Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

Embed Size (px)

Citation preview

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    1/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    Geothermal Investment OpportunitiesGeothermal Investment OpportunitiesGeothermal Investment OpportunitiesGeothermal Investment Opportunities

    in Indonesiain Indonesiain Indonesiain Indonesia

    by:

    Sugiharto Harsoprayitno, M.Sc

    Director for Geothermal

    DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION

    MINISTRY OF ENERGY AND MINERAL RESOURCES

    Thursday, July 14, 2011

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    2/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    Geothermal Potency in Indonesia

    Potential Geothermal Indonesia is the largest in the world, 40% of

    world reserves, amounting to 29.038 MW, spread over 276locations

    Installed Capacity 1,189 MW (4% of whole potency), consists of

    field: Sibayak 12 MW, Salak Mt. 375 MW, Wayang Windu 227 MW,

    Kamojang 200 MW, Darajat 255 MW, Dieng 60 MW and Lahendong

    60 MW

    Geothermal Road Map Target 9,500 MW in 2025

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    3/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    Source : Geological Survey, MEMR(2010)

    GEOTHERMAL POTENTIAL MAPGEOTHERMAL POTENTIAL MAPGEOTHERMAL POTENTIAL MAPGEOTHERMAL POTENTIAL MAP

    Already Developed

    Ready to Developad

    Detail Survey

    Preliminary Survey

    Note:

    1 Sumatera 86 13,516 122 Java 71 10,092 1,1173 Bali 5 2964 Nusa Tenggara 22 1,4715 Kalimantan 8 115

    6 Sulawesi 55 2,519 607 Maluku 26 9548 Papua 3 75

    1,18929,038

    Install

    Capacity

    (MW)

    Potency

    (MW)

    Total 276

    No. IslandNumber

    of Loc.

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    4/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    No.Geothermal Working

    Area/ LocationLicense Holder Developer

    Name of

    Geothermal

    Power Plant

    Installed

    Capacity

    (MW)

    1Sibayak Sinabung,

    SUMUT

    PT. Pertamina Geothermal

    Energy (PGE)

    PT. Pertamina Geothermal

    Energy (PGE)Sibayak 12

    2Cibeureum Parabakti,

    JABAR

    PT. Pertamina Geothermal

    Energy (PGE)

    KOB - Chevron Geothermal

    Salak, Ltd (CGS)Salak 375

    3 Pangalengan, JABARPT. Pertamina Geothermal

    Energy (PGE)

    KOB - Star Energy

    Geothermal Wayang

    Windu, Ltd (SEGWWL)

    Wayang

    Windu227

    4Kamojang Darajat,

    JABAR

    PT. Pertamina Geothermal

    Energy (PGE)

    PT. Pertamina Geothermal

    Energy (PGE)Kamojang 200

    5Kamojang Darajat,

    JABAR

    PT. Pertamina Geothermal

    Energy (PGE)

    KOB - Chevron Geothermal

    Indonesia, Ltd (CGI)Darajat 255

    6Dataran Tinggi Dieng,

    JATENG

    PT. Pertamina Geothermal

    Energy (PGE)PT. Geo Dipa Energi (GDE) Dieng 60

    7Lahendong Tompaso,

    SULUT

    PT. Pertamina Geothermal

    Energy (PGE)

    PT. Pertamina Geothermal

    Energy (PGE)Lahendong 60

    1.189

    4

    INSTALLED GEOTHERMAL POWER PLANT CAPACITY 2010

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    5/22

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    6/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    GOVERNMENT POLICIES TO SCALE UP GEOTHERMALDEVELOPMENT IN INDONESIA

    1. Presidential Regulation No. 04/2010 jo Ministerial Regulation No. 15/2010 (2nd

    Stage of 10,000 MW Crash Program) in order to speed up the development ofgeothermal power to the amount of 3,967 MW by the year 2014 which willrequire a total of US$ 12 Billions.

    2. Government provide fiscal incentives for geothermal:

    Income Tax Facilities (Based on Government Regulation No. 62/2008 jo No.1/2007) which provide:

    - 30% (thirty percent) net income tax deduction of the total Investment, for6 (six) years, 5% (five percent) annually

    - Income tax charge for dividend paid to Foreign Tax Subject shall be 10%(ten percent), or lower tariff according to effective Double Taxation

    Avoidance Agreement

    - Compensation of financial loss for more than 5-10 years

    Custom Duties Exemption for Importing Items (based on MoF Decree No.177/PMK.011/2007)

    Value Added Tax of Import Items Covered by Government (based on MoFDecree No. 22/PMK.011/2011)

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    7/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    GOVERNMENT POLICIES TO SCALE UP GEOTHERMALDEVELOPMENT IN INDONESIA

    3. Government support in the form of reducing upstream geothermal risk by

    providing revolving funds (for exploration and FS), particularly for the Easternparts of Indonesia.

    4. The GoI is in process of establishing a State-Owned Company in the geothermalbusiness to support its development.

    5. To accelerate geothermal development, the Government offers a PreliminarySurvey Assignment to third part (investor) which provides first right refusal.

    6. The Government has determined Regulations on Geothermal Price Structure(based on MEMR Regulation No. 02/2011) :

    Purchase price of electricity by PT PLN from a Geothermal Power Plant, as the

    result of a GWA tender, is used for the Power Purchase Agreement, the electricityprice is final and non negotiable

    Ceiling price for geothermal energy: US$ 9.7 cents/kWh

    7. In order to enhance certainty in geothermal investment, the government has set

    a Standard Power Purchase Agreement.

    Continue ...

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    8/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    President Decree No 45/1991, No 49/1991,and No 23/1992

    Business structure based on JOC and ESC

    34% of Net Operating Income (NOI), that hadincluded all kinds of taxes and retribution,except personal tax.

    Project Management : Under Pertamina (JOC)and PLN (ESC)

    Project Type: Total (Integrated) Project Partial Project

    Law No. 27/2003

    Business structure in the form of Permit: Geothermal Mining Permit Enterprise Permit for Electricity

    Obligation to pay for taxes and royalty

    Project Management :Under Permit Holder

    Project Type:Total (Integrated) ProjectWKP holder will be granted as generally planoperation

    Implementation of Geothermal PoliciesImplementation of Geothermal PoliciesExisting GWA New GWA

    8

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    9/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    Big geothermal potential development

    in mid-big scale project

    Existing projects as brown fields detail data is unavailable

    Conducive investment condition is

    enough attractive to investor (B to Bapproach)

    Small geothermal potential

    development in small scale project

    Most of the area are green fields detail data is not available

    Not attractive to investor. Not only

    need conducive investmentcondition, but also funding supportfrom government

    Government support in the form ofreducing upstream geothermal risk

    (GoI allocates budget for explorationand FS)

    9

    Development of Geothermal Energy

    Western Part of Indonesia Eastern Part of Indonesia

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    10/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    MEMR

    Prov.Gov.

    Corporation

    PLN

    GWA/WKP

    DeterminationPre-SurveyGWA/WKP

    TenderingIUP

    Issuance

    Electricity

    Price

    Reportof

    Tendering

    Process

    Geothermal

    Potential

    Potential

    Map

    Surve

    y

    APBN

    SurveyAPBD

    Prov.

    OtherParties

    Assignment

    Evaluati

    onWKPRep. WKP-N

    WKP-P

    WKP-K

    (S3-N)

    (S3-P)

    (S3-K)

    IUP-N

    IUP-P

    IUP-K

    (S4-N)

    (S4-P)

    (S4-K)

    Tender Winner

    GEOTHERMAL VALUE CHAIN

    (S-1) (S-2) (S-3) (S-4) (S-5)

    PPA

    (S-6)

    Assignment

    Explorat

    ion

    (S-7)

    (Current Regulations)

    (S-0)

    BUSINESS STADIUM (S-X)

    Survey

    APBD

    Kab./

    Kota

    Pemda

    Kab./

    Kota

    Units

    Potential/

    StadiumExploitat

    ionFS Production/

    Utilization

    (S-8) (S-9) (S-10)

    Tender Winner

    Tender Winner

    TheGolde

    nBridge

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    11/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    Road Mapof Geothermal Development 2006 2025

    Current Condition

    2006

    852 MW

    (Produksi)

    2008 2012 2016 2020

    2000MW

    3442MW

    4600MW

    6000MW

    9500MW

    (Target)

    1148 MWExisting

    WKP

    1442 MWExisting

    WKP

    1158 MWExisting

    WKP + NewWKP

    1400 MWNew WKP

    3500 MWNew WKP

    2025

    1189 MW

    (based on Presidential Decree No. 5/2006 on National Energy Policy)

    Plus 2nd Phase CrashProgram Scenario

    5156 MW

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    12/22

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    13/22

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    14/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    - Development of 3,967 MW electricity from Geothermal in 10,000 MWCrash Program Stage II up to the year 2014 is required more than US$

    12,000 millions for the investment.- Development plan of 12,000 MW Geothermal Power Plant up to the

    year 2025, international supports are needed.

    - Foreign ownership in Geothermal Business is allowed up to 95 %;

    - Business opportunities in geothermal sector: Geothermal direct use;

    Low temperature geothermal potential;

    Small scale power plant.

    Partners and Investors are welcomed to be parts of Indonesiadevelopment as the largest geothermal producer.

    INVESTMENT OPPORTUNITIESINVESTMENT OPPORTUNITIESINVESTMENT OPPORTUNITIESINVESTMENT OPPORTUNITIES

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    15/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION

    MINISTRY OF ENERGY AND MINERAL RESOURCES

    www.ebtke.esdm.go.id

    www.energiterbarukan.net

    Jalan Jenderal Gatot Subroto, Kav. 49 Jakarta 12950

    Telp/Faks : 021-5250575

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    16/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    NO Geothermal PowerPlant Project

    Status Province Estimationof Capacity

    (MW)

    InstalledCapacity

    2014 (MW)

    RequiredFinancing 2014

    (US$ Million)

    1 Seulawah Agam New WKP Aceh 1x55 55 165

    2 Jaboi New WKP Aceh 1x7 7 21

    3 Sarulla 1 Existing WKP North Sumatera 3x110 330 990

    4 Sarulla 2 Existing WKP North Sumatera 2x55 110 330

    5 Sorik Merapi New WKP North Sumatera 1x55 55 165

    6 Muaralaboh New WKP West Sumatera 2x110 220 660

    7 Lumut Balai Existing WKP South Sumatera 4x55 220 660

    8 Rantau Dadap New WKP South Sumatera 2x110 220 660

    9 Sungai Penuh Existing WKP Jambi 2x55 110 330

    10 Hululais Existing WKP Bengkulu 2x55 110 330

    11 Rajabasa New WKP Lampung 2x110 220 660

    12 Ulubelu 3 dan 4 Existing WKP Lampung 2x55 110 330

    13 Rawa Dano New WKP Banten 1x110 110 330

    14 Kamojang 5 & 6 Existing WKP West Java 1x40 & 1x60 100 300

    15 Cibuni Existing WKP West Java 1x10 10 30

    16 Cisolok-Cisukarame New WKP West Java 1x50 50 150

    17 Darajat Existing WKP West Java 2x55 110 330

    18 Karaha Bodas Existing WKP West Java 1x30 & 2x55 140 420

    19 Patuha Existing WKP West Java 3x60 180 540

    20 Salak Existing WKP West Java 1x40 40 120

    21 Tampomas New WKP West Java 1x45 45 135

    22 Tangkuban Perahu I New WKP West Java 2x55 110 330

    NO Geothermal PowerPlant Project

    Status Province Estimationof Capacity

    (MW)

    InstalledCapacity

    2014 (MW)

    RequiredFinancing 2014

    (US$ Million)

    23 Tangkuban Perahu II Existing WKP West Java 2x30 60 180

    24 Wayang Windu Existing WKP West Java 2x120 240 720

    25 Batu Raden New WKP Central Java 2x110 220 660

    26 Dieng Existing WKP Central Java 1x55 & 1x60 115 345

    27 Guci New WKP Central Java 1x55 55 165

    28 Ungaran New WKP Central Java 1x55 55 165

    29 Ijen New WKP East Java 2x55 110 330

    30 Iyang Argopuro Existing WKP East Java 1x55 55 165

    31 Wilis/Ngebel New WKP East Java 3x55 165 495

    32 Lahendong 5 dan 6 Existing WKP North Sulawesi 2x20 40 120

    33 Kotamobagu 1 dan 2 Existing WKP North Sulawesi 2x20 40 120

    34 Kotamobagu 3 dan 4 Existing WKP North Sulawesi 2x20 40 120

    35 Bora Open Area Central Sulawesi 1x5 5 15

    36 Merana/Masaingi New WKP Central Sulawesi 2x10 20 60

    37 Huu New WKP West Nusa Tenggara 2x10 20 60

    38 Sembalun Open Area West Nusa Tenggara 2x10 20 60

    39 Atadei New WKP East Nusa Tenggara 2x2,5 5 15

    40 Sukoria New WKP East Nusa Tenggara 2x2,5 5 15

    41 Tulehu Existing WKP Maluku 2x10 20 60

    42 Jailolo New WKP North Maluku 2x5 10 30

    43 Songa Wyaua New WKP North Maluku 1x5 5 15

    3967 11.901Total Development of Geothermal Power Plant until 2014

    Geothermal Power Plant Projects included in Crash Program Phase II

    Note : Cost to develop 1 MW = US$ 3 Million

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    17/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    . 2/200

    .

    ()

    ()

    1 . . 124 12

    2 (.

    ) . . , 952 375

    3 .

    400 227

    . 706

    4 . . 855 200 , 610 255

    5 . . 780 60

    6 . . 358 60

    7 . 1146

    8 . . 873

    9 . . 1066 10 . . 208

    11 . . 556

    12 . . 725

    13 () . , 276

    14 . () . () 199

    15 . () . () 100

    16 140

    17 . . 295

    18 . . 410

    19 .

    . 90

    10, 1,1

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    18/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    NO FIELD REGENCY PROVINCE

    DEVELOP

    MENT

    TARGETS

    (MW)

    STATUS OF

    TENDER

    PROCESS

    1 Seulawah agam Aceh Besar Nangroe Aceh Darusallam 160 On Going

    2 Jailolo West Halmahera North Maluku 75 Finished

    3 Telaga Ngebel Ponorogo and Madiun East Java 120 Finished

    4 Ungaran Mt. Semarang and Kendal Central Java 100 Finished

    5 Tampomas Mt. Sumedang and Subang West Java 50 Finished

    6 Cisolok Cisukarame Sukabumi West Java 45 Finished

    7 Tangkuban Perahu Mt. Subang, Bandung and purwakarta West Java 100 Finished

    8 Jaboi Sabang Nangroe Aceh Darusallam 50 Finished

    9 Sokoria Ende East Nusa Tenggara 30 Finished

    10 Talang Mt. Solok West Sumatera 36 Preparation

    11 Blawan Ijen Bondowoso, Banyuwangi and Situbondo East Java 270 Finished

    12 Hu'u Daha Dompu West Nusa Tenggara 65 Finished

    13 Sipaholon Ria-ria Noth Tapanuli North Sumatera 75 Re-Tender

    14 Bukit Kili Solok West Sumatera 83 Re-Tender

    15 Sorik Marapi Roburan Mandailing Natal North Sumatera 200 Finished

    16 Marana Donggala Central Sulawesi 36 Re-Tender

    17 Songa Wayaua South Halmahera North Maluku 140 Preparation

    18 Atadei Lembata East Nusa Tenggara 40 Finished19 Suwawa Bone Bolanga and Gorontalo Gorontalo 110 Re-Tender

    20 Kaldera Danau Banten Serang and Pandeglang Banten 115 Finished

    21 Rajabasa Mt. South Lampung Lampung 91 Finished

    22 Liki Pinangawan Muara Laboh, Solok Selatan West Sumatera 400 Finished

    23 Suoh-Sekincau West Lampung Lampung 230 Finished

    24 Rantau Dadap Muara Enim, Lahat dan Pagar Alam South Sumatera 106 Finished

    25 Guci Tegal, Brebes and Pemalang Central Java 79 Finished26 Baturaden Tegal, Brebes, Pemalang, Banyumas and Purbalin Central Java 175 Finished

    2981TOTAL

    New GWAs Offered Through Tender Process(after Law No. 27/2003 on Geothermal)

    As Total Project Scenario, IPP SchemeAs Total Project Scenario, IPP SchemeAs Total Project Scenario, IPP SchemeAs Total Project Scenario, IPP Scheme As of 10 July 2011

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    19/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    2011

    NO Area ProvincePotency

    (MWe)

    Required Financing

    (US$ Million)

    1 * 200 6002 * 210 630

    3 * 63 189

    4 * 150 450

    5 . * 80 2406 120 360

    7 194 582

    8 225 675

    9 92 276,002

    *)

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    20/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    No. Location Regency Province

    1. Sungai Betung Kerinci and Pesisir Selatan Jambi and West Sumatera

    2. Sungai Tenang Merangin Jambi

    3. Ciseeng Bogor and Lebak West Java and Banten

    4. Malawa Maros, Pangkajene Kepulauan,Bone and Barru

    South Sulawesi

    5. Gn. Dua Saudara Bitung North Sulawesi

    6. Ulumbu Manggarai NTT

    7. Gn. Gede/Pangrango Bogor, Sukabumi, and Cianjur West Java

    Areas offered for Pre-Survey Assignment(Announcement of Director General of New Renewable Energy and Energy

    Conservation No. 104Pm/30/DJE/2011)

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    21/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011

    FLOW OF GEOTHERMAL BUSINES PROSES

    GWA

    Winner

    Buyer

    Candidate

    Local Government Related AgenciesPower Purchaser

    (PLN)

    BUSINESS

    ENTITY

    REGULATOR

    Selling

    Price*) WhohastheSender??

    IUP Holder

    MEMRE

    Selling price

    agreement*)

    STEAM/

    ELECTRICITY

    Recommendation

    In Forrest?

    yes

    no

    no

    yes

    EBTKE- KESDM 2010

    Selling price approval

    Note:

    In Forest Area

    Forestry Permit

    *) main constraint

    1

    2

    GWA Auction

    Preliminary Survey

    EXPLORATION

    EXPLOITATION

    Forestry PermitIn Forrest?

    Local gov. Permit

  • 8/10/2019 Ketenagalistrikan 20110714 Panas Bumi Geothermal Investment Opportunities in Indonesia

    22/22

    Kementerian Energi dan Sumber Daya Mineral

    Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi

    EBTKE KESDM - 2011