Kensington/TalmadgePedestrian Master Plan
Kensington/Talmadge Area DescriptionThe Kensingtonof El Cajon Boulevard, east of IKensington and Talmadge neighborhoods are physically separated by canyons that are traversed by Fairmount Avenue, generallynorthwest/southwest direction and connects to Adams Avenue in Kensington and Monroe Avenue in Talmadge.
The predominant street pattern is a gridcommunity, El Cajon Boulevard connects
Kensington’s character. It is a narrow peninsula isolated on three sides bopen space. Kensington offers a miniature "Main Street" along Adams Avenue, shops, restaurants, a branch library and the regionally famous Ken Theatre.
Talmadge, to the east, is also surroundTalmadge Gates Historical District. The neighborhood is comprised of a mixture of singleand mid- was established in 2001 for the purpose of improving the public rightornamental lighting and traffic calming devices. As part of this beautification effort, Talmadge planted more than 400 trees along its streets
Community OutreachThe project was presented to the time, the Focus AreaAudits and Community
Kensington/Talmadgeevents held in December 2012 to review the recommendations for their community. House, recommendations for all Phase 4 communities were presented and participants were encouraged to provide input and complete surveys to share their thoughts and ideas on the plan. The survey feedback41 survey forms,
Kensington/TalmadgePedestrian Master Plan
Kensington/Talmadge Area DescriptionThe Kensington-Talmadge of El Cajon Boulevard, east of IKensington and Talmadge neighborhoods are physically separated by canyons that are traversed by Fairmount Avenue, generallynorthwest/southwest direction and connects to Adams Avenue in Kensington and Monroe Avenue in Talmadge.
The predominant street pattern is a gridcommunity, El Cajon Boulevard connects
Kensington’s first subdivision dates to 1910character. It is a narrow peninsula isolated on three sides bopen space. Kensington offers a miniature "Main Street" along Adams Avenue, shops, restaurants, a branch library and the regionally famous Ken Theatre.
Talmadge, to the east, is also surroundTalmadge Gates Historical District. The neighborhood is comprised of a mixture of single
to large apartment complexes. Talmadge has a Maintenance Assessment District (TMAD) was established in 2001 for the purpose of improving the public rightornamental lighting and traffic calming devices. As part of this beautification effort, Talmadge planted more than 400 trees along its streets
ommunity OutreachThe project was presented to the time, the Focus Area Audits and the Online Survey.
ommunity.
Kensington/Talmadge events held in December 2012 to review the recommendations for their community. House, recommendations for all Phase 4 communities were presented and participants were encouraged to provide input and complete surveys to share their thoughts and ideas on the plan. The survey feedback collected 41 survey forms, including 1
Kensington/TalmadgePedestrian Master Plan –
Kensington/Talmadge Area DescriptionTalmadge Community
of El Cajon Boulevard, east of I-15, south of IKensington and Talmadge neighborhoods are physically separated by canyons that are traversed by Fairmount Avenue, generally running north/south, and Aldine Drive which crosses Fairmount in a northwest/southwest direction and connects to Adams Avenue in Kensington and Monroe Avenue in
The predominant street pattern is a gridcommunity, El Cajon Boulevard connects
first subdivision dates to 1910character. It is a narrow peninsula isolated on three sides bopen space. Kensington offers a miniature "Main Street" along Adams Avenue, shops, restaurants, a branch library and the regionally famous Ken Theatre.
Talmadge, to the east, is also surroundTalmadge Gates Historical District. The neighborhood is comprised of a mixture of single
to large apartment complexes. Talmadge has a Maintenance Assessment District (TMAD) was established in 2001 for the purpose of improving the public rightornamental lighting and traffic calming devices. As part of this beautification effort, Talmadge planted more than 400 trees along its streets
ommunity Outreach The project was presented to the
was presented and community members were encouraged to complete ine Survey. One
Area residents and businessevents held in December 2012 to review the recommendations for their community. House, recommendations for all Phase 4 communities were presented and participants were encouraged to provide input and complete surveys to share their thoughts and ideas on the plan. The
collected was specific to each communiincluding 12 for the
Page | KT
Kensington/Talmadge– Phase 4
Kensington/Talmadge Area DescriptionCommunity lies in the northern reaches of the
15, south of I-8/Montezuma Road, and west of Collwood Boulevard. The Kensington and Talmadge neighborhoods are physically separated by canyons that are traversed by
running north/south, and Aldine Drive which crosses Fairmount in a northwest/southwest direction and connects to Adams Avenue in Kensington and Monroe Avenue in
The predominant street pattern is a grid, interrupted by the canyons. At the southecommunity, El Cajon Boulevard connects the Kensington and Talmadge neighborhoods.
first subdivision dates to 1910 character. It is a narrow peninsula isolated on three sides bopen space. Kensington offers a miniature "Main Street" along Adams Avenue, shops, restaurants, a branch library and the regionally famous Ken Theatre.
Talmadge, to the east, is also surrounded by canyons. It was established in 1925 and is home to the Talmadge Gates Historical District. The neighborhood is comprised of a mixture of single
to large apartment complexes. Talmadge has a Maintenance Assessment District (TMAD) was established in 2001 for the purpose of improving the public rightornamental lighting and traffic calming devices. As part of this beautification effort, Talmadge planted more than 400 trees along its streets.
The project was presented to the Kensington/Talmadge was presented and community members were encouraged to complete
One on-line survey wa
Area residents and businessevents held in December 2012 to review the recommendations for their community. House, recommendations for all Phase 4 communities were presented and participants were encouraged to provide input and complete surveys to share their thoughts and ideas on the plan. The
specific to each communifor the Kensington/Talmadge
Page | KT-1
Kensington/Talmadge Pedestrian Plan
Kensington/Talmadge Area Description lies in the northern reaches of the
8/Montezuma Road, and west of Collwood Boulevard. The Kensington and Talmadge neighborhoods are physically separated by canyons that are traversed by
running north/south, and Aldine Drive which crosses Fairmount in a northwest/southwest direction and connects to Adams Avenue in Kensington and Monroe Avenue in
interrupted by the canyons. At the southethe Kensington and Talmadge neighborhoods.
and the neighborhood is recognized for its historic character. It is a narrow peninsula isolated on three sides bopen space. Kensington offers a miniature "Main Street" along Adams Avenue, shops, restaurants, a branch library and the regionally famous Ken Theatre.
ed by canyons. It was established in 1925 and is home to the Talmadge Gates Historical District. The neighborhood is comprised of a mixture of single
to large apartment complexes. Talmadge has a Maintenance Assessment District (TMAD) was established in 2001 for the purpose of improving the public rightornamental lighting and traffic calming devices. As part of this beautification effort, Talmadge planted
Kensington/Talmadge Planning Gwas presented and community members were encouraged to complete
survey was completed online
Area residents and business owners were also invited to attend two Open House events held in December 2012 to review the recommendations for their community. House, recommendations for all Phase 4 communities were presented and participants were encouraged to provide input and complete surveys to share their thoughts and ideas on the plan. The
specific to each community. Open House participantsKensington/Talmadge C
Pedestrian Plan
lies in the northern reaches of the 8/Montezuma Road, and west of Collwood Boulevard. The
Kensington and Talmadge neighborhoods are physically separated by canyons that are traversed by running north/south, and Aldine Drive which crosses Fairmount in a
northwest/southwest direction and connects to Adams Avenue in Kensington and Monroe Avenue in
interrupted by the canyons. At the southethe Kensington and Talmadge neighborhoods.
and the neighborhood is recognized for its historic character. It is a narrow peninsula isolated on three sides by steep slopes, much of which is dedicated open space. Kensington offers a miniature "Main Street" along Adams Avenue, shops, restaurants, a branch library and the regionally famous Ken Theatre.
ed by canyons. It was established in 1925 and is home to the Talmadge Gates Historical District. The neighborhood is comprised of a mixture of single
to large apartment complexes. Talmadge has a Maintenance Assessment District (TMAD) was established in 2001 for the purpose of improving the public rightornamental lighting and traffic calming devices. As part of this beautification effort, Talmadge planted
Planning Group in was presented and community members were encouraged to complete
completed online
owners were also invited to attend two Open House events held in December 2012 to review the recommendations for their community. House, recommendations for all Phase 4 communities were presented and participants were encouraged to provide input and complete surveys to share their thoughts and ideas on the plan. The
Open House participantsCommunity.
Pedestrian Plan
lies in the northern reaches of the Mid-City area, generally north 8/Montezuma Road, and west of Collwood Boulevard. The
Kensington and Talmadge neighborhoods are physically separated by canyons that are traversed by running north/south, and Aldine Drive which crosses Fairmount in a
northwest/southwest direction and connects to Adams Avenue in Kensington and Monroe Avenue in
interrupted by the canyons. At the southethe Kensington and Talmadge neighborhoods.
and the neighborhood is recognized for its historic y steep slopes, much of which is dedicated
open space. Kensington offers a miniature "Main Street" along Adams Avenue, complete shops, restaurants, a branch library and the regionally famous Ken Theatre.
ed by canyons. It was established in 1925 and is home to the Talmadge Gates Historical District. The neighborhood is comprised of a mixture of single
to large apartment complexes. Talmadge has a Maintenance Assessment District (TMAD) was established in 2001 for the purpose of improving the public right-of-way with landscaping, ornamental lighting and traffic calming devices. As part of this beautification effort, Talmadge planted
roup in Septemberwas presented and community members were encouraged to complete
completed online for the Kensington/Talmadge
owners were also invited to attend two Open House events held in December 2012 to review the recommendations for their community. House, recommendations for all Phase 4 communities were presented and participants were encouraged to provide input and complete surveys to share their thoughts and ideas on the plan. The
Open House participants returned a total of
Pedestrian Plan
area, generally north 8/Montezuma Road, and west of Collwood Boulevard. The
Kensington and Talmadge neighborhoods are physically separated by canyons that are traversed by running north/south, and Aldine Drive which crosses Fairmount in a
northwest/southwest direction and connects to Adams Avenue in Kensington and Monroe Avenue in
interrupted by the canyons. At the southern edge of the the Kensington and Talmadge neighborhoods.
and the neighborhood is recognized for its historic y steep slopes, much of which is dedicated
complete with coffee
ed by canyons. It was established in 1925 and is home to the Talmadge Gates Historical District. The neighborhood is comprised of a mixture of single-family homes
to large apartment complexes. Talmadge has a Maintenance Assessment District (TMAD) way with landscaping,
ornamental lighting and traffic calming devices. As part of this beautification effort, Talmadge planted
September 2012. Atwas presented and community members were encouraged to complete
Kensington/Talmadge
owners were also invited to attend two Open House events held in December 2012 to review the recommendations for their community. At each Open House, recommendations for all Phase 4 communities were presented and participants were encouraged to provide input and complete surveys to share their thoughts and ideas on the plan. The
returned a total of
area, generally north 8/Montezuma Road, and west of Collwood Boulevard. The
Kensington and Talmadge neighborhoods are physically separated by canyons that are traversed by running north/south, and Aldine Drive which crosses Fairmount in a
northwest/southwest direction and connects to Adams Avenue in Kensington and Monroe Avenue in
rn edge of the
and the neighborhood is recognized for its historic y steep slopes, much of which is dedicated
with coffee
ed by canyons. It was established in 1925 and is home to the family homes
to large apartment complexes. Talmadge has a Maintenance Assessment District (TMAD) that way with landscaping,
ornamental lighting and traffic calming devices. As part of this beautification effort, Talmadge planted
2012. At that was presented and community members were encouraged to complete Walk
Kensington/Talmadge
owners were also invited to attend two Open House At each Open
House, recommendations for all Phase 4 communities were presented and participants were encouraged to provide input and complete surveys to share their thoughts and ideas on the plan. The
returned a total of
Kensington/Talmadge Area
Open House surveys way or another about the make suggestions as followswest of that intersection to Aldine and Menlo was the priority mentioned the most times, followed bybeing able to walk (and bike) between Kensington and Talmadge. Improvements to Aldine Drive were mentioned often in support of these other prioritiesTalmadge, and improving pedestrian conditions near the Eucliwas another priority location for improvements.
Inventory of Missing Sidewalks and Curb RampsThe City of San Diego and SANDAG provided detailed information regarding missing sidewalks and existing curb ramps. GIS files for existing sidewalks and curb ramps wefforts. A visual inspection of field conditions was conducted to verify the accuracy of the information provided and to identify the presence of sidewalk obstructions, pedestrian activity and otherMissing sidewalks and curb ramps are illustrated in
Route TypesAll roadways within the Kensington/Talmadgeon pedestrian functionality as defined in the Phase I Framework DoThere are four key route types included in Kensington/Talmadge: District, Corridor, Connector and Neighborhood. Type Classifications defined within the Kensington/Talmadge
Focus AreasFocus Areas narrow down Master Plan. In most cases routes that are not within the Focus Area are located in low density residential areas, industrial areas, or areas with low demand for pedestrian activit The Pedestrian Priority Model (PPM) was used to calculate a priority score for all routes within the Kensington/Talmadgedefined in the Phase I Framework Document, werethe routes had an associated score, the mean and standard deviation was calculated specific for the Kensington/Talmadge(second highest ranking) routes. Tier 1 and Tier 2 routes were included in the Focus Area. Focus areas
Kensington/Talmadge Area
Open House surveys for way or another about the make suggestions as followswest of that intersection to Aldine and Menlo was the priority mentioned the most times, followed bybeing able to walk (and bike) between Kensington and Talmadge. Improvements to Aldine Drive were mentioned often in support of these other prioritiesTalmadge, and improving pedestrian conditions near the Eucliwas another priority location for improvements.
Inventory of Missing Sidewalks and Curb RampsThe City of San Diego and SANDAG provided detailed information regarding missing sidewalks and existing curb ramps. GIS files for existing sidewalks and curb ramps were provided by SANDAG for inclusion in the base mapping efforts. A visual inspection of field conditions was conducted to verify the accuracy of the information provided and to identify the presence of sidewalk obstructions, pedestrian activity and otherMissing sidewalks and curb ramps are illustrated in
oute Types All roadways within the Kensington/Talmadgeon pedestrian functionality as defined in the Phase I Framework DoThere are four key route types included in Kensington/Talmadge: District, Corridor, Connector and Neighborhood.
Classifications defined within the Kensington/Talmadge
Focus Areas Focus Areas narrow down Master Plan. In most cases routes that are not within the Focus Area are located in low density residential areas, industrial areas, or areas with low demand for pedestrian activit
The Pedestrian Priority Model (PPM) was used to calculate a priority score for all routes within the Kensington/Talmadge defined in the Phase I Framework Document, werethe routes had an associated score, the mean and standard deviation was calculated specific for the Kensington/Talmadge
nd highest ranking) routes. Tier 1 and Tier 2 routes were included in the Focus Area. Focus areas
Kensington/Talmadge Area Pedestrian Plan
for Kensington/Talmadgeway or another about the identified make suggestions as follows. Improvingwest of that intersection to Aldine and Menlo was the priority mentioned the most times, followed bybeing able to walk (and bike) between Kensington and Talmadge. Improvements to Aldine Drive were mentioned often in support of these other prioritiesTalmadge, and improving pedestrian conditions near the Eucliwas another priority location for improvements.
Inventory of Missing Sidewalks and Curb RampsThe City of San Diego and SANDAG provided detailed information regarding missing sidewalks and existing curb ramps. GIS files for existing sidewalks and
ere provided by SANDAG for inclusion in the base mapping efforts. A visual inspection of field conditions was conducted to verify the accuracy of the information provided and to identify the presence of sidewalk obstructions, pedestrian activity and otherMissing sidewalks and curb ramps are illustrated in
All roadways within the Kensington/Talmadgeon pedestrian functionality as defined in the Phase I Framework DoThere are four key route types included in Kensington/Talmadge: District, Corridor, Connector and Neighborhood.
Classifications defined within the Kensington/Talmadge
Focus Areas narrow down the routes within each community studied in the Master Plan. In most cases routes that are not within the Focus Area are located in low density residential areas, industrial areas, or areas with low demand for pedestrian activity.
The Pedestrian Priority Model (PPM) was used to calculate a priority score for all routes within the Community. Point values associated with each of the five key priority factors, as
defined in the Phase I Framework Document, werethe routes had an associated score, the mean and standard deviation was calculated specific for the
Community, which was used to determine the Tier 1 (highest ranking) and Tier 2 nd highest ranking) routes. Tier 1 and Tier 2 routes were included in the Focus Area. Focus areas
Pedestrian Plan
Page | KT
Kensington/Talmadge indicated identified Improvement Areas
Improving the Monroe/Euclid intersection and the segment of Monroe west of that intersection to Aldine and Menlo was the priority mentioned the most times, followed bybeing able to walk (and bike) between Kensington and Talmadge. Improvements to Aldine Drive were mentioned often in support of these other prioritiesTalmadge, and improving pedestrian conditions near the Eucliwas another priority location for improvements.
Inventory of Missing Sidewalks and Curb RampsThe City of San Diego and SANDAG provided detailed information regarding missing sidewalks and existing curb ramps. GIS files for existing sidewalks and
ere provided by SANDAG for inclusion in the base mapping efforts. A visual inspection of field conditions was conducted to verify the accuracy of the information provided and to identify the presence of sidewalk obstructions, pedestrian activity and other pedestrian issues in this community. Missing sidewalks and curb ramps are illustrated in
All roadways within the Kensington/Talmadge Communityon pedestrian functionality as defined in the Phase I Framework DoThere are four key route types included in Kensington/Talmadge: District, Corridor, Connector and Neighborhood. Exhibit
Classifications defined within the Kensington/Talmadge
the routes within each community studied in the Master Plan. In most cases routes that are not within the Focus Area are located in low density residential areas, industrial areas, or areas with low
The Pedestrian Priority Model (PPM) was used to calculate a priority score for all routes within the . Point values associated with each of the five key priority factors, as
defined in the Phase I Framework Document, werethe routes had an associated score, the mean and standard deviation was calculated specific for the
ommunity, which was used to determine the Tier 1 (highest ranking) and Tier 2 nd highest ranking) routes. Tier 1 and Tier 2 routes were included in the Focus Area. Focus areas
Pedestrian Plan
Page | KT-2
indicated that Improvement Areas or
the Monroe/Euclid intersection and the segment of Monroe west of that intersection to Aldine and Menlo was the priority mentioned the most times, followed bybeing able to walk (and bike) between Kensington and Talmadge. Improvements to Aldine Drive were mentioned often in support of these other priorities—creating a connection between Kensington and Talmadge, and improving pedestrian conditions near the Eucliwas another priority location for improvements.
Inventory of Missing Sidewalks and Curb RampsThe City of San Diego and SANDAG provided detailed information regarding missing sidewalks and existing curb ramps. GIS files for existing sidewalks and
ere provided by SANDAG for inclusion in the base mapping efforts. A visual inspection of field conditions was conducted to verify the accuracy of the information provided and to identify the presence of sidewalk
pedestrian issues in this community. Missing sidewalks and curb ramps are illustrated in Exhibit
Community were defined based on pedestrian functionality as defined in the Phase I Framework DoThere are four key route types included in Kensington/Talmadge: District,
Exhibit KT-2 illustrates the Route Classifications defined within the Kensington/Talmadge
the routes within each community studied in the Master Plan. In most cases routes that are not within the Focus Area are located in low density residential areas, industrial areas, or areas with low
The Pedestrian Priority Model (PPM) was used to calculate a priority score for all routes within the . Point values associated with each of the five key priority factors, as
defined in the Phase I Framework Document, were summed to provide an overall priority score. Once the routes had an associated score, the mean and standard deviation was calculated specific for the
ommunity, which was used to determine the Tier 1 (highest ranking) and Tier 2 nd highest ranking) routes. Tier 1 and Tier 2 routes were included in the Focus Area. Focus areas
that the respondents did not feel strongly one recommended improvements
the Monroe/Euclid intersection and the segment of Monroe west of that intersection to Aldine and Menlo was the priority mentioned the most times, followed bybeing able to walk (and bike) between Kensington and Talmadge. Improvements to Aldine Drive were
creating a connection between Kensington and Talmadge, and improving pedestrian conditions near the Euclid/Monroe intersection. Fairmount Avenue
Inventory of Missing Sidewalks and Curb Ramps The City of San Diego and SANDAG provided detailed information regarding missing sidewalks and existing curb ramps. GIS files for existing sidewalks and
ere provided by SANDAG for inclusion in the base mapping efforts. A visual inspection of field conditions was conducted to verify the accuracy of the information provided and to identify the presence of sidewalk
pedestrian issues in this community. Exhibit KT-1.
were defined based on pedestrian functionality as defined in the Phase I Framework Document. There are four key route types included in Kensington/Talmadge: District,
illustrates the Route Classifications defined within the Kensington/Talmadge Community.
the routes within each community studied in the Master Plan. In most cases routes that are not within the Focus Area are located in low density residential areas, industrial areas, or areas with low
The Pedestrian Priority Model (PPM) was used to calculate a priority score for all routes within the . Point values associated with each of the five key priority factors, as
summed to provide an overall priority score. Once the routes had an associated score, the mean and standard deviation was calculated specific for the
ommunity, which was used to determine the Tier 1 (highest ranking) and Tier 2 nd highest ranking) routes. Tier 1 and Tier 2 routes were included in the Focus Area. Focus areas
the respondents did not feel strongly one recommended improvements
the Monroe/Euclid intersection and the segment of Monroe west of that intersection to Aldine and Menlo was the priority mentioned the most times, followed bybeing able to walk (and bike) between Kensington and Talmadge. Improvements to Aldine Drive were
creating a connection between Kensington and d/Monroe intersection. Fairmount Avenue
The City of San Diego and SANDAG provided detailed information regarding missing sidewalks and existing curb ramps. GIS files for existing sidewalks and
ere provided by SANDAG for inclusion in the base mapping efforts. A visual inspection of field conditions was conducted to verify the accuracy of the information provided and to identify the presence of sidewalk
pedestrian issues in this community.
were defined based cument.
There are four key route types included in Kensington/Talmadge: District, illustrates the Route
Community.
the routes within each community studied in the Master Plan. In most cases routes that are not within the Focus Area are located in low density residential areas, industrial areas, or areas with low
The Pedestrian Priority Model (PPM) was used to calculate a priority score for all routes within the . Point values associated with each of the five key priority factors, as
summed to provide an overall priority score. Once the routes had an associated score, the mean and standard deviation was calculated specific for the
ommunity, which was used to determine the Tier 1 (highest ranking) and Tier 2 nd highest ranking) routes. Tier 1 and Tier 2 routes were included in the Focus Area. Focus areas
District:includes sidewalks in the more intensive mixed use and concentrated areas of the city.
Corridor: sidewalk is associated withlinear corridors m
Connector: connector sidewalk is often along a lower density corridor with few connections to adjacent land uses.
Neighborhood: neighborhood sidewalk is limited to areas of density and single use residential areas.
the respondents did not feel strongly one recommended improvements, but they did
the Monroe/Euclid intersection and the segment of Monroe west of that intersection to Aldine and Menlo was the priority mentioned the most times, followed bybeing able to walk (and bike) between Kensington and Talmadge. Improvements to Aldine Drive were
creating a connection between Kensington and d/Monroe intersection. Fairmount Avenue
The Pedestrian Priority Model (PPM) was used to calculate a priority score for all routes within the . Point values associated with each of the five key priority factors, as
summed to provide an overall priority score. Once the routes had an associated score, the mean and standard deviation was calculated specific for the
ommunity, which was used to determine the Tier 1 (highest ranking) and Tier 2 nd highest ranking) routes. Tier 1 and Tier 2 routes were included in the Focus Area. Focus areas
District: A district route
includes sidewalks in the more intensive mixed use and concentrated areas of the city.
Corridor: A corridor
sidewalk is associated with major arterials and linear corridors moderate level of density.
Connector: connector sidewalk is often along a lower density corridor with few connections to adjacent land uses.
Neighborhood: neighborhood sidewalk is limited to areas of density and single use residential areas.
the respondents did not feel strongly one , but they did
the Monroe/Euclid intersection and the segment of Monroe west of that intersection to Aldine and Menlo was the priority mentioned the most times, followed by being able to walk (and bike) between Kensington and Talmadge. Improvements to Aldine Drive were
creating a connection between Kensington and d/Monroe intersection. Fairmount Avenue
The Pedestrian Priority Model (PPM) was used to calculate a priority score for all routes within the . Point values associated with each of the five key priority factors, as
summed to provide an overall priority score. Once the routes had an associated score, the mean and standard deviation was calculated specific for the
ommunity, which was used to determine the Tier 1 (highest ranking) and Tier 2 nd highest ranking) routes. Tier 1 and Tier 2 routes were included in the Focus Area. Focus areas
A district route
includes sidewalks in the more intensive mixed use and concentrated areas of
A corridor
sidewalk is associated major arterials and
linear corridors with a oderate level of density.
Connector: A
connector sidewalk is often along a lower density corridor with few connections to adjacent
Neighborhood: A
neighborhood sidewalk is limited to areas of lower density and single use residential areas.
were refined as a result of the existing conditions needs assessment and input from the community. Exhibit
Improvement Overlaying the existing conditions, physical conditions assessment and community input, Improvement Areas were defined within the Focus Area for the Kensington/TalmadgeAreas are defined as either intimprovements focus on a single intersection or a group of intersections within a reasonable proximity of one another. Corridor improvements focus on improvements either along a roadway or throof intersections.
For the Kensington/Talmadge Community, Exhibit recommendations for each I
Priority Score The Improvement Areas and recommended projects within each improvement areaevaluated against priority ranking criteria established during Phase I of the PedestriaPriority scores were based connectivity and accessibility.
were refined as a result of the existing conditions needs assessment and input from the community. Exhibit KT-3 illustrates the Kensington/Talmadge Focus A
Improvement AreasOverlaying the existing conditions, physical conditions assessment and community input, Improvement Areas were defined within the Focus Area for the Kensington/TalmadgeAreas are defined as either intimprovements focus on a single intersection or a group of intersections within a reasonable proximity of one another. Corridor improvements focus on improvements either along a roadway or throof intersections.
For the Kensington/Talmadge Community, Exhibit KT-4 and summarized recommendations for each I
Priority Score The Improvement Areas and recommended projects within each improvement areaevaluated against priority ranking criteria established during Phase I of the PedestriaPriority scores were based connectivity and accessibility.
were refined as a result of the existing conditions needs assessment and input from the community. illustrates the Kensington/Talmadge Focus A
Areas Overlaying the existing conditions, physical conditions assessment and community input, Improvement Areas were defined within the Focus Area for the Kensington/TalmadgeAreas are defined as either intersection improvements or corridor improvements. Intersection improvements focus on a single intersection or a group of intersections within a reasonable proximity of one another. Corridor improvements focus on improvements either along a roadway or thro
For the Kensington/Talmadge Community, and summarized in the table on the following page
recommendations for each Improvement Area are described in detail.
The Improvement Areas and recommended projects within each improvement areaevaluated against priority ranking criteria established during Phase I of the PedestriaPriority scores were based on issues and connectivity and accessibility.
Page | KT
were refined as a result of the existing conditions needs assessment and input from the community. illustrates the Kensington/Talmadge Focus A
Overlaying the existing conditions, physical conditions assessment and community input, Improvement Areas were defined within the Focus Area for the Kensington/Talmadge
ersection improvements or corridor improvements. Intersection improvements focus on a single intersection or a group of intersections within a reasonable proximity of one another. Corridor improvements focus on improvements either along a roadway or thro
For the Kensington/Talmadge Community, six Improvement Areas were defined,in the table on the following page
mprovement Area are described in detail.
The Improvement Areas and recommended projects within each improvement areaevaluated against priority ranking criteria established during Phase I of the Pedestria
on issues and recommendations associated with walkability, safety,
Page | KT-3
were refined as a result of the existing conditions needs assessment and input from the community. illustrates the Kensington/Talmadge Focus A
Overlaying the existing conditions, physical conditions assessment and community input, Improvement Areas were defined within the Focus Area for the Kensington/Talmadge
ersection improvements or corridor improvements. Intersection improvements focus on a single intersection or a group of intersections within a reasonable proximity of one another. Corridor improvements focus on improvements either along a roadway or thro
Improvement Areas were defined,in the table on the following page
mprovement Area are described in detail.
The Improvement Areas and recommended projects within each improvement areaevaluated against priority ranking criteria established during Phase I of the Pedestria
recommendations associated with walkability, safety,
were refined as a result of the existing conditions needs assessment and input from the community. illustrates the Kensington/Talmadge Focus Area routes.
Overlaying the existing conditions, physical conditions assessment and community input, Improvement Areas were defined within the Focus Area for the Kensington/Talmadge
ersection improvements or corridor improvements. Intersection improvements focus on a single intersection or a group of intersections within a reasonable proximity of one another. Corridor improvements focus on improvements either along a roadway or thro
Improvement Areas were defined,in the table on the following page. Following the exhibit and table,
mprovement Area are described in detail.
The Improvement Areas and recommended projects within each improvement areaevaluated against priority ranking criteria established during Phase I of the Pedestria
recommendations associated with walkability, safety,
were refined as a result of the existing conditions needs assessment and input from the community. rea routes.
Overlaying the existing conditions, physical conditions assessment and community input, Improvement Areas were defined within the Focus Area for the Kensington/Talmadge Community. Improvement
ersection improvements or corridor improvements. Intersection improvements focus on a single intersection or a group of intersections within a reasonable proximity of one another. Corridor improvements focus on improvements either along a roadway or thro
Improvement Areas were defined, which are illustrated in ollowing the exhibit and table,
The Improvement Areas and recommended projects within each improvement areaevaluated against priority ranking criteria established during Phase I of the Pedestria
recommendations associated with walkability, safety,
City of San Diego
were refined as a result of the existing conditions needs assessment and input from the community.
Overlaying the existing conditions, physical conditions assessment and community input, Improvement Community. Improvement
ersection improvements or corridor improvements. Intersection improvements focus on a single intersection or a group of intersections within a reasonable proximity of one another. Corridor improvements focus on improvements either along a roadway or through a series
which are illustrated in ollowing the exhibit and table,
The Improvement Areas and recommended projects within each improvement area were evaluated against priority ranking criteria established during Phase I of the Pedestrian Master Plan.
recommendations associated with walkability, safety,
City of San Diego
were refined as a result of the existing conditions needs assessment and input from the community.
Overlaying the existing conditions, physical conditions assessment and community input, Improvement Community. Improvement
ersection improvements or corridor improvements. Intersection improvements focus on a single intersection or a group of intersections within a reasonable proximity of
ugh a series
which are illustrated in ollowing the exhibit and table,
were then n Master Plan.
recommendations associated with walkability, safety,
Kensington/Talmadge Area
Improvement Area Recommendations
Improvement Area
KT-1 Adams Avenue Walkability Improvements(Terrace Drive to 42
KT-2 El Cajon Boulevard Corridor Mobility Study(41st Street to Marcellena Road)
KT-3 El Cajon Boulevard / Central Avenue Intersection Improvements
KT-4 Aldine Drive Connectivity Improvements
KT-5 Fairmount Avenue Connectivity Improvements
KT-6 Monroe AvenueAvenue Intersection Improvements
Kensington/Talmadge Area
Improvement Area Recommendations
Improvement Area
Adams Avenue Walkability Improvements (Terrace Drive to 42nd Street)
El Cajon Boulevard Corridor Mobility Study (41st Street to Marcellena
El Cajon Boulevard / Central Avenue Intersection Improvements
Aldine Drive Connectivity Improvements
Fairmount Avenue Connectivity Improvements
Monroe Avenue / Euclid Avenue Intersection Improvements
Kensington/Talmadge Area Pedestrian Plan
Improvement Area Recommendations
Improvement Area
Adams Avenue Walkability
Street)
Conduct a Mobility Study and will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing traffic calming measures.roundabout at
El Cajon Boulevard Corridor
(41st Street to Marcellena
Prepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Caj/ 50th
Corridor Mobility Study to address existing walkability issues.
El Cajon Boulevard / Central Implementpedestrians and improve visibility near IImprovements will also reduce pedestrian crossing distance
Aldine Drive Connectivity Improve connectivity between Kensingtonto trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce speeds to 25 mph.
Connectivity Improvements
Complete pedestrian connection from Talmadge Canyon to Meade by Ave.
/ Euclid Implementsafety by reducing crossing distances and creating buffers from vehicles. Improve access at intersection by evaluating realignments
Pedestrian Plan
Page | KT
Improvement Area Recommendations
Conduct a Mobility Study and will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing traffic calming measures.roundabout at Marborough Drive.
Prepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Caj
th Street should be Corridor Mobility Study to address existing walkability issues.
Implement improvements that address driver awareness of pedestrians and improve visibility near IImprovements will also reduce pedestrian crossing distance
Improve connectivity between Kensingtonto trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce speeds to 25 mph.
Complete pedestrian connection from Talmadge Canyon to Meade by implement
Implement improvements that will enhance pedestrian safety by reducing crossing distances and creating buffers from vehicles. Improve access at intersection by evaluating realignments and restriping crosswalks.
Pedestrian Plan
Page | KT-4
Recommendations
Conduct a Mobility Study and considerwill enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing traffic calming measures. Consider installation of a
Marborough Drive.
Prepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Caj
Street should be implementCorridor Mobility Study to address existing walkability issues.
improvements that address driver awareness of pedestrians and improve visibility near IImprovements will also reduce pedestrian crossing distance
Improve connectivity between Kensingtonto trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce speeds to 25 mph.
Complete pedestrian connection from Talmadge Canyon to implementing sidewalk on east side of Fairmount
improvements that will enhance pedestrian safety by reducing crossing distances and creating buffers from vehicles. Improve access at intersection by evaluating
and restriping crosswalks.
Recommendations
consider improvements that will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing
Consider installation of a Marborough Drive.
Prepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Caj
implemented in advance of the Corridor Mobility Study to address existing walkability issues.
improvements that address driver awareness of pedestrians and improve visibility near I-Improvements will also reduce pedestrian crossing distance
Improve connectivity between Kensington and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce speeds to 25 mph.
Complete pedestrian connection from Talmadge Canyon to ing sidewalk on east side of Fairmount
improvements that will enhance pedestrian safety by reducing crossing distances and creating buffers from vehicles. Improve access at intersection by evaluating
and restriping crosswalks.
improvements that will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing
Consider installation of a
Prepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Cajon Boulevard
ed in advance of the Corridor Mobility Study to address existing walkability issues.
improvements that address driver awareness of -15 on-ramp.
Improvements will also reduce pedestrian crossing distance.
and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming
Complete pedestrian connection from Talmadge Canyon to ing sidewalk on east side of Fairmount
improvements that will enhance pedestrian safety by reducing crossing distances and creating buffers from vehicles. Improve access at intersection by evaluating
Priority Score
improvements that will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing
Consider installation of a 20
Prepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at
on Boulevard ed in advance of the
34.5
improvements that address driver awareness of ramp.
12
and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming
5
Complete pedestrian connection from Talmadge Canyon to ing sidewalk on east side of Fairmount 10
improvements that will enhance pedestrian safety by reducing crossing distances and creating buffers from vehicles. Improve access at intersection by evaluating
10
Priority Score
Exhibit KT
KT-1: Missing Sidewalk and Curb Ramps
Missing Sidewalk and Curb Ramps
Missing Sidewalk and Curb Ramps
Missing Sidewalk and Curb Ramps
Page | KT
Page | KT-5
City of San Diego City of San Diego
Kensington
Exhibit KT
Kensington-Talmadge Area
KT-2: Route Type Classifications
Talmadge Area
Route Type Classifications
Talmadge Area Pedestrian Plan
Route Type Classifications
Pedestrian Plan
Page | KTPage | KT-6
Exhibit KT
KT-3: Focus Area
Focus Area
Page | KT
Page | KT-7
City of San Diego City of San Diego
Kensington
Exhibit KT
Kensington-Talmadge Area
Exhibit KT-4: Improvement Areas
Talmadge Area
Improvement Areas
Talmadge Area Pedestrian Plan
Improvement Areas
Pedestrian Plan
Page | KTPage | KT-8
Recom
mendations: C
onduct a Mobility Study and consider im
provements that w
illenhance the pedestrian environm
ent through streetscape and lighting. Improve
walkability and connectivity to transit stops by evaluating and installing traffic
calming m
easures.(See Table KT-1 for m
ore detailed descriptions)
Note: These concepts are for illustrative purposes only. They are not intended to serve as the only solution and further study and com
munity input m
ay be necessary before engineering design is complete.
Develop M
obility Corridor Plan to consider streetscape, landscape, m
edians,roundabout at Adam
s Ave/Marlborough D
r, and other pedestrian features toenhance w
alkability.Im
plement curb extensions on all four corners at Adam
s Ave / Edgeware R
dw
ith ADA com
pliant curb ramps
Evaluate feasibility of im
plementing enhanced m
arked crosswalk on east leg
of Adam
s Ave / E
dgeware R
dIm
plement curb extensions on all four corners of Adam
s Ave / Marborough
Dr w
ith AD
A com
pliant curb ramps
Implem
ent curb extensions on all four corners of Adams Ave / Kensington
Dr w
ith AD
A com
pliant curb ramps
Evaluate feasibility of im
plementing enhanced m
arked crosswalk on w
estleg of Adam
s Ave / Kensington Dr
Recom
mendations: Prepare a com
prehensive Corridor M
obility Study that addresses pedestrian access(including access to transit), bicycle facilities and vehicular circulation. Im
provements at El C
ajonB
oulevard / Euclid Avenue and at El C
ajon Boulevard / 50th Street should be im
plemented in advance of
the Corridor M
obility Study to address existing walkability issues.
(See Table KT-2 for m
ore detailed descriptions)
Note: These concepts are for illustrative purposes only. They are not intended to serve as the only solution and further study and com
munity input m
ay be necessary before engineering design is complete.
Conduct C
orridor Mobility Study along corridor
Replace existing pedestrian heads w
ith countdown tim
ers ( ) at El Cajon Blvd / Euclid Ave
Implem
ent curb extensions on northeast and southwest corners of El C
ajon Blvd / Euclid Ave w
ithA
DA
compliant curb ram
psE
valuate feasibility of installing a protected left turn phase on all phases at El Cajon Blvd / E
uclidAveE
valuate feasibility of eliminating W
B left turn at El C
ajon / 50th St to accomm
odate pedestrianrefuge w
ith an enhanced marked crossw
alk on the east leg with left turn pocket on the w
est legIm
plement curb extensions at all corners of E
l Cajon Blvd / 50th St w
ith ADA com
pliant curb ramps
Recom
mendations: Im
plement im
provements that address driver aw
areness ofpedestrians and im
prove visibility near I-15 ramp. Im
provements w
ill also reducepedestrian crossing distance.
(See Table KT-3 for m
ore detailed descriptions)
Note: These concepts are for illustrative purposes only. They are not intended to serve as the only solution and further study and com
munity input m
ay be necessary before engineering design is complete.
Implem
ent curb extension on northeast corner of El C
ajon Blvd / Central Ave
with AD
A compliant curb ram
psIm
plement m
edian island south of barrier wall on the w
est side ofC
entral AveP
aint crosswalk on w
est leg of intersection and extend existing median to
crosswalk (SR
-15 MidC
ity BRT im
provement)
Recom
mendations: Im
prove connectivity between K
ensington and Talmadge and to
trolley stations to north. Conduct speed survey to identify 85th percentile speed and
identify potential traffic calming m
easures to reduce speeds to 25 mph.
(See Table KT-4 for m
ore detailed descriptions)
Note: These concepts are for illustrative purposes only. They are not intended to serve as the only solution and further study and com
munity input m
ay be necessary before engineering design is complete.
Assess long term
feasibility of implem
enting multi-use path along east side of
corridor (long term)
Conduct speed survey along corridor (short-term
)Install additional street lights along corridor (short-term
)D
evelop traffic calming plan for the corridor (short-term
)
Recom
mendations: C
omplete pedestrian connection from
Talmadge C
anyon toM
eade by implem
enting sidewalk on east side of Fairm
ount Avenue.
(See Table KT-5 for m
ore detailed descriptions)
Note: These concepts are for illustrative purposes only. They are not intended to serve as the only solution and further study and com
munity input m
ay be necessary before engineering design is complete.
Evaluate the feasibility of im
plementing a 5' sidew
alk on east side of corridor fromM
eade Ave to Aldine D
rInstall street lighting along new
sidewalk on Fairm
ount AvenueInstall AD
A compliant curb ram
ps at all intersectionsA
ssess feasibility of implem
enting an enhanced marked crossw
alk across AldineD
r at on-ramp
Evaluate the feasibility of extending the proposed m
ulti-use path on Aldine D
rnorth along on-ram
p to existing sidewalk on Fairm
ount Ave
Recom
mendations: Im
plement im
provements that w
ill enhance pedestrian safety byreducing crossing distances and creating buffers from
vehicles. Improve access at
intersection by evaluating realignments and restriping crossw
alks.
(See Table KT-6 for m
ore detailed descriptions)
Note: These concepts are for illustrative purposes only. They are not intended to serve as the only solution and further study and com
munity input m
ay be necessary before engineering design is complete.
Evaluate opportunities to realign intersection at M
onroe Ave / E
uclid AveIm
plement curb extensions on northeast and southw
est corners of Monroe
Ave / E
uclid AveR
estripe marked crossw
alks at Monroe Ave / Euclid Ave
Improvement Area KTAdams Avenue Walkability Improvements (Terrace Drive to 42 Purpose & Need:This segment of Adams Avenue is a twoposted speed limit of 25 mph. This commercial area includes retail shops, Kensington Park, and the Kensington Library. There is onboth sides of the street. MTS Route 11 bus stops are located at Adams Avenue / Terrace Drive and Adams Avenue / Kensington Drive. Despite the potential for high pedestrian activity, field visits revealed moderate activity. This is in part due to limited pedesand bus stops that need improvement. There have been two pedestrian involved accidents at the intersection of Adams Avenue and Kensington Street in the past five years. Crossing the corridor is difficult due to thheavy traffic volume and difficulty finding gaps in traffic. Improvements in this area should address safety and connectivity at intersections, bus stop amenities, as well as connectivity on side streets.
RecommendationsConduct a Mobility Study andthrough streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing traffic calming measures. The table below provides potential considered.
Improvement Area KTAdams Avenue Walkability Improvements (Terrace Drive to 42
Purpose & Need: This segment of Adams Avenue is a twoposted speed limit of 25 mph. This commercial area includes retail shops, Kensington Park, and the Kensington Library. There is on-street parking along the corridor and sidewalks on
h sides of the street. MTS Route 11 bus stops are located at Adams Avenue / Terrace Drive and Adams Avenue / Kensington Drive. Despite the potential for high pedestrian activity, field visits revealed moderate activity. This is in part due to limited pedestrian amenities, lack of marked crosswalks and bus stops that need improvement. There have been two pedestrian involved accidents at the intersection of Adams Avenue and Kensington Street in the past five years. Crossing the corridor is difficult due to thheavy traffic volume and difficulty finding gaps in traffic. Improvements in this area should address safety and connectivity at intersections, bus stop amenities, as well as connectivity on side streets.
Recommendations: Conduct a Mobility Study andthrough streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing traffic calming measures. The table below provides potential considered.
Improvement Area KT-1:Adams Avenue Walkability Improvements (Terrace Drive to 42
This segment of Adams Avenue is a twoposted speed limit of 25 mph. This commercial area includes retail shops, Kensington Park, and the Kensington Library.
street parking along the corridor and sidewalks on h sides of the street. MTS Route 11 bus stops are located
at Adams Avenue / Terrace Drive and Adams Avenue / Kensington Drive. Despite the potential for high pedestrian activity, field visits revealed moderate activity. This is in part
trian amenities, lack of marked crosswalks and bus stops that need improvement. There have been two pedestrian involved accidents at the intersection of Adams Avenue and Kensington Street in the past five years. Crossing the corridor is difficult due to the heavy traffic volume and difficulty finding gaps in traffic. Improvements in this area should address safety and connectivity at intersections, bus stop amenities, as well as connectivity on side streets.
Conduct a Mobility Study and considerthrough streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing traffic calming measures. The table below provides potential
Page | KT
1: Adams Avenue Walkability Improvements (Terrace Drive to 42
This segment of Adams Avenue is a two-lane road with a posted speed limit of 25 mph. This commercial area includes retail shops, Kensington Park, and the Kensington Library.
street parking along the corridor and sidewalks on h sides of the street. MTS Route 11 bus stops are located
at Adams Avenue / Terrace Drive and Adams Avenue / Kensington Drive. Despite the potential for high pedestrian activity, field visits revealed moderate activity. This is in part
trian amenities, lack of marked crosswalks and bus stops that need improvement. There have been two pedestrian involved accidents at the
consider improvements that will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing traffic calming measures. The table below provides potential
Edgeware Rd
Page | KT-15
Adams Avenue Walkability Improvements (Terrace Drive to 42
lane road with a posted speed limit of 25 mph. This commercial area includes retail shops, Kensington Park, and the Kensington Library.
street parking along the corridor and sidewalks on h sides of the street. MTS Route 11 bus stops are located
at Adams Avenue / Terrace Drive and Adams Avenue / Kensington Drive. Despite the potential for high pedestrian activity, field visits revealed moderate activity. This is in part
trian amenities, lack of marked crosswalks and bus stops that need improvement. There have been two
improvements that will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing traffic calming measures. The table below provides potential
Edgeware Rd at Adams Ave
Adams Avenue Walkability Improvements (Terrace Drive to 42nd Street)
lane road with a posted speed limit of 25 mph. This commercial area includes retail shops, Kensington Park, and the Kensington Library.
street parking along the corridor and sidewalks on h sides of the street. MTS Route 11 bus stops are located
at Adams Avenue / Terrace Drive and Adams Avenue / Kensington Drive. Despite the potential for high pedestrian activity, field visits revealed moderate activity. This is in part
trian amenities, lack of marked crosswalks and bus stops that need improvement. There have been two
improvements that will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing traffic calming measures. The table below provides potential
Kensington
at Adams Ave
improvements that will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and installing traffic calming measures. The table below provides potential improvements that should be
Kensington Dr at Adams Ave
City of San Diego
improvements that will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and
improvements that should be
at Adams Ave
City of San Diego
improvements that will enhance the pedestrian environment through streetscape and lighting. Improve walkability and connectivity to transit stops by evaluating and
improvements that should be
Kensington/Talmadge Area
Table KT- Location Adams Avenue(Terrace Drive to 42
Adams Ave / Edgeware Road
Adams Ave / Marborough Drive
Adams Avenue / Kensington Drive
TOTAL ESTIMATED COST(1) A = Access
C = Connectivity
Kensington/Talmadge Area
1: Adams Avenue Walkability Improvements (Terrace Drive to 42
Adams Avenue (Terrace Drive to 42nd Street)
Ave / Edgeware Road
Adams Ave / Marborough Drive
Adams Avenue / Kensington
TOTAL ESTIMATED COSTA = Access C = Connectivity
Kensington/Talmadge Area Pedestrian Plan
1: Adams Avenue Walkability Improvements (Terrace Drive to 42
Street) 1)
Ave / Edgeware Road 2)
3)
Adams Ave / Marborough Drive 4)
Adams Avenue / Kensington 5)
6)
TOTAL ESTIMATED COST S = Safety
W = Walkability
Pedestrian Plan
Page | KT
1: Adams Avenue Walkability Improvements (Terrace Drive to 42Description
Develop Comprehensive Mobility Plan tostreetscape, landscape, roundabouts and walkability improvements.
Implement curb extensions at all four corners of intersectionwith ADA compliant curb ramps
Evaluate the feasibility of implementingmarked crosswalk including highly reflective paint and in pavement flashers on eastintersection
Implement curb extensions at all four corners of intersectionwith ADA compliant curb ramps
Implement curb extensions at all four corners of intersectionwith ADA compliant curb ramps
Evaluate the feasibility of implementingmarked crosswalk including highly reflective paint and in-pavement flashers on west leg of intersection
W = Walkability
Pedestrian Plan
Page | KT-16
1: Adams Avenue Walkability Improvements (Terrace Drive to 42Description
omprehensive Mobility Plan to consider streetscape, landscape, roundabouts and
improvements. curb
extensions at all four corners of intersection with ADA compliant curb
Evaluate the feasibility of ing enhanced
marked crosswalk including highly reflective paint and in pavement
east leg of
curb extensions at all four corners of intersection with ADA compliant curb
curb extensions at all four corners of intersection with ADA compliant curb
Evaluate the feasibility of ing enhanced
marked crosswalk including highly reflective
pavement flashers on west leg of
1: Adams Avenue Walkability Improvements (Terrace Drive to 42Goal (1)
S,W Encourage more pedestrian trips by enhancing the walking environment
S, W
Improve pedestrian visibility and decrease vehicle turning speeds
A, S Improve visibility of pedestrians and connectivity to bus stop on north side of street
S, W
Reduce pedestrian crossing distance and decrease vehicle turning speeds
A, S Reduce pedestrian crossing distance and decrease vehicle turning speeds
A, S Improve visibility of pedestrians and connectivity to bus stop on north side of street
1: Adams Avenue Walkability Improvements (Terrace Drive to 42nd Street) Objective
Encourage more pedestrian trips by enhancing the walking environment
Improve pedestrian visibility and decrease vehicle turning speeds Improve visibility of pedestrians and connectivity to bus stop on north side of street
Reduce pedestrian crossing distance and decrease vehicle turning speeds
Reduce pedestrian crossing distance and decrease vehicle turning speeds Improve visibility of pedestrians and connectivity to bus stop on north side of street
Est. Cost
Encourage more pedestrian trips by
$350
pedestrian visibility
vehicle turning
$80
Improve visibility of pedestrians and connectivity to bus stop on north side
$18
Reduce pedestrian crossing distance
vehicle turning
$80
Reduce pedestrian crossing distance
vehicle turning
$30
Improve visibility of pedestrians and connectivity to bus stop on north side
$12,100
$590
Est. Cost
350,000
80,000
18,250
80,000
30,000
12,100
590,900
Improvement Area KTEl Cajon Boulevard Corridor Mobility Study (41 Purpose & Need:This segment of El Cajon Boulevard has a posted speed limit of 35 mph with average daily traffic ranging from 30,000 to 33,000 vehicles per day. There is also a 25 mph school zone at 44High School. Short street blocks, high density land use and frequent transit stops support high levels of pedestrian activity along this corridor. A frequent occurrence of midlack of pedestrian connectivity at intintersections are unsignalized and lack marked crosswalks, making crossing this wide, highstreet difficult. Key pedestrian issues include improving path of travel, improving access to transit, and improving safety at intersections. A Corridor Mobility Study is recommended for this improvement area to determine potential multimodal improvements for El Cajon Boulevard. To address immediate walkability concerns, improvements at Euclid Avenue and at 50th Street RecommenPrepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Cajon Boulevard / 50should be walkability issues. The table below provides potential improvements that should be considered in the near term.
Improvement Area KTEl Cajon Boulevard Corridor Mobility Study (41
Purpose & Need: This segment of El Cajon Boulevard has a posted speed limit of 35 mph with average daily traffic ranging from 30,000 to 33,000 vehicles per day. There is also a 25 mph school zone at 44High School. Short street blocks, high density land use and frequent transit stops support high levels of pedestrian activity along this corridor. A frequent occurrence of mid-block jaywalking demonstrates the lack of pedestrian connectivity at intintersections are unsignalized and lack marked crosswalks, making crossing this wide, highstreet difficult. Key pedestrian issues include improving path of travel, improving access to transit, and improving safety at intersections. A Corridor Mobility Study is recommended for this improvement area to determine potential multimodal improvements for El Cajon Boulevard. To address immediate walkability concerns, improvements at Euclid Avenue and
Street are recommended.
ecommendations: Prepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Cajon Boulevard / 50should be implementwalkability issues. The table below provides potential improvements that should be considered in the near term.
Improvement Area KT-2:El Cajon Boulevard Corridor Mobility Study (41
This segment of El Cajon Boulevard has a posted speed limit of 35 mph with average daily traffic ranging from 30,000 to 33,000 vehicles per day. There is also a 25 mph school zone at 44th Street for HerbertHigh School. Short street blocks, high density land use and frequent transit stops support high levels of pedestrian activity along this corridor. A frequent
block jaywalking demonstrates the lack of pedestrian connectivity at intintersections are unsignalized and lack marked crosswalks, making crossing this wide, highstreet difficult. Key pedestrian issues include improving path of travel, improving access to transit, and improving safety at intersections. A Corridor Mobility Study is recommended for this improvement area to determine potential multimodal improvements for El Cajon Boulevard. To address immediate walkability concerns, improvements at Euclid Avenue and
recommended.
Prepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Cajon Boulevard / 50
implemented in advance of the Corridor Mobility Study to address existing safety and walkability issues. The table below provides potential improvements that should be considered in the
Page | KT
2: El Cajon Boulevard Corridor Mobility Study (41st
This segment of El Cajon Boulevard has a posted speed limit of 35 mph with average daily traffic ranging from 30,000 to 33,000 vehicles per day. There is also a 25
Street for Herbert Hoover High School. Short street blocks, high density land use and frequent transit stops support high levels of pedestrian activity along this corridor. A frequent
block jaywalking demonstrates the lack of pedestrian connectivity at intersections. Many intersections are unsignalized and lack marked crosswalks, making crossing this wide, highstreet difficult. Key pedestrian issues include improving path of travel, improving access to transit, and improving safety at intersections. A Corridor Mobility Study is recommended for this improvement area to determine potential multimodal improvements for El Cajon Boulevard. To address immediate walkability concerns, improvements at Euclid Avenue and
Prepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Cajon Boulevard / 50
ed in advance of the Corridor Mobility Study to address existing safety and walkability issues. The table below provides potential improvements that should be considered in the
Page | KT-17
Street to Marcellena Road)
This segment of El Cajon Boulevard has a posted speed limit of 35 mph with average daily traffic ranging from 30,000 to 33,000 vehicles per day. There is also a 25
Hoover High School. Short street blocks, high density land use and frequent transit stops support high levels of pedestrian activity along this corridor. A frequent
block jaywalking demonstrates the ersections. Many
intersections are unsignalized and lack marked crosswalks, making crossing this wide, high-speed street difficult. Key pedestrian issues include improving path of travel, improving access to transit, and improving safety at intersections. A Corridor Mobility Study is recommended for this improvement area to determine potential multimodal improvements for El Cajon Boulevard. To address immediate walkability concerns, improvements at Euclid Avenue and
Prepare a comprehensive Corridor Mobility Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Cajon Boulevard / 50
ed in advance of the Corridor Mobility Study to address existing safety and walkability issues. The table below provides potential improvements that should be considered in the
El Cajon Blvd at
Street to Marcellena Road)
Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Cajon Boulevard / 50
ed in advance of the Corridor Mobility Study to address existing safety and walkability issues. The table below provides potential improvements that should be considered in the
El Cajon Blvd at 50intersection with bus stop
El Cajon Blvd at Euclid
Street to Marcellena Road)
Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Cajon Boulevard / 50
ed in advance of the Corridor Mobility Study to address existing safety and walkability issues. The table below provides potential improvements that should be considered in the
El Cajon Blvd at 50th Street intersection with bus stop
Euclid – unprotected left turns
City of San Diego
Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular circulation. Improvements at El Cajon Boulevard / Euclid Avenue and at El Cajon Boulevard / 50th Stre
ed in advance of the Corridor Mobility Study to address existing safety and walkability issues. The table below provides potential improvements that should be considered in the
Street – uncontrolled intersection with bus stop
unprotected left turns
City of San Diego
Study that addresses pedestrian access (including access to transit), bicycle facilities, and vehicular Street
ed in advance of the Corridor Mobility Study to address existing safety and walkability issues. The table below provides potential improvements that should be considered in the
uncontrolled
unprotected left turns
Kensington/Talmadge Area
Table KT-Location
El Cajon Boulevard (41Street to Marcellena Road) Intersection IEl Cajon Boulevard / Euclid Avenue
El Cajon Boulevard / 50Street
TOTAL ESTIMATED COST(1) A = Access
C = Connectivity
Kensington/Talmadge Area
2: El Cajon Boulevard Location
El Cajon Boulevard (41st Street to Marcellena
Intersection Improvements:El Cajon Boulevard / Euclid Avenue
El Cajon Boulevard / 50th
TOTAL ESTIMATED COSTA = Access C = Connectivity
Kensington/Talmadge Area Pedestrian Plan
El Cajon Boulevard Corridor Mobility Study (41
1) Conduct Study
mprovements: 2) Replace existing pedestrian
heads with countdown timers
3) Implementnortheast and southwest corner of intersection on Euclid Avenuecompliant curb ramps
4) Evaluate the feasibility of installing a protected left turn phase on all approaches
th 5) Evaluate feasibility of eliminating westbound left turn at 50pedestrian refuge with an enhanced marked crosswalk on the east leg. Continue median to the west with a left turn pocket on west leg.
6) Implementall corners of intersection on El Cajon Blvdcompliant curb ramps
TOTAL ESTIMATED COST S = Safety
W = Walkability
Pedestrian Plan
Page | KT
Corridor Mobility Study (41Description
Conduct Corridor Mobility Study
Replace existing pedestrian heads with countdown timers
Implement curb extensions on northeast and southwest corner of intersection on Euclid Avenue with ADA compliant curb rampsEvaluate the feasibility of installing a protected left turn phase on all approaches
Evaluate feasibility of eliminating westbound left turn at 50th to accommodate a pedestrian refuge with an enhanced marked crosswalk on the east leg. Continue median to the west with a left turn pocket on west leg.Implement curb extensions at all corners of intersection on El Cajon Blvd with ADA compliant curb ramps
W = Walkability
Pedestrian Plan
Page | KT-18
Corridor Mobility Study (41st
Corridor Mobility
Replace existing pedestrian heads with countdown timers
curb extensions on northeast and southwest corner of intersection on
with ADA compliant curb ramps Evaluate the feasibility of installing a protected left turn phase on all approaches
Evaluate feasibility of eliminating westbound left
to accommodate a pedestrian refuge with an enhanced marked crosswalk on the east leg. Continue median to the west with a left turn pocket on west leg.
curb extensions at all corners of intersection on
with ADA compliant curb ramps
st Street to Marcellena Road)Goal (1) W, A, S, C
Address multimodal issues along the corridor
S Discourage pedestrians from crossing at end of phase
S,W Decrease vehicle turning speed, improve pedestrian visibility, and reduce crossing distance
S, W Reduce pedestrianvehicle conflicts and reduce cuttraffic on Aldine Dr.
A, S Reduce pedestrianvehicle conflicts create safe access to transit across El Cajon Blvd
S, W Decrease pedestrian crossing distance and improve pedestrian visibility
Street to Marcellena Road)Objective
Address multimodal issues along the corridor
Discourage pedestrians from crossing at end of phase Decrease vehicle turning speed, improve pedestrian visibility, and reduce crossing distance Reduce pedestrianvehicle conflicts and reduce cut-through traffic on Aldine Dr.Reduce pedestrianvehicle conflicts and create safe access to transit across El Cajon Blvd
Decrease pedestrian crossing distance and improve pedestrian visibility
Street to Marcellena Road) Est. Cost
Address multimodal $350,000
$24
improve pedestrian visibility, and reduce
$57
Reduce pedestrian-vehicle conflicts and
through traffic on Aldine Dr.
$2
Reduce pedestrian-and
create safe access to
$50
Decrease pedestrian crossing distance and improve pedestrian
$57
$548
Est. Cost $350,000
24,000
57,000
2,500
50,000
57,000
548,500
Improvement Area KTEl Cajon Boulevard / Central Avenue Intersection Improvements Purpose & Need:Central Avenue is located ramp for the northbound Ithe northeast corner of the intersection in order to enter the on-ramp, but first have to cross the Central Avenue intersection. The for pedestrians to cross due to the width of the intersection, vehicle turning speed and uncertainty in vehicular paths of travel (IPedestrians cross at this location to access the El Cajon Boulevard transit staCentral Avenue, and to access businesses on El Cajon Boulevard. Vehicles also use Central Avenue as a cutthrough route adding unnecessary vehicular volume to the street. The SR-15 implementintersection for the implementation of a future BRT station on the freeway overpass. recommended Plan are consistent with or supplement the improvements proposed by the BRT project at this intersection. RecommendImplementon-ramp. Improvements will also potential improvements that should be considered.
Table KT-
Improvement Area KTEl Cajon Boulevard / Central Avenue Intersection Improvements
Purpose & Need: entral Avenue is located
ramp for the northbound Ithe northeast corner of the intersection in order to enter
ramp, but first have to cross the Central Avenue intersection. The north legfor pedestrians to cross due to the width of the intersection, vehicle turning speed and uncertainty in vehicular paths of travel (IPedestrians cross at this location to access the El Cajon Boulevard transit staCentral Avenue, and to access businesses on El Cajon Boulevard. Vehicles also use Central Avenue as a cutthrough route adding unnecessary vehicular volume to the street.
15 Mid-City implement improvements at this intersection for the implementation of a future BRT station on the freeway overpass. The proposed
ended in the Pedestrian Master are consistent with or supplement
the improvements proposed by the BRT project at this intersection.
ecommendations: Implement improvements that address driver awareness
. Improvements will also potential improvements that should be considered.
3: El Cajon Boulevard / Central Avenue Intersection Improvements
Improvement Area KT-3:El Cajon Boulevard / Central Avenue Intersection Improvements
entral Avenue is located directly adjacent to the onramp for the northbound I-15. Vehicles accelerate around the northeast corner of the intersection in order to enter
ramp, but first have to cross the Central Avenue north leg of the inter
for pedestrians to cross due to the width of the intersection, vehicle turning speed and uncertainty in vehicular paths of travel (I-15 or Central Avenue). Pedestrians cross at this location to access the El Cajon Boulevard transit station, access parked vehicles on Central Avenue, and to access businesses on El Cajon Boulevard. Vehicles also use Central Avenue as a cutthrough route adding unnecessary vehicular volume to
City BRT Project will improvements at this
intersection for the implementation of a future BRT station on the freeway
proposed improvements in the Pedestrian Master
are consistent with or supplement the improvements proposed by the BRT project at this intersection.
improvements that address driver awareness. Improvements will also
potential improvements that should be considered.
3: El Cajon Boulevard / Central Avenue Intersection Improvements
Page | KT
3: El Cajon Boulevard / Central Avenue Intersection Improvements
directly adjacent to the on15. Vehicles accelerate around
the northeast corner of the intersection in order to enter ramp, but first have to cross the Central Avenue
of the intersection is difficult for pedestrians to cross due to the width of the intersection, vehicle turning speed and uncertainty in
15 or Central Avenue). Pedestrians cross at this location to access the El Cajon
tion, access parked vehicles on Central Avenue, and to access businesses on El Cajon Boulevard. Vehicles also use Central Avenue as a cutthrough route adding unnecessary vehicular volume to
Project will improvements at this
intersection for the implementation of a future BRT station on the freeway
improvements in the Pedestrian Master
are consistent with or supplement the improvements proposed by the BRT
improvements that address driver awareness. Improvements will also reduce pedestrian crossing distance
potential improvements that should be considered.
3: El Cajon Boulevard / Central Avenue Intersection Improvements
Page | KT-19
El Cajon Boulevard / Central Avenue Intersection Improvements
directly adjacent to the on-15. Vehicles accelerate around
the northeast corner of the intersection in order to enter ramp, but first have to cross the Central Avenue
section is difficult for pedestrians to cross due to the width of the intersection, vehicle turning speed and uncertainty in
15 or Central Avenue). Pedestrians cross at this location to access the El Cajon
tion, access parked vehicles on Central Avenue, and to access businesses on El Cajon Boulevard. Vehicles also use Central Avenue as a cut-through route adding unnecessary vehicular volume to
improvements that address driver awareness of pedestrians and improvereduce pedestrian crossing distance
potential improvements that should be considered.
3: El Cajon Boulevard / Central Avenue Intersection Improvements
Entrance to I
El Cajon Boulevard / Central Avenue Intersection Improvements
of pedestrians and improvereduce pedestrian crossing distance
3: El Cajon Boulevard / Central Avenue Intersection Improvements
Entrance to I-15 NB on-ramp
Central Avenue
of pedestrians and improve reduce pedestrian crossing distance. The table below provides
3: El Cajon Boulevard / Central Avenue Intersection Improvements
Central Avenue
ramp – at Central Avenue
Central Avenue at El Cajon Blvd
City of San Diego
visibility near I. The table below provides
Central Avenue
at Central Avenue
at El Cajon Blvd
City of San Diego
visibility near I-15 . The table below provides
Central Avenue
Kensington/Talmadge Area
El Cajon Boulevard at Central Avenue
TOTAL ESTIMATED COST(1) A = Access
C = Connectivity
Kensington/Talmadge Area
Location El Cajon Boulevard at Central
TOTAL ESTIMATED COSTA = Access C = Connectivity
Kensington/Talmadge Area Pedestrian Plan
El Cajon Boulevard at Central 1)
2)
3)
TOTAL ESTIMATED COST S = Safety
W = Walkability
Pedestrian Plan
Page | KT
Description1) Implement
extension on northeast corner of intersectionwith ADA compliant curb ramps
2) Implement island south of barrier wall on west street
3) Paint crosswalk on west leg of intersection and extend existing median to crosswalk(Included in the MidCity BRT improvement)
W = Walkability
Pedestrian Plan
Page | KT-20
Description curb
extension on northeast corner of intersection with ADA compliant curb ramps
median island south of barrier wall on west side of
Paint crosswalk on west leg of intersection and extend existing median to crosswalk
in the Mid-City BRT improvement)
Goal (1) S Decrease vehicle
turning speed and discourage cutthrough traffic
S Create better buffer from freeway onand decrease vehicle speed
A, W Provide access to and from future BRT Station per 15 BRT Projectrecommended improvements
Objective Decrease vehicle turning speed and discourage cut-through traffic
Create better buffer from freeway on-ramp and decrease vehicle turning speed Provide access to and from future BRT Station per I-15 BRT Project recommended improvements
Est. CostDecrease vehicle turning speed and
$21
ramp
$8
Provide access to
-
$9
$38
Est. Cost 21,000
8,000
9,000
38,000
Exit to Fairmount Avenue
Improvement Area KTAldine Drive Connectivity Improvements Purpose & Need:Aldine Boulevard is a twolimit of 25 mph. The community has expressed multiple concerns related to walkability along this road. Pedestrians on Aldine Drive incomplete sidewalks along the corridor. There are no marked crosswalks at the merge with Fairmount Avenue to the north or Monroe Avenue to the south. Highuncontrolled rigconditions. There is also a lack of street lights along the corridor. This project would reduce traffic speeds along the corridor as well as improve pedestrian connectivity.
RecommendImprove connectisurvey to identify 85th percentile speed and identify potential traffic calming measures to reduce speeds to 25 Table KT-
LocationAldine Drive (Long Term)
Aldine Drive (Short Term)
TOTAL ESTIMATED COST(1) A = Access
C = Connectivity
to Fairmount Avenue
Improvement Area KTAldine Drive Connectivity Improvements
Purpose & Need: Aldine Boulevard is a twolimit of 25 mph. The community has expressed multiple concerns related to walkability along this road. Pedestrians on
Drive walk along the shoulder of the road due to incomplete sidewalks along the corridor. There are no marked crosswalks at the merge with Fairmount Avenue to the north or Monroe Avenue to the south. Highuncontrolled right turning vehicles result in difficult crossing conditions. There is also a lack of street lights along the corridor. This project would reduce traffic speeds along the corridor as well as improve pedestrian connectivity.
ecommendations: Improve connectivity between Kensington and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce speeds to 25 mph. The table below summarizes the potential improvements.
4: Aldine Drive Connectivity ImprovementsLocation
Aldine Drive (Long Term)
1) Assess feasibility of multithe corridor
Aldine Drive (Short Term)
2) Conduct speed survey 3) Install additional street lights along
the corridor4) Develop traffic calming
reduce traffic speeds
TOTAL ESTIMATED COSTA = Access C = Connectivity
to Fairmount Avenue – no pedestrian crossings
Improvement Area KT-4:Aldine Drive Connectivity Improvements
Aldine Boulevard is a two-lane Collector with a posted speed limit of 25 mph. The community has expressed multiple concerns related to walkability along this road. Pedestrians on
walk along the shoulder of the road due to incomplete sidewalks along the corridor. There are no marked crosswalks at the merge with Fairmount Avenue to the north or Monroe Avenue to the south. High
ht turning vehicles result in difficult crossing conditions. There is also a lack of street lights along the corridor. This project would reduce traffic speeds along the corridor as well as improve pedestrian connectivity.
vity between Kensington and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce
The table below summarizes the potential improvements.
4: Aldine Drive Connectivity ImprovementsDescription
Assess feasibility of multi-use path along the east side of the corridor Conduct speed survey Install additional street lights along the corridor Develop traffic calming reduce traffic speeds
TOTAL ESTIMATED COST S = Safety
W = Walkability
Page | KT
no pedestrian crossings
4: Aldine Drive Connectivity Improvements
lane Collector with a posted speed limit of 25 mph. The community has expressed multiple concerns related to walkability along this road. Pedestrians on
walk along the shoulder of the road due to incomplete sidewalks along the corridor. There are no marked crosswalks at the merge with Fairmount Avenue to the north or Monroe Avenue to the south. High-speed traffic and
ht turning vehicles result in difficult crossing conditions. There is also a lack of street lights along the corridor. This project would reduce traffic speeds along the corridor as well as improve pedestrian connectivity.
vity between Kensington and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce
The table below summarizes the potential improvements.
4: Aldine Drive Connectivity ImprovementsDescription
Assess feasibility of implementuse path along the east side of
Conduct speed survey Install additional street lights along
Develop traffic calming plan to reduce traffic speeds
W = Walkability
Page | KT-21
no pedestrian crossings
lane Collector with a posted speed limit of 25 mph. The community has expressed multiple concerns related to walkability along this road. Pedestrians on
walk along the shoulder of the road due to incomplete sidewalks along the corridor. There are no marked crosswalks at the merge with Fairmount Avenue to the north
speed traffic and ht turning vehicles result in difficult crossing
conditions. There is also a lack of street lights along the corridor. This project would reduce traffic speeds along the corridor as well as improve pedestrian connectivity.
vity between Kensington and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce
The table below summarizes the potential improvements.
4: Aldine Drive Connectivity Improvements Goal
implementing use path along the east side of
C
SInstall additional street lights along S
plan to S,W
Aldine Drive / Monroe Avenue Merge
Aldine Drive
lane Collector with a posted speed limit of 25 mph. The community has expressed multiple concerns related to walkability along this road. Pedestrians on
walk along the shoulder of the road due to incomplete sidewalks along the corridor. There are no marked crosswalks at the merge with Fairmount Avenue to the north
speed traffic and ht turning vehicles result in difficult crossing
conditions. There is also a lack of street lights along the corridor. This project would reduce traffic speeds along the
vity between Kensington and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce
The table below summarizes the potential improvements.
Goal (1) C Provide missing sidewalk link
connect from Monroe Avenue
S Determine existing travel speedS Improve visibility of pedestrians
S,W Identify measures (horizontal or vertical) to maintain 25 mph travel speed
Aldine Drive / Monroe Avenue Merge
Aldine Drive – no sidewalks
vity between Kensington and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce
The table below summarizes the potential improvements.
Objective Provide missing sidewalk link connect from Monroe Avenue
Determine existing travel speedImprove visibility of pedestrians
Identify measures (horizontal or vertical) to maintain 25 mph travel speed
City of San Diego
Aldine Drive / Monroe Avenue Merge
no sidewalks
vity between Kensington and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce
Provide missing sidewalk link to connect from Monroe Avenue
Determine existing travel speed Improve visibility of pedestrians
Identify measures (horizontal or vertical) to maintain 25 mph
City of San Diego
Aldine Drive / Monroe Avenue Merge
vity between Kensington and Talmadge and to trolley stations to north. Conduct speed survey to identify 85th percentile speed and identify potential traffic calming measures to reduce
Est. Cost $350,000
$7,500 $36,000
$20,000
$413,500
Kensington/Talmadge Area
Improvement Area KTFairmount Avenue Purpose & Need:Fairmount Avenuestriped median and a posted speed limit of 55 mph. There are grade separated interchanges at Montezuma Road and Aldine Drive. MTS transit Routes 11 and 13 travel along Fairmount Avenue with stops at Talmadge Canyon Row, Meadeand Camino del Rio South. There are no sidewalks along either side of Fairmont Avenue, except for short segments near the bus stops and from Talmadge Canyon Row to Montezuma Row. There are no sidewalk connections along the corridor from Meade Avenualso missing connections between Aldine Drive and Fairmount Avenue. This project would provide pedestrian connectivity along this corridor, including completion of sidewalk to provide connections to the commercial areas stops located along the corridor. RecommendationsComplete pedestrian connection from Talmadge Canyon to Meade by side of Fairmount Ave.additional improvements that should be considered.
Kensington/Talmadge Area
Improvement Area KTFairmount Avenue Connectivity Improvements
Purpose & Need: Fairmount Avenue is a fourstriped median and a posted speed limit of 55 mph. There are grade separated interchanges at Montezuma Road and Aldine Drive. MTS transit Routes 11 and 13 travel along Fairmount Avenue with stops at Talmadge Canyon Row, Meadeand Camino del Rio South. There are no sidewalks along either side of Fairmont Avenue, except for short segments near the bus stops and from Talmadge Canyon Row to Montezuma Row. There are no sidewalk connections along the corridor from Meade Avenue to Talmadge Canyon Row. There are also missing connections between Aldine Drive and Fairmount Avenue. This project would provide pedestrian connectivity along this corridor, including completion of sidewalk to provide connections to the commercial areas on Meade Avenue and the bus stops located along the corridor.
Recommendations: Complete pedestrian connection from Talmadge Canyon to Meade by implement
f Fairmount Ave.additional improvements that should be considered.
Kensington/Talmadge Area Pedestrian Plan
Improvement Area KT-5:Connectivity Improvements
is a four-lane roadway with a striped median and a posted speed limit of 55 mph. There are grade separated interchanges at Montezuma Road and Aldine Drive. MTS transit Routes 11 and 13 travel along Fairmount Avenue with stops at Talmadge Canyon Row, Meadeand Camino del Rio South. There are no sidewalks along either side of Fairmont Avenue, except for short segments near the bus stops and from Talmadge Canyon Row to Montezuma Row. There are no sidewalk connections along the corridor from
e to Talmadge Canyon Row. There are also missing connections between Aldine Drive and Fairmount Avenue. This project would provide pedestrian connectivity along this corridor, including completion of sidewalk to provide connections to
on Meade Avenue and the bus stops located along the corridor.
Complete pedestrian connection from Talmadge implementing sidewalk on east
f Fairmount Ave. The table below provides additional improvements that should be considered.
Pedestrian Plan
Page | KT
5: Connectivity Improvements
lane roadway with a striped median and a posted speed limit of 55 mph. There are grade separated interchanges at Montezuma Road and Aldine Drive. MTS transit Routes 11 and 13 travel along Fairmount Avenue with stops at Talmadge Canyon Row, Meade Street and Camino del Rio South. There are no sidewalks along either side of Fairmont Avenue, except for short segments near the bus stops and from Talmadge Canyon Row to Montezuma Row. There are no sidewalk connections along the corridor from
e to Talmadge Canyon Row. There are also missing connections between Aldine Drive and Fairmount Avenue. This project would provide pedestrian connectivity along this corridor, including completion of sidewalk to provide connections to
on Meade Avenue and the bus
Complete pedestrian connection from Talmadge ing sidewalk on east
The table below provides additional improvements that should be considered.
Pedestrian Plan
Page | KT-22
Northbound Fairmount Avenue just north of Meade
Fairmount Avenue (grade issues?)
Northbound Fairmount Avenue sidewalk north of Aldine Drive on
lane roadway with a striped median and a posted speed limit of 55 mph. There are grade separated interchanges at Montezuma Road and Aldine Drive. MTS transit Routes 11 and 13 travel along Fairmount Avenue
Street and Camino del Rio South. There are no sidewalks along either side of Fairmont Avenue, except for short segments near the bus stops and from Talmadge Canyon Row to Montezuma Row. There are no sidewalk connections along the corridor from
e to Talmadge Canyon Row. There are also missing connections between Aldine Drive and Fairmount Avenue. This project would provide pedestrian connectivity along this corridor, including completion of sidewalk to provide connections to
on Meade Avenue and the bus
Complete pedestrian connection from Talmadge ing sidewalk on east
The table below provides additional improvements that should be considered.
Northbound Fairmount Avenue just north of Meade
Fairmount Avenue (grade issues?)
Northbound Fairmount Avenue sidewalk north of Aldine Drive on
Northbound Fairmount Avenue just north of Meade
Fairmount Avenue – no sidewalks on either side (grade issues?)
Northbound Fairmount Avenue sidewalk north of Aldine Drive on
Northbound Fairmount Avenue – sidewalk ends
no sidewalks on either side
Northbound Fairmount Avenue – discontinuous sidewalk north of Aldine Drive on-ramp
sidewalk ends
no sidewalks on either side
discontinuous ramp
Table KT-
Fairmount Avenue
Fairmount Avenue / Aldine Drive
TOTAL ESTIMATED COST(1) A = Access
C = Connectivity
5: Fairmount Avenue Connectivity ImprovementsLocation
Fairmount Avenue
Fairmount Avenue / Aldine Drive
TOTAL ESTIMATED COSTA = Access C = Connectivity
5: Fairmount Avenue Connectivity Improvements
1)
2)
3)
Fairmount Avenue / Aldine Drive 4)
5)
TOTAL ESTIMATED COST S = Safety
W = Walkability
Page | KT
5: Fairmount Avenue Connectivity ImprovementsDescription
1) Evaluate the feasibility of implementsidewalk on east side of corridor from Meade Avenue to Aldine Drive
2) Install street lighting along new sidewalk
3) Install ADA curb ramps at all intersections
4) Assess feasibility of implementing anenhanced crosswalk across Aldine Drive onramp with pedestrian signal
5) Evaluate the feasibility of extending theproposed multiuse path on Aldine Drive north along the onramp to the existing sidewalk on Fairmount Avenue
W = Walkability
Page | KT-23
5: Fairmount Avenue Connectivity Improvements Description
Evaluate the feasibility implementing a 5’
sidewalk on east side of corridor from Meade Avenue to Aldine Drive Install street lighting along new sidewalk
compliant curb ramps at all intersections Assess feasibility of
ing an enhanced crosswalk across Aldine Drive on-ramp with pedestrian
Evaluate the feasibility of extending the
multiuse on Aldine Drive
north along the on-ramp to the existing sidewalk on Fairmount
Goal (1)
C Provide pedestrian connection
S, W Provide for safe walking environment
A, W Provide access for all users
C, S Provide connection between sidewalk and Aldine Drive
C, W Provide connection between Aldine Drive and stop on Fairmount Avenue
Objective Provide pedestrian connection
Provide for safe walking environment Provide access for all users
Provide connection between proposed sidewalk and Aldine Drive
Provide connection between Aldine Drive and the bus stop on Fairmount Avenue
City of San Diego
Est. CostProvide pedestrian $350
$60
Provide access for $6
Provide connection proposed
$18
Provide connection
the bus stop on Fairmount
$50
$484
City of San Diego
Est. Cost 350,000
60,000
6,000
18,250
50,000
484,250
Kensington/Talmadge Area
Improvement Area KTMonroe Avenue / Euclid Avenue Intersection Improvements Purpose & Need:Monroe Avenue is Improvement Program projectblind spots, congestion, and speeding. According to the Planning Group, walkabilflooding and sheeting of water during rainstorms resulting in pedestrian safety concerns. This segment of Monroe Avenue is also an important pedestrian connection for surrounding residents to the future YMCA located at Fairmount Avenue /will likely increase following construction of the YMCAdistances, with high vehicular speeds, and fmodifications to intersection geometries to reduce crossing distances, and enhanced marked crosswalks to improve connectivity and safety for pedestrians. Recommendations:
Implementcreating buffers from vehicles. Improve access at intersection by evaluating realignments crosswalks.
Table KT-
Monroe Avenue / Euclid Avenue
TOTAL ESTIMATED COST(1) A = Access
C = Connectivity
Kensington/Talmadge Area
Improvement Area KTMonroe Avenue / Euclid Avenue Intersection Improvements
Purpose & Need: Monroe Avenue is identified in the Kensington Talmadge Planning Group’s list of 2014 Capital Improvement Program projectblind spots, congestion, and speeding. According to the Planning Group, walkabilflooding and sheeting of water during rainstorms resulting in pedestrian safety concerns. This segment of Monroe Avenue is also an important pedestrian connection for surrounding residents to the future YMCA located at Fairmount Avenue /will likely increase following construction of the YMCAdistances, with high vehicular speeds, and fmodifications to intersection geometries to reduce crossing distances, and enhanced marked crosswalks to improve connectivity and safety for pedestrians.
Recommendations:
Implement improvementcreating buffers from vehicles. Improve access at intersection by evaluating realignments crosswalks. The table below provides potential improvements that should be co
6: Monroe Avenue / Euclid Avenue Intersection ImprovementsLocation
Monroe Avenue / Euclid
TOTAL ESTIMATED COSTA = Access C = Connectivity
Kensington/Talmadge Area Pedestrian Plan
Improvement Area KT-6:Monroe Avenue / Euclid Avenue Intersection Improvements
identified in the Kensington Talmadge Planning Group’s list of 2014 Capital Improvement Program project requestsblind spots, congestion, and speeding. According to the Planning Group, walkabilflooding and sheeting of water during rainstorms resulting in pedestrian safety concerns. This segment of Monroe Avenue is also an important pedestrian connection for surrounding residents to the future YMCA located at Fairmount Avenue /will likely increase following construction of the YMCAdistances, with high vehicular speeds, and fmodifications to intersection geometries to reduce crossing distances, and enhanced marked crosswalks to improve connectivity and safety for pedestrians.
improvements that will enhance creating buffers from vehicles. Improve access at intersection by evaluating realignments
The table below provides potential improvements that should be co
6: Monroe Avenue / Euclid Avenue Intersection Improvements
Monroe Avenue / Euclid 1) Evaluate opportunities to realign intersection to reduce crossing distance
2) Implementnortheast and southwest cornerscurb ramps
3) Restripe align with legs of intersections and proposed curb extensions
TOTAL ESTIMATED COST S = Safety
W = Walkability
Pedestrian Plan
Page | KT
6: Monroe Avenue / Euclid Avenue Intersection Improvements
identified in the Kensington Talmadge Planning Group’s list of 2014 Capital requests. It is referenced as an area of recurring accidents caused by
blind spots, congestion, and speeding. According to the Planning Group, walkabilflooding and sheeting of water during rainstorms resulting in pedestrian safety concerns. This segment of Monroe Avenue is also an important pedestrian connection for surrounding residents to the future YMCA located at Fairmount Avenue / Meade Street. will likely increase following construction of the YMCAdistances, with high vehicular speeds, and few gaps in traffic. Improvements in this area include modifications to intersection geometries to reduce crossing distances, and enhanced marked crosswalks to improve connectivity and safety for pedestrians.
s that will enhance creating buffers from vehicles. Improve access at intersection by evaluating realignments
The table below provides potential improvements that should be co
6: Monroe Avenue / Euclid Avenue Intersection ImprovementsDescription
Evaluate opportunities to realign intersection to reduce crossing distanceImplement curb extensions on northeast and southwest corners with ADA compliant curb ramps
Restripe marked align with legs of intersections and proposed curb extensions
Walkability
Pedestrian Plan
Page | KT-24
Monroe Avenue / Euclid Avenue Intersection Improvements
identified in the Kensington Talmadge Planning Group’s list of 2014 Capital . It is referenced as an area of recurring accidents caused by
blind spots, congestion, and speeding. According to the Planning Group, walkabilflooding and sheeting of water during rainstorms resulting in pedestrian safety concerns. This segment of Monroe Avenue is also an important pedestrian connection for surrounding residents to the future
Meade Street. Adult and child will likely increase following construction of the YMCA.. Intersections in this area have long crossing
ew gaps in traffic. Improvements in this area include modifications to intersection geometries to reduce crossing distances, and enhanced marked crosswalks to improve connectivity and safety for pedestrians.
s that will enhance pedestrian safety by reducing crossing distances and creating buffers from vehicles. Improve access at intersection by evaluating realignments
The table below provides potential improvements that should be co
6: Monroe Avenue / Euclid Avenue Intersection ImprovementsDescription
Evaluate opportunities to realign intersection to reduce crossing distance
curb extensions on northeast and southwest
with ADA compliant
marked crosswalks to align with legs of intersections and proposed curb extensions
identified in the Kensington Talmadge Planning Group’s list of 2014 Capital . It is referenced as an area of recurring accidents caused by
blind spots, congestion, and speeding. According to the Planning Group, walkabilflooding and sheeting of water during rainstorms resulting in pedestrian safety concerns. This segment of Monroe Avenue is also an important pedestrian connection for surrounding residents to the future
Adult and child pedestrian . Intersections in this area have long crossing
ew gaps in traffic. Improvements in this area include modifications to intersection geometries to reduce crossing distances, and enhanced marked crosswalks
pedestrian safety by reducing crossing distances and creating buffers from vehicles. Improve access at intersection by evaluating realignments
The table below provides potential improvements that should be co
6: Monroe Avenue / Euclid Avenue Intersection ImprovementsGoal (1)
A, S Reduce crossingat this skewed intersection
S Reduce pedestrian crossing distance, improve visibility of pedestrians and reduce vehicle turning speeds
S, W Straighten to reduce crossing distances and improve visibility
identified in the Kensington Talmadge Planning Group’s list of 2014 Capital . It is referenced as an area of recurring accidents caused by
blind spots, congestion, and speeding. According to the Planning Group, walkability is impaired by flooding and sheeting of water during rainstorms resulting in pedestrian safety concerns. This segment of Monroe Avenue is also an important pedestrian connection for surrounding residents to the future
pedestrian activity along this route . Intersections in this area have long crossing
ew gaps in traffic. Improvements in this area include modifications to intersection geometries to reduce crossing distances, and enhanced marked crosswalks
pedestrian safety by reducing crossing distances and creating buffers from vehicles. Improve access at intersection by evaluating realignments
The table below provides potential improvements that should be considered.
6: Monroe Avenue / Euclid Avenue Intersection Improvements Objective
Reduce crossingat this skewed intersection
Reduce pedestrian crossing distance, improve visibility of pedestrians and reduce vehicle turning speeds
Straighten to reduce crossing distances and improve visibility
identified in the Kensington Talmadge Planning Group’s list of 2014 Capital . It is referenced as an area of recurring accidents caused by
ity is impaired by flooding and sheeting of water during rainstorms resulting in pedestrian safety concerns. This segment of Monroe Avenue is also an important pedestrian connection for surrounding residents to the future
activity along this route . Intersections in this area have long crossing
ew gaps in traffic. Improvements in this area include modifications to intersection geometries to reduce crossing distances, and enhanced marked crosswalks
pedestrian safety by reducing crossing distances and creating buffers from vehicles. Improve access at intersection by evaluating realignments and restriping
nsidered.
Objective Reduce crossing distances at this skewed intersection
Reduce pedestrian crossing distance, improve visibility of pedestrians and reduce vehicle turning speeds
Straighten to reduce crossing distances and improve visibility
identified in the Kensington Talmadge Planning Group’s list of 2014 Capital . It is referenced as an area of recurring accidents caused by
ity is impaired by flooding and sheeting of water during rainstorms resulting in pedestrian safety concerns. This segment of Monroe Avenue is also an important pedestrian connection for surrounding residents to the future
activity along this route . Intersections in this area have long crossing
ew gaps in traffic. Improvements in this area include modifications to intersection geometries to reduce crossing distances, and enhanced marked crosswalks
pedestrian safety by reducing crossing distances and and restriping
Est. Cost $50,000
$54,000
$3,000
$107,000