    ACTIVITY : KAMPUNG BOY. : 1 Hour

    INSTRUCTION : Facilitator explains how to make a campfire.

    1. Finding leaf / fiber / cotton as combustible materials.

    2. Finding and collecting twigs.

    3. Finding and collecting twigs with larger size.

    4.Finding and collecting dry branches.

    REGULATION : * Each group should make a medium campfire.

    *The bonfire was lit earlier then need to be able to burn a wood

    chopstick placed horizontally on top.

    * The first team to successfully burn the chopstick will be considered as winner.

    * Activity ends when the third winner is identified.

    EQUIPMENT : ~ Short wooden poles = 2. ( 2 x 15 groups = 30 )

    ~ Wooden chopstick = 2. ( 2 x 15 groups = 30 )Wooden chopstick~ Matches = 1 box. ( 1 x 15 groups = 15 )

    ~ Hammer to help fixing the wooden poles. = 3

    Wooden poles

    ACTIVITY : BIL AIR TERTUNGGAK'. : 1 Hour

    INSTRUCTION : Facilitator explains how the activities will be carried out.

    REGULATION : * Group members will line up in a long line from Point A (The water source) to Point B.

    *Each group will be given two pieces of PVC pipe with holes in both end.

    * Each group is asked to transfer the water from the water source to fill up the pail.

    thus extracting a ball that is in a bucket without using hands.

    * Use their own creativity, each group has to figure out a way to avoid

    water from spilling when moving from point A (The source) to Point B.

    * The first team to successfully released the ball from the bucket to be a winner.

    *Activity ends when the third winner is identified.

    EQUIPMENT : ~ Small pail = 1. ( 1 x 15 Groups = 15 )

    ~ Ping-pong ball = 1. ( 1 x 15 groups = 15 )

    ~ PVC pipe = 2. ( 2 x 15 groups = 30 ) Pipe length 30 cm.

    PVC pipe

    Point B

    Pail with ball

    KEMBARA SK BANDAR TUN HUSSEIN ONN

    ESTIMATED TIME

    ESTIMATED TIME

    Point A ( Water source )

    GROUPWORK

  • 7/31/2019 KEMBARA GROUPWORK ACTIVITIES.pdf

    2/4

    ACTIVITY : TITIAN KASIH' : 1 Hour

    INSTRUCTION : Facilitator explains how the activities will be carried out.

    REGULATION : * These activities require each participant in each group move from location A to B

    without stepping on the ground.

    *Each team will be supplied with 4 wooden bridge measuring 1 m. in length.

    * Hanya 3 kumpulan akan menjalankan aktiviti ini pada setiap sesi.

    * All three groups time will be taken by the facilitator.

    *If any of the band members fell from the bridge, then the entire group has to turn back

    to Location A again.

    *The group managed to get the fastest time will win the event.

    EQUIPMENT : ~ Wooden bridge = 4 ( 4 x 3 groups = 12 ) Wooden bridge length - 1 m.

    ~ Stopwatch = 3

    Wooden bridgePoint B

    ACTIVITY : TALIAN HAYAT' : 1 Hour

    INSTRUCTION : Facilitator explains how the activities will be carried out.

    REGULATION : * Each team will be given five strings which measures 3 m. in length each.

    * Without making any bond each group asked to remove a bucket from Location A to Location B.

    * Not a single member of the group is allowed to hold the bucket by hand.

    * Group that committed the offense turned back to location A.

    * Only three groups will conduct activities at each session.

    * All three groups time will be recorded by the facilitator's.

    *The group managed to get the fastest time will win the event.

    EQUIPMENT : ~ Rope = 5 ( 5 x 3 = 15 utas ) Rope length 3 m. each.

    ~ Pail = 3.

    ~ Stopwatch = 3.Point A Point B

    Point A

    ESTIMATED TIME

    ESTIMATED TIME

    KEMBARA SK BANDAR TUN HUSSEIN ONN

    GROUPWORK

  • 7/31/2019 KEMBARA GROUPWORK ACTIVITIES.pdf

    3/4

    ACTIVITY : MENARA IMPIAN'. : 1 hour 15 m

    INSTRUCTION : Facilitator explains how the activities will be carried out.

    REGULATION : * Each group is given a packet of straws & a roll of tape.

    * By using materials that are given above, each group must build

    a high tower in a timely manner.

    * The tower must be able to withstand the load of a soap loaf.

    * Successful teams which build the highest tower, and can accommodate loads

    mentioned above will be the winner.

    EQUIPMENT : ~ Straws = 15 packets.

    ~ Tape = 15 roles. Soap

    Tower

    ACTIVITY : BAHTERA MERDEKA'. : 1 Hour

    INSTRUCTION : Facilitator explains how the activities will be carried out.

    REGULATION : * Each group will be given a piece of polystyrene, double sided tape, 5 skewers & 5 rubber.

    * By using materials that are given above, each group must build

    ship / boat / boat capable of fast moving on the water surface.

    * Design / creation of each group will then be contested in a race.

    * The race will start at location A and ends at location B.

    * Design / creation which reach the finish line first will wins.

    EQUIPMENT : ~ Polystyrene = 15 pieces.

    ~ Skewers = ( 5 x 15 groups = 75 sticks.

    ~ Rubber band = ( 5 x 15 groups = 75 )

    ~ Double sided tape = 15 gulung.

    ~ Boundry tape = 1 role ( for the starting and finishing line )

    STARTING ENDS

    ESTIMATED TIME

    ESTIMATED TIME

    KEMBARA SK BANDAR TUN HUSSEIN ONN

    GROUPWORK

  • 7/31/2019 KEMBARA GROUPWORK ACTIVITIES.pdf

    4/4

    ACTIVITY : PENYU BERTELUR'. : 1 Hour

    INSTRUCTION : Facilitator explains how the activities will be carried out.

    REGULATION : * 5 people from the group will be given a PVC pipe that was splitinto half.

    * Each group will be given a ball ping-pong.

    * By balancing a ping-pong ball placed in the PVC pipes,

    each group must move the ping-pong ball from Location A to Location B.

    * If the ball is dropped, the group must return to location A.

    * Only three groups will conduct activities at each session.

    * All three groups time will be recorded by the facilitator's.

    *The group managed to get the fastest time will win the event.

    EQUIPMENT : ~ PVC pipe split in 2. ( 5 x 4 groups = 20 ) pipe length = 50 cm.

    ~ Ping-pong balls = 6 x 4 groups = 24.

    ~ Stopwatch = 4.

    Point A PVC pipe Ping-pong ball Point B

    ESTIMATED TIME

    KEMBARA SK BANDAR TUN HUSSEIN ONN

    GROUPWORK