPICAL FINISHED SURFACE AREA 5-10m²
COVER WITH AVAILABLE WEATHEREDSTONE, WOODY DEBRIS
WETLAND
TYPICAL CONTROL HUT
CLEARSTONE
TYPICAL HIGHWATER LEVEL
SLOPE
GEOTEXTILE
RESTORE WORK ZONE(SEE NOTE 1)
WEATHERED STONE
PERFORATED/SCREENEDDISTRIBUTION PIPE BURIED WATER SUPPLY
LINE
FLOWCONTROL
VALVE ANDMETER
2m OR ALTERNATEFROST PROTECTION
DIFFUSE DISCHARGE SLOPE LENGTH 1-2mTYPICAL FINISHED SURFACE AREA 5-10m²COVERED WITH AVAILABLE WEATHERED
STONE, WOODY DEBRIS
CLEARSTONE
GEOTEXTILE
TYPICAL HIGHWATER LEVEL
TYPICAL CONTROL HUT
LOW POOLLEVEL
RESTORE WORK ZONE(SEE NOTE 1)
WEATHERED STONE
WETLAND
TO WATER SUPPLY
DIFFUSION MATERIAL USE EXISTING STONE PILE,FENCE ROW, OR SIMILAR, OR HAND BUILD FROM
AVAILABLE WEATHERED STONE. USE FILTERFABRIC AS NECESSARY TO SUIT FIELD CONDITIONS
TEMPORARY ABOVE GROUNDWATER SUPPLY (PIPE OR HOSE)
PERFORATED/SCREENEDDISTRIBUTION PIPE
CONNECTION FLOWCONTROLVALVE ANDMETER
TYPICAL CONTROL HUT
VALVE ANDFLOW METER
WATERMAINTAP
RECHARGEWATERMAIN
WELL PUMP
AMABELBEDROCKSUPPLY WELL
DEPTH AS NECESSARY
GENERATORVALVE ANDFLOW METER
WMS CONTROL HUT WATER SUPPLY WELL(TEMPORARY CONTINGENCY ONLY)
TAP INTO WMS WATERLINE Approved
DRAWING STATUS
ON Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :o
Date:
Report N :o Drawing No :
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATES ACTON QUARRY
TYPICAL DIFFUSE DISCHARGE DETAILS
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE NOVEMBER 2014
30193-19 028 C-0930193-19(028)CI-WA009 NOV 26/2014
N.T.S.
NOTES:
1. DISTURBED AREA TO BE RESTORED AND COVERED WITH WOOD CHIPS ORRE-VEGETATED WITH NATIVE SPECIES UNDER SUPERVISION OF ECOLOGIST.
2. ALTERNATE FROST PROTECTION MAY INCLUDE SUBSURFACE INSULATION AND/ORHEAT TRACING.
TYPICAL INTERMITTENT WETLAND DIFFUSE DISCHARGE DETAIL(WETLAND WITHOUT PERENNIAL POOL)
TYPICAL PERENNIAL WETLAND DIFFUSE DISCHARGE DETAIL(WETLAND WITH PERENNIAL POOL)
NTS NTS
LOCATIONS:
U31 * U3 U4 W2-N * W2-S (MIN. OF 3 DIFFUSE DISCHARGE TO BE IMPLEMENTED) W2-S - LOWER W3 - UPPER * W3 - LOWER W4 U6 * U30 3rd LINE *
* DIFFUSED DISCHARGES ARE TO BE INCORPORATED INTO EXISTING DRAINAGE DITCHES ANDMAY BE ADAPTED FROM TYPICAL DETAIL UNDER SUPERVISION OF ENGINEER AND ECOLOGIST.
LOCATIONS:
W1 U5
TYPICAL TEMPORARY DIFFUSE DISCHARGE (CONTINGENCY)NTS
LOCATIONS:
H3 H4 H10 H15 (IF NECESSARY)OTHERS AS NECESSARY
TYPICAL WATER SUPPLY OPTIONSNTS
1 2 3
JRM11/26/2014ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL
SUMP SIZE AS REQUIREDTYPICALLY LESS THAN 100m³
SUBMERSIBLE PUMP(S) (MAX 2 PUMPS) MAX 200mm
DIA. PUMP DISCHARGE PIPE OR HOSE FLOW TORECEIVING SUMPOR AREA WITHINQUARRY FLOORFOOT PRINT
SUBMERSIBLE PUMP(S) (MAX 2 PUMPS) MAX 200mm
DIA. PUMP DISCHARGE
PIPE OR HOSE FLOW TORECEIVING SUMPOR AREA WITHINQUARRY FLOORFOOT PRINT
BERM(OPTIONAL)
SUBMERSIBLE PUMP(S) (MAX 2 PUMPS) MAX 200mm
DIA. PUMP DISCHARGE PIPE OR HOSE FLOW TO RECEIVINGSUMP, WATER BODYOR AREA WITHINQUARRY FLOORFOOT PRINT
EXISTING WATER BODY(i.e. LAKE, FLOODED QUARRY CELL,
RESERVOIR, ETC.)
SUBMERSIBLE PUMP(S) OR SELFPRIMING CENTRIFUGAL PUMP(S)(MAX. 3 PUMPS) MAX. 250mm DIA.
PUMP DISCHARGE.
SUMP
AREA UP TO 3000 m²TOTAL VOLUME UP TO 15000 m³
FLOW METERINGBY RUNTIME ORINLINE METER.
FLOW TO RESERVOIR OROTHER DISCHARGE POINT
PIPE OR HOSE
FLOW FROMSATELLITE SUMPS OR
TRANSFER PUMP
WATERTRUCK FILING
STATION
Approved
DRAWING STATUS
ON Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :o
Date:
Report N :o Drawing No :
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATES ACTON QUARRY
TYPICAL DEWATERINGSUMP DETAILS
WATER MANAGEMENT SYSTEM
M. TOMKA R. HANKE NOVEMBER 2014
30193-19 028 C-1030193-19(028)CI-WA010 NOV 26/2014
N.T.S
NOTES:
NTSTYPICAL LOW - LYING AREA DEWATERING (SATELLITE SUMP)
1) POWER SUPPLY TO PUMPS FROM ELECTRICAL SERVICE FEEDER OR LOCAL POWERGENERATOR
2) SUBMERSIBLE PUMP(S) INCLUDE CONTROLS, ELECTRICAL EQUIPMENT,INSTRUMENTATION, PIPING, VALVES, AND APPURTENANCES ESSENTIAL FOR THEPROPER OPERATION OF THE PUMP STATION.
NTSTYPICAL SATELLITE SUMP
NTSTYPICAL TRANSFER PUMPING
TYPICAL QUARRY CELL DEWATERING SUMP
PLAN
NOTES:
1) MAY INCORPORATE INFLOW FROM SATELLITE SUMP(S)2) SUMP LOCATION MAY VARY WITH QUARRY EXTRACTION.3) PUMP(S) AND APPURTENANCES MAY BE LOCATED WITHIN A BUILDING.
NTS
ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL JRM11/26/2014
Approved
DRAWING STATUS
ON Revision
Date Initial
Date Initial
Status
Scale:
Source Reference:
Project Manager: Reviewed By:
Project N :o
Date:
Report N :o Drawing No :
THIS BAR MEASURES 50mm ON ORIGINAL. ADJUST SCALE ACCORDINGLY.
SCALE VERIFICATION
DUFFERIN AGGREGATESACTON QUARRY
PRIMARY PUMPING STATION (PHASE 1)PLAN & ELEVATIONS
WATER MANAGEMENT SYSTEM
M. TOMKA R.HANKE NOVEMBER 2014
30193-19 028 A-0130193-19(028)AL-WA001 NOV 26/2014
1:25
WEST ELEVATION EAST ELEVATION
SOUTH ELEVATION
FLOOR PLAN
NORTH ELEVATION
12
12
349.50
346.00
343.00
13000
3500
2500 2000
2000
DESK
COUNTERSINK
ELECTRICALROOM
WASHROOM
ENCLOSEDSTAIRWELL
349.50
346.00
343.00
3500
EQUIPMENTACCESS HATCH
CONTROLROOM
7000
ISSUED FOR NEC DEVELOPMENT PERMIT APPROVAL JRM
NOTES:
1. PRIMARY PUMPING STATION IS LOCATED IN PHASE 1. SEE DRAWING C-02.
11/26/2014