KAGRA RoadmapKAGRA Roadmapand and
Progress Evaluation Progress Evaluation AssessmentAssessment
S.Miyoki S.Miyoki M.AndoM.Ando2012/7/302012/7/30
Outline
• Introduction• Updated KAGRA Roadmap• KAGRA Progress Chart (KPC) as
milestones according to bottom up plans
• KAGRA Progress Chart Evaluation
• Summary
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
Update Roadmap- Ando’s Ext.Rev Presentation-
We Updated the KAGRA Roadmap. • Mainly because of delay in the excavation
schedule. • It is regarded as a good chance to refine the
schedule. • Recent some budget status might require minor
changes.
Roadmap special working group was held chaired by M.Ando • We made iteration between the project
constraints and the bottom-up plans submitted from subgroups.
• Open discussions in the collaboration were done -> Finally, this recommendation was approved by EO.
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
KAGRA Roadmap (ic1)
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
2013 2014 2015 2016 2017 2018
Tunnel Excavation(14/3)
FPMI (15/12)
Vacuum(15/3)
DRMI (16/9)
Type-A Cryo(16/9)
RSE(17/8)
Cryo-RSE(18/3)
TuningAndObservation
Sapphire Test mass preparation(16/3)
b-KAGRA
i-KAGRA• Training for km-scale IFO.
• Sorting out the problems involved in KAGRA
• Short observation will be done
• Introduce Full Type-A SAS, Cryogenic and RSE Technique.
• Realize the targeted sensitivity and observation.
12
12
12
12
12
12
ic1 phase
Tunnel Excavation and FAL Construction
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
Tunnel Excavation Power line, water line, air
humidity conditioner, network installation
Clean room construction
North Direction
Mozumi Tunnel
GW Atotsu Tunnel
From 12/5
From 12/6
till 14/3
GW Office(2012/08)
30 degY arm
X arm
KAGRA Roadmap (ic2)
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
2013 2014 2015 2016 2017 2018
Tunnel Excavation(2014/3)
FPMI (2015/12)
Vacuum(2015/3)
DRMI (2016/9)
Type-A Cryo(2016/9)
RSE(2017/8)
Cryo-RSE(2018/3)
TuningAndObservation
Sapphire Test mass preparation(16/3)
b-KAGRA
i-KAGRA
12
12
12
12
12
12
ic2 phase
Vacuum and Laser Stuff Installation 1
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
• Both Arm and IY*, EY* installation
• Laser, MC*, IFI, IMM installation
No ConnectionParallel task
Type-C
Type-AType-B
Mozumi Tunnel
GW Atotsu Tunnel
EYC,EYV, EYT
EXC,EXV, EXT
IXC,IXV, IXT
IYC,IYV
MCE
EYA
IYA
IXA
VIS Types
MCF
IFI, IMM
Laser
EXA
GW Office
Vacuum and Laser Stuff Installation 2
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
Mozumi Tunnel
GW Atotsu Tunnel
MCE
MCF
PRM MR2
MR3IFI, IMM
Type-C
Type-AType-B
VIS Types
EYC,EYV, EYT
EXC,EXV, EXT
IXC,IXV, IXT
IYC,IYV
EYA
IYA
IXA EXA
• Center part construction without SR* and OMC, OFI
• Type-A SAS test at Y End at room tmp
• Cryogenic test at X End
Laser
GW Office
KAGRA Roadmap (ic3)
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
2013 2014 2015 2016 2017 2018
Tunnel Excavation(14/3)
FPMI (15/12)
Vacuum(15/3)
DRMI (16/9)
Type-A Cryo(16/9)
RSE(17/8)
Cryo-RSE(18/3)
TuningAndObservation
Sapphire Test mass preparation(16/3)
b-KAGRA
i-KAGRA
12
12
12
12
12
12
ic3 phase
iKAGRA CommissioningMozumi Tunnel
GW Atotsu Tunnel
MCE
MCF
PRM MR2
MR3
Type-C
Type-AType-B
VIS Types
EYC,EYV, EYT
EXC,EXV, EXT
IXC,IXV, IXT
IYC,IYV
EYA
IYA
IXA EXA
IFI, IMM• Low Laser Power (15W ?)
• FPMI operation using Silica Mirrors in IXA, IYA, EYA, EXA.
• Short Commissioning ~ 1 month(15/12)
Laser
GW Office
KAGRA Roadmap (bc1)
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
2013 2014 2015 2016 2017 2018
Tunnel Excavation
FPMI (15/12)
Vacuum(15/3)
DRMI (16/9)
Type-A Cryo(16/9)
RSE(17/8)
Cryo-RSE(18/3)
TuningAnd
Observation
Sapphire Test mass preparation(16/3)
b-KAGRA
i-KAGRA
12
12
12
12
12
12
bc1 phase
bKAGRA Commissioning 1
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
Mozumi Tunnel
GW Atotsu Tunnel
MCE
MCF
PRM MR2
MR3
Type-C
Type-AType-B
VIS Types
EYC,EYV, EYT
EXC,EXV, EXT
IXC,IXV, IXT
IYC,IYV
EYA
IYA
IXA EXA
IFI, IMM
• SR*, OMC, OFI are prepared.• VIS upgrade to Type-B for
core optics• DRMI Operation using Silica
Mirrors• Full test of VIS Type-A +
Cryo-Mirror
SRM
SR3
OFIOMC
SR2
Laser
GW Office
KAGRA Roadmap (bc2)
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
2013 2014 2015 2016 2017 2018
Tunnel Excavation
FPMI (15/12)
Vacuum(15/3)
DRMI (16/9)
Type-A Cryo(16/9)
RSE(17/8)
Cryo-RSE(18/3)
TuningAnd
Observation
Sapphire Test mass preparation(16/3)
b-KAGRA
i-KAGRA
12
12
12
12
12
12
bc2 phase
bKAGRA Commissioning 2
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
Mozumi Tunnel
GW Atotsu Tunnel
MCE
MCF
PRM MR2
MR3
Type-C
Type-AType-B
VIS Types
EYC,EYV, EYT
EXC,EXV, EXT
IXC,IXV, IXT
IYC,IYV
EYA
IYA
IXA EXA
IFI, IMM
• Sapphire mirrors suspended Type-A.
• RSE Operation (Sapphire mirrors at room temp.)
SRM
SR3
OFIOMC
SR2
Laser
GW Office
KAGRA Roadmap (bc3,4)
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
2013 2014 2015 2016 2017 2018
Tunnel Excavation
FPMI (15/12)
Vacuum(15/3)
DRMI (16/9)
Type-A Cryo(16/9)
RSE(17/8)
Cryo-RSE(18/3)
TuningAnd
Observation
Sapphire Test mass preparation(16/3)
b-KAGRA
i-KAGRA
12
12
12
12
12
12
bc3,4 phase
bKAGRA Commissioning 3
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
Mozumi Tunnel
GW Atotsu Tunnel
MCE
MCF
PRM MR2
MR3
Type-C
Type-AType-B
VIS Types
EYC,EYV, EYT
EXC,EXV, EXT
IXC,IXV, IXT
IYC,IYV
EYA
IYA
IXA EXA
IFI, IMM
• RSE Operation (at Cryo Temp.)
• IFO Tuning • Observation
SRM
SR3
OFIOMC
SR2
Laser
GW Office
In the Last PAB Report … ‘We believe the project needs a more systematic
technique for monitoring of status and plans, in effect, some version of a performance measurement system. … We recommend that some form of baseline planning and performance assessment be added to the project.’
-> A :Progress Evaluation System Introduction
‘A key element in this performance measurement system will be establishing an integrated schedule, built up from the individual subsystem schedules.’
-> A: Construct Master schedule and make detail schedule from each subgroup Bottom-up Plans.
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
Bottom-up Plan and Progress Evaluation System
Schedule management system for quantitative evaluation of project progress was introduced.
Progress evaluation is done by a ‘Milestone scheme’. • Set ~10 milestones for each subsystem, picked up
from a detailed schedule of each subsystem. • Status for the milestones will be checked in
regular “Chief” meetings.• Required progress evaluation accuracy is ~20%
resolution. • The status will be open for all the collaborators. • For this purposes, a software and network system
: MS Project and Web server were prepared. F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
KAGRA Progress Chat (KPC)based on bottom-up Plan
• KAGRA bottom up schedules of all subgroups are collected in one MS Project file.
• The mile stones and some important construction items , their anteroposterior relation and period are listed with respect to each subgroup.
• Time schedule consistency and anteroposterior relations between subgroups items are also specified.
KAGRA External Review 2012/4/17~20 in ICRR, Kashiwa
All KAGRA Progress Chart (KPC)
KAGRA External Review 2012/4/17~20 in ICRR, Kashiwa
Subgroups Schedule for each milestones
Important Items and Anteroposterior relations in
Subgroups
KAGRA External Review 2012/4/17~20 in ICRR, Kashiwa
VAC milestones and some importantItems and schedule.
Detailed Progress schedule and Milestones
Anteroposterior relations bw Sub-Gs
KAGRA External Review 2012/4/17~20 in ICRR, Kashiwa
VIS milestones and schedules
CRY milestones and schedules
KPC progress sign for each item
F2F Meeting 2012/7/30~1 in ICRR, Kashiwa
• Black lines in the bar shows progress rate.
Progress Evaluation and Action
• Each subgroup chief is requested to check the progress with this schedule for each item by himself in every chief meetings (every tweek weeks).
• If the chief encounters some problems that result in the delay of schedule, he is encouraged to consult with SEO.
• SEO should find any signs that show progress delay as soon as possible, and try to find reasons and problems with chiefs, and to show solutions. At the same time SEO should report to EO about KPC.
KAGRA External Review 2012/4/17~20 in ICRR, Kashiwa
Where we can find the KPC ?
KAGRA External Review 2012/4/17~20 in ICRR, Kashiwa
• Schedule can be found in the “Chief meeting report page (pass required)” and the “Subgroup blog page (free access)” (in Japanese).
Progress schedule link
http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/http://gwclio.icrr.u-tokyo.ac.jp/lcgtchief/
Summary• KAGRA Roadmap was refined and some
minor re-refines might be expected because of budget status in the future.
• As detailed roadmap progress, KPC (KAGRA Progress Chart) was prepared by gathering milestone items (bottom-up plans) of subgroups.
• Chiefs are requested to update their progress status in KPC, while SEO members should check them, follow and report any troubles and delays for them to EO.