Karish and Tanin Development
On Track to Deliver Gas – 1Q 202116th Israel Energy and Business Convention
November 19th 2018
Mathios Rigas, CEO
2
Energean at a Glance: a strong, effective operator
2
Operational
Strength
Effective
execution
$1.8bn ongoing investment in
Israel & Greece
$1.4bnEPCIC contract with
TechnipFMC
$12bnrevenue secured
through 12 GSPAs
4Countries, an
approved operator
c.350mmboe 2P
385Highly skilled
employees
Proven access to
capital$460m
equity raised in 2018
$1.275bnProject finance secured
in 2018
$180mRBL refinancing in
2018
3
Strong Market Positioning in London & Tel Aviv
3
• Biggest Oil & Gas IPO in London
IPO in 4 years
• One of the top Oil & Gas
performers in FTSE 250 YTD
• First London-listed, international
O&G operator to list on TASE
STRONG S/P PERFORMANCE
ENOG
35%
4
Growth and Performance at the Heart of Energean
4
2 57 11 17 24 30
58
237
300
397
0
50
100
150
200
250
300
350
400
450
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Jun-18
mm
boe
Prinos 2P Prinos 2C Katakolo 2P Karish and Tanin 2C Karish and Tanin 2P
5
A history of delivery in Greece
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
1Q 2017 2Q 2017 3Q 2017 4Q 2017 1Q 2018 2Q 2018 3Q to date
kbo
ed 10
kbopd
by 2021
2018
• Prinos North extended reach well
• Production: 4,000 – 4,250 boepd
• Epsilon extended reach well – Dec 2018
2019
• 3 Epsilon wells to be drilled
27,500 boepd process & operating capacity
5
BP Offtake Agreement until 2025
6
Karish Tanin: FDP approval to FID in 6 months
Efficient, fast and effective execution
6
7
Karish development
8
On track to deliver First Gas in 1Q 2021
FPSO Key Milestones Well Key Milestones Subsea / SURF and Onshore Key Milestones
Source: Company.
March 2018
• FID
2018 2019 2020Q1 2021
First Gas
26 Nov 2018
• FPSO First
steel cut
Q4 2019
• FPSO hull
towed from
China to
Singapore
Q4 2020
• Completed
FPSO towed
to Israel
Q1 2019
• Pipeline
beach
crossing at
Dor
Q3/Q4 2019
• Sales-gas
pipeline
installation
Dor to Karish
Q2 2020
• Installation of
production
manifold and
other sub-surf
structures
March 2019
• Mobilise
Stena Forth
rig
• Drill 4 wells
17 8
FPSO
• Integration of
Topsides
9
Building an 8 BCMA vessel…gearing for further growth
• The only FPSO in the East Med
• Infrastructure hub for future developments
• 3.8 BCMA of “Spare” Capacity…to be filled
9
10
Significant near-field prospective resources
10
Targeting multiples of upside through infrastructure-led exploration
1. NSAI August 2018
1
22
1
2
2
2
3TANIN FIELD
TANIN E
TANIN F
TANIN G
HERA
ZEUS ATHENAAPOLLO
HESTIA KARISH
MAIN
KARISH EAST
KARISH NORTH
HERCULES
ARTEMIS
DEMETER
ARES
POSEIDON
HERMES
ORPHEUS
SURFACE = TOP TAMAR SAND DEPTH
TAMAR FIELD
10KM
TAMAR FIELD
BLOCK 12
BLOCK 23BLOCK 22BLOCK 21
BLOCK 31
TANIN D
TANINMESOZOI
C
KARISHMESOZOIC
Material prospective
resource volumes with a
high1 chance of success
21/22/23/31
7.5 TCF
11
• Drilling March ’19
• 1.3 Tcf Gas & 16.4 mmbbls liquids
• Well to be suspended as potential producer.
• 69% chance of success
• Single well development in the success case
First Step…Karish North
KarishMain
Karish NorthKarish North
111. Previously quoted figure of >80% relates to the C sands only. C sands still have an individual chance of success > 80%
Key Stats
12 12
Next Steps…three wells into Karish Main
• Karish Main development drilling – 3
wells in 2019
• Upside to be targeted through Karish
development drilling – Lower D sands
0.5 Tcf
• Good quality sands identified at this
geological depth in Tanin-1
Key Stats
13
Right Project, Right Market, Right Time
Providing the lowest cost resource to meet Israeli gas demand growth
13Source: Adiri report 2018, BDO Report
0
5
10
15
20
25
30
35
bcm
a
Energean Contracted Energean Available CapacityRest of Market per Adiri Additional demand per BDO
Adiri committee demand
forecasts
BDO demand forecasts
14
Key Highlights
➢ Karish-Tanin a $1,6 billion project on track for first gas in 2021
➢ Bringing competition and security of supply to Israeli Gas Market
➢ Building an 8 BCM FPSO – creating strategic infrastructure for the
country
➢ Drilling 4 wells in 2019 in Israel
➢ Developing 2.4 TCF of Karish-Tanin reserves
➢ Targeting 7.5 TCF Prospective resources in our 7 licences in Israel
➢ Continuing to grow the leading independent E&P player in the Med
14