6
Intuitive Mining Solutions Key features of Micromine 2020 Micromine 2020 is the latest version of MICROMINE’s exploraton and mine design soluton, it is scalable and fexible, providing you with the fexibility to choose the functonality you need when you need it. The aim of Micromine 2020 has been to develop features and functonality across the mining value chain to add signifcant value to our clients. 6 7 8 1 2 3 4 5

Key features of Micromine 2020€¦ · chart data in a 3D Vizex view. Full support for expressions. Auto-labelling opions produce readable charts without resoring Charts may be exported

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • can be defined

    Additional drillholes can be added to rings

    Supports interactive adjustment of drillhole

    Blasting can be restricted to or excluded from specified polygons/wireframes. Calculates charging using AEL or influence radius, with support for selection of initiator hole and placement of decking.

    generated wireframe, with option to save

    Micromine facilities.

    with comprehensive options for annotation.Exports positioning and setup information

    Imports as-blasted locations and directions

    energy distribution.

    Intuitive Mining Solutions

    Key features of Micromine 2020 rings for blasting of stopes at specified locations along the drive, performs an array of operations on the rings, creates fans of drillholes for the rings, facilitates editing of the drillholes, calculates and/or assigns charging and stemming, models energy distribution, plots rings and

    to define the size and shape of a rig(s) being

    (in accordance with rig specifications) ensures

    not inadvertently exceeded during the design

    Provides feedback to the planner as they are working.

    Eliminates the need for guesstimations

    measurements after. Leads to practical and precise drill plans.

    downtime caused by impractical plans.Multivariate Histogram:multiple variables.Ternary Diagram: Visualises the ratios of three-

    Boundary Analysis: Inspects grade differences

    Swath Plot:

    Search Neighbourhood:properties of samples for interpolation.Top Cut: Determines the maximum allowable grade to be used for resource estimation.QKNA: Experimentally optimises kriging (interpolation) parameters to produce an optimal grade estimation.Grade Tonnage Curve:

    Micromine’s charts are an integral part of its workflow. By creating a suite of specific charts, users can set up each chart using specific choices instead of configuring a more generic chart. Together, the charts target many of the decisions where there is no “best” answer in an interactive and visual way.

    specific geological or geostatistical

    Micromine via Vizex and the File

    Selection syncing in most charts

    chart data in a 3D Vizex view.Full support for expressions.Auto-labelling options produce readable charts without resorting

    Charts may be exported in high

    Micromine 2020 is the latest version of MICROMINE’s exploration and mine design solution, it is scalable and flexible, providing you with the flexibility to choose the functionality you need when you need it.

    The aim of Micromine 2020 has been to develop features and functionality across the mining value chain to add significant value to our clients.

    6

    7

    8

    12

    3

    4

    5

    [email protected] Brazil

    Mexico Turkey Uzbekistan

  • Implicit Modelling

    Takes known data points (Drillholes

    usually) plus interpreted points and uses

    a mathemati cal model to build a surface or solid defi ning a region or domain. This is then used in resource modelling.

    Micromine’s Implicit Modelling tools are

    integrated into the Geologists workfl ow. Being able to do all their explorati on and modelling acti viti es in one place, allows for increased effi ciency and producti vity.

    • Implicit Modelling makes domain modelling

    100x faster than manual secti onal modelling.• Its repeatable, using the same data and

    parameters will generate the same model.• It is easy to rerun when new data becomes

    available.• Integrated with our standard wireframing

    tools so models can be manipulated aft er creati on allowing for more complex models to be generated.

    Features

    • Can model veins and dykes.• Can model surfaces such as contacts

    and faults.• Can model intrusive shapes.• Can model grade values.• Can uti lise complex trend models to

    bett er defi ne the model.

    Accepts block model of resource, minimum stope dimensions, stope orientati on, processing opti ons and economic parameters, identi fi es most profi table regions for stoping, and generates stope wireframes.

    Complete underground equivalent for Pit Opti miser. Generates opti mum digline to suit minimum mining width for open-pit mining.

    Generates best possible stope outlines that sati sfy design and economic parameters.

    Generates opti mum digline for open-pit bench to suit minimum mining width.

    Determines maximum possible profi t for underground mining operati on.

    Full support for standard long-term planning methodology with provision for mining, processing and sales rates, startup costs, capital injecti ons and discounted cash fl ow analysis to assist in opti mising size of operati on based on net present value.

    Suitable for all planning horizons.

    Seamless integrati on with Micromine, with full support from new Expression Editor and unit conversion faciliti es.

    Built-in material fl ow model with support for material bins.

    Material bins defi ned using simple fi lters or complex expressions.

    Opti misati on values for blocks calculated externally and preassigned to blocks, or derived from built-in material fl ow model.

    Support for zones defi ned by polygons/wireframes to which stopes should be confi ned, or from which they should be excluded.

    Support for multi ple regions with diff erent design parameters.

    Accepts sizes and orientati ons of minimum stopes, and minimum pillar width.

    Minimum stope sizes can be overlapped to form larger mining areas that sati sfy minimum mineable shape.

    Stopes can be constrained to planes, digital

    opti on to anchor planes and digital terrain models to reference point and replicate at regular elevati on intervals.

    Uses integrated mathemati cal programming solver to determine opti mum soluti on.

    Exports stope wireframes and/or coordinates of blocks comprising opti mum soluti on.

    Full suite of reports to facilitate post-processing and analysis of all input parameters, block processing outcomes and generated stopes.

    Reports can be customised, summarised and have unit conversions applied using new Report Generator, and are suitable for use with pivot tables and other post-processing in Microsoft Excel and Business Intelligence soft ware.

    Fully compati ble with Micromine Pit Opti miser, including many common form sets. Since both share same concepts and work fl ow, if you can use one, you can use both.

    Accepts sets of tasks with properti es, presented in the form of wireframes with att ributes, provides faciliti es for sequencing the tasks to suit requirements, displays the tasks in a Gantt chart, and generates 3D animati on and reports.

    Use the best Scheduling tools on the market to ensure you are sati sfying specifi ed objecti ves; maximising net present value and achieving producti on targets.

    Operati onal scheduling: Assists in planning of operati ons to suit anti cipated producti on rates, with support for allocati on of resources and calendars to tasks.

    Suitable for all planning horizons. Strategic scheduling: Sequences tasks

    to best sati sfy specifi ed objecti ves, such as maximisati on of net present value or achievement of producti on targets.

    Seamless integrati on with Micromine with full support from new Expression Editor and unit conversion faciliti es.

    Diff erent att ributes and criteria can be applied to diff erent types of tasks.

    Flexible faciliti es for importi ng tasks with expression-based derivati on of att ributes from source wireframes and/or other att ributes, automati c linkage to task groups and/or other tasks with same resources, and automati c expression-based sequencing from specifi ed reference date.

    Many opti ons for selecti ng tasks within the schedule.

    For operati onal scheduling, working hours and excepti on dates can be specifi ed for calendars, and rates, effi ciencies, calendars and producti vity excepti ons can be specifi ed for resources.

    For strategic scheduling, att ributes can be constrained by capacity and/or grade for ranges of periods.

    Supports grouping, sorti ng and fi ltering of tasks. Automati c/manual assignment of

    dependencies between tasks to ensure that prerequisite tasks are completed by the ti me that they are required.

    Cycles of sub-tasks that must be performed for primary tasks of specifi ed type(s) can be generated automati cally.

    Animati on of task sequences in Vizex facilitates interacti ve 3D visualisati on of mine development over ti me.

    Full suite of reports to facilitate post-processing and analysis of all input parameters, block processing outcomes and generated stopes.

    Reports can be customised, summarised and have unit conversions applied using new Report Generator, and are suitable for use with pivot tables and other post-processing in Microsoft Excel and Business Intelligence soft ware.

    Exports wireframes with results from scheduling for use with other Micromine faciliti es.

  • Takes known data points (Drillholes

    a mathematical model to build a surface or solid defining a region or domain. This is then used in resource modelling.

    integrated into the Geologists workflow. Being able to do all their exploration and modelling activities in one place, allows for increased efficiency and productivity.

    Implicit Modelling makes domain modelling 100x faster than manual sectional modelling.

    tools so models can be manipulated after creation allowing for more complex models

    Can model veins and dykes.

    Can utilise complex trend models to better define the model.

    • Generates best possible stope outlines

    that satisfy design and economic parameters.

    • Generates optimum configurations of stopes for underground mining.

    • Determines maximum possible profit for underground mining operation.

    • Full support for standard long-term

    planning methodology with provision

    for mining, processing and sales rates,

    startup costs, capital injections and discounted cash flow analysis to assist in optimising size of operation based on net present value.

    • Suitable for all planning horizons.

    Features

    • Seamless integration with Micromine, with full support from new Expression Editor and unit conversion facilities.

    • Built-in material flow model with support for material bins.

    • Material bins defined using simple filters or complex expressions.

    • Optimisation values for blocks calculated externally and preassigned to blocks, or derived from built-in material flow model.

    • Support for zones defined by polygons/wireframes to which stopes should be confined, or from which they should be excluded.

    • Support for multiple regions with different design parameters.

    • Accepts sizes and orientations of minimum stopes, and minimum pillar width.

    • Minimum stope sizes can be overlapped to form larger mining areas that satisfy minimum mineable shape.

    • Stopes can be constrained to planes, digital

    terrain models and centreline strings – with

    option to anchor planes and digital terrain models to reference point and replicate at

    regular elevation intervals.• Uses integrated mathematical programming

    solver to determine optimum solution.• Exports stope wireframes and/or coordinates

    of blocks comprising optimum solution.• Full suite of reports to facilitate post-processing

    and analysis of all input parameters, block processing outcomes and generated stopes.

    • Reports can be customised, summarised and

    have unit conversions applied using new

    Report Generator, and are suitable for use

    with pivot tables and other post-processing

    in Microsoft Excel and Business Intelligence software.

    • Fully compatible with Micromine Pit Optimiser, including many common form sets. Since both

    share same concepts and work flow, if you can use one, you can use both.

    Accepts sets of tasks with properties, presented in the form of wireframes with attributes, provides facilities for sequencing the tasks to suit requirements, displays the tasks in a Gantt chart, and generates 3D animation and reports.

    market to ensure you are satisfying specified objectives; maximising net present value and achieving production

    Operational scheduling: Assists in planning of operations to suit anticipated production rates, with support for allocation of resources and calendars to tasks.Suitable for all planning horizons.Strategic scheduling: Sequences tasks to best satisfy specified objectives, such as maximisation of net present value or achievement of production

    Seamless integration with Micromine with full support from new Expression Editor and unit conversion facilities.

    Different attributes and criteria can be applied to different types of tasks.Flexible facilities for importing tasks with expression-based derivation of attributes from source wireframes and/or other attributes,automatic linkage to task groups and/or other tasks with same resources, and automatic expression-based sequencing from specified

    Many options for selecting tasks within the

    For operational scheduling, working hours and exception dates can be specified for calendars, and rates, efficiencies, calendars and productivity exceptions can be specified

    For strategic scheduling, attributes can be

    Supports grouping, sorting and filtering of tasks.Automatic/manual assignment of dependencies between tasks to ensure that prerequisite tasks are completed by the time

    Cycles of sub-tasks that must be performed for primary tasks of specified type(s) can be generated automatically.Animation of task sequences in Vizex facilitates interactive 3D visualisation of minedevelopment over time.

    parameters, block processing outcomes and

    tables and other post-processing in MicrosoftExcel and Business Intelligence software.Exports wireframes with results from

    facilities.

    Stope Optimiser

    Accepts block model of resource, minimum stope dimensions, stope

    orientation, processing options and economic parameters, identifies most profitable regions for stoping, and generates stope wireframes.

    Complete underground equivalent for

    Pit Optimiser. Generates optimum configurations of stopes for underground mining.

  • Takes known data points (Drillholes

    a mathematical model to build a surface or solid defining a region or domain. This is then used in resource modelling.

    integrated into the Geologists workflow. Being able to do all their exploration and modelling activities in one place, allows for increased efficiency and productivity.

    Implicit Modelling makes domain modelling 100x faster than manual sectional modelling.

    tools so models can be manipulated after creation allowing for more complex models

    Can model veins and dykes.

    Can utilise complex trend models to better define the model.

    Accepts block model of resource,

    orientation, processing options and economic parameters, identifies most profitable regions for stoping, and

    Pit Optimiser. Generates optimum

    that satisfy design and economic

    Generates optimum digline for open-pit

    Determines maximum possible profit for underground mining operation.

    startup costs, capital injections and discounted cash flow analysis to assist in optimising size of operation based

    Suitable for all planning horizons.

    Seamless integration with Micromine, with full support from new Expression Editor and unit conversion facilities.Built-in material flow model with support for

    Material bins defined using simple filters or complex expressions.Optimisation values for blocks calculated externally and preassigned to blocks, or derived from built-in material flow model.Support for zones defined by polygons/wireframes to which stopes should be confined,or from which they should be excluded.Support for multiple regions with different

    Accepts sizes and orientations of minimum

    Minimum stope sizes can be overlapped to form larger mining areas that satisfy minimum

    option to anchor planes and digital terrain

    regular elevation intervals.Uses integrated mathematical programming solver to determine optimum solution.Exports stope wireframes and/or coordinates of blocks comprising optimum solution.

    and analysis of all input parameters, block

    in Microsoft Excel and Business Intelligence software.Fully compatible with Micromine Pit Optimiser,

    share same concepts and work flow, if you can

    Scheduler

    Accepts sets of tasks with properties, presented in the form of wireframes with attributes, provides facilities for sequencing the tasks to suit requirements, displays the tasks in a Gantt chart, and generates 3D animation and reports.

    Use the best Scheduling tools on the

    market to ensure you are satisfying specified objectives; maximising net present value and achieving production targets.

    • Operational scheduling: Assists in planning of operations to suit anticipated production rates, with support for allocation of resources and calendars to tasks.

    • Suitable for all planning horizons.• Strategic scheduling: Sequences tasks

    to best satisfy specified objectives, such as maximisation of net present value or achievement of production targets.

    • Seamless integration with Micromine with full support from new Expression Editor and unit conversion facilities.

    Features

    • Different attributes and criteria can be applied to different types of tasks.

    • Flexible facilities for importing tasks with expression-based derivation of attributes from source wireframes and/or other attributes, automatic linkage to task groups and/or other tasks with same resources, and automatic expression-based sequencing from specified reference date.

    • Many options for selecting tasks within the schedule.

    • For operational scheduling, working hours and exception dates can be specified for calendars, and rates, efficiencies, calendars and productivity exceptions can be specified for resources.

    • For strategic scheduling, attributes can be constrained by capacity and/or grade for

    ranges of periods.

    • Supports grouping, sorting and filtering of tasks.• Automatic/manual assignment of

    dependencies between tasks to ensure that prerequisite tasks are completed by the time that they are required.

    • Cycles of sub-tasks that must be performed for primary tasks of specified type(s) can be generated automatically.

    • Animation of task sequences in Vizex facilitates interactive 3D visualisation of mine development over time.

    • Full suite of reports to facilitate post-

    processing and analysis of all input

    parameters, block processing outcomes and generated stopes.

    • Reports can be customised, summarised and

    have unit conversions applied using new Report

    Generator, and are suitable for use with pivot

    tables and other post-processing in Microsoft Excel and Business Intelligence software.

    • Exports wireframes with results from scheduling for use with other Micromine

    facilities.

  • can be defined

    Additional drillholes can be added to rings

    Supports interactive adjustment of drillhole

    Blasting can be restricted to or excluded from specified polygons/wireframes. Calculates charging using AEL or influence radius, with support for selection of initiator hole and placement of decking.

    generated wireframe, with option to save

    Micromine facilities.

    with comprehensive options for annotation.Exports positioning and setup information

    Imports as-blasted locations and directions

    energy distribution.

    Statistics Charts

    rings for blasting of stopes at specified locations along the drive, performs an array of operations on the rings, creates fans of drillholes for the rings, facilitates editing of the drillholes, calculates and/or assigns charging and stemming, models energy distribution, plots rings and

    to define the size and shape of a rig(s) being

    (in accordance with rig specifications) ensures

    not inadvertently exceeded during the design

    Provides feedback to the planner as they are working.

    Eliminates the need for guesstimations

    measurements after. Leads to practical and precise drill plans.

    downtime caused by impractical plans.• Multivariate Histogram: Shows histograms of

    multiple variables.• Ternary Diagram: Visualises the ratios of three-

    component data.

    • Boundary Analysis: Inspects grade differences at the contact between two wireframe domains.

    • Swath Plot: Compares one-dimensional graphs from related data sources.

    • Search Neighbourhood: Analyses the properties of samples for interpolation.

    • Top Cut: Determines the maximum allowable grade to be used for resource estimation.

    • QKNA: Experimentally optimises kriging (interpolation) parameters to produce an optimal grade estimation.

    • Grade Tonnage Curve: Displays grades and tonnages on a graph.

    Micromine’s charts are an integral part of its workflow. By creating a suite of specific charts, users can set up each chart using specific choices instead of configuring a more generic chart. Together, the charts target many of the decisions where there is no “best” answer in an interactive and visual way.

    Features

    • Each chart is dedicated to a

    specific geological or geostatistical scenario.

    • Fully integrated with the rest of

    Micromine via Vizex and the File Editor.

    • Selection syncing in most charts allows the user to display selected

    chart data in a 3D Vizex view.• Full support for expressions.• Auto-labelling options produce

    readable charts without resorting to customised labels.

    • Charts may be exported in high quality in a variety of formats.

    Micromine 2020 is the latest version of MICROMINE’s exploration and mine design solution, it is scalable and flexible, providing you with the flexibility to choose the functionality you need when you need it.

    The aim of Micromine 2020 has been to develop features and functionality across the mining value chain to add significant value to our clients.

    [email protected] Brazil

    Mexico Turkey Uzbekistan

  • Features

    • Rings can

    be created,

    viewed,

    edited,

    mirrored,

    copied and/or

    replicated.

    • Ring boundary

    can be defined by polygon or

    wireframe.

    • Drive

    wireframe can be updated as required.

    • Both angled and parallel fans of drillholes

    can be created for rings.

    • Additional drillholes can be added to rings as required.

    • Supports interactive adjustment of drillhole lengths.

    • Blasting can be restricted to or excluded from specified polygons/wireframes.

    • Calculates charging using AEL or influence radius, with support for selection of initiator hole and placement of decking.

    • Reports masses and grades of stopes within

    generated wireframe, with option to save generated wireframe for reuse with other

    Micromine facilities.• Generates detailed plots of ring designs

    with comprehensive options for annotation.

    • Exports positioning and setup information for drill rigs via IREDES.

    • Imports as-blasted locations and directions of drillholes from drill rig via IREDES.

    • Generates colour-coded grid of blast

    energy distribution.

    Ring Design

    Accepts centreline string and wireframe

    for underground access drive, creates new

    rings for blasting of stopes at specified locations along the drive, performs an array of operations on the rings, creates fans of drillholes for the rings, facilitates editing of the drillholes, calculates and/or assigns charging and stemming, models energy distribution, plots rings and reports results.

    Micromine’s ring design tool allows a planner

    to define the size and shape of a rig(s) being used at a mine. Being able to apply constraints

    (in accordance with rig specifications) ensures that boom’s range and coverage limits are

    not inadvertently exceeded during the design process.

    • Provides feedback to the planner as they are working.

    • Eliminates the need for guesstimations during the design process.

    • Prevents the need for manual

    measurements after.• Leads to practical and precise drill plans.• Minimises the probability of incidents/

    downtime caused by impractical plans.Multivariate Histogram:multiple variables.Ternary Diagram: Visualises the ratios of three-

    Boundary Analysis: Inspects grade differences

    Swath Plot:

    Search Neighbourhood:properties of samples for interpolation.Top Cut: Determines the maximum allowable grade to be used for resource estimation.QKNA: Experimentally optimises kriging (interpolation) parameters to produce an optimal grade estimation.Grade Tonnage Curve:

    Micromine’s charts are an integral part of its workflow. By creating a suite of specific charts, users can set up each chart using specific choices instead of configuring a more generic chart. Together, the charts target many of the decisions where there is no “best” answer in an interactive and visual way.

    specific geological or geostatistical

    Micromine via Vizex and the File

    Selection syncing in most charts

    chart data in a 3D Vizex view.Full support for expressions.Auto-labelling options produce readable charts without resorting

    Charts may be exported in high

    Micromine 2020 is the latest version of MICROMINE’s exploration and mine design solution, it is scalable and flexible, providing you with the flexibility to choose the functionality you need when you need it.

    The aim of Micromine 2020 has been to develop features and functionality across the mining value chain to add significant value to our clients.

    micromine.com [email protected]

    Africa • Australia • Brazil • Canada • Central Asia • China • Ghana • Indonesia LATAM • Mexico • Mongolia • Russia • Turkey • United Kingdom • USA • Uzbekistan