Prepared by: Miko Aliño | ABS‐CBN Foundation, Inc. | 8 June 2012
Partner: Kapit Bisig Para Sa Ilog Pasig (ABS‐CBN Foundation, Inc.)
Activity: Building of Segregation Bins, Cleanup at Paco Market (Batch 1) Address: Paco Market Activity Center, Pedro Gil St. cor A. Linao St., Paco, Manila
Contact Information: Miko Aliño
4152272 local 3743; 09228456242; 09175447062
Jonald Balgos (on ground)
09155647480
Project Description: Kapit Bisig Para sa Ilog Pasig (KBPIP), a project of the ABS‐CBN Foundation,
Inc., is an organization of committed individuals dedicated to the
rehabilitation and transformation of the Pasig River. Realizing the
importance of first cleaning the various sources that flow into the Pasig
before taking on the main body of the river itself, KBPIP has been working
to rehabilitate
waterways
first,
starting
with
Estero
de
Paco
and
Estero
de
San Miguel. Part of the overhaul is the renovation of Paco Market, a 100‐
year‐old structure that also dumps wastewater and rubbish into Estero de
Paco. After the renovation, we, together with the vendors and other
stakeholders, strive to turn Paco Market into an environment‐friendly
model for modern‐day trade.
For this activity, students will be assigned to work on building segregation
bins for the Paco Market. Using recycled oil tin cans and wood, they will be
divided into 3‐4 groups to build a three‐bin segregation set with the labels
nabubulok , hindi nabubulok and residwal . The bins will be turned over to
the
market
housekeepers
that
help
maintain
cleanliness
in
the
area.
After building the segregation bins, students will join housekeepers in their
daily maintenance duties in the market. This range from collecting
segregated trash to sweeping floors.
Materials Needed:
For 4 sets of segregation
bins
2L Enamel Paint (Yellow)
1L Enamel Paint (Green)
1L Enamel Paint (Red)
Paintbrush 2”
Paintbrush 1.5”
Finishing Nail 2”
Finishing Nail 1.5”
4 units
4 units
4 units
8 pcs.
8 pcs.
1 kg
1 kg
Deployment Fee:
PHP
150
Activity Dates: Class/Batch 1: 14 July 2011
Time: 8AM to 3PM
Center Orientation: Class/Batch 1: 13 July 2011; 10AM‐12PM
* Date can be adjusted to a weekend if students are not available.
7/31/2019 Kbpip Rw Project Dslu-tred2 20120611
http://slidepdf.com/reader/full/kbpip-rw-project-dslu-tred2-20120611 2/2
Prepared by: Miko Aliño | ABS‐CBN Foundation, Inc. | 8 June 2012
Location Map: Paco Market
Directions going to Paco Market From La Salle, take LRT1‐Northbound (going to Monumento). Alight at Pedro Gil Station and then take a
jeep plying
the
route
along
Pedro
Gil.
Paco
Market
is
on
the
right
side.