16

K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List
Page 2: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

COMPANY PROFILE

K & J Projects Pvt. Ltd. (K&J) is a leading

consulting company in the civil engineering

industry and provides holistic services for

infrastructure projects. K&J was incorporated in

2004, in Maharashtra, with our Head office and

design center at Nagpur. We have pan India

presence through our various regional and

project offices spread all over India.

K&J Projects provides consultancy services for

Multi-disciplinary infrastructure development

projects. K&J invests in continued training of our

engineering staff to build and update knowledge

in their respective domain. We have gained

expertise built through decades of experience.

Currently, K&J proudly offers:

• One-stop and comprehensive solutions for awide range of assignments

• Consultancy based on extensive knowledge ofinfrastructure projects

• Experience gained from a wide portfolio ofprojects

• Best-in-class quality, value and time-boundservices

• Innovative solutions for critical issues

Page 3: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

Fields of Specialization:

♦ Highways:

❖ Feasibility Studies & Detailed Project Report

❖ Supervision & Quality Control

❖ Independent Engineer

❖ Authority’s Engineer

❖ Detailed Design & Engineering Services

❖ Proof Consultancy Services

❖ Pre-Bid services

♦ Bridges:

❖ Feasibility Studies & Detailed Project Report

❖ Supervision & Quality Control

❖ Bridge Inspection with MBIU

♦ Railways

❖ Preliminary Location Surveys

❖ Final Location Surveys

❖ ROB / RUB DPR and Designs

❖ PMC Consultancy for Railway Siding

Page 4: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

♦ Buildings

❖ Master Planning / Architectural / Structural Design

❖ Approvals from Local Bodies

❖ Allied Services Design (MEP / WTP/ STP)

❖ Project Management

♦ Engineering Surveys andInvestigations:

❖ Topographic Survey

❖ Material Investigations

❖ Pavement Investigations and analysis

❖ Traffic Surveys, analysis and modelling

❖ Forest Clearance

❖ Land acquisition

Page 5: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

Falling Weight Deflectometer A Falling Weight Deflectometer (FWD) is a Non

Destructive Test Equipment to evaluate the Physical properties of pavement.

The Falling Weight Deflectometer is base on imparts adynamic load to a pavement

The Falling Weight Deflectometer measure deflectionof pavement surface

KUAB 70VM SPGE Vehicle Mounted Falling WeightDeflectometer (VMFWD) as per IRC 115-2014 Guidelines for Structural Evaluation and Strengthening of Flexible Road Pavements using Falling Weight Deflectometer(FWD) technique.

MOBILE BRIDGE INSPECTION UNITS: A large operating range A high level of working comfort Maximum operational safety The shortest possible setting up and dismantling times Full mobility in inspection operation without stabilizer

supports An optimum weight/performance ratio

Automatic Traffic Counter and Classifier (ATCC)

This piezoelectric system is ideal for major roads with heavy flow. While collecting axle data year-round, this counter is the solution to identify traffic patterns, seasonal variations, and assess infrastructure over time.

Retroreflectivemeter

MiniReflecto Vertical is a handheld instrument for measurement of the coefficient of retroreflection (RA) of road signs, safety clothing and other materials. The innovative optical system can measure up to 4 (four) simultaneous observation angles. The entrance angle (β) can be fixed ( −4° / +5° ) or it can be continuously adjusted by the operator.

Page 6: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

Highway Projects:

At present, K&J is executing consulting assignments in 13 States & 1 Union Territory viz.

Andhra Pradesh, Arunachal Pradesh, Bihar, Chhattisgarh, Gujarat, Madhya Pradesh,

Maharashtra, Mizoram, Tamil Nadu, Telangana, Uttar Pradesh, West Bengal, Kerala and

Andaman & Nicobar Islands.

The present project portfolio includes:

➢ DPR for 6 Lanning of NH – 2 Projects

➢ DPR for 4 Lanning of NH – 10 Projects

➢ Independent Engineer – 12 Projects

➢ Authority’s Engineer – 7 Projects

➢ Bridge Condition Surveys using Mobile Bridge Inspection Unit (MBIU) – Bihar, West-

Bengal and IE O&M Projects

➢ Project Management (Building) – 225 Acres / 3000 tenements

➢ Detailed Design and Engineering Projects: 4 Projects.

Following is the List of all Highway Projects: Sr. PROJECT’S SUMMARY Client

Supervision Projects

1 ROB at Hinganghat & Pimphalkhutti, on Nagpur Hyderbad Section of -

NH7

NHAI

MADC MIHAN Projects

1 Consultancy Services for development of Road Network, Storm Water Drainage

& Other infrastructure including water supply and sewerage system in

Chinchbhuvan and Sumthana area in MIHAN at Nagpur

MADCL

2 PMC for Planning, Designing and Construction Supervision of Parking for Code

E Type of Aircraft at Dr. Babasaheb Ambedkar International Airport, Nagpur.

MIHAN India

Ltd.

3 Consultancy Services for Construction of Extended Link Taxiway (Connectivity)

from Existing MRO to Proposed Reliance Aero structure Ltd. Project

MIHAN SEZ at Nagpur.

MADCL

4 Project Management Consultancy for Road Connectivity, Bridge Connection,

Channelization of Nallah and Zudpi Jungle demarcation at the location of

Proposed Food Park.

MADCL

5 MADC-Consultancy Services of Proposed Commercial complex in MIHAN MADCL

Page 7: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

6 MADC-PMC-Chinchbhuvan & Sumthana (new-additional LOA dtd. 21.11.17).

Construction of Commercial Complex at Sector 21 in the MIHAN Notified

area, Nagpur.

MADCL

7 MADC-PMC Construction of Approach road for Connectivity to 12.5%

Scheme of MIHAN at Sumthana Telhara

MADCL

8 Consultancy services for Construction of SH Way 348 from outer ring road to

MIHAN Boundary length 0.600 Km and widening of Z-Z4 road (2 Lane to 4

Lane) length 0.400 Km. in MIHAN SEZ.

MADCL

9 Appointment of PMC for Detailed Project Report for construction of Roads,

Storm Water Drain, Water supply & Sewerage System at Sector 17 near

Infosys (Client MADC)

MADCL

Independent Engineering Projects

1 Independent Engineer services during Operation & Maintenance Period for

Chhattisgarh/Maharashtra Border to Wainganga Bridge Section (Bhandara

- Sakoli) from Km.405.000 to Km.485.000 of NH-53(Old NH-6) in the State of

Maharashtra under NHDP Phase IIIA on Build, Operate and Transfer (BOT)

basis- Consultancy Package No.IE-O&M/NH-6/NAG-2

NHAI

2 NHAI – RO Hyderabad – PIU Nirmal - Appointment of Independent Engineer

Services during Operation & Maintenance Period for 4 laned Stretch from Km.

367.000 (Adloor Yellareddy) to Km. 464.000 (Gundla Pochanpalli) (Contract

Package No. NS-2/BOT/AP_2) on Nagpur – Hyderabad Section of NH-44 (Old

NH-7) in the State of Telangana on BOT (Annuity) Basis under North – South

Corridir (NHDP Phase-II) and Additional Highway from Km. 464.000 (Gundla

Pochanpalli) to Km. 474.000 (Bowenpalli)

NHAI

3 Correspondence_IE & O&M_"for 4 Laning of Pune-Solapur Section of NH-65

(erstwhile NH-9) from Km. 150.050 to Km. 251.325 in the state of Maharashtra

under NHDP Phase-III Package-II on DBFOT basis)

NHAI

4 Consulting Services as Independent Engineer during Operation & Maintenance

period for 4 lane divided carriageway facility of the section from Rajahmundry -

Dharmavaram - Tuni constructed on BOT (Annuity) on NH-16 in the state of

Andhra Pradesh on NHDP Phase - I

NHAI

5 Independent Engineers' Services During O & M Phase of 4-laned Dhule -

Pimpalgaon Km 265+000 to 380+000 (Dhule -Pimpalgaon ) Section of NH-3

(New NH-60) in the State of Maharashtra.

NHAI

6 Independent Engineer Services during (O&M) for 4/6 laned stretch from

Km.40.000 to Km.221.500 of Hyderabad -Vijayawada Section of NH-65(old

NH no. 9) Package No. NHDP-III/BOT/AP-01 in the state of Telangana &

Andhra Pradesh under North-South corridor (NHDP Phase - III) for length of

181.500 km.

NHAI

Page 8: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

7 Independent Engineer Services for Operation & Maintenance for Kolaghat -

Haldia including the incomplete section of ROB cum Flyover from KM 52.080

to KM 53.472 at the end of NH-41 on OMT Basis in the state of West Bengal.

NHAI

8 Independent Engineer Services for Four Laning of Kallagram to Karuppur

from KM 38+700 to KM 50+382 & two laning with paved shoulders from

Karuppur to Meensurutti from KM 50 + 382 to KM 98 + 433 of NH 227 under

Bharatmala Pariyojana (Residual Projects under NHDP Phase-IV) in the state of

Tamil Nadu on Hybrid Annuity Mode - LOA-reg..

NHAI

9 Independent Engineer Services during Operation & Maintenance stage of 4

Laning of Walayar-Vadakkancherry from existing Km 182.250 to Km 240.000

(Design length 54.00 Km) in the State of Kerala under NHDP Phase-III

executed on BOT(TOLL) on DBFOT basis.

NHAI

10 Independent Engineer during Operation and Maintenance for the project of

Design, Engineering, Finance, Construction, Operation and Maintenance of

access-controlled highway project of Bangalore - Nelamangala section of NH-

4 from KM 10.000 to KM 29.500 in the state of Karnataka on Build, Operate &

Transfer (BOT) basis.

NHAI

Authority Engineering Projects

1 Consultancy Services for Authority’s Engineer for Supervision work of

Rehabilitation & up-gradation of NH-12A from Km. 246.849 to Km. 317.406

(Kawardha – Simga Section) to two lane with paved shoulder under NHDP-IV

on EPC basis in the State of Chhattisgarh.

PWD-

Chhattisgarh

2 Consultancy Services for Authority’s Engineer for Supervision of " constructions

Widening of Road Two Lane with paved shoulders including construction of

Bridge & Culvert in KM 130+000 to 146+200 & KM 159+900 to KM 188+400 &

overlay at existing road in Chhatarpur from KM 146+200 to KM 159+900

(Excluding Construction of Bridge 188/4 and Chhatarpur Bypass on NH 86

(Sagar - Chhatarpur Road) Length 58.400 KM on EPC mode in the state of

Madhya Pradesh.

PWD -

Madhya

Pradesh

3 Consultancy Services for Authority’s Engineer for Supervision of " constructions

Widening of Road Two Lane with paved shoulders including construction of

Bridge & Culvert in KM 1 to 49/4 (length 48.7 KMs) on NH 26A (Sagar - Bina

Road) on EPC mode in the state of Madhya Pradesh.

PWD - MP

4 Consultancy Services for Authority's Engineer for Supervision of Rehabilitation

and upgradation to 2 lane with paved shoulder / 4 Lane standards of National

Highway section Chikhli - Khamgaon section of NH 548C (Length - 56.103

KM) in the State of Maharashtra under EPC Mode (PKG-25)

MORT&H

Page 9: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

5 Consultancy Services for Authority's Engineer for Supervision of Rehabilitation

and upgradation to 2 lane with paved shoulder / 4 Lane standards of National

Highway section (I) Bhandara - Ghotitok section of NH 753 (Length 37.47 KM

& Section (II) Amdi - Saoner Section of NH 753 (Lenght 39.58 KM) on EPC

mode (NH/MAH/PWD/NAGPUR -1/AE/PKG-12) (Ramtek Section)

MORT&H

6 Consultancy Services for Authority's Engineer for Supervision of Rehabilitation

and upgradation to 2 lane with paved shoulder / 4 Lane standards of National

Highway section (I) Nandgaon - Morshi Warud section of NH 753K (Length -

43 KM) & Section (II) Morshi to MH/MP State Border Section of NH 353K

(Length - 52.39 KM) on EPC Mode (NH/MAH/PWD/NAGPUR -7/AE/PKG-18)

MORT&H

7 Consultancy Services for Authority's Engineer for Supervision of Rehabilitation

and upgradation to 2 lane with paved shoulder / 4 Lane standards of National

Highway section (I) Akola to Akot section of NH 161A from Design CH : KM

0.00 (Below VUP of NH-6 Bypass, Akola) to CH : 51.700 (Akot) (Length 39.286

KM) & Section (II) Akot to Anjangaon Section of NH 548 C (Lenght 31.53 KM)

on EPC mode (NH/MAH/PWD/NAGPUR -11/AE/PKG-22)

MORT&H

8 Consultancy Services for Authority's Engineer for Supervision of Balance work

of Rehabilitation and upgradation Satna Bela section of NH 75 from KM

155+000 to KM 202+040 (Design Length 47.040 KM) to 4 Lane with paved

shoulders & Balance work of Rehabilition & up-gradation from KM 98 + 147

(Mangawan) to KM 45 +420 (Chakghat) Section of NH 27 on EPC mode in the

state of Madhya Pradesh.

PWD MP

9 Consultancy Services for Authority’s Engineer for Construction of Access

Controlled Nagpur - Mumbai Super Communication Expressway, Package-

1, from Km. 0.000 to Km. 31.000 (Section – Village Shivmadka to Village Khadki

Amgaon) in District Nagpur

MSRDCL

Building Supervision Projects

1 Construction Supervision and Quality Control works for the Central Library

building at DMCH Darbhanga and PG girls hostel building at DMCH,

Darbhanga - Bihar (BMSCIL)

(BMSICL)

MBIU Projects

1 Detailed breakup of cost for Collection of bridge condition and bridge inventory

data under each Regional Office of the Ministry for a period of three years-

BIHAR (MBIU - PATNA)

MORT&H

2 Detailed breakup of cost for Collection of bridge condition and bridge inventory

data under each Regional Office of the Ministry for a period of three years -

WEST BENGAL, Andaman & Nicobar (MBIU - KOLKOTA)

MORT&H

Page 10: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

Feasibility Study & DPR Projects

Sr. Project Summary Client

1 Consultancy Services for preparation of Feasibility Study cum Detailed Project

Report for Rehabilitation &Upgradation of NH-565 from Km. 361.327 to Km.

425.900 (Dornala T Junction to Penchalakona section) to two lane with

paved shoulder in the State of Andhra Pradesh.

R&B, AP

2 DPR Package-VII (km60.00 to 153.00 (except km90.00 to 100.80 and

Pratapgarh Bypass) of NH96 and 4 lanning of NH56 ( from

Harahua to Varanasi City about 10 km length) Incl.ROB & NH 233 ( 5km

length in city)

MORT&H

DPR Package-VIII (Km 0.00 to 109.46 of NH330A except Aam Ghat Bridge

Over Gomti River in km 61)

3 Feasibility study and prepration of DPR of Kodad Khammam Kurvi section of

NH-365A

4 Technical Consultancy for preparation of detailed project report for

Rehabilitation & Improvement to 4 lane with improvement of junctions, Medians,

RCC drain, Footpath with PQC in (I) KM 704/227-709/00 (Kanhan town existing

- 10 section) (II) km 712/00-715/00 (Kamptee to Bhilgaon Naka existing 7-10 m

section) (iii) km 721/000 to 729/000 (Bhilgaon Naka to Zero Mile stone average

14 m section) of Urban Link of Nagpur Kamptee section of Nagpur Jabalpur

Road NH-44

NHAI

5 Consultancy services for preparation of feasibility study and preparation of

detailed project report for 2 lane with paved shoulders including strengthening

of Ratnagiri-Kolhapur section of NH 166 from Km 0.000 to km 137.285 in

Ratnagiri & Kolhapur districts in the state of Maharashtra.

PWD

Maharashtra

6 Feasibility study and prepration of DPR for two laning of Joram Koloriang

road from Km 70.0 to km 138.0(length :68 km) in the state of Arunanchal

Pradesh under SARDP-NE on EPC mode.

7 Consultancy Services for preparation of detailed project report (DPR) for four-

laning of Meerut-Najibabad Section (about 110 Km.) of NH-119 in the State of

Uttar Pradesh under NHDP-IV.

8 Consultancy Services for Feasibility Study, Detailed Project Report, Survey,

Preparation of Land Plan Schedules for Widening to Two/Four lane with Paved

Shoulder from Km 0.000 to Km 125.000 of Nh-563 on EPC Mode Jagityal-

Karimnagar-Warangal Road in the State of Telangana

Page 11: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

9 Consultancy Services for Preparation of Detailed Project Report of Amravati –

Nandgaon – Morshi – Warud – Pandhurna National Highway from Km 0/000

to 100/000 in the State of Maharashtra for Up-gradation to Two Lanes with

Paved Shoulder / Four lane Configurations. (Package No. PWD/1)

NHAI

10 Consultancy Services for Preparation of Feasibility study & Detailed Project

Report for the work of Selected/Corridors of Road Network in the State of

Maharashtra for up gradation to two lane with Paved shoulders / Four Lane

configration for the work of Package No. III/6 " Stretch starting from Korchi -

Deori - Chichagad - Amgaon - Gondia" (Length 110 Km)

PWD

Maharashtra

11 Consultancy Services for Preparation of Feasibility study & Detailed Project

Report for the work of Selected/Corridors of Road Network in the State of

Maharashtra for up gradation to two lane with Paved shoulders / Four Lane

configration for the work of Package No. III/8 " Stretch starting from

Gondkhairi - Sangam - Wanadongri - Hingna - Mihan - Gumgaon -

Salaidhaba - Butibori - MIDC - Takalghat - Asola - Seldoh - Sindhi Rly.

Hamdapur - Sewagram - Wardha NH 361" (Length 110 Km)

PWD

Maharashtra

12 Consultancy Services for Project Management including preparation of DPR of

selected stretches/corridors of National Highways/State Roads (approved "In

Principle" for declaration as National Highways) in the state of Andhra Pradesh

for Up gradation to Two/Four lane with paved shoulder configuration (CS

Puram - Singarayakonda(on NH 16) road (90 Km.))

R&B AP

13 Consultancy Services for Project Management including preparation of DPR of

selected stretches/corridors of National Highways/State Roads (approved "In

Principle" for declaration as National Highways) in the state of Andhra Pradesh

for Up gradation to Two/Four lane with paved shoulder configuration (a.

Rampachodavaram-Koyyuru road section (85 Km.). (b. Bhimavaram on

NH165-Tadepalligudem on NH-16 road section (32 Km.)-

14 Consultancy Services for Project Management Phase-I including preparation of

detailed project report of selected stretches /corridors of National Highways /

state roads (Approved in principle for declarateion as National Highways) in the

state of Telangana for up gradation to two / four lane with paved shoulder

configuration - Deverkonda-Peddavuru-Miryalaguda-Kodad

R&B

Telangana

15 Consultancy Services for Project Management including preparation of Detailed

Project Report of selected stretches/corridors of National Highways / state roads

(Approved “In – Principal” for declaration as National Highways) in the State of

Telangana for up gradation to Two/Four lane with paved shoulder configuration-

Khammam to Ashwaraopet/ Khammam to Deverapalle (160 kms)

R&B/NHAI

Page 12: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

16 Selection of Consultant for Preparation of DPR of newly declared National

Highways in MP under Package-V

NHAI

17 Consultancy Services for preparation of Detailed Project for Review of Capacity

of Nagpur-Bhandara Road NH-53 (Old NH-6) in the State of Maharashtra –

Reg.

NHAI

18 Consultancy services for preparation of DPR for development of Economic

Corridors, Inter Corridors, (Narketpalli-Nalgonda-Tipparthi-Miryalaguda-

Kondrapole-Pondugala) Feeder Routes and Coastal Roads (Armoor-Jagital

Sec of section of NH63 & Jagital-Ramagundam Sec of NH 563) to improve

the efficiency of freight movement in India (Lot-1/Telangana/Package-2)

NHAI

19 Consultancy services for preparation of DPR for development of Economic

Corridors, Inter Corridors, (Nagpur-Sawli Sec of NH 547, Wardha-Pulgaon-

Brahmankhed Sec of SH 243 & SH 207, Hingoli-Raghunandan Colony

Washim-Malegaon Sec of NH 161) Feeder Routes, Coastal Roads (Jamb-

Wardha-Gautam Ngr Sec of SH 264 & Chandrapur Chitegaon Sec of NH

930, Degloor-Wadikharkhed-Aurad Sec of SH 168 & SH 15) to improve the

efficiency of freight movement in India (Lot-1/Maharashtra/Package-2)

NHAI

20 Consultancy services for preparation of DPR for 6 laning of existing 4 lane

Dhule - Pimpalgaon section from KM 265.000 to Km 380 of NH 3 in the State

of Maharashtra - DPR Consultants Appointment

NHAI

21 Consultancy services for project management of Phase I including preparation

of detailed project report of selected stretches / corridors of National Highways /

State Roads (Approved "In Principal" for declaration as National Highways) in

the state of Telangana for upgradation to two/four lane with paved shoulder

configuration - Badrachalam - Ashwarapet

R&B

Telangana

22 Consultancy Services for Preparation of Detailed Project Report of stretches

from Ankaleshwar to Netrang (KM 0.000 to KM 45.000) & Taloda to

Burhanpur (KM 143.000 to KM 543.000) of National Highways for upgradation

to 4 lane in the state of Maharashtra - Reg. (Total Length 285 Kms)

NHAI

23 Consultancy Services to carry out detailed technical assessment of the

Corridors to Identify issues impacting the efficiency of the corridors and its

design solutions - Mumbai-Kolkata Corridor

NHAI

24 Consultancy Serviced for preparation of DPR for development of Economic

Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight

movement in Indian under Bharatmala Pariyogana (LOT4-Package-7-

Rajasthan)

NHAI

Page 13: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

25 Consultancy Serviced for preparation of DPR for development of Economic

Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight

movement in Indian under Bharatmala Pariyogana (LOT6-Package-2-Tamil

Nadu)

NHAI

26 Consultancy Serviced for preparation of DPR for development of Expressways,

Economic Corridors and Inter Corridors under Bharatmala Pariyogana Phase-

II (LOT-9/Package-1) Andhra Pradesh, Telangana and Karnataka.

NHAI

Concessionaire / Detailed Design / Other Projects

Sr. Project Summary Client

1 Proof Consultancy Services of 2" Laning from Pasighat to Pangin Section of

NH-229 (New NH-13) from KM 41.3 to 57 (Existing KM 42 to KM 59) (Length-

17.12 KM) in Arunachal Pradesh under Package of SARDP-NE"

TK

Engineering

Consortium

Pvt. Ltd. 2 Proof Consultancy Services (PC) of 2" Laning from Changlang/ Tirap District

boundary to Changlang section of NH -52B (New NH-215) from KM 0.00 to

18.266 (Length 18.266 KM) in Arunachal Pradesh under Package of SARDP-

NE"

3 Proof Consultancy Services of 2" Laning of existing Akajan - Likabali - Bame

Road from design KM 33.000 to KM 65.810 (Existing KM 36.000 to KM 71.000)

(Length 32.81 KM) in Arunachal Pradesh on EPC mode nder Arunachal

Pradesh Package of SARDP-NE"

4 PMC Construction of Police Bhavan at Nagpur (Administrative Building for

C.P. & S.P. Nagpur)

Maharashtra

State Police

Housing &

Welfare Corp.

Ltd.

5 Construction of Approximate 3000 Police Quarters for CP Nagpur at Takli

Nagpur

6 GDC for D.C. Gurbaxani, Design Engineering Services for “Upgradation of

Gadchiroli – Mul Package-II of NH-930 to two lane with paved shoulder in the

state of Maharashtra under EPC)

D.C.

Gurbaxani

7 Prebid / Tender Engineering Services or Six Lanning of Bhandara Nagpur

Section of NH-53 (Old NH-6) in the State of Maharashtra under NHDP from

Km. 499 + 545 (Design Chainage 499.800) to Km. 544 + 095 (Design Chainage

544.365) on Hybrid Annuity mode Project.

IRB

Infrastructure

Developers

Ltd. Mumbai

Page 14: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

Railway Projects: Ongoing Projects (Final Location Survey):

Sr.No.

Railway Length KMs

Project Minor bridges Nos

Major Bridges Nos.

ROBs Nos

RUBs Nos

Place

1 SWR-Karnataka

256 New 183 78 36 56 Gadag-Wadi.

2. SCR-Telangana

201 3rd Line 256 24 - - Ballarshah- Kazipet

3. SCR-Kerala-TN

86 Doubling 314 13 30 11 Kanyakumari Trivandrum

4. NR-Lucknow

83 Doubling 126 11 - - Jaunpur - Tanda

5. SCR-AP 216 Doubling 187 34 11 5 Guntur - Diguvematta

6 SCR-AP 83 Doubling 150 15 - 4 Diguvematta-Beddamcherlu

7. NR-Lucknow

87 Doubling 183 7 - - Amethi -Jhangai

8 ECR-Odisha

44 New 50 11 7 10 Nunkhari - Pondriponi Rd.

9. RVNL-Lucknow

48 Doubling 160 3 5 5 Jhangai - Phaphamau

10 RVNL - ROB - - 1 - Divitapally (design)

Completed Projects (Final Location Survey):

Sl.No.

Railway KMs Line Min. Bridge Nos.

Major Bridge Nos.

ROBs Nos

RUBs Nos

Place

1 SWR-Karnataka

31 Doubling 57 11 12 32 Sakleshpur-Chikmagaluru

2. SCR-Telangana

16.50 New 33 2 13 1 Akkanapet -Medak

3. SCR-Telangana/AP

202 3rd line 343 16 3 9 Kazipet - Kondapalli

4. SCR-AP 53 New 31 10 21 11 Bhadracahalam-Sattupalli

5. SWR -Karnataka

Pet Survey

- - - - - Hassan Mangalore

6 SWR-Karnataka

Only Geo Tech

- - - - - Tumkur - Ariskere

7. SCR-AP 330 3rd Line 684 83 9 19 Vijayawada - Duvvada.

8 SCR-AP 156 New 100 36 66 38 Badhrachalam -Kovvur

9. NR-Lucknow

46 New 69 12 33 6 Akbargunj - Raiberali

10. NR-Lucknow

35 New 38 8 21 1 Sultanpur-Amethi

11 NR-Lucknow

64 New 66 16 27 3 Amethi - Unchahar

Page 15: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List

Head Office: Nagpur

Regional Center

and Design HUB: Hyderabad

Head Office (Nagpur)

Regional Office (New Delhi & Hyderabad)

Project Office

Page 16: K J Profile 20.09.2017 › pdf › broucher.pdfProject Management (Building) – 225 Acres / 3000 tenements Detailed Design and Engineering Projects: 4 Projects. Following is the List