Key Largo Wastewater Treatment DistrictBoard of Commissioners Meeting
Agenda Item Summary
Meeting Date:
June 6, 2017
Agenda Item Type:
Information / Presentation
Department:
General Manager
Agenda Item Scope:
Review / Discussion
Sponsor:
Peter Rosasco
Agenda Item Number:
Recommended Action:
Discussion
Subject:
Florida Keys Water Quality Improvement Program Update
Summary of Discussion:
Staff to present an e-mail from Fred Hicks, District lobbyist In Washington, D.C.
Reviewed I Approved
Operations:
Administration:
Finance:
District Counsel:
District Clerk:
Engineering:
Approved By:General Manager
Financial Impact
$ 500,000.00
Revenue
Funding Source:
Grant(s)
Budgeted:
No
Attachments
1. E-mail from Fred Hicks
2. Army Civil Works Program -FY2017 Work Plan
Date:
\
\
\
G-2
Katherine Jackson <[email protected]>
Fwd: FKWQIP Finished "In the Money" for FY171 message
Peter L. Rosasco <[email protected]> Thu, Jun 1, 2017 at 3:40 PMTo: Katherine Jackson <[email protected]>
Please attach the email from Fred to this ARF
Sincerely,Peter Rosasco, CPA
Begin forwarded message:
From: "fred b. hicks" <[email protected]>Date: May 24, 2017 at 7:42:35 PM EDTTo: "Peter L. Rosasco" <[email protected]>Subject: FKWQIP Finished "In the Money" for FY17
Peter,
Late today the Corps released its FY17 Work Plan. They had until June 20 so this year they worked fast.
The FKWQIP once again finished "in the money" at $2,000,000.
I would have liked to have had more. However I am pleased that we were one of the very few"reimbursement" projects on the list.
I will study the national list and get a report out to you to give you a better idea of how we fit into the biggerpicture. Having been at this process for 38 years I always want to have clients noticed and funded and tohave this occur year after year. When you finish "in the money" you are in good shape to compete forwhatever future opportunities present themselves because this helps to prove once again that the Corpsand the South Florida Congressional Delegation both continue to be supportive of the FKWQIP.
Again, this $2 million wouldn't have been possible without the successful FKWQIP DC trip which you andthe others carried out in late March.
FYI.
Fred
2 attachments
fQi FY17_WP_Construction.pdf" 132K
®1KATT00001..htm
ARMY aVIL WORKS PROGRAM
FY 2017 WORK PLAN • CONSTRUCTION
STATE DIVISION BUSINESS
PROGRAM
1/
PROGRAM NAME FY2017
EXPLANATORY
STATEMENT
ADDITIONAL
WORK PLAN
AMOUNT
TOTAL FY 2017
AUOCATJON
LINEITEMOF
ADDITIONAL
FUNDING 1/
SUMMARY OF WORK TO BE ACCOMPUSHED WITH TOTAL FY 2017 ALLOCATION
RIO DEFLAGFLAGSTAFF, AZ 1,000,000 1,000,000 1 Complete 100%design of project to enable non-Federal sponsor to identlFycostsavings that might result in a positive Federal interest determination
SPO FORR
TUCSON DRAINAGE AREA, AZ <1,000,000 4,000,000 1 mprovements to rainfalldrairsage systems that address flood damages-Completeconstruction and fiscally close out proiect.
CA SPD FDRR
AMERICAN RIVER COMMON
FEATURES,NAT0MA5 BASIN,CA
ZLISO.OOO 31,500,000 52,650,000 2 Award construction contract for Reach 1. Phase 1($18 million); Geotech Explorations
iReachesE,F,& G)($1.5 million);Designand Take Letter for ReachE($550,000);Design andTakeLetterfor ReachesFa G($1.1million); CompleteconstrurRlon ofReach D ($6.5 million); Construct Reach H ($25 million)
CA SPD FORR
AMERICAN RIVERWATERSHEO
(FOLSOM DAM MODIFICATIONS).
20,7A0,000 2,000,000 22,740,000 1 Complete and fiscally close out project
CA SPD
CAMBRIA SEAWATER
DESALINATION. CA
S0,000 50.000 8
Continue PMP update, modify EIS
CA SPD FDRR
ISABELLA LAKE, CA(DAMSAFETY) 70,500,000 70,500,000 Phase IIDamsand SpillwayConstruction ($40,882.0001;Phase IIEngineeringDuringConstruction. Labor and Construction Management ($11,900,000); Phase IIIReal EstateAcquisitions($65,000,000); Real Estate Condemnation ($2,000,000);USES FacilitiesRelocation Contract ($6 million): Environmental Mitigation ($4,600,407)
CA SPD FORR
MURRIETTA CREEK. CA 2,400,000 2,400,000 1 Complete construction of Phase 2A (S2 million); Complete limited reevaluation report15400 niyii
CA SPO
r • •
? :H ENR ;
NAPA RIVER. SALT MARSH
RESTORATION. CA
890,000 890,000 6 Continue monitoring and adaptive management, complete the Interim OSM manual,complete LERRDs crediting, test manual operations of the water mixing chamber, anddesign/construct the fix for Ponds 6/6A water control structure
CA SPO
OAKLAND HARBOR (SOFOOTPROJECT!. CA
1,056,000 1,056.000 Complete and fiscally close out construction project
CA SPD FDRR
SACRAMENTO RIVER BANK
PROTEaiON PROJECT, CA
8,000,000 8,000,000 Continued mRigationfor previouslyconstructed repairs, ongoing biologicalmonitoring, O&Mmanual updates, and notices of completion {$5CX).000); Levee/bankerosion Inventory within the SRFCP limits and subsequent designs, contract
development, award and administration for needed erosion repairs and associated
mitigation; NEPA/CEQA documenlallon and compliance ($4,100,000);Awardconstruction and mitigation contracts ($6,490,000)
CA SPD FDRR
SAN LUIS RET RIVER, CA 1,750,000 1,750,000 1 Sediment Removal {$4,182,000}; Mitigation ($600,000); Restoration (S3SO.OOO):Cnmnlelp Pnst-Authorlaation Chanae Reoort IS800.0001
CA SPD FORR
SANTA ANA RIVER MAINSHM, CA 37,200,000 11,800,000 49,000,000 2 Construction Management, Supervls on ft Administrabon. Engineering & Design andcomplete remaining mitigation efforts for the ongoing Reach9 contracts ($10 million);Award Reach 9 Phase (BNSF)Railroad Bridge Protection construction contract (533million); Fish Translocation (SI.8 million); Economic Evaluation Update (5150,000);Award AuxiliaryDike ft Floodwall Connector Contract ($2.5 million); SedimentTransport and Geomorphology Study for Santa Ana sucker fish (Si million); Awarddrilling services contract (SSOO.OOO); Ongoing contract modifications (S2 million)
CA SPD SOUm PERRIS, CA
4,007,000 4,007,000 Perns II Desaller Treatment Facility with construction of Site Developmeni and Treated
Water Facilities
CA SPD FDRR
TUBA RIVER BASIN, CA 7,000,000 7,000,000 Continue design for Phases 23 2C. 3 |S2 million); Award Phase 2A North ConstructionContract, includingproject oversight ($S million);Continue Designfor Phases 2Band 3($1,062 million); Award Phase 2CConstruction Contract (includes supervision and
CA SPO 1mHAMILTON AIRFIELD WETLANDS
RESTORATION, CA
700.000 700,000 Continued adaptive management and monitoring ($640,000); Completion of Nurserymanagement and planting ($45,000): Award 2-year contract for the Monitoring ft
Adaptive Management Plan (MAMP)($579,000), Site Monitoring (MethylMcrcurY)($31,000): Contraa management and project management ($45,000)
OE NAD FDRC
DELAWARE COAST, CAPE
HENLOPEN TO FENWtCK ISLAND,
4,000,000 4,000,000 Beach nourishment to be accomplished along with an estimated $4 million of PCCEfunds and Si.9 million of supplemental funds for a total of S9.9 million.
OE NAD FDRC
DELAWARE COAST, BETHANY
BEACH TO SOUTH BETHANY
6,500,000 6,500,000 Beach nourishment to be accomplished along with an estimated $15 million of FCCEfunds and $4 millionof supplemental funds for a total of $25.5 million.
FL SAD
FLORIDA KEYSWATER QUAUTY
IMPROVEMENTS, ft
2.000,000 2.000,000
Reimburse for work in Key Largo. Islamorada and Marathon
FL SAO FDRC
FORT PIERCE BEACH. FL 1,414,000 1,414,000 Beach nourishment to be accomplished along with an estimated $574,000 ofsupplemental funds and $4,178 mlllton of operation and maintenance funds tomitigate damages to this project from a Civil Works navigation project for a total ofCR IRfi mlllinn
FL SAD FDRR
HERBERTHOOVERDIKE,FL
(SEEPAGECONTROL)
49,S0O,0OO 18,670,000 63,170,000 Continue Construction Managemertt ($12 million); Preconstructlon Design($1,800,000); Continue Construction of Culverts ($16,700,000); Continue EngineeringDuring Construction ($6,800,000); Continue Design/Field investigation ($4,000,000);Contract Award for Extension of Reach ICut Off Wail ($8,200,000): fund the Structure
S-285 (Culvert HP-6) replacement construction contract ($18.67 million)
1 JACKSONVILLE HARBOR 17,300,000 17,500,000 4 New Start; Initiate construction of the deep draft navigation improvements at
FL SAD FDRC
MARTINCOUNTY,FL 4,965,000 4,965,000 1 Beachnourishment to be accompll^ed along with $2,135 millionof FCCE funds for atotal of 57 057 million
FL SAD FDRC
NASSAU COUNTY. FL 3,185,000 3,185,000 3 Beach nourshment to be accomplished along with an estimated 57.711 millionallocation of FCCEfunds and $2.09 million of operation and maintenance funds to
mitigate damages to this project from a ChrilWorks navigation project for a total of
FL SAD FDRC
PINEILASCOUNTY,f L(SAND KEY &TREASURE ISI AND!
16,260D0O 16,260,000 3 Beach nourishment to be accomplished along with an estimated $12.8 millionallocation of FCCE funds for a total of $28.995.66C
FL SAD FDRC
ST JOHN'S COUNTY, FL 3,301TX>0 3,301,000 3 Beach nourishment to be accompilshedalongwith an estimated S2,0tX),160 of
sjpplamenial funding and S4.45 millionof operation and maintenance funds tomitigate damages to this project from a CivilWorks navigation project for a total ofS9.7S1.160
ARMY CIVIL WORKS PROGRAM
FY 2017 WORK PLAN - CONSTRUaiON
STATE DIVISION BUSINESS
PROGRAM
1/
PROGRAM NAME FY2017
EXPLANATORY
STATEMENT
AOOtTIONAL
WORK PLAN
AMOUNT
TOTAL FY 2017
AUOCATION
UNEITIMOF
ADDITIONAL
FUNDING 1/
SUMMARY OF WORK TO BE ACCOMPLISHED WITH TOTAL FY 2017 ALLOCATION
> SOUTH FLORIDA ECOSYSTEM 106,000,000 8,500,000 114,500.000 7 r-111 Snijih Dadi>Kl 3.797 millionl: Fullvfjnd Contract Sa (S9.121 million):
RESTORATION, FL Englnaaringand Deiign/Suparvision and Administration ($1.2 mlliion);C-lll SouthDads Post-Authoritation Change Report (SI million): Land Admin/independentExternal Peer Review (5471,0001: Project Overslghl/Ooseoot (S2 million);Piraviine Strand IS4.6S7 millinnl: Continue Construction LS.3 million): Coristruction
management (SI million);Engineeringand Design(5657,000);intllanRiverlagoon South (SS9S7l trillion):Continue Construction (SS3.331million):
i 1 Construction management (S3.752 million);Engineeringand Design(S1.938mlliion);Oversightof Sponsor Construction ($500,000);KIsslmmee River LS74 4SI millinnl: Fullv fund construction of 5-69 Weir ISl 1.960.000):
i j
; ]
EngineeringDuringConstruction/Project Oversightof S-69Weir ($1,540,000);ProjectOversight/Construction Management (52 million); Engineering and Design/Supervision
and Administration of McArthur Ditch (5103,000); Fullyfund 2B1/C-37 Embankment,including engineering during conslruction and construction supervision andadministration labor and possible modifications (S8.5 million)fFRP«?n 7 (.SS7S 0001- Calonsahatchee C-43W8.SR: Construction Oversiaht
, ; (SSOO.OOO): C-lll Spreader Canal; Takings Analysis (S7S,000)Studies IS2.SS2 millioni' loxahatehee River Watershed Studv 15952.000): Western
I 'i ;
Everglades(BigCypress/L-28interceptor) Study (SSOO.OOO): LakeOkeechobeeWatershed Study ($800,000);Other (Sfi 17Smlllion|-ArlanHve AsuECsmentand Monitorine 154 000 OflOl- PuWIr
FL SAD ENR
Outreach (S2S,000); Program Management ($2,000,000): Information and DataManagement ($200,000); RECOVER ($1,400,000); Interagency Modeling Center($500,000)
FL SAD j NHD : TAMPA HARBOR. BIG BEND. FL 9.000.000 9.000.000 4 New Start: Initiate, complete and fiscally close out project
GA SAD MMRICHARD B RUSSEU DAM AND
LAKE.GA&Sr
930,000 930,000 Complete and fiscally close out project
..
.
SAVANNAH HARBOR EXPANSION,
GA
42,700,000 42,700,000 Continue Environmental Monitoring (54,000,000); Continue Entrance Channel
Dredging (535,797,000); Construction Management ($1,913,000): Engineering DuringConstruction ($990,000)
GA SAD
M
DES MOINES RECREATION RIVER
ANDGREENBELT.IA
9,350.000 9,3SO,000 G Riverfront Development • Complete construction of Riverwalk, lAproject (52,150,000);Complete construction of Red Rock Trail. lA trail system (S4,7SO,000|; and complete
construction of the Fort Dodge, lA project (S2.4SO.0OO)
MISSOURI RIVER FISH AND
WILDLIFE RECOVERY, lA. KS, MO,
MT, NE, ND&5D
18,000,000 10,810,000 31,090,000 6 Program Management Activities (S5.000.000); Integrated Science Program(511,000,000); Missouri River Recovery Implementation Committee (52,000.000);Shallow Water Habitat ($12.44 million) and Emergent Sandbar Habitat IS6SO.OCO)
lA NWD i ENft
<A NWD I E^R
MISSOURI RIVER FISH AND
WILDLIFE RECOVERY. lA. KS. MO,
MT. NF NO A sn
2,230.000 7
lA NWD FDRR
MISSOURI RIVER LEVEESYSTEM,
lA, N£, KS8. MO (DEFICIENCYf.ORRFmONl
41,983.000 41,983,000 1 Complete correction to identified deficiencies at L4SS & R460-471. MO & KSand
fiscally close out construction project
ID NWD RURAL IDAHO, ID 3.200.000 3.700.000 Execute design and construction PPAs for mulciole orolecls In Idahc
IL LRD
!L ENR
CHICAGO SANITARY AND SHIP
CANAL DISPFRSAl RARRIFR II
12,000,000 12,000,000 Operation and maintenance of existing barrier system.
1 IRD mtCOOK COUNTY INFRASTRUCTURE, 700,000 700.000
Environmental Infrastructure project In Country Club Hills
IL LRD FDRR
MCCOOK AND THORNTON
RESERVOIRS, IL
6,500,000 6,500,000 Stage 1 Reservoir coniraa modificat ons (S3 9 million); Requests for EquitableAdjustments ($1.62 million); Project Oversight and Administration ($980,000)
IL LRD
OLMSTEDLOCKS AND DAM, OHIO
RIVER,IL&KY
225,000,000 21,250,000 250,000.000 Continue Dam Construction Contract ($200 million); Mussel Monitoring {$450,000);Planning,Engineering,and Design($4.S million);Construction Management (S7million);Loc); GSM during Construction (Hired Labor)(S2 million);RiverDkes (S30
IL LRD
OLMSTED LOCKS AND DAM, OHIO
RIVFR II A KY
3,750,000
! •
UPPER MISSISSIPPI RIVER
RESTORATION, IL,lA, MN, MO &
Wl
20.000,000 13,170,000 33,170,000 Initiate, continue, and/or complete design, construction, and or O&M manuals for
multiple projects (531,487,000); Adaptive Management (5200,000): HabitatEvaluation/Monitoring($975,000); Model Certincation/Regiona) HREP ($50,000);Public Outreach (575,000); Science m Support of Restoration/Management (5513,000)
IL MVD ^ Mi
IL MVD FDRR
WOOD RIVER LEVEE DEFICIENCY
CORRECTION II
31,700.000 31,700,000 Complete and fiscatly dose out deficiency correction
IN LRD wm CALUMET REGION, IN
3,000.000 3,000,000 LKStreet Sewer Improvement, Deep River Street Sewer - Hobart, MeadowdalcSubwatershed - Merrtllville
IN LRD FDRC INDIANA SHORELINE EROSION. IN 2.400.000 2.400.000 Conduct srolect sand renourishmeni
KS NWD 1 FDRR TOPEKA, KS 8,034,000 8,034,000 Camolete and Rscallv close out oroiect
KY LRD
•-1
vNIH -1
KENTUCKYLOCK AND 0AM,
TENNESSEE RIVER, KY
19,500,000 39,000,000 Award all remaining options to Downstream Cofferdam Contract and E60 and S&Aofon-going contracts (527.72 million); Additional funding to complete Certified TotalProject Cost Estimate & Post Authortiation Change Report (5100.000); Award fulfyfunded contract for Site. Demolition and Utilities ($8.18 million); Develop plans &
specifications for downstream lock monoliths, approach walls, ubliHeS, bridges {S3mlliion)
KV LRD NIH
KENTUCKY LOCKAND DAM,TENNESSEE RIVER. KV
19,500,000
KV LRD FDRR
OHIO RIVER SHORELINE,
PADUCAH. KV
19,500,000 19,500,000 New Start: Initiate and complete construction and fiscally close out project
KY LRD FDRR
ROUGH RIVER,KY(DAM SAFETY) 1,200,000 1,200,000 Complete design of a full depth concrete cutoff wall ($1.2 million]; Constructionmanagement (Si.8 million); Engineering during Construction and Project Management15365 nnni
KY LRD •SOUTHERN AND EASTERN
KENTUCKY ENVIRONMENTAL
INFRASTRUCTURE. KY(SECTION
SJU
3,000,000 3,000,000
Environmental Infrastructure projects In several counties in Kentuckv
STATE DIVISION BUSINESS
PROGRAM
U
PROGRAM NAME
(ASCENSION PARISHENVIRONMENTAL
INFRASTRUCTURE
COMITE RIVER. LA
EAST BATON ROUGE PARISH
ENVIRONMENTAL
INFRASTRUCTURE. LA
,J BENNEn JOHNSTON
WATERWAY. LA
lA
MA
MA
MVD i ENRLOUISIANA COASTAL AREA
ECOSYSTEM REnORAnON.LA
ENB
FORR
BOSTON HARBOR DEEP DRAFT
IMPROVEMENTS, MA
MUOOY RIVER,MA
ASSATEAGUE, MO
ATLANTIC COASTOF MARYLAND.
MD
POPLAR ISLAND, MD
OAKLAND COUNTY, M-.D64:D134INORTHEASTERN MINNESOTA
ENVIRONMENTAL
INFRASTRUCTURE. MN
BLUERIVERBASIN,KANSAS CITY.
MO
BOIS BRULE DRAINAGE AND LEVEE
DISTRICT. MISSOURI(DEFIOENCY
CORRECTION!MONARCH• CHESTERFIELD, MOST. LOUISMO (COMBINEDSEWER
OVERFLOW)TURKEY CREEK BASIN. KS&MO
JACKSON COUNTY INDUSTRIAL
WATER SUPPLY, MS
MISSISSIPPI ENVIRONMENTAL
INFRASTRUCTURE, MS
RURAL MONTANA MT
BRUNSWICK COUNTY BEACHES,
CAROLINABEACH& VICINITY, NC
WRIGHTSVILLE BEACH. NC
FARGO,ND - MOORHEAD, MN
METRO
NORTH DAKOTA
INFRASTRUCTURE. NO
DELAWARE RIVERMAIN CHANNEL,
NJ. PA&DEGREAT EGG HARBOR INLET AND
PECK BEACH. NJ
LOWER CAPE MAY MEADOWS,
CAPE MAY POINT. NJ
RARITAN RIVER BASIN, GREEN
BROOK SUB-BASIN. NJ
ALAMOGORDO. NM
CENTRALNEWMEXICO.NMNEW MEXICO ENVIRONMENTAL
INFRASTRUCTURE PROGRAM
RURAL NEVADA
TAHOE BASIN RESTORATION 108
NEW YORK CITY WAHRSHED, NY
BOUVAR DAM, OH (QAM SAFETY!jOHIOS. NORTH DAKOTA
ENVIRONMENTAL
INFRASITUCTURE,OH & NO(SEaiON 594) - OHIO
PINE CREEK LAKE,OK
COLUMBIA RIVERATTHE MOUTH,
OR SWA
FY2017
EXPLANATORY
STATEMENT
ARMY CIVIL WORKS PROGRAM
FY 2017 WORK PLAN • CONSTRUCTION
ADDITIONAL
WORK PLAN
AMOUNT
6.700.000
SOO.OOO
1,600,000
21,S29,COO
3,000,000
2,500,000
4,615,000
1,500,000
1,000,000
500JOO
TOTAL FY 2017
ALLOCATION
2,dSd,000
62,650.000
50,000
20,000,000
62.375,000
6,500.000
LINE ITEM OF
ADDITIONAL
FUNDING 1/
1,933,000
SUMMARY OF WORK TO BE ACCOMPLISHED WITH TOTAL FY 2017 ALLOCATION
Design of Etfulent DiFCharge System
Diversion Point Channel Protection {S5 rnillion|; Update ensting H&Hmodel toincorporate existingconditions {SSOO.OOO): Repair Lilly BayouControl Structure {SImillion):Developa detailed Geotechnlcal Report for Hwy19 RRBridge($200,000)
Design of Pump Station
Continue authorized mitigation associated with prior construction activity
To b« determined due to cKenged conditions.
New Start: Initiate construnion of navigation improvements at Boston Harbor
Physically and Tiscally complete the flood risk management portion of this projectncludlne notification to the non-Federal sponsor of completion
Continue annual sand by passing rdicdglng") to the restoration project at AssaleagueIsland and monitoring activities for endangered and threatened species habitatrestoration
Beach nourishment to be accomplished along with an estimated S8.SS3 mlliionallocation of FCCE funds and S2.713 mlliion of supplemental funds for a total of $19.72mlliionOriginal Work: Construction management, monitoring, and stakeholder coordln»on
IS3.I100.000): Cell SA-Bwetland planting ($850,000)
nsion Work: Initiate construction of lateral expansion embayment and wetland
dikes ($58,400,000)
Cqmplele additional 200 feet of bank stabiiltaiion
Pine City Main LiftStation
Complete and fiscally close out project
Conllnue previouslyfunded work:Construct ReliefWell (Sl.600.000): DesignLeveeRaiseand Seepage Bermsand road raise ($600,000): InstallPiezometers ($600,000)
Project management
Increment 4 of Phase 3-Old Mil! Crek
Complete and fiscally close out project
Design of system to reclaim (collect, redirect and repurpose) treated wastewatereffluentfrom pointsinsouthern JacksonCountyWastewater interceptor Rehabilitation System - Jackson. Sewer System
Repair/Replacement - Crystal SpringsExecute design and construction PPAs for multiple projects in Montana
Beach nourishment of Ocean Isle segment to be accomplished along with S4.85million of FCCE funds for a total of Sl0,310 milli(
Beach nourishment of Kure Beach (SS million) and Carolina Beach (S4,26S million] toplishedalong witJiS3.7 mlliionof FCCE funds for a total of $15,965 million
Beach nourishment to be accomplished along with 51.35 million of FCCE funds and
S4.933 million of operation and maintenance funds to mitigate damages to this projectfrom a CivilWorks navigation project for a total ofSlO.OS million
Award and complete the Draytoh Dam Modification mitigation construction contract
<S10 mlllionj:Awardand complete tne WildRiceDam Removalmitigation constructioncontract (SSmillion): Design the W.ldRiceControl Structure (SS million)
Sanitary Sewer Replacement - City of PetersburgComplete and fiscally dose out project
Beach nourishment to be accomplished along with S29.485 millionof FCCE funds and$4 million of operation and maintenance funds to mitigate damages to this projectfrom a CivilWorks navigation project for a total of$39.9S5 irllllon
Project monitoring
ConstructiOhManagement/ Engineeringand Design (52 milLon); Award multiplecontracts for Element lb ($19,449 million); Award Nonstructural Flood Proofing,PiscatawayTownshipStructures (52 milUon)
Complete and fiscally close out projectReimburse for South Valley DrinkingWater Project, Albuquerque West Levee Project,RioRanchoWater Upgrade IIProject
fleconstruelion of Griggs Reservoir embankment and emergency spillwayConMnua waslewatertreatment on Searchlight ProjectReimbursement for work - AI5
Environmental Infrastructure prelects In Delaware County. NY
Complete and fiscally dose out prelect
Execute multiple Environmental Infrastructure projects In the State of Ohic
Complete and fiscallydose out project using these funds along with $660,000 ofsupplemenlal funding
Procure Rock for North Jetty
ARMY CIVIL WORKS PROGRAM
FY 2017 WORK PLAN • CONSTRUCTION
STATE DIVISION BUSINESS
PROGRAM
V
PROGRAM NAME FY2017
EXPLANATORY
STAHMENT
ADDITIONAL
WORK PLAN
AMOUNT
TOTAL FY 2017
AUOCATION
LINE ITEM OF
ADOmONAL
FUNDING 1/
SUMMARY OF WORK TO BE ACCOMPLISHED WITH TOTAL FY 2017 ALLOCATION
PA IRD FORR
EAST BRANCH CLARION RIVER
LAKE. PA
S6.250,000 56,250,000 Continue cutoff wall construction contract ($49,620,000); Engineering, design,sunprvision and arimlnistrarinn K7 010 0001
PA LRD
It -r ••
fL NIL
EM5W0RTH LOCKS AND DAM,
OHIO RIVER. PA
500,000 1,000,000 4 Remediate pittingcorrosion on EmergencyDulKfieads that were used during majorrehabilitation of the project and fiscallyclose out construction project.
PA LRO p NILEMSWORTH LOCKS AND DAM,
OHIO RIVER PA
500,000 5
PA LRO L NIL
LOCKS ANO DAMS 2. SAND 4,
MONONGAHELA RIVER, PA
49,010.000 82,010,000 4 AwardOption 1 of Son RiverChambe'Contract (518.8 million);Award Option 2 of 5on River Chamber Contract (S37.9 million); Plan, design, and award Dredging Contract
to accommodate new pool ($15 million);Batch Plant NPDES Permit ($1 million);E8iDand 58iAof or-golng contracts (58.81 million); Re-acquisition of real estate easementsset to expire 31 December 2019 ($500,000)
PA LRO E NilLOCKS ANO DAMS 2,3 ANO 4,
MONONGAHELA RIVER PA
33,000,000 5
PA LRO FDRC
PHE5QUE ISLE PENINSULA. PA 1.500.000 1,500,000 2 Beach renourishmenc to support Checontinued growth of habitat for an endangeredsnorips
PA LRD
SOUTH CENTRAL PA
ENVIRONMENTAL IMPROVEMENT
PROGRAM. PA
1.500,000 1,500,000 8
Environmental Infrastructure prolect in Favelle County
PA LRD
SOUTHEASTERN PENNSYLVANIA,
PA
200.000 200,000 8
Construction ofCobbs Creek Fish Passage
SC SAO
-CHARLESTON HABSOfl, DEEP
DRAFT NAVIGATION
17,500,000 17,500,000 4 New Start: Initiate construction of the Charleston Harbornavigation Improvements
LAKES MARION ANO MOULTRIE. SC
4,660.000 4,660,000 8
Construct water iransmisslon line - Dorchester Reach
SC SAO FORC
MYRTLE BEACH, SC 908.000 7,292,000 3 Beach nourishment of Reach 2 10 he accomplished along with $8,705 million of FCCEfunds for a tnral of 515.997 milllnn
SC SAO FORC MYHRE BEACH. SC 6.384.000 1
TN LRD FDRR
CENTER HILLLAKE,TN 40.000,000 40,000,000 ContinueCorutruction of Saddle Dam Seepage Rehab (S35,0aO.(X)O); ConstructionManagement ($4,000,000); ContinueSite Restoration ($1,500,000)
TN LRD l.'-WH,...
CHICKAMA JGA LOCK,TENNESSEE
RIVER, TN
18,500.000 37,000,000 4 Award all remaining options on LockExcavation Contract, including pro)ect oversight(S9.89 millioni; Award LockChamber Base Contract, including project oversight(576.11 mllllnnl- Cnntrart modification (SI million)
T^ LRD
CHICKAMAUGA LOCK,TENNESSEERIVFR TN
18,500.000 5
TX SWD FDRR
BRAYS BAYOU,HOUSTON,TX 11.989.000 11,989,000 1 Improvements to rainfall drainage systems that address flood damages - Reimbursenon-federal sponsor for the Federal share of completed project construction
TX SWD FDRR
BUFFALO BAYOU AND
TRIBUTARIES, TX
I3.300.000 13.300.000 Continue construction of new Outlet Work Structure atAddlcks and Barker Dams
($9,037,000);Engineeringand Designduring Construction ($923,000);ConstructionManaspmpnt 153 340 0001
TX SWD FDRR
CENTRAL CITY, FORT WORTH,
DPPFRTRINITY RIVER BASIN TX
6,000,000 6,000,000 1 RiverfrontDevelopment • Construct OxbowValleyStorage Site H (SS,000,000)andOvhnw Vallpv 5rnra«p 5itp 1 (51 000.0001
TX SWO EL PASO COUNTY. TX
3.000,000 3,000,000 8 Improvements to wastowater collectionsystem and infrastructure •Soonc StreetSiphon
TX SWD 1 -Nl^-..HOUSTON-GALVESTON
NAVIGATION THANNFIS.TX
5,000,000 5,000,000 Mlb'gation for previously awarded contract.
TX SWO i ENRSAN ANTONIO CHANNEL
IMPROVEMENT PROJECT
10,000.000 10,000,000 Reimbursement - Reimburse non-federal sponsor for the Federal share of completedDfoiect conslruclion fnr rhe Mission Rparh Spnarahip Elpment
VA NAD
B- -A^V
Lriea
ATLANTIC INTRACOASTAL
WATERWAY(AlWW). BRIDGESAT
12.000.000 12.000.000 Complete and fiscally dose out project
VA LRO
EASTERN SHORE AND SOUTHWEST
VIRGINIA, VA
510,000 510,000
Complete design ofwastewaterlnfrastructure plan
VA LRD FDRR
lEVISA AND TUG FORKS AND
UPPER CUMBERLAND RIVER, VA,
21,670,000 26,431,000 Non-structural flood control projects - Continue and complete on-going constructionactivities In VA.WV, and KY.
VA LRO FDRR
LEVISA AND TUG FORKS AND
UPPER CUMBERLAND RIVER, VA,
4,761,000
VT NAD PiLAKE CHAMPLAIN WATERSHED
INTIATIVE.VT
400,000 400,000Initiate PPA and study addressing Waterburv Dam Spillwav
WA NWO li ENR
COLUMBIA RIVER FISH
MITIGATION,WA, OR&IO
70,300,000 70,300,000 Executehighest priorityactions to meet Wlllamelte Basinand Federal Columbiapowersystem Endangered Species Actrequirements to avoid jeopardy; Executehighestpriority actions toward Pacific lamprey passage In accordance with 2007 ColumbiaRTvpf Fish Arrnrris
WA NWD ENR
MUO MOUNTAIN DAM, WA 16,400,000 16,400,000 New Start: Complete barrier and fish trap and haul faciltty design ($7,3SO,COO); initiateconstruction (S9.050,000)
WA «ya-..
THE DALIESLOCKAND DAM, WA&
OR
150,000 150,000 Complete a Tribal Housing Action Plan
Wl LRD
IJNORTHERN WISCONSIN
IenvironmentalEL-- Iinfrastructure
50,000 50,000 8
Program Coordination for ongoing work
WV LRD FORR
BLUESTONELAKE.WV 4,000.000 577,000 4,577,000 Continue engmeerfng and design and Construction Management; Complete DamSafety Modification Study (OSMS); Perform lift-off anchor testing
WV LRD
[central WEST VIRGINIAENVIRONMENTAL
INFRASTRUCTURE
1,000,000 1,000,000 8
WaterllneAVater System upgrade
WV
mBMMMSOUTHERN WEST VIRGINIA^P^QIenvironmental
LRD ISu^lHilNFRASTRUCnjRE (SECTION J401
1,500,000 1,500,000 8
Waterline/Watcr System upgrade
XX ERDC ! ENRAQUATIC PLANT CONTROL
PROGRAM
9.000.0CO 9,000,000 Develop biological controls, chemical technologies, environmencal managementstrategies and evaluate herhiridp pffirarv
XX HQ FDRC
CAP-SEC 103 500,000 500,000 Construct projects whose total cost does not exceed SSmillionto reduce floodrlxmaees frnm rnastal storms
XX HO
CAP-SEC107 8,SOO,000 8,500,000 Study and construct navigation Improvement projects whose total cost does notexreerl Sinmillion
ARMV CIVIL WORKS PROGRAM
FY 2017 WORK PLAN - CONSTRUaiON
STATE DIVISION BUSINESS
PROGRAM
1/
PROGRAM NAME FY2IJ17
EXPLANATORY
STATEMENT
ADDITIONAL
WORK PLAN
AMOUNT
TOTAl FY 2017
AUOCATION
UNE ITEM OF
ADDITIONAL
FUNDING 1/
SUMMARY OF WORK TO BE ACCOMPUSHED WITH TOTAL FY 2017 ALLOCATION
XX „ Lks/nhdCAP-SECm 500,000 500,000 Sudy and construct small projects whose cost does not exceed SlO millionto mitigate
the littoral impacts of navigation structures and operations
XX HQ : ENR
CAP-SEC 1135 3.000.000 3.000.000 Construct environmental modifications to operating CivilWorXsprojects whose totalrost drses not exceed SlO million
XX HQ FDRR
CAP - SEC 14 S.OOO.OOO 5,000.000 Construct bank stabilization projects whose total cost does not exceed SS million
XX HQ : ENR
CAP-SEC 204 1.000,000 1,000,000 Construct projects for the benericiat use of dredged matenal whose total cost does notexceed 510 million
XX HQ FORR
CAP - SEC 205 8.000,000 8.000,000 Construct projects for flood risk management whose total cost does not exceed 510milfion
XX HQ i ^tNR.CAP - SEC 206 8,000.000 8,000.000 Construct aquatic ecosystem restoration projects whose total tost does not exceed $1(
miliion
XX IWR FDRR
DAM SAFETY & SEEPAGE/STABILITY
CORRECTION PROGRAM (HQMASTFfi AMsrni
21.000,000 21,000.000 Conduct Issue Evaluation Studies; Prepare Dam Safety Modification Reports;Preconstructon engineering and design
XX HQ N/AEMPLOYEE COMPENSATION FUND 19.000.000 19,000.000 Reimburse Department of Labor for Compensation of Employees for Injuries and
Harassment
XX IWR
INLAND WATERWAYS USERS
BOARD-BOARD EXPENSE
50,000 50,000 Conduct Board Meetings and Related Activilics, Including Meeting and CommitteeMember Travel Costs
XX IWR
INLAND WATERWAYS USERS
BOARD-CORPSEXPENSE
275.000 275,000 Perform analyses of project delivery, participate and coordinate ongoingTransportation Research Board efforts and support Users Board committee meetingsanri relarnri arriviries
XX SPO
RESTORATION OF ABANDONED
MINESrTES
2.000.000 2.000.000 Provide Planning and Design Assistance to Federal, non-Federal, and Native American
Interests for carrying out projects presenting threats to public health and safety andthat have water quality problems caused by abandoned and inactive non-coal mine
GrandTotal 1.071.460.000 804.540.000 1.R76.000.000
1/KEY; Additional
Fimdinr
1 FLOOD AND STORM DAMAGE
REDUCTION
190.090,000
2 FLOOD AND STORM DAMAGE
REDUCTION (FinOD CONTROL)
150.000,000
3 FLOOD AND STORM DAMAGE
REDUCTION(SHORE PROTEaiON)
50.000,000
4 NAVIGATION 211.200.000
5 NAVIGATION flWTF) 7S.2S0.CI00
6 OTHER AUTHORIZED PROJECT
PURPOSES
48,000,000
7 OTHER AUTHORIZED PROJECT
PURPOSES (ENVIRONMENTALRFRTOHATION OR COMPI lANfFl
25,000,000
8 O^ER AUTHORIZED PROJECT
PURPOSES (ENVIRONMENTALINFRASTRUmjHFI
55,000,000
FOftC FLOOD DAMAGE REDUCTION
COACTAl
FDRR FLOOD DAMAGE REDUCTION
RIVERINE
SHAUOW DRAFT NAVIGATION
DEEP DRAFT NAVIGATION
INLAND NAVIGATION
ENR ECOSYSHM RESTORATION
WTR WAHR REALLOCATION