KERP Remediation Technology Workshop : KOC Contracting KERP: Kuwait Environmental Remediation Program Restoring Kuwait Treasures” 25 January 2015

KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

  • Upload
    others

  • View
    87

  • Download
    2

Embed Size (px)

Citation preview

Page 1: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

KERP

Remediation Technology Workshop : KOC Contracting

KERP: Kuwait Environmental Remediation Program

“Restoring Kuwait Treasures” 25 January 2015

Page 2: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

2

KOC Contracting

Agenda Contracting for

Remediation Projects

Contract Strategy

overview

General information on

Tender/proposed Contract

Remediation Phase &

Results Measurement

Page 3: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

3

KOC Contracting

Within the

framework of contractual and regulatory obligations.

Contracting for Remediation Projects

Page 4: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

4

KOC Contracting

Contracting for Remediation Projects

Kuwait Environment Remediation

Program(KERP) has high visibility

and importance : locally and

internationally

Multi-tier approvals requirement

Complex Contracting Cycle

Page 5: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

5

KOC Contracting

KOC Contracting Cycle for KERP Projects (Total 360 days)

49 DaysTender

Preparation

Terms of

Reference

approval

by KNFP

7 Days

Screening of

Bids

5 Days

Tender

Publish

Approval to

Issue RFP

KOC-TC

28 DaysTender

Circulation

Approval to

Issue RFP

KPC-HTC

Approval to

Issue RFP

CTC77 Days

Bidding

70 Days

Bid Evaluation21 Days

Contract

Signature

21 DaysTender Final

Update

5 Days

Preparation of

Recommendation

for Award

28 D

ays

Appro

vals

for

Issue

21 Days

Contract

Preparation

By

KOC-TC

By

KPC-HTC

By

CTC

28 Days

Approvals for Recommendation of Award

Start

Page 6: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

6

KOC Contracting

Contracting Cycle Timeline Overview

1

3

2

4

Timeline is in number of days

Page 7: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

7

KOC Contracting

Method

AssessmentTender

Remediation

Implementation

Contract Strategy overview

Page 8: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

8

KOC Contracting

Who can participate in the Method Assessment ?

Category-58 is open for all

Pre-qualification KOC website URL http://mcsetender.kockw.com/Commercial%20Documents/contract/files

/00_INDEX_KOC_LIST_APPROVED_CONTRACTORS1.pdf

KOC approved Contractors for Soil

Remediation Services-Category 58

who

List continuously updated based on

successful applicant(s)

Page 9: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

9

KOC Contracting

Not Approved

yet

Already Approved

Current Status under Category-58?

Apply for pre-qualifying

to Catgory-58

Method

Assessment

Page 10: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

10

KOC Contracting

Bank Guarantees

Bid Bond (general industry practice)

Performance Bond

Insurances

Erection all Risk

Employer's Liability Policy and Workmen Compensation Policy

General Third Party Liability Policy

Professional Liability and Indemnity Policy

Subcontracting

As per proposed Contract

Generally KOC Pre-qualified Contractors

HSE Requirements

Compliance to Company’s HSE Management System and HSEMS Procedures

General information on Tender/proposed Contract

Page 11: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

11

KOC Contracting

Financial viability

Technical requirements

Remediation Phase & Results Measurement

Page 12: KERP: Kuwait Environmental Remediation Program · 2015-01-22 · 5 KOC Contracting KOC Contracting Cycle for KERP Projects (Total 360 days) 49 Days Tender Preparation Terms of Reference

12

KOC Contracting

Questions ?