    Karmakitta Tarni Rural Water Supply SchemeDraft DPR

    Annexure VI.1

    Particulars of the catchment

    Name of Sub-zone

    Name of tributary

    River system

    Shape of catchment Fan shaped

    Location LatitudeLongitude

    Topography Plain Areas

    IA Equivalent Slope

    S.NO

    (km)

    1 2 3 4 5 6 7

    1 0.00 160 0.000 0

    2 13.10 180 13.100 20 20 262.0

    3 22.40 200 9.300 40 60 558.0

    4 30.09 220 7.690 60 100 769.05 34.74 240 4.650 80 140 651.0

    6 37.70 260 2.960 100 180 532.8

    2772.8

    S = 1.951

    L 37 7 19 600 km

    Karmakitta Tarni Rural Water Supply Scheme

    Assessment of design flood for Karmakitta Tarni Scheme

    (As per CWC Flood Estimation Report for Lower Ganga Plains Sub-Zone 1 (g)

    Lower Ganga plains -1(g)

    Mothihara

    Mayurakshi

    240

    28' 10.83860 58' 37.72

    The weir site is located on river Mothihara, tributary of river Mayurakshi in the Lower Ganga plains. Thesynthetic unit hydrograph for Mothihara river at the proposed weir site is derived based on the FloodEstimation Report for Lower Ganga Plains Subzone-1(g) (revised) published by Central Water Commission.

    Synthetic Unit Hydrograph

    Reduceddistance

    Starting fromPoint of study

    Reduced Levels Of RiverBed

    Length OfEach

    SegmentLi

    Height AboveDatum *(DiDifference

    Between Datum

    and the with R.L

    (Di-1

    +Di)Li* (D

    i-1+Di)

    (4) x (6)

    (kms) (m) (m) (m x km)

    Li(Di-1+Di) =

    Li(Di-1+Di)/L^2= m / km

    km Lc

  • 7/29/2019 Karmakitta Tarni Deisgn Flood

    2/11

    Karmakitta Tarni Rural Water Supply SchemeDraft DPR

    Annexure VI.1

    10 20.0

    4 8.402 hours 11 24.0

    12 29.0

    5 4.674 hours 13 35.0

    14 37.2

    6 2.525 hours 15 37.1

    16 36.7

    7 82.294 hours 17 35.5

    18 33.5

    8 14.188 hours 19 31.0

    Say 15.000 20 27.8

    9 37.174 21 25.2

    22 23.0

    10 3066012 cum 23 21.0

    Volume due to 1cm excess RF 3066600 cum 24 19.5

    Ratio = 1.000 25 18.0

    26 17.0

    27 16.0

    28 15.1

    29 14.3

    30 13.5

    31 12.8

    32 12.1

    33 11.5

    34 10.9

    35 10.4

    36 9.9

    37 9.5

    38 9.1

    39 8.7

    40 8.3

    41 8.042 7.7

    43 7.4

    44 7.1

    45 6.8

    W75 = 0.8955(qp) -1.061

    WR50 = 0.5524(qp) -1.012

    WR75 = 0.2984(qp) -1.012

    TB = 12.4755(tp)^0.721

    Tm = tp + tr/2

    Qp = qp x A cumecs

    Vol Qi = A x d / tr x 0.36

    2

    4

    6

    8

    10

    1214

    16

    18

    20

    22

    24

    26

    28

    30

    32

    34

    36

    38

    40

  • 7/29/2019 Karmakitta Tarni Deisgn Flood

    3/11

    Karmakitta Tarni Rural Water Supply SchemeDraft DPR

    Annexure VI.1

    59 3.8

    60 3.6

    61 3.4

    62 3.2

    63 3.0

    64 2.8

    65 2.6

    66 2.4

    67 2.2

    68 2.0

    69 1.8

    70 1.6

    71 1.4

    72 1.2

    73 1.0

    74 0.9

    75 0.8

    76 0.777 0.6

    78 0.5

    79 0.4

    80 0.3

    81 0.2

    82 0.0

    Sum 851.67

  • 7/29/2019 Karmakitta Tarni Deisgn Flood

    4/11

    Karmakitta Tarni Rural Water Supply SchemeDraft DPR

    Annexure VI.1

    I Design storm (50 year return storm)

    A Storm duration (TD)

    The design storm duration is adopted as 1.1 times tp = 1.1 *13.5 = 14.85

    Rounding it to the nearest hour TD= 15

    B Point Rainfall

    C TD (15hr) rainfall

    Conversion factor of 0.860 is taken from fig.10 to convert 24 hr rainfall to 15 hr rainfall

    206.4 mm

    D Areal Rainfall

    188.46 mm

    E Temporal Distribution of Rainfall

    Design loss rate of 2.7mm per hour is recommended in para 3.5 for the sub-zone -1 (g).

    Excess rainfall (mm)

    mm mm

    1 0 28 52 77 52 8 50 07

    Karmakitta Tarni Rural Water Supply Scheme

    Assessment of design flood for Karmakitta Tarni Scheme

    (As per CWC Flood Estimation Report for Lower Ganga Plains Sub-Zone 1 (g)

    hrs

    hrs

    The project is situated near Karmakitta Tarni Village in Jarmundi Block of Dumka District in Jharkhandstate

    The 50 year 24 hour point rainfall for the catchment is 240 mm vide plate-9 of the Flood Estimation

    Report for Lower Ganga Plains Sub-Zone 1 (g)

    Thus the 15 hr rainfall =240*0.860mm =

    The Areal to Point Rainfall % as per Fig 12b, annex-4.2 of the report is 91.31 for

    306.66sqkm . Therefore the 50 year 15 hour areal 'Rainfall' for Karmakitta Tarniproject is 206.4*0.9131=

    Using the distribution percentages given in Annexe 4.1 or fig-11, the 50 year 15hr areal rainfall is splitinto 1hr rainfall increments as below.

    Duration(hours)

    Distributioncoefficient

    StormRainfall

    Rainfallincrements Loss rate 2.7mm per

    hour)

  • 7/29/2019 Karmakitta Tarni Deisgn Flood

    5/11

    Karmakitta Tarni Rural Water Supply SchemeDraft DPR

    Annexure VI.1

    12 0.94 177.16 5.7 2.95

    13 0.96 180.93 3.8 1.07

    14 0.98 184.69 3.8 1.0715 1 188.46 3.8 1.07

    Total 188.46 148.0

  • 7/29/2019 Karmakitta Tarni Deisgn Flood

    6/11

    Karmakitta Tarni Rural Water Supply SchemeDraft DPR

    Annexure VI.1

    UG Rainfall Rainfall

    Time Ordinate mm mm

    1 2.0

    2 3.0

    3 4.5

    4 6.0

    5 7.5

    6 9.0

    7 11.0

    8 13.5

    9 16.510 20.0 1.07 1.0692768

    11 24.0 2.95 1.0692768

    12 29.0 2.95 2.9539152

    13 35.0 8.61 2.9539152

    14 37.2 50.07 2.9539152

    15 37.1 27.45 6.723192

    16 36.7 19.91566 6.723192

    17 35.5 10.49247 10.4924688

    18 33.5 6.723192 19.9156608

    19 31.0 6.723192 27.4542144

    20 27.8 2.953915 50.0698752

    21 25.2 2.953915 8.6078304

    22 23.0 2.953915 2.9539152

    23 21.0 1.069277 2.9539152

    24 19.5 1.069277 1.0692768

    25 18 0

    Critical Sequencing of ExcessRainfall increments

    Reversingthe

    sequence

  • 7/29/2019 Karmakitta Tarni Deisgn Flood

    7/11

    Karmakitta Tarni Rural Water Supply SchemeDraft DPR

    Annexure VI.1

    35 10.4

    36 9.9

    37 9.538 9.1

    39 8.7

    40 8.3

    41 8.0

    42 7.7

    43 7.444 7.1

    45 6.8

    46 6.5

    47 6.2

    48 6.0

    49 5.850 5.6

    51 5.4

    52 5.2

    53 5.0

    54 4.8

    55 4.656 4.4

    57 4.2

    58 4.0

    59 3.8

    60 3.6

    61 3.4

    62 3.2

    63 3.0

    64 2.8

    65 2.6

  • 7/29/2019 Karmakitta Tarni Deisgn Flood

    8/11

    Karmakitta Tarni Rural Water Supply SchemeDraft DPR

    Annexure VI.1

    76 0.7

    77 0.6

    78 0.579 0.4

    80 0.3

    81 0.2

    82 0.0

  • 7/29/2019 Karmakitta Tarni Deisgn Flood

    9/11

    Karmakitta Tarni Rural Water Supply SchemeDraft DP

    Annexure VI.1

    DW&S DepartmentGovt. of Jharkhand

    9aarvee associates architects

    engineers consultants pvt. Ltd.

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

    mm /cm 1.06928 1.06928 2.95392 2.9539 2.9539 6.723192 6.7232 10.49247 19.91566 27.45421 50.07 8.60783 2.9539152 2.95392 1.06928

    DRH

    Time Ordinate 0.11 0.11 0.30 0.30 0.30 0.67 0.67 1.05 1.99 2.75 5.01 0.86 0.30 0.30 0.11

    0.0 0 0 15.3 15.3

    1 2.0 0.2 0 15.3 15.5

    2 3.0 0.3 0.2 1 15.3 15.9

    3 4.5 0.5 0.3 0.6 1 15.3 16.7

    4 6.0 0.6 0.5 0.9 0.6 3 15.3 17.9

    5 7.5 0.8 0.6 1.3 0.9 0.6 4 15.3 19.6

    6 9.0 1.0 0.8 1.8 1.3 0.9 1.3 7 15.3 22.4

    7 11.0 1.2 1.0 2.2 1.8 1.3 2.0 1.3 11 15.3 26.2

    8 13.5 1.4 1.2 2.7 2.2 1.8 3.0 2.0 2.1 16 15.3 31.7

    9 16.5 1.8 1.4 3.2 2.7 2.2 4.0 3.0 3.1 4.0 26 15.3 40.9

    10 20.0 2.1 1.8 4.0 3.2 2.7 5.0 4.0 4.7 6.0 5.5 39 15.3 54.4

    11 24.0 2.6 2.1 4.9 4.0 3.2 6.1 5.0 6.3 9.0 8.2 10.0 61 15.3 76.7

    12 29.0 3.1 2.6 5.9 4.9 4.0 7.4 6.1 7.9 11.9 12.4 15.0 1.7 83 15.3 98.1

    13 35.0 3.7 3.1 7.1 5.9 4.9 9.1 7.4 9.4 14.9 16.5 22.5 2.6 0.6 108 15.3 123.1

    14 37.2 4.0 3.7 8.6 7.1 5.9 11.1 9.1 11.5 17.9 20.6 30.0 3.9 0.9 0.6 135 15.3 150.215 37.1 4.0 4.0 10.3 8.6 7.1 13.4 11.1 14.2 21.9 24.7 37.6 5.2 1.3 0.9 0.2 164 15.3 179.7

    16 36.7 3.9 4.0 11.0 10.3 8.6 16.1 13.4 17.3 26.9 30.2 45.1 6.5 1.8 1.3 0.3 197 15.3 212.0

    17 35.5 3.8 3.9 11.0 11.0 10.3 19.5 16.1 21.0 32.9 37.1 55.1 7.7 2.2 1.8 0.5 234 15.3 249.2

    18 33.5 3.6 3.8 10.8 11.0 11.0 23.5 19.5 25.2 39.8 45.3 67.6 9.5 2.7 2.2 0.6 276 15.3 291.4

    19 31.0 3.3 3.6 10.5 10.8 11.0 25.0 23.5 30.4 47.8 54.9 82.6 11.6 3.2 2.7 0.8 322 15.3 337.1

    20 27.8 3.0 3.3 9.9 10.5 10.8 24.9 25.0 36.7 57.8 65.9 100.1 14.2 4.0 3.2 1.0 370 15.3 385.7

    21 25.2 2.7 3.0 9.2 9.9 10.5 24.7 24.9 39.0 69.7 79.6 120.2 17.2 4.9 4.0 1.2 421 15.3 435.9

    22 23.0 2.5 2.7 8.2 9.2 9.9 23.9 24.7 38.9 74.0 96.1 145.2 20.7 5.9 4.9 1.4 468 15.3 483.4

    23 21.0 2.2 2.5 7.4 8.2 9.2 22.5 23.9 38.5 73.9 102.0 175.2 25.0 7.1 5.9 1.8 505 15.3 520.724 19.5 2.1 2.2 6.8 7.4 8.2 20.8 22.5 37.2 73.1 101.9 186.1 30.1 8.6 7.1 2.1 516 15.3 531.7

    25 18.0 1.9 2.1 6.2 6.8 7.4 18.7 20.8 35.1 70.7 100.8 185.8 32.0 10.3 8.6 2.6 510 15.3 525.1

    26 17.0 1.8 1.9 5.8 6.2 6.8 16.9 18.7 32.5 66.7 97.5 183.8 31.9 11.0 10.3 3.1 495 15.3 510.3

    27 16.0 1.7 1.8 5.3 5.8 6.2 15.5 16.9 29.2 61.7 92.0 177.7 31.6 11.0 11.0 3.7 471 15.3 486.4

    28 15.1 1.6 1.7 5.0 5.3 5.8 14.1 15.5 26.4 55.4 85.1 167.7 30.6 10.8 11.0 4.0 440 15.3 455.3

    29 14.3 1.5 1.6 4.7 5.0 5.3 13.1 14.1 24.1 50.2 76.3 155.2 28.8 10.5 10.8 4.0 405 15.3 420.8

    30 13.5 1.4 1.5 4.5 4.7 5.0 12.1 13.1 22.0 45.8 69.2 139.2 26.7 9.9 10.5 3.9 370 15.3 384.9

    31 12.8 1.4 1.4 4.2 4.5 4.7 11.4 12.1 20.5 41.8 63.1 126.2 23.9 9.2 9.9 3.8 338 15.3 353.5

    32 12.1 1.3 1.4 4.0 4.2 4.5 10.8 11.4 18.9 38.8 57.7 115.2 21.7 8.2 9.2 3.6 311 15.3 326.033 11.5 1.2 1.3 3.8 4.0 4.2 10.2 10.8 17.8 35.8 53.5 105.1 19.8 7.4 8.2 3.3 287 15.3 301.9

    34 10.9 1.2 1.2 3.6 3.8 4.0 9.6 10.2 16.8 33.9 49.4 97.6 18.1 6.8 7.4 3.0 266 15.3 281.8

    Karmakitta Tarni Rural Water Supply Scheme

    Assessment of design flood for Karmakitta Tarni Scheme

    Baseflow

    (0.05cumec

    /sq.km)

    TotalHydrograph

  • 7/29/2019 Karmakitta Tarni Deisgn Flood

    10/11

  • 7/29/2019 Karmakitta Tarni Deisgn Flood

    11/11

    Karmakitta Tarni Rural Water Supply SchemeDraft DP

    Annexure VI.1

    DW&S DepartmentGovt. of Jharkhand

    11aarvee associates architects

    engineers consultants pvt. Ltd.

    80 0.3 0.0 0.0 0.1 0.2 0.2 0.5 0.6 1.0 2.4 3.8 8.0 1.5 0.6 0.6 0.3 20 15.3 35.4

    81 0.2 0.0 0.0 0.1 0.1 0.2 0.5 0.5 0.9 2.0 3.3 7.0 1.4 0.5 0.6 0.2 17 15.3 32.8

    82 0.0 0.0 0.0 0.1 0.1 0.1 0.4 0.5 0.8 1.8 2.7 6.0 1.2 0.5 0.5 0.2 15 15.3 30.4

    83 0.0 0.1 0.1 0.1 0.3 0.4 0.7 1.6 2.5 5.0 1.0 0.4 0.5 0.2 13 15.3 28.3

    84 0.0 0.1 0.1 0.3 0.3 0.6 1.4 2.2 4.5 0.9 0.4 0.4 0.2 11 15.3 26.6

    85 0.0 0.1 0.2 0.3 0.5 1.2 1.9 4.0 0.8 0.3 0.4 0.1 10 15.3 25.186 0.0 0.1 0.2 0.4 1.0 1.6 3.5 0.7 0.3 0.3 0.1 8 15.3 23.6

    87 0.0 0.1 0.3 0.8 1.4 3.0 0.6 0.2 0.3 0.1 7 15.3 22.2

    88 0.0 0.2 0.6 1.1 2.5 0.5 0.2 0.2 0.1 5 15.3 20.8

    89 0.0 0.4 0.8 2.0 0.4 0.2 0.2 0.1 4 15.3 19.5

    90 0.0 0.5 1.5 0.3 0.1 0.2 0.1 3 15.3 18.1

    91 0.0 1.0 0.3 0.1 0.1 0.1 2 15.3 16.9

    92 0.0 0.2 0.1 0.1 0.1 0 15.3 15.8

    93 0.0 0.1 0.1 0.0 0 15.3 15.5

    94 0.0 0.1 0.0 0 15.3 15.4

    0.0 0.0 0 15.3 15.4

    0.0 0 15.3 15.3

    1 2 3 4 5 6 7 8 910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061626364656667686970717273747576777879808182838485868788899091929394

    0

    100

    200

    300

    400

    500

    600

    Rural Water Supply Project

    Karmakitta Tarni-50 year return flood

    Time in hours

    Discha

    rge9cumec)