NAME OF SCHOOL:…………………………………………Changalume ZONE:Linyangwa TA:Mawawa
CONSTITUENCY: Kasungu West
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Leave for natural regeneration of vegetation PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Refill all open pits with PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Collect all debri and fill them in the open dishes and at designated
area.
PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles (However there is no budget line for painting the roofs)
PMC
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Time FrameEnvironmental
Component
Expected Impacts Proposed Mitigation measures Responsibility
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
E3042 v3
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
Loss of farming land due to
Extension of land for the school
Make proper consulattion and procedures if need arises PMC
Loss of livelihood Allocate the affected families with another peice of land PMC
Land ownership (was there any
extension of land)
Make proper consulattion and procedures if need arises PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks
Establishemnet/ revamping of woodlots for the schools
and establishment of village tree woodlots
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment
Empower community policing forum and employ a
watchman
Quality of materials and
workmanship Inspecvtions by the village local leadership
Leadership and committees
Hold meetings and minutes kept by the school
administration
Flora and
terrestrial Fauna
Sustainability
Social conflicts
Stage of the Project
at the time of
inspection
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………NSAWALA ZONE: CHANKHANGA TA: MWASE
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
N/A PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be filled by debris from the project PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be filled by debris from the project PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
Loss of farming land due to
Extension of land for the school
N/A (School Land) PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Planting Blue gum trees
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment School Watchman availableQuality of materials and
workmanship
Leadership and committees
Stage of the Project
at the time of
inspection Gable level
Sustainability
Soils
Social conflicts Flora and
terrestrial Fauna
Challenges faced
and their proposed
mitigation
measures Water supply problem
NAME OF SCHOOL:…………………………………………Makwiniro ZONE:Suza TA: Kaomba
CONSTITUENCY: Central
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
N/A ( School Land) Used the anti hill for moulding bricks PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
No ditches/open pits created- used Chulu soil for brick making. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Fill up small pits around the house. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Replant trees
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment School Watchman to provide securityQuality of materials and
workmanship
Leadership and committees SMC to provide for mainteinance & repairs
Stage of the Project
at the time of
inspection Gable level
Challenges faced
and their proposed
mitigation
measures Water supply Problem
Social conflicts Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
NAME OF SCHOOL:…………………………………………Mwimba ZONE:Kalolo TA: Mwase
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Company unused land PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
As above PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Fill up pits created for manure making PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Trees provided by co.To be replanted.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment Company security to be providedQuality of materials and
workmanship
Leadership and committees SMC to provide for mainteinances & repairs
Stage of the Project
at the time of
inspection Window level
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………Mponda ZONE: Lisasadzi TA: Kaomba
CONSTITUENCY:
AugustSept Oct Nov Dec
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Flora and
terrestrial Fauna
Sustainability
Loss of top soil for agriculrural
activities during moulding of
bricks
N/A School land PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
N/A . Used surface soils PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Fill up used toilet pits PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it (hold sensistisation meetings)
PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A (None lost livelihood) PMC
Land ownership (was there any
extension of land)
N/A Land belonged to the school PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMCFlora and
terrestrial Fauna
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Replant trees
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment Community police to do patrolsQuality of materials and
workmanship
Leadership and committees School Committee to do periodic checks
Stage of the Project
at the time of
inspection Gable level
Challenges faced
and their proposed
mitigation
measures No beams in windows
NAME OF SCHOOL:…………………………………………Chaima. ZONE: Chaima. STA: Chaima
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Not Agriculural land (enhance sensitisation to the committees) PMCSoils
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Flora and
terrestrial Fauna
Sustainability
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
N/A .Were using soils heaped during road construction. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be used to fill up little borrows & trenches made at brick
making site
PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it (sensitisation meetings on the need to protect the cemetery)
PMC
Loss of farming land due to
Extension of land for the school
N/A . School land. GVH
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Social conflicts Flora and
terrestrial Fauna
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Loss of vegetation during kilning
of bricks
To replant trees from areas felled. (Planting will start
in September when schools open and students will be
watering the outplented tree seedlings)
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment To engange community police.Quality of materials and
workmanship N/A
Leadership and committees
Periodic checks for pre-damaged repairs by School
Committee
Stage of the Project
at the time of
inspection Window level
Challenges faced
and their proposed
mitigation
measures Brick repleneshment slow
NAME OF SCHOOL:…………………………………………: Khola. ZONE: Chaima TA: Chidzuma
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Not Agricultural land. N/A PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be filled with broken bricks from the project PMC
Soils
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Flora and
terrestrial Fauna
Sustainability
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be used to fill up pit created when moulding bricks PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve hold meetings with the chiefs
and the comuunity
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest. Trees to be replanted
PMC
Loss of vegetation during kilning
of bricks Trees to be replanted
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment
Fence will be built around the house. (Mpanda
watsekela)
Social conflicts Flora and
terrestrial Fauna
Sustainability
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Quality of materials and
workmanship N/A
Leadership and committees
Periodic checks for pre -damaged repairs by School
Committee
Stage of the Project
at the time of
inspection Gable level, Kitchen yet to be constructed, Toilet dug.
Challenges faced
and their proposed
mitigation
measures No problems yet
NAME OF SCHOOL:………………………………………… Chafisi ZONE: Chaima STA: Chaima
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
N/A , Not Agricultural land PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be filled by soil excavated on the house site. PMC
PMC
PMC
PMC
PMC
PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Sustainability
Restoration of the sites, draining and filling pits with construction
rubble.
Debri from construction activities
left on site become a nuisance
and eyesore
To fill up pits dug during brick making PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles (budget constraint the roof cannot be painted)
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
N/A
Loss of farming land due to
Extension of land for the school
N/A land belonged to the school PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Trees used already replaced by replanting
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment Sensitization meetings will be heldQuality of materials and
workmanship
Leadership and committees Periodic checks for pre - damaged repairs by SMC
Stage of the Project
at the time of
inspection Window level
Social conflicts Flora and
terrestrial Fauna
Sustainability
Soils
Challenges faced
and their proposed
mitigation
measures
Cement wont be enough(150 bags),K123,000.00.
remaining in the MK1.5. 95bags used,10 more bags
needed to reach up to the Gable level, Toilet not yet
dug.
NAME OF SCHOOL:…………………………………………: Chipoza ZONE: Santhe TA: Santhe
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
N/A PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
No pits - Used top cover soil to mould bricks and manure will be
applied to replenish soil fertility
PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To fill up any pits made during construction PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles due budget constraint
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
N/A PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Restoration of the sites, draining and filling pits with construction
rubble.
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A -School land PMC
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks To replant cemetry trees
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project PMCTheft and vandalism of solar
equipment and other equipment Sensitization meetings by SMC
Community
PolicingQuality of materials and
workmanship
Leadership and committees Periodic checks for pre - damaged repairs by SMC
Stage of the Project
at the time of
inspection Gable level / Still building kitchen
Challenges faced
and their proposed
mitigation
measures None
Social conflicts Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
NAME OF SCHOOL:…………………………………………: Kamono ZONE: Chitenje
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
N/A , School land PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Top cover soil used PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Fill up unused rubbish pits PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles due budget constraint
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
N/A School has enough land and this will be enhanced by proper
planning and zoning
PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
TA: Chilowamatambe
Social conflicts
Restoration of the sites, draining and filling pits with construction
rubble.
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks To replant hybrid trees
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment To Employ WatchmanQuality of materials and
workmanship N/A
Leadership and committees SMC to sustain house with DC's funds
Stage of the Project
at the time of
inspection Gable level
Challenges faced
and their proposed
mitigation
measures N/A
NAME OF SCHOOL:…………………………………………: Lisasadzi ZONE: Lisasadzi Zone TA: Kaomba
CONSTITUENCY:
AugustSept Oct Nov Dec
Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Loss of top soil for agriculrural
activities during moulding of
bricks
School land PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
fill up up of pits with debri or plant bananas in the pits PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
collected and used for filling up the pits PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Social conflicts Flora and
terrestrial Fauna
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks planted tree, grass and shrubs
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment To employ a security guardQuality of materials and
workmanship N/A
Leadership and committees Maintenance & repairs plan produced
Stage of the Project
at the time of
inspection
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………: Kabira ZONE: Malepera. TA: Kawamba
CONSTITUENCY: Kasungu West
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Plant bananas PMC
Flora and
terrestrial Fauna
Sustainability
Soils
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Fill up with with broken bricks from the kiln PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Broken bricks to beautify the school. Fill up ditches. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
Loss of farming land due to
Extension of land for the school
To open new farming areas provided by the chief PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Social conflicts Flora and
terrestrial Fauna
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Loss of vegetation during kilning
of bricks Replant more trees
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment Engange Community police for night patrolsQuality of materials and
workmanship
Leadership and committees SMC to provide funds for maintenance & repairs
Stage of the Project
at the time of
inspection Window level.
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………: Changuluwe. ZONE: Linyangwa. TA: Lukwa.
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
N/A - School land. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Fill up ditches / open pits with broken bricks from the kiln. PMC
PMC
PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Flora and
terrestrial Fauna
Sustainability
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Fill up ditches created by vacated residents around the school PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Used wood donated by KFCTA.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment Community police to provide security.Quality of materials and
workmanship
Leadership and committees SMC to provide funds for maintenance & repairs.
Social conflicts Flora and
terrestrial Fauna
Sustainability
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Stage of the Project
at the time of
inspection Foundation level -Foundation walls.
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………: Kayereka. ZONE: TA:
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Land belongs to school - Land left farrow to regenerate PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Refill all open pits left during brick moulding. - Fill the pits with
crop residues.
PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Same as above. PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
Loss of farming land due to
Extension of land for the school
Land belongs to school. PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
Land belongs to school. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Village woodlots - Establish nurseries.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar
equipment and other equipment Employ watchman,who will be paid by the communityQuality of materials and
workmanship Inspection by school committee.Leadership and committees Hold meeting to brief the school committee & chiefs
Stage of the Project
at the time of
inspection Window level.
Social conflicts Flora and
terrestrial Fauna
Sustainability
Soils
Challenges faced
and their proposed
mitigation
measures Supply of sand.
NAME OF SCHOOL:…………………………………………:Chimwang'ombe. ZONE: Wimbe. TA:
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Open space - Grass & other vegetation to be allowed to germinate. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Refill all pits. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Same as above. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Loss of farming land due to
Extension of land for the school
No loss of land -Land was donated by Estate 41 PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
Chiefs met management of Press Agriculture PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Used Nthethe trees & Plant acacia trees(3000).
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment Community policing forum.
Quality of materials and
workmanship Inspections.
Leadership and committees
Stage of the Project
at the time of
inspection
Outside walls on Window level,Inside(rooms)at
foundation level.
Challenges faced
and their proposed
mitigation
measures Supply of bricks.
Social conflicts Flora and
terrestrial Fauna
Sustainability
NAME OF SCHOOL:…………………………………………: Mthawira ZONE: TA: Mdunga.
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Open land was used for brick moulding/left open pits. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Refill all open pits. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Same as above. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
Loss of farming land due to
Extension of land for the school
No loss of land PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
Belonged to chief and donated to school. PMC
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment Employ watchman & community police.
Quality of materials and
workmanship Inspections by chief.
Leadership and committees Hold meetings.
Stage of the Project
at the time of
inspection Roofing level.
Challenges faced
and their proposed
mitigation
measures No roofing materials,waiting for the second tranche.
NAME OF SCHOOL:…………………………………………: Livwezi. ZONE: Livwezi. TA: Chitanthamapiri.
CONSTITUENCY:
AugustSept Oct Nov Dec
Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Loss of top soil for agriculrural
activities during moulding of
bricks
Natural generation farming activities going on. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Planting banana in all pits. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
N/A PMC
Loss of farming land due to
Extension of land for the school
enhance proper planning and siting of the buildings and create
awareness to school management committee
PMC
Loss of livelihood NB PMC
Land ownership (was there any
extension of land)
project was built within school boundaries. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Planting of Blue gum trees amounting to 1500
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment Awareness meetings with all sorrounding villages.
Quality of materials and
workmanship Generally good.But wheelbarrows not in good condition.
Leadership and committees Meetings. Minutes of meetings.
Stage of the Project
at the time of
inspection House at Frame level.
Challenges faced
and their proposed
mitigation
measures Sand not readilly available to the contractor.
NAME OF SCHOOL:…………………………………………: Chigumba. ZONE: Livwezi. TA:
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Replacing top soil with building residues PMC
Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Filling with building material residues. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
collect and used for filling pits PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
No loss of land. PMC
Loss of livelihood No loss of livestock. PMC
Land ownership (was there any
extension of land)
It is within the school boundaries. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Loss of vegetation during kilning
of bricks Tree planting.No loss of vegetation.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment There are no cases of vandalism.
Quality of materials and
workmanship
Generally good.But wheelbarrows have already passed
their usefulness.
Leadership and committees Holding meetings with Chiefs.
Stage of the Project
at the time of
inspection The house is at window level.
Challenges faced
and their proposed
mitigation
measures
Bricks and sand not readilly available to the
contractor.Part of the concrete mixture have soil
instead of sand.
NAME OF SCHOOL:…………………………………………: Mthitimira. ZONE: TA: Kapelula.
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Moulded at the Dambo and would be naturally replaced through
sedimentation
PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Refill all pits left during brick moulding PMC
Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be used to refill small pits at the school PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
N/A coz bricks were moulded outside the Estate belonging to
Kondowe.
PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Planting of trees.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Sustainability
Theft and vandalism of solar
equipment and other equipment
Solar to be fitted once the house is
occupied,Community police forum.
Quality of materials and
workmanship Not seen coz it is at slab level.
Leadership and committees Very good leadership.
Stage of the Project
at the time of
inspection Slab level.
Challenges faced
and their proposed
mitigation
measures No sand on site,
NAME OF SCHOOL:…………………………………………: Chikoko. ZONE: TA: Kapichira.
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Naturally replaced. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Refill PMC
PMC
PMC
PMC
PMC
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Refill with old houses under construction. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
Belong to CCAP Church - Snr group Mnundwe agreed amicably. PMC
Loss of livelihood None. PMC
Land ownership (was there any
extension of land)
School is under CCAP Church. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks No loss /School has a wood lot.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment
Community policing-Chiefs have rules &
regulations.Meetings were held locally & people were
briefed about the security.
Quality of materials and
workmanship Very good quality.
Leadership and committees Good leadership.
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Sustainability
Stage of the Project
at the time of
inspection Door frame level.
Challenges faced
and their proposed
mitigation
measures Supply of sand -quarry.Met Chiefs & TA on the issue.
NAME OF SCHOOL:…………………………………………: Kamizu. ZONE: TA: Kapelula.
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
To landscape and plant trees ,-Land Scaping. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be filled and plant Bananas. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Same as above. PMC
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
Belonged to school PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
Land belongs to school. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks To plant Acacia ,Cenderela trees.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment Watchman,Police forum
Quality of materials and
workmanship Very good -Inspection.
Leadership and committees Good leadership & hold meetings
Stage of the Project
at the time of
inspection Ring beam - Window level.
Soils
Social conflicts Flora and
terrestrial Fauna
Sustainability
Challenges faced
and their proposed
mitigation
measures None.
NAME OF SCHOOL:…………………………………………: Kamilaza ZONE: Sopani. TA: Chisemphere.
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Plant trees to replace fertility. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Burry all ditches old & new ones. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Burry to make compost manure. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles, To paint after works are through.
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
School land. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest. Plant trees and flowers and generate natural trees.
PMC
Loss of vegetation during kilning
of bricks Plant trees.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment Strengthen vigilants.
Quality of materials and
workmanship Very good.
Leadership and committees Strong but need close monitoring to encourage them.
Stage of the Project
at the time of
inspection Window level.
Challenges faced
and their proposed
mitigation
measures
Social conflicts Flora and
terrestrial Fauna
Sustainability
NAME OF SCHOOL:…………………………………………: Mitula. ZONE: Chamwabvi.
CONSTITUENCY: South East.
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Plant trees. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Burry the pits. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Burry the debris to make manure. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles. To paint after roofing.
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
School land. PMC
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
TA: Chilowamatambe.
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest. Plant trees and flowers encourage regeneration of
natural trees.
PMC
Loss of vegetation during kilning
of bricks Replace the vegetation.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment N/A
Quality of materials and
workmanship
Leadership and committees Need a lot of encouragement.
Stage of the Project
at the time of
inspection At gable level.
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………:Dunda. ZONE: Lisasadzi. TA: Njombwa.
CONSTITUENCY: : South East.
AugustSept Oct Nov Dec
Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Loss of top soil for agriculrural
activities during moulding of
bricks
To plant trees wwhich will replacefertility after gap filling. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Filling the pits with soil. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Burry the debris. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
School land. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest. Plant trees and flowers - natural trees regeneration.
PMC
Loss of vegetation during kilning
of bricks Plant trees.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment N/A
Quality of materials and
workmanship
Leadership and committees Need frequent follow ups.
Stage of the Project
at the time of
inspection
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………: Kalulu. ZONE: Chamwabvi.
CONSTITUENCY: South East.
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Plant trees which replace soil fertility. PMC
Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
TA: Chilowamatambe
Soils
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Burry the pits with soil. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Burry in rubbish pits to make manure. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles. To paint after roofing.
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
School land. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest. To plant trees.
PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Loss of vegetation during kilning
of bricks Replace trees.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment
Sensitize the community and form community policing
group.
Quality of materials and
workmanship Good work and are roofing the house.
Leadership and committees
Coorperative and cordial relationship-need
encouraging with follow ups.
Stage of the Project
at the time of
inspection At roofing stage,to finish in 4 weeks time.
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………:Chipata. ZONE: Nkhamenya. TA: Kalulu.
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Tree planting to replace soil fertility. PMC
Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To fill all the pits with soil. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
N/A PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles To paint after roofing.
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
School land. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Loss of vegetation during kilning
of bricks N/A
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment Local leaders to strengthen community policing.
Quality of materials and
workmanship Good and are at slab making level.
Leadership and committees Very cordial relationship need follow ups.
Stage of the Project
at the time of
inspection
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………: Kanyata. ZONE: Sopani.
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Very minor- need for tree replacing soil fertiliy. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Available from old pits the community led by SMC to fill them. PMC
Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
TA: Chisemphere.
Soils
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
N/A PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles To consider it after the completion of all work.
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
School land. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve. Not tampered with to
encourage regeneretion.
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Not in their area but from Mzimba side.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Sustainability
Theft and vandalism of solar
equipment and other equipment N/A
Quality of materials and
workmanship Have only dug foundation & put hardcore.
Leadership and committees Good and coorperative
Stage of the Project
at the time of
inspection Have only done footing.
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………:Kavidebwere ZONE: Nkhamenya. TA: Kaluluma.
CONSTITUENCY:
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
To plant fertility replacement trees. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To fill the ditches by Nov.The community led by SMC. PMC
PMC
PMC
PMC
PMC
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble. N/A.
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
N/A PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles.To consider after completion of the house.
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
Land ownership (was there any
extension of land)
School land PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest. Used the planted forest within the school.To plant
more.
PMC
Loss of vegetation during kilning
of bricks Use planted forest. To plant more
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment N/A
Quality of materials and
workmanship Good but slow -at slab level.
Leadership and committees Good.
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble. N/A.
Social conflicts Flora and
terrestrial Fauna
Sustainability
Stage of the Project
at the time of
inspection Slab level.
Challenges faced
and their proposed
mitigation
measures None.
NAME OF SCHOOL:…………………………………………: Chambwe. ZONE: Chamwabvi. STA: Chambwe.
CONSTITUENCY: : South East.
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Planting of trees which replace soil fertility. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
Filling has already started led by STA Chambwe. 95% Done. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
N/A. PMC
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles. To consider after completion of work.
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
N/A. PMC
Loss of livelihood N/A. PMC
Land ownership (was there any
extension of land)
School land. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest. No tresses seen.To plant more trees.
PMC
Loss of vegetation during kilning
of bricks No tresses observed. To plant more trees
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment N/A.
Quality of materials and
workmanship
Poor workmanship-Bent walls,no ring beam & poor
mixtures.
Leadership and committees
Stage of the Project
at the time of
inspection
Soils
Social conflicts Flora and
terrestrial Fauna
Sustainability
Challenges faced
and their proposed
mitigation
measures
Contractor & builders not coorperative,PMC was
advised not to buy some of the materials like
Brickforce wire,making the work difficult.
NAME OF SCHOOL:…………………………………………:Mderanjiwa ZONE: TA: Chisinga.
CONSTITUENCY: : North West.
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
To be covered. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be covered. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be well desposed of. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Project will protect the cemetery by not passing the by pass road
through it
PMC
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Loss of farming land due to
Extension of land for the school
No land loss. PMC
Loss of livelihood No livestock loss. PMC
Land ownership (was there any
extension of land)
No. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Replant to replace the used ones.
PMC
Loss of roofs due to hailwinds
To increase vegetative cover. Planting
of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment Watchman to be maintained payed by Chiefs.
Quality of materials and
workmanship Good work.
Leadership and committees Good coordination among all committees
Stage of the Project
at the time of
inspection Gable level.
Challenges faced
and their proposed
mitigation
measures None.
Social conflicts Flora and
terrestrial Fauna
Sustainability
NAME OF SCHOOL:…………………………………………: Nkhuta. ZONE: Kawiya. TA: Simlemba.
CONSTITUENCY: North north east.
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Manure application. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be covered after completion. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
Burnt and buried. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
N/A PMC
Loss of livelihood N/A PMC
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble. Disposal by burrying in the pit.
Social conflicts
Land ownership (was there any
extension of land)
N/A PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve. No.
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest. Used firewood from school woodlot.
PMC
Loss of vegetation during kilning
of bricks Re afforestation.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment Engange a watchman.
Quality of materials and
workmanship Good.
Leadership and committees Good Coordination.
Stage of the Project
at the time of
inspection
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………: Chimwa. ZONE: Sopani. TA: Simlemba.
CONSTITUENCY: : NNE
Social conflicts Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Manure to be applied. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To cover them with ribbish and broken bricks. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be buried and others to be burnt. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
No. PMC
Loss of livelihood No. PMC
Land ownership (was there any
extension of land)
No. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble. As above.
Social conflicts Flora and
terrestrial Fauna
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks They used exotic trees from school forest.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment To engange a Watchman until the house is occupied.
Quality of materials and
workmanship Good.
Leadership and committees Good coordination among all committees.
Stage of the Project
at the time of
inspection Gable level.
Challenges faced
and their proposed
mitigation
measures 100 Bags of cement are not enough.
NAME OF SCHOOL:…………………………………………: Sopani. ZONE: Sopani.
CONSTITUENCY: NNE.
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
To be covered with manure. PMC
Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
TA: Chisemphere.
Soils
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be covered by broken bricks PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be buried and others to be burnt. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
No. PMC
Loss of livelihood No. PMC
Land ownership (was there any
extension of land)
No. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Loss of vegetation during kilning
of bricks Use of exotic trees from the school woodlot
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment
Watchman to guard,until the house is occupied by the
Head Teacher.
Quality of materials and
workmanship Good.
Leadership and committees Good coordination among committees
Stage of the Project
at the time of
inspection Window level.
Challenges faced
and their proposed
mitigation
measures 100 bags of cement are not enough.
NAME OF SCHOOL:…………………………………………:Kanyengezera. ZONE: Kavizinde. TA: Chisinga.
CONSTITUENCY: North west.
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Were advised to use manure. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be covered. PMC
Flora and
terrestrial Fauna
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be burnt or buried. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
No. PMC
Loss of livelihood No. PMC
Land ownership (was there any
extension of land)
Institutional land. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks To be replanted.Afforestation.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Sustainability
Theft and vandalism of solar
equipment and other equipment Community sensitization and project ownership.
Quality of materials and
workmanship Good
Leadership and committees Good coordination among all committees.
Stage of the Project
at the time of
inspection Window level.
Challenges faced
and their proposed
mitigation
measures
NAME OF SCHOOL:…………………………………………: Vilingowe. ZONE: TA: Mnyanja.
CONSTITUENCY: NNE.
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be covered. PMC
PMC
PMC
PMC
PMC
Sustainability
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be buried in pits. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
Yes but to be compensated. PMC
Loss of livelihood No. PMC
Land ownership (was there any
extension of land)
No. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks No.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment To discuss with Chiefs.
Quality of materials and
workmanship Use of poor bricks at foundation level.
Leadership and committees No good coordination between PMC & SMC.
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
Social conflicts Flora and
terrestrial Fauna
Sustainability
Stage of the Project
at the time of
inspection Foundation level.
Challenges faced
and their proposed
mitigation
measures Used earth mortar on some parts of the foundation.
NAME OF SCHOOL:…………………………………………: Makungwa. ZONE: Kasasanya. TA: Mphomwa.
CONSTITUENCY: NW.
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Use of manure. PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be covered. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be disposed in pits PMC
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble. To be covered.
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Loss of farming land due to
Extension of land for the school
No. PMC
Loss of livelihood No. PMC
Land ownership (was there any
extension of land)
No. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Exotic trees from school forest used.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment Community to safeguard safety of solar panel.
Quality of materials and
workmanship
Leadership and committees Good leadership between SMC & PMC.
Stage of the Project
at the time of
inspection Foundation level.
Soils
Social conflicts Flora and
terrestrial Fauna
Sustainability
Challenges faced
and their proposed
mitigation
measures Very slow progress.
NAME OF SCHOOL:…………………………………………: Chamkango. ZONE: Chulu. TA: Mphomwa.
CONSTITUENCY: NW
AugustSept Oct Nov Dec
Loss of top soil for agriculrural
activities during moulding of
bricks
Applying manure PMC
Creations of dishes/open pits
which could be a danger to
children and could also be
breeding grounds for mosquitoes
To be covered. PMC
PMC
PMC
PMC
PMC
PMC
Debri from construction activities
left on site become a nuisance
and eyesore
To be disposed clearly. PMC
Reflections from roof surfaces
and general poor workmanship
roof surfaces should be non-reflective either through painting or use
of tiles
PMC
Cultural Heritage
and SitesDestruction of nearby cemetery
and artifacts therein is possible
Observe cultural rights and create awareness PMC
Soils
Borrow pits & trenches left due
to sand/clay mining or brick
making may lead to growth of
pathogens like mosquitoes as still
water collects in them.
Restoration of the sites, draining and filling pits with construction
rubble.
KASUNGU DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF
Environmental
Component
Expected Impacts Proposed Mitigation measures Responsibility Time Frame
Loss of farming land due to
Extension of land for the school
No. PMC
Loss of livelihood No. PMC
Land ownership (was there any
extension of land)
No. PMC
Disturbance and loss of protected
and endangered animal and plant
species
Protect the planted natural miombo woodlot to give potential for
biodiversity ; observe stream reserve
PMC
Destruction of vegetation during
burning of bricks, clearing &
excavation; may cause loss of
fauna or important ecosystems
Confine cutting of tree to positions of activity. Provide tree belts in
the layout plan and implement; avoid any building in natural
miombo forest.
PMC
Loss of vegetation during kilning
of bricks Used exotic trees to burn bricks.
PMC
Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project
Theft and vandalism of solar
equipment and other equipment Permanent Watchman to be paid by community.SMC.
Quality of materials and
workmanship Good.
Leadership and committees
Strong school management committee to take over
the project.
Stage of the Project
at the time of
inspection Slab level.
Challenges faced
and their proposed
mitigation
measures Slow progress coz of witchcraft cleansing.
Sustainability
Social conflicts Flora and
terrestrial Fauna
Jan/FebJan/Feb