Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
KB 1
KB 2
KB 3
Agenda
1.What it is
2. How it was created
3. How it works
4. Questions
www.farmorganizer.com
Penelope Tunnell
FREE
KB 4
? Business plan
KB 5
? KB 6
Business plan
Harris Ivens
KB 7
Organic certification
How can it impact your farming activities?
e.g. Equipment – must be kept clean to meet certification standards
KB 8
1-1 Planning Include planning required to become certified in farm planning
1-2 Constraints Include costs for certification when completing taxes. Check if any
insurance is required.
1-3 Finances Costs for certification. Find out if any financial assistance for certification
costs.
1-4 Performance evaluation What standards should be met? What monitoring and data recording is
required?
2 Production Production methods required for organic certification
3-1 Intelligence Find out about the organic certification body and organic certification
companies. Join COG
3-2 Selling Promotional material to include “organically certified” Pricing should
reflect that products are organically certified. Delivery vehicles
3-3 Customers Inform customers, e.g. restaurants so that they can benefit too.
3-4 Contacts Record contact information for certification bodies
4-1 Resources-Human Get training on organic certification
4-2 Resources-Animal What are the practices should be followed for raising animals?
4-3 Resources-Land What land maintenance practices should be followed?
4-4 Resources-Building Must comply with standards for organic certification
4-5 Resources-Equipment Must keep equipment cleaned.
4-6 Resources-Supplies Ensure water sources comply.
Seeds, feed etc.
4-7 Productivity What would be the most efficient way to record data required for organic
certification
4-8 Knowledge base Easy retrieval of documentation that will be required by inspector KB 9
OUTSIDE WORLD
1
PLANNING
MONITORING
CONTROL
2
PRODUCTION
3
LINKING
4 SUPPORTING
KB 10
1 Planning, Monitoring and Control
KB 11
Future
position
Risks
Planned route
Actual route
1.1 Planning
1.2 Constraints
1.3 Finances
Current
position
1.4 Performance
shipping lanes
1 Planning Monitoring & Control
1.1 Planning
1.2 Constraints
1.3 Finances
1.4 Performance
KB 12
2 Production
KB 13
How to produce Quality Storage
Product
information
2
Production
KB 14
KB 15
3 LINKING
3.1 Intelligence
3.3 Customers
3.2 Selling
3.4 Contacts
KB 16
3 Linking
3.1 Intelligence
3.2 Selling
3.3 Customers
3.4 Contacts
KB 17
4 Supporting
4.1 Human 4.2 Animal 4.4 Building
4.6 Supplies
4.5 Equipment
4.3 Land
[2]
PRODUCTION
[1]
PLANNING
MONITORING
CONTROL
[3]
LINKING
RESOURCES
KB 18
4 Supporting
4.8 Knowledge base 4.7 Productivity
[2]
PRODUCTION
[1]
PLANNING
MONITORING
CONTROL
[3]
LINKING
4 Supporting
4.1 Resources: Human 4.5 Resources: Equipment
4.2 Resources: Animal 4.6 Resources: Supplies
4.3 Resources: Land 4.7 Productivity
4.4 Resources: Buildings 4.8 Knowledge base
KB 19
KB 20
KB 21
Worksheets
Examples
KB 22
Organizational framework
1
PLANNING
MONITORING
CONTROL
2
PRODUCTION
3
LINKING
4
SUPPORTING
Guides
KB 23
KB 24
KB 25
KB 26
KB 27
KB 28