GAS DRYER
CONDUIT PENETRATIONS C1-C81" 8 PLACES DRYER
CONDUITCONNECTIONS
(EXTERNAL)
MOTOR CONDUITPENETRATION
C9 3"PRIORITY PANELPENETRATIONS
1/2" COMPRESSIONFITTINGS (6 PLACES)
COMPRESSORINLET
DRYER INLET3" CL150 RF FLANGE
VENT STACKCOMPRESSOR DATAWEIGHT: 20,000 LBS (APPROXIMATE)TYPE: ARIEL RECIPROCATING COMPRESSOR JGQ/2 4-STAGECLEARANCE: ALLOW 36" MINIMUM ON ALL SIDES FOR ACCESS UNLESS OTHERWISE INDICATEDMOUNTING: REQUIRES EIGHT (8) 1" DIAMETER ANCHOR BOLTS (NOT PROVIDED). GROUTING THE COMPRESSOR TO CONCRETE IS NOT RECOMMENDED.LIFTING: MINIMUM 24" SPREADER BAR IS REQUIRED. UTILIZE FOUR (4) LIFT RINGS.SHIPPING: VENT STACK REMOVED FOR SHIPPING.
COMPRESSOR
NG50
24ft
SEQUENTIAL
PANEL
ESD
300
UCP
C106
DRYER
EXISTING
ON SKID
COM
PANEL
NEW ESD
3/4" CONDUIT
C105 - 3/4" CONDUIT
MOTOR CONTROL
PANEL
C109A - 3" CON
C108A
C107A
C112A
C104A 1-1/4" CONDUIT
GFCI
RECPT
C101A - 3/4" CONDUIT
Detail
A
SEE
DETAIL
'A'
DRYER
C105A 1 1/2 " COND.
C104 - 3/4" COND.
C103 - 3/4" COND.
C101B - 3/4" COND.
C101B - 3/4" COND.
C106B - 3/4" CONDUIT
C100
3/4" CONDUIT
TO H1 /GRUNSKY FILL POST
J BOX
C106B
C101B
WIRELESS
ANTENNA
COM1
50 MCP
50 UCP
TO CNG
DISPENSER
COMPRESSOR
NG50
POLE
TRANSFORMER
24ft
ASPHALT
NE
M
ON
RO
E S
T
PRIORITY
PANEL A
ESD2
3600/2000
FILL POST
1.25" PVC #3
ESD3
ESD4
SLO
W F
ILL E
XIS
TIN
G E
SD
7 &
8
ESD5
C111
CNG DISPENSER
ESD
POLE
TRANSFORMER
COMPRESSOR
NG50
24ft
ASPHALT
NE
M
ON
RO
E S
T
PRIORITY
PANEL A
ESD2
3600/2000
FILL POST
1.25" PVC #3
(2) 3/4" PVC
1 1/4" PE
ESD3
ESD4
SLO
W F
ILL E
XIS
TIN
G E
SD
7 &
8
ESD5
POLE
TRANSFORMER
3" PE
3/4"
CONDUIT
COMPRESSOR
NG50
24ft
ASPHALT
NE
M
ON
RO
E S
T
24"
PRIORITY
PANEL A
ESD
FILL
POST
C111
3/4" CONDUIT
1.25" PVC #3
POLE
TRANSFORMER
COMPRESSOR
NG50
24ft
ASPHALT
SEQUENTIAL
PANEL
ESD
UCP
DRYER
Detail
B
DRYER
J BOX
TO
G
AS
M
ET
ER
D
IS
P
H
O
S
E
V
E
N
T
S
L
O
W
F
IL
L
L
O
W
B
A
N
K
M
ID
B
A
N
K
H
I B
A
N
K
H1
LOW BANK
MID BANK
HIGH BANK
3" BORE
3" YELLOW PE
1 1/2" YELLOW PE
DETAIL B
1/2" .049 SS
1/2' .049 SS
TUBE IN PE
SLEEVE
1 1/4" BORE
1/2" .049 SS
IN PE
SLEEVE
L
L
L L
M
H
FRONT
TO SEQUENTIAL PANEL
POLE
TRANSFORMER
NOTES:1. COMPRESSION SUCTION 20 PSI.2. MAOP MUST BE AT MINIMUM 28 PSIG.3. AT MINIMUM PIPE MUST TEST TO 42 PSIG (1.5 TIMES THE MAOP.)4. ABOVE GRADE USE 4-1/2" SCHEDULE 40 STEEL5. BELOW GRADE PLASTIC MAOP OF MIN.28 PSI
COMPRESSOR
NG50
24ft
ASPHALT
NE
M
ON
RO
E S
T
SEQUENTIAL
PANEL
ESD
UCP
DRYER
DRYER
J BOX
TO
G
AS
M
ET
ER
3" YELLOW PE
1 1/2" YELLOW PE
PROPOSED LOCATION -
TO BE DETERMINED
BY KGS
POLE
TRANSFORMER