16
1 of 16 56- 73 KA 5251-01

KA 5251-01 FINAL

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KA 5251-01 FINAL

1 of 16

56-7

3KA

5251

-01

To Do:Add page #'s

Page 2: KA 5251-01 FINAL

2 of 16

10 The contractor shall schedule his operations so that no traffic is allowed on any area that has beenmachined prepped but not overlaid.

Page 3: KA 5251-01 FINAL

3 of 16

475

56- 73 KA 5251-01

Page 4: KA 5251-01 FINAL

4 of 16

56- 73 KA 5251-01

Page 5: KA 5251-01 FINAL

5 of 16

56- 73 KA 5251-01

56- 73 KA 5251-01

Page 6: KA 5251-01 FINAL

6 of 16

Page 7: KA 5251-01 FINAL

7 of 16

Page 8: KA 5251-01 FINAL

8 of 16

Page 9: KA 5251-01 FINAL

9 of 16

Page 10: KA 5251-01 FINAL

10 of 16

Page 11: KA 5251-01 FINAL

11 of 16

Page 12: KA 5251-01 FINAL

12 of 16

Page 13: KA 5251-01 FINAL

13 of 16

Page 14: KA 5251-01 FINAL

14 of 16

Page 15: KA 5251-01 FINAL

15 of 16

Page 16: KA 5251-01 FINAL

16 of 16

R11-3A 1

20.1

56- 73 KA 5251-01