Kai Tak Development Kai Tak Development Urban Design Enhancement Proposals Urban Design Enhancement Proposals Civil Engineering and Development Department June 2011

Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

Kai Tak DevelopmentKai Tak Development Urban Design Enhancement ProposalsUrban Design Enhancement Proposals

Civil Engineering and Development DepartmentJune 2011

Page 2: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

KTD Projects Targeted for Completion in 2013KTD Projects Targeted for Completion in 2013

Page 3: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

Cruise Terminal Building and First Berth Targeted for Cruise Terminal Building and First Berth Targeted for Completion in 2013Completion in 2013

Page 4: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

Public Housing Development at North Apron Targeted Public Housing Development at North Apron Targeted for Completion in 2013for Completion in 2013

Page 5: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

Original Roads in Kai Tak OZP

Proposed Roads

Original road at waterfront(under the landscaped deck)

Relocation of roads away from the waterfront to central Runway Boulevard under the landscaped deck

Waterfront

Proposed Relocation of Roads and the Associated Proposed Relocation of Roads and the Associated Landscaped Deck at Runway away from the WaterfrontLandscaped Deck at Runway away from the Waterfront

Residential Sites

Commercial Sites

Original road at waterfront

Page 6: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

Waterfront

Pedestrian Link

Proposed Road

New “G/IC” Site

Proposed Relocation of Road at South Apron away Proposed Relocation of Road at South Apron away from the Waterfrontfrom the Waterfront

45

Original Road in Kai Tak OZP

Relocation of road away from the waterfront

Original road at waterfront

Page 7: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

Kai Kai TakTak

Waterfront Free from Road BarrierWaterfront Free from Road Barrier

Page 8: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

Kai Kai TakTak OZP and Lung OZP and Lung TsunTsun Stone BridgeStone Bridge

Location of Lung Tsun Stone Bridge

Page 9: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

Prince

Edward R

oad Eas

t

Pedestrian Access

Three “CDA” sites abutting on Preservation Corridor

Subway to connect Kowloon Walled City Park

Subway to connect upstream of Kai Tak River

Kowloon Walled City Park

Upstream of Kai Tak River

Proposed Enhancement to Facilitate Proposed Enhancement to Facilitate Preservation of Lung Preservation of Lung TsunTsun Stone BridgeStone Bridge

30 m-wide Preservation Corridor

Delete a section of elevated walkway crossing Prince Edward Road East

Development sites west of Preservation Corridor

Page 10: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

Proposal to Reinforce Gateway Image and Provision of a Proposal to Reinforce Gateway Image and Provision of a Large Landscaped and Community Area for Arts and Large Landscaped and Community Area for Arts and PerformancePerformance

Two landmark buildings along Kai Tak

River

A

A

Section A‐A

“OU” for arts and performance

Page 11: Kai Tak Development Urban Design Enhancement Proposals2011/06/01  · KTD Projects Targeted for Completion in 2013 Cruise Terminal Building and First Berth Targeted for Completion

Design Concept having Residential Towers and Design Concept having Residential Towers and Low Blocks with a Courtyard is Adopted at Grid Low Blocks with a Courtyard is Adopted at Grid NeighbourhoodNeighbourhood