Upload
quinn-nielsen
View
23
Download
0
Embed Size (px)
DESCRIPTION
Kendall Area Supply. Presentation to NEPOOL Reliability Committee July 22, 2004. Kendall Area Load At Risk. Based on projected 2005 peak load conditions for Cambridge the following constraints exist: - PowerPoint PPT Presentation
Citation preview
Kendall Area Supply
Presentation to NEPOOL Reliability Committee
July 22, 2004
Kendall Area Load At Risk• Based on projected 2005 peak load conditions for
Cambridge the following constraints exist:– All lines in conditions require at least 25 MW of
generation to be running calling for two steam units to be dispatched
– N-1 conditions call for either dispatching a Jet or closing Mirant’s T43 115 kV tie
– N-1 + Generator out calls for both dispatching a Jet and closing Mirant’s T43 115 kV tie (see diagram)
• Conclusion is that two steam generating units as well as one jet generator are needed for system reliability until the new East Cambridge substation is in service
Cambridge Supply Concernsw/ Somerville Xfm Out and Loss of One Steam Unit