BL13 — XALOC

Guifré CuníJordi Juanhuix

on behalf of the XALOC team

Page 2: Kappa Group Meeting - September 20091 BL13 — XALOC Guifré Cuní Jordi Juanhuix on behalf of the XALOC team

Kappa Group Meeting - September 2009 2

BL13 Current StatusLead hutches:

installed

Electrical power, fluids and cable trays:

installed

Personal safety system: installed

OHRemaining optics

End 2009

Beamline commissioning:End 2010EH

Undulator: Sep 2010

End station elements: Beginning 2010

Monochromator and mirrors: installed

BL13-XALOC – Status

Page 3: Kappa Group Meeting - September 20091 BL13 — XALOC Guifré Cuní Jordi Juanhuix on behalf of the XALOC team

Kappa Group Meeting - September 2009 3

DetectorStatus: Deadline CFT 15 Sep

DiffractometerStatus: DDR approved

Delivery: Jan 2010

Beam conditioning el’sStatus: Designing

Diffractometer tableStatus: Manufacturing

Delivery: Jan 2010Sample changerStatus: DDR

Delivery: Jan 2010

Detector tableStatus: Manufacturing

Delivery: Jan 2010

in-house

commercial

mixed

BL13-XALOC – Status End Station

Page 4: Kappa Group Meeting - September 20091 BL13 — XALOC Guifré Cuní Jordi Juanhuix on behalf of the XALOC team

Kappa Group Meeting - September 2009 4

ISPyBLaboratory Information Management System

mxCuBE GUIExperiment

Management

EDNAOn Line data

AnalysisEdna project

ESRF

ESRF/spineeHTPX

mxCuBE

Framework 4

Control objectsALBA implementation

Pool andMacroserver

ALBA ESRF

Device Servers

Control objectsESRF implementation

SpecDevice Servers

BL13-XALOC – Control arquitecture

?

STAC

Page 5: Kappa Group Meeting - September 20091 BL13 — XALOC Guifré Cuní Jordi Juanhuix on behalf of the XALOC team

Kappa Group Meeting - September 2009 5

• Optics: Standard TAU widgets Macros (monitoring, alignment, etc)

• End Station:– Special Device Servers

• Automatic Sample Changer (CATS-Irelec-FIP)• Diffractometer MD2M (Maatel-Bruker-EMBL) ??

– Spec Macros• Monitoring, alignment, data collection, etc • Implement Macros in our MacroServer

– mxCuBE (Bliss Framework 4)• Adapt and extend to our experiment requirements

in collaboration with the ESRF

BL13-XALOC – Status of BL Control