Kaizen at Coretec Kaizen at Coretec Presented by Narayan Rao VP Operations Yuken India Limited How Coretec became a totally transformed Company through major Kaizen efforts

Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Kaizen at CoretecKaizen at Coretec

Presented byNarayan RaoVP OperationsYuken India Limited

How Coretec became a totally transformed Company through major Kaizen efforts

Page 2: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

AgendaAgenda

• Introduction to Coretec• Transformation at Coretec:

– The Methodology– Re-layout– Seiton and other Improvements– Introduction of Kanban– Use of barcode technology

• Summing-Up

Page 3: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Introduction to CoretecIntroduction to Coretec

Page 4: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

About CoretecAbout Coretec

• An ancillary of Yuken India Limited

• Compact, independent unit

Page 5: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

About CoretecAbout Coretec

• Set up and managed by a senior executive with over 35 years experience (25 years at Yuken)

Page 6: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

About CoretecAbout Coretec

• Manufactures iron cores

• Used in solenoid-operated Direction Control Valves manufactured by Yuken India

01 AC

01 DC

03 AC 03 DC

Direction Control Valve

Iron cores

Iron core comes in here

Page 7: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

The methodologyThe methodology

How it was all done!

Page 8: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Guidance, WorkshopGuidance, Workshop

• Mr. V.K. Grover, Kaizen Consultant, started guiding Yuken and its sister companies from April 2000

• Initially, training was given in 5-S and in Kaizen concepts including kanban

• A four-day Gemba Kaizen workshop was conducted at these companies from 12th to 15th July 2000

Page 9: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Guidance, WorkshopGuidance, Workshop

• The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited

• The team re-laid out the Factory and initiated most of the changes explained here

• Every Friday afternoon was reserved for continuation of Kaizen activities

Page 10: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Re-layout at CoretecRe-layout at Coretec

Wasteful movements drastically reduced!

Page 11: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Original layoutOriginal layout

Incoming items

Finished items

Assembly , final welding to despatch

Raw material to tube-to-tube weldingStopper welding

MD’s office

Welding

Storage racks

Stor

age

rack

s

Stor

age

rack

s

Storage racks

Enclosure for grinding, buffing

Ultrasonic cleaning

Inspection / AssemblyTesting For backbite

removal

To next shed for air leak test

Return after air leak test

Return after backbite removal

Page 12: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Revised layoutRevised layout

Finished items

Incoming items

Assembly , final welding to despatch

Raw material to tube-to-tube weldingStopper welding

For backbite removal

Return after backbite removal

Welding

Inspection, Assembly, Ultrasonic cleaning

Grinding, buffing

Ultrasonic cleaning, testing

Page 13: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

BenefitsBenefits

• Material movement reduced by 10 kms by: – Re-layout– Some operations were brought in– Some operations were closer

• Total floor space released : 40%• Part of the space released used for:

– Enlarging Managing Director’s office by 30%: very cramped earlier

– Providing space for visitors

Page 14: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Seiton and other Seiton and other improvementsimprovements

Making the worker’s life easier

Page 15: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Arrangement of toolsArrangement of tools

• Tools and equipment required stored neatly near the work place

• Space for keeping rejection and rework items:– Stored by type of

defect

Page 16: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Grinding and buffingGrinding and buffing

• Lot of time was wasted in changing wheels for tip grinding:– Additional bench

grinder procured and located properly

• Dust extractor installed

Page 17: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

New fixtureNew fixture

• Copper rods inserted into stainless steel tubes at time of welding

• Removing these rods after welding was manual, time-consuming

• New pneumatic fixture:– Removes copper rod– Inserts into tubes to be

welded next

Page 18: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Right-sized machinesRight-sized machines

• One large ultrasonic cleaning machine used earlier: batches of 50 cleaned at a time

• Now, two small ultrasonic machines clean 6 at a time

New machine

Old ultrasonic cleaning machine including panel

New ultrasonic cleaning

machine (no extra panel)

Page 19: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Testing – before KaizenTesting – before Kaizen

• Testing of iron cores very laborious:– Fill up oil, assemble

to valve body– Manually operate

switch 100 times for each iron core

– Assemble 49 at a time to manifold

– Test one by one for air leak and for movement of the manual pin

Page 20: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Testing – after KaizenTesting – after Kaizen

• New test rig using a hydraulic power pack and a timer mechanism:– Both tests done

separately earlier now combined

– Saving of 3 minutes per iron core

– Higher reliability of testing

Page 21: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Manpower ReductionManpower Reduction

Before Kaizen

After Kaizen (present status)

Final target

5 3 2

Page 22: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Introduction of KanbanIntroduction of Kanban

No more planning!

Kanban from Customer

Kanban to Supplier

Page 23: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Kanban from CustomerKanban from Customer

• Daily supply to Yuken:– Empty trays

collected from Yuken

– Required iron cores produced the same day

– Filled trays delivered to Yuken the next day

Page 24: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Kanban to SupplierKanban to Supplier

• Subcontractors also operate on kanban in a similar way

• Subcontractor visits daily, picks up empty trays and returns filled trays next day

• No more shortages, no more follow-up and tension!

Page 25: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Kanban to SupplierKanban to Supplier

• Kanban through trays operates even with a supplier located at Harihar, 350 kms away from Bangalore

• Trays sent by bus overnight and returned in 2 – 3 days

Page 26: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Benefits from KanbanBenefits from Kanban

Item Before Kanban

After Kanban

Reduction %age

Iron Cores at Yuken & Coretec

Rs. 0.4 million

Rs. 0.02 million

95%

Raw materials and components

Rs. 0.82 million

Rs. 0.4 million

52%

Total inventory Rs. 1.22 million

Rs. 0.4 million

66%

Page 27: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Benefits from KanbanBenefits from Kanban

0.82

0.4

0.4

0.02

0

0.2

0.4

0.6

0.8

1

1.2

1.4

Before After

Finished Iron CoresComponents

All values in Rupees millions

Page 28: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Use of barcode Use of barcode technologytechnology

Material movement fully computerised:

No more manual material accounting and reconciliation!

Page 29: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Bar-code technologyBar-code technology

• All trays affixed with bar code stickers

• Trays scanned:– Incoming– Outgoing

• Automatic generation of DC’s and MRNs

• Analysis of tray (and therefore material) movement easily possible

Page 30: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Summing-UpSumming-Up

Total transformation of operations!

Page 31: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Future PlansFuture Plans

• Buy a small lathe so that components do not go out for removing weld “backbite”

• Use the same welding transformer to run three independent welding stations so that true one-piece flow can be implemented

Page 32: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

The Last WordThe Last Word

• Mr. T.R. Prasanna, the Managing Director of Coretec feels that Kaizen has made his Company run by itself and left him free to plan for expansion and further growth

Page 33: Kaizen at CoretecYuken)_0_0.pdf · 2013-04-18 · • The team consisted of one person from Coretec, and others from Yuken India Limited and Sai India Limited • The team re-laid

Thank You!Thank You!