TITLE :

URBAN TRANSPORTATION

ASSIGNMENT 1

NAME : MUHAMMAD BIN RAMLAN

MATRIX NO : P 57600

SUBJECT : KKKA 6564

YEAR : 2011/2012

LECTURER : PROF IR DR RIZA ATIQ O.K. RAHMAT

Page 2: KA6564 Assignment 1

QUESTION ASSIGNMENT 1

A proposed development will be constructed near the Putrajaya-Kajang highway as

shown in Figure 1.

Figure 1

The development consists of an office building with 102,000 square meter floor area and

a 295 units condominium tower.

It is expected will attract 3.3 person-trips per 100 square meter floor area per hour in

the morning, whereas the condominium will produce 1.45 person-trips per unit per

hour. It is estimated that only 16% of the generated trip by the condominium destine to

the office building in the development area.

Mode Split Average

Capacity

Car 55% 1.9

Motorcycle 9% 1.15

Bus 36% 50

You are required to:

a) Compute production and attraction.

b) Compute the number of persons entering and exiting the development area per hour in

the morning.

c) Compute the number of each transport mode entering and exiting the development in

the morning.

d) If 80% of the attraction is from Kajang, determine the minimum width of the bridge.

Proposed Development

To Kajang To Putrajaya

Page 3: KA6564 Assignment 1

SOLUTION ASSIGNMENT 1

a) Compute production and attraction

Land Use Residential Unit Production rate

(person-trip / unit /

hr)

Morning production

(person-trip / hr)

Condominium 295 1.45 428

Land Use Residential Unit (m2) Attraction rate

(person-trip / m2 /

hr)

Morning Attraction

(person-trip / hr)

Office building (102000/100) = 1020 3.3 3366

b) Compute the number of persons entering and exiting the development area per hour in

the morning

Land Use Number of person

from the

condominium

destine to the office

building in the

development area

(person-trip / hr)

Number of persons

entering the

development area

(person-trip / hr)

Number of persons

exiting the

development area

(person-trip / hr)

Development area (16/100) x 428 = 68 3366 – 68 = 3298 428 – 68 = 360

Page 4: KA6564 Assignment 1

c) Compute the number of each transport mode entering and exiting the development in

the morning

Number of each vehicle entering development:

Land Use Entering Modal Split Person Trip Number of vehicles

car motorcycle bus car motorcycle bus car motorcycle bus

Development

area

3298 55% 9% 36% 1814 297 1187 955 258 24

TOTAL 955 258 24

Number of each vehicle exiting development:

Land Use Exiting Modal Split Person Trip Number of vehicles

car motorcycle bus car motorcycle bus car motorcycle bus

Development

area

360 55% 9% 36% 198 32 130 104 28 3

TOTAL 955 258 24

D) If 80% of the attraction is from Kajang, determine the minimum width of the bridge.

Land Use Attraction from kajang (person-trip / hr)

Development area (80/100) x 3298 = 2638

Numbers Quantity

Cars 2638/1.9 = 1388

Lane *For Malaysian Standard: 1800 Cars Per Link

1388/1800 = 0.77 ≈ 1

Items Description

Bridge Width *assume 1 lane is 3.5m, road shoulder is 1m, marginal strip is 0.5m.

Therefore, bridge width for two lane is:

= (3.5m + 1m + 0.5m) x 2

= 10m