t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396-- March 20,1998 NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States, nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any infonnation, apparatus, product or process disclosed, or represents that its use would not infringe privately owned rights. KAPL ATOMIC POWER LABORATORY SCEENECTADY, NEW YORK 12301 Operated for the U. S. Department of Energy by KAPL, Inc. a Lockheed Martin company

(K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

t

KAPL-P-000068 (K-98037)

CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE

A.E. Miller, B.J. Lawson ~0~ ,1F-780396- -

March 20,1998

NOTICE

This report was prepared as an account of work sponsored by the United States Government. Neither the United States, nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any infonnation, apparatus, product or process disclosed, or represents that its use would not infringe privately owned rights.

KAPL ATOMIC POWER LABORATORY SCEENECTADY, NEW YORK 12301

Operated for the U. S. Department of Energy by KAPL, Inc. a Lockheed Martin company

Page 2: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Thb report was p p a t c d as an account of work spoasad by aa agency of the United States Goveinmeat Neither the United States Government nor any agency tbmof. nor my of their anployas. makes m y wurapty, arpreu of implied. or

fdness of any infomation, apparatus, product, or procor dkdmed or rrprrscats that its use would not infringe privately owned rights. Rcfcrrncc herern to any spe d c comm#ci?l product. proceu. or savi= by uade n u n c rrndtrnutt blaufac- turn. or oth#rwise does not -nly coastimtc or impiy its endomcar. m r n - mendation. or favoring by the United Suta Govanmeat or my ylcncy thmof. The vim a d m o a s of lotfiors expnued h c m n do not n e u s a d y state or rcfiecr t h e of the United States Government or any agency rhcrrof.

usumes any legal liability or rrsponuiiiity for the rrcnuncy, completeness or w-

Page 3: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

DISCLAIMER

Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

Page 4: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

?

Conversion from 8800 to 8800 PC - Evaluation and Experience

Andrew E. Miner, Brian J. Lawson Lockheed Martin River Road Schenectady, NY 12301

Abstract

Though a final version of the software is pending the 8800PC operating system host computer is a welcomed change from the old Digital (DEC) host computer. The 8800PC host computer uses the Windows NT operating system and has proven to be very user friendly. Descriptive window messages replace the cryptic coding of the DEC host. Though numerous electrical components were replaced, system calibration remained constant. Calibrated Thermoluminescent (TL) output from a randomly selected 88 15 field card was measured before and after the upgrade. The % difference, when comparing calibrated output from an upgraded reader to the non upgraded reader, ranged from 0.2 to 3 %. The most disappointing aspect of the upgrade experience was the lag time between hardware installation and software completion.

History

Lockheed Martin, Schenectady purchased two Harshaw/Bicron 8800 systems in 1990. Starting with the first quarter of 1992, the Harshaw 88 15 and 8806 Thermoluminescent dosimeter (TLD) card and case combinations became the dosimeter of record for whole body BetdGamma and Neutron personnel monitoring, respectively. During the next few years the addition of the 8807 and Doseclip TLD card and case combinations were implemented as the environmental and extremity system of record, respectively.

Though the TLDREMS software has been updated on numerous occasions in the last six years, the 8800 readers had few changes. The technology in the host computer of the 8800 reader was becoming obsolete, with some components no longer being made. In 1996, an order was placed with Bicron to,update the 8800 readers to the 88OOPCs in 1997. In August of 1997, one of the 8800 readers (Reader 2) broke down with a suspected problem in the host computer. Rather than repair the host computer, the decision was made to wait for the scheduled upgrade. On September 8, 1997 the first 8800 PC in fieId uggrade pe rformed by Bicron was performed on Reader 2. Reader 1 was upgraded on October 28,1997.

During the upgrade process the 8800 reader is completely gutted. Numerous new components replace the outdated ones. Two significant concerns were: (1) will the upgrade affect system calibration and (2) will the overall system support all the hnctions required in the dosimetry program operating procedures. Since the Photomultiplier tubes (PMT) and their voltage setting controls were not changed (these were probably the only two components that weren't changed) it was expected that system calibration would not be affected. However, the system software was new and a carehl evaluation was required to veri@ procedural compliance.

Page 5: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Comparison Testing

Since the DOELAP Dose Algorithm is used to calculate dose, calibrated TL output is measured in generic units (gu). The following procedure was established to compare the calibrated TL output of a reader before and after the upgrade.

Note: The test is designed to be a before and after comparison of the same reader. However, Reader 2 was inoperable before its upgrade. Therefore, its gU output was compared to Reader 1 (the non upgraded reader).

Prerequisites:

1. Obtain a subset of calibration cards and one field card recently calibrated (within last 6 months) to the TTP being used in the test.

2. Establish a pre-fade and post fade time for the irradiation and read. (This is important ifthe irradiation and read are being performed shortly after the anneal.)

3. Choose an irradiation value and irradiation methodology.

Procedure:

1. Using the subset of calibration cards calibrate the Time Temperature Profile (TTP) being used in the 8800 reader (prior to upgrade) per local procedures and accept the calibration.

2. Anneal the TLD card being used for the test.

3. Wait the appropriate amount of pre-fade time, irradiate the TLD card, wait the appropriate amount of post-fade time, and then read the TLD card applying all calibration factors (Le., Reader Calibration Factor (RCF) and element correction coefficient (ecc)).

4. Repeat steps 2 and 3 ten times. Complete all reads as soon as possible after calibrating the reader. Calculate the average, sample standard deviation, and relative standard deviation.

5 . M e r the reader is upgraded, perform steps 1 - 4 of the procedure using the same TLD cards and parameters established in the prerequisites.

Data Analysis

Test parameters: Pre-fade time 5 minutes Post-fade time 10 minutes Irradiation Value 500 mR Irradiation Method HarshawBicron 66 1OC 13’Cs Irradiator

Page 6: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Average

Rel. STD

Channel i (gv)

556.40

4.7

0.84

Figure l:.Reader 2 Comparison Test Data

Channel ii Channel iii Channel iv Reader 1 Channel i Channel ii Channel iii (gv) kv) (Pv) NOll (gv) (Pv) (gv)

Upgrade Data

575.79 559.42 584.84 Average 554.57 546.46 549.80

3.57 1.79 3.60 Sample 1.05 1.27 1.51 STD

0.62 0.32 0.62 ReI. STD .19 .23 .27

Channel iv kv)

572.12

1.96

.34

I Channeli(gU) Channel ii (gu) I Channel iii (gv) I Channel iv (gv) I Upgraded Reader 2 556.40 575.79 559.42 584.84

Reader 1 554.57 546.46 549.80 572.12

'YO Difference 0.33 5.37 1.75 2.22

Figure 2:-Reader 1 Comparison Test Data

Upgrade

574.75 587.92

Sample 1.69 2.66 1.01 0.96 STD

Rel. STD 0.30 0.45 0.18 0.16

I

Channel i (gU)

Upgraded Reader 1 568.38

Non Upgraded 1 567.35 I Reader 1

I %Dif€erence I 0.18

Reader1 Channeli Channelii Channeliii Channeliv

Average 567.35 560.59 562.92 580.52

Sample I 1.70 I .075 1 1.16 I 0.56 STD

ReI. STD I 0.3 I 0.13 I 0.21 I 0.1

I I i

Channel ii (gU) Channel iii (gv) Channel iv (gv)

578.03 574.75 587.92

560.59 I 562.92 I 580.52

3.11 I 2.1 I 1.27

..

An acceptance criteria of +/- 6% was established as the maximum acceptable difference between the same channel when comparing the value obtained from the upgraded reader to the non upgrded reader'. As expected, the comparison between Reader 2 upgraded and Reader 1 non- upgraded tended to have YO differences slightly higher than Reader 1 compared to itself. However, it met the +/- 6% criteria established for this test.

Page 7: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Trend Analysis

Trend analysis was performed to determine if there are any large discontinuities attributable to the start up of the 8800 PC. Data from the first run electronic QC of every operating day from January 29, 1997 thru January 20, 1998 was used for this evaluation. The categories evaluated were Reference Light, PMT noise, High Voltage Readings, and weekly Reader Calibration Factors.

Figure 3: Reader 1 Trending Data

Reference Light

I Ref. Light Data, Reader 1, Channel i

PMT Noise I PMT Noise Data. Reader 1. Channel i 1

0.1 , 1

PMT Noise Data, Reader 1, Channel iii B

Page 8: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

High Voltage Figure 3: Continued

791 781 771 ili A-29 ; Mar-27 Hey21 42L21 SW-12 - NW-IO 24-13

F.8-21 Apr-24 42-20 Aw-11 Od-10 D . d 0 w.

8 24

774 784 ' 24-29 Mer-27 May11 42C21 SW-12 NW-10 A w l 3

F&-27 Apr-24 42-20 AYI-18 O d l O D M 9 w.

Reader Calibration Factor

~ ~~~~~~

I High Voltage Data, Reader 1, Ch-1 865 855 - 845 -

8 135 - 8 825 - - > 815 -

105 - 795 - 715

24-29 Mar-27 M a r l 1 Ab21 5.P-12 NW-10 An-13 F.b-27 Apr-24 42-20 -0-18 Od-10 D.S-09

D.I.

4 > 180

710 i~~ 760 750 A-29 MaF27 May21 42L21 5.P-12 Nw-10 A-13

F&-27 Aw-24 42-20 Aw-18 06-10 D.po9

w.

1 0 4

9 5 0 3 8 I e 0 3 *

9 2 0 3 4 !:- 0 3 2 - ' 0 3

AM2 F-bQS Mar-12 nPr-16 May21 42-25 42*ICfO S e p M O d Q l NwQ5 D.0-lo M a

t P 4 .::.-----c; 0 33

f Y 0 2 9

011 - f 0 2 7 L

0 15 AM2 F.b-95 Mw-12 m-16 Hay21 A m 2 5 42L30 Sw04 OdQl NwQS Ms-10 mn-02 F.b-05 Mar-12 m-18 May-21 42-25 42L30 SeDQ4 O d Q l Nw-05 D.s-10

' 0 2 5

D.le M.

Figure 4: Reader 2 Trending Data

Reference Light - 400

300

Ref. Light Data, Reader 2, Channel i

'I."' J-q 380

370 1 360

II

An-29 Mar-27 May22 ab211 Od-15 o l c 4 7 170 I I F.b-27 Apr-24 42"-20 Aq:lS. , N w 0 6 24nQ8 24"-29 Mar-27 May22 42L22 06-15 W Q 7

M. F.8-27 nPr-24 42"-IO Aug-19 Now46 An08 M.

Ref. Light Data, Reader 2, Channel iv 180

' 170 ,-

I I I An-20 Mar-I7 May22 &C22 Od-15 D.507

F18-27 Apr-24 an-20 Aw-(9 N w 0 6 Jan01 'I I 1 7 5 ' M.

130 Jan-29 Mer-27 May22 42L22 Od-15 D.S-07

Feb-27 Am-24 42"-IO Aw-19 N n 0 6 An08 -.

Page 9: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

PMT Noise

Figure 4: Continued

. .

1 PMT Noise Data , Reader 2, Channel i 1 0 2 4 I I

I PMT Noise Data , Reader 2. Channel ii

PMT Noise Data , Reader 2. Channel iv

e !! 0 04 An40 Mar-27 Map22 AI42 OSl-15 0.-10

F.b.27 Wr-24 An40 AW-19 NO-9 Jm-12 m

0 2 , i

I I a n 4 9 Mar-27 Mer22 AI42 OSI-I5 0.-10

Feb-27 Apr-ll An-20 Auo-19 NovQO a n 4 2 Du.

High Voltage

L 823 $ > 813 803 [p\p 1

793 713 773

~ a n . 2 ~ ~ a r . 2 7 MW-22 a t 2 2 oa.15 m.07 F.b.27 Aw.24 Jun50 A u p i 9 Nw-06 Jan48

0.I.

I High Voltage Data. Reader 2. Channel iv I

2 782 : 772

863 853 - 843 - 823 - Y

& 833 - > 813 -

803 - 793 - 783

Jan-29 F.t-27 Mm-27 Aw.24 Mer-22 J u n X A b 2 2 Au-10 Oci-15 Nn-06 -07 h.n.01 M.

High Voltage Data, Reader 2. Channel iii I

::: 1 I I 182

Jan-29 Mar-27 Mw-22 Jub22 OQ-15 D ~ c - O I ~e0.27 ~w.14 ~ n - 2 0 ~ u g - 1 0 ~ n . 0 8 a n a

0.I.

Reader Calibration Data

I Reader 2 Calibration Data, Channel ii I

a

Page 10: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

The most notable change, indicated in Figures 3 and 4, is the PMT High Voltage for Reader 2. The voltage dropped an average of OS%, per channel, when compared to its non upgraded value. However, there is no significant difference in Reference Light, PMT noise, and Reader Calibration Factor pre- and post-upgrade. Therefore, this small change is not significant. It should also be noted that the PMT High Voltage became more stable in both readers.

Software Review

The upgrade replaced the DEC host computer with a PC using a Microsoft NT operating system. There are many new features that are not available on the DEC host computer. Some of these new features are:

Real Time PMT Data during the read cycle (e.g., High Voltage, Temperature etc.) A History Log which records the most recent commands used. Printer capabilities directly from the reader PC. The Transport Maintenance commands are listed and can be activated with a double click. This screen also displays current carrousel position, rack position, and various other parameters.

Information displayed in the various windows are easy to read and more descriptive. The new software puts a lot of information at your fingertips that was not easily available, if available at all, in the 8800 system. Another major advantage of the upgrade is that DEC proprietary peripherals are no longer required (e.g., DEC monitors).

The following evaluations are discrepancies/observations that were noted during software testing.

After Reader 2 was upgraded the following software versions were supplied by Bicron:

Host version 26469.000.001 TLDREMS 23688.020.003

Following is a list of missing functions or software limitations in the above software versions.

1. 2.

3. 4.

Inability to perform an Electronic QC . * Controlled Shutdown did not work when the Unintenuptible Power Supply ( U P S ) was activated. * No audible alarms for error conditions (e.g., Halt Machine Sound Alarm).* TLDREMS did not properly store the channel location if less than 4 elements are used in the TTP (e.g., Evaluated Doseclips use only channel iv, but data was being stored in channel i location).* Program stop location for the rack was inoperable (i.e., would misread a jammed rack as the back of the unload cartridge and try to proceed). Glow Curve printing defaulted to filling in the glow curve. Printer did not page advance when a new group number was started.

TLDREMS referred to a start button on the reader monitor to start the read. However, there was no start button on the reader monitor - All reads had to be started fiom the

5 .

6. 7. 8.

Page 11: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

I

TLDREMS PC keyboard. When the barcode reader was unable to read the barcode, a separate window would prompt the user for a card id. This window would not time out and allow the read to continue. It would remain on the screen stopping the reader until the user performed some action (i.e. enter a card id, reject the card, or accept a blank id). This function did not require that a card id be entered. Therefore, cards could be read without recording the barcode number. Occasionally would get “Photronics Bin # Out of Range” error.

9.

10.

* - Required by local procedure to be operational prior to using the reader

The next two software updates were received and loaded on September 23, 1997 and October 6, 1997, respectively. At the completion of these updates the software versions were:

Host version 26469.000.003 TLDREMS 23 68 8.020.003

This update also included an EPROM change on the transport digital board. Testing of these versions resulted in the following:

1. All of the numbered items, above, were corrected, except #3 and #9.

2. Beep tones were added for missing card ids, end of read, and when errors occur. However, the Halt Machine Sound Alarm error did not have an audible alarm.

3. The Electronic QC was functional, but when the Electronic QC was completed the start button on the reader screen (item #8 above) was missing. It remained missing until the screen was refreshed (e.g., either changing to another window and then returning or by starting a read).

4. The missing card id dialogue box (item #9 above) was enhanced with a time out * function. When a card id could not be read and there was no user input, this

function would close the missing card id dialogue box, reject the card, and then continue with the read. However, the enhancement still allowed user input of blank card ids. Another noted problem in this enhancement occurred when the reader was unable to read the card id on the last card in a cartridge. After unloading this card the rack would return to the empty load cartridge. Though the rack would not retrieve a card, the reader did not recognize that the rack was empty. The reader would then try to read a card id. When it was unsuccessful, the routine for a missing card id would be initiated. If the user entered a card id or a blank id the reader performed a read cycle on an empty rack.

5 . During testing of cards that included .035” thick CaF, Phosphor (TLD-200) with a signal of approximately 2uc, a loop error would occur and shut down the reader.

6. When the reader shut down due to error conditions it would not unload the card

Page 12: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

being read. The card would remain under the PMT Tube until rejected at the start of the next read.

7. Bicron notified Lockheed Martin of a nitrogen sensing problem. The reader did not correctly sense low nitrogen pressure.

Reader 1 was upgraded on October 28, 1997. The software versions of both readers were upgraded at this time and then again on November 12, 1997 to the following versions.

Host version 26469.000.007 TLDREMS 23 6 8 8.020.00 5

On November 13, 1997, the hard drive in the Host computer in Reader 2 crashed. The cause of the crash could not be determined by Bicron and was assumed to be a manufacturing error. Bicron sent a new Host computer which was installed prior to continuing the software testing.

The following comments apply to’the software versions updated on November 12, 1997.

1 . 2.

3.

All problems noted in items 1-7 have been corrected. The approximate time to read 180 standard BetdGamma field cards (i.e., 7776 card) using the recommended TTP is approximately 2 hours. If a card requires a reread and there is a loss of nitrogen just prior to the reread, the reader will unload the card and the rack will cycle between the read position and the unload position until the user intervenes. If the nitrogen is turned back on during this recycling stage the rack will return to the read position, and the reader will apply the last used TTP with no card in the rack and then shutdown. Occasionally during an anneal cycle a window will be displayed showing the message “Value not within Allowable Range”. However, this did not stop the anneal cycle and no data was corrupted.

4.

On February 2, 1998 the host computer software was upgraded. At the time of this report, the software versions in use are:

Host version 26469.000.01 1 TiDREMS 23 68 8.020 -00 5

Current Software EvaluaQiodObservations

The following comments apply to the software versions loaded on February 2, 1998. NOTE Many of these comments also apply to the earlier versions of the software.

Cannot start a read with the Carrousel Control window opened. Cannot start an Electronic QC with the Carrousel Control window open. If this occurs

Page 13: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

0

0

0

0

0

* 0

0

0

0

you must use ctrl/X to exit the Electronic QC program on the TLDREMS data PC. Remove the Carrousel Control window on the reader and then start over. NOTE: Ifa ctrybreak is used to exit the Electronic QC program the final data screen will be corrupted (e.g., incomplete date field). This requires a reboot of the TLDREMS data PC. The volume of the alarms on the reader is very low. When testing the barcode reader using the Tran.sportMaintenance window, the first card id that is detected by the barcode reader will be displayed in the card id text box. All other subsequent cards will beep as though they have been read, but the card id text box will not be updated.. If the reader is powered off without first performing a shutdown o f the N T operating System, then when power is returned the date on the reader may be wrong. If this occurs the date field in the lower right hand comer of the Glow Curve window will be blank. This may affect communication between the reader and the TLDREMS data PC (i.e., The two will not be able to communicate). All other functions on the reader and data PC work thus making this a difficult problem to find. If the screen saver is used it will: (1) Pop on during the read if no mouse or keyboard buttons have been used, and (2) When clearing the screen saver at the completion of reading a card using less than 4 channels, the unused channels will be grayed out. &pestion: Turn off the Screen Saver! A change from the old 8800 reader is at the completion of a read, the data PC will not exit to the comment line. You will no longer be able to exit the acquisition screen with the <return> key. The <return> key will start the reader again. You have to hit the <est> key to get to the comment line, and then hit <return>. There is no longer a warning if the reader has been started and no cards found. When you turn the reader on, the PMT tube will need to be booted prior to performing an Electronic QC. The PMT boot can be performed using the rack position commands in the TransportMaintenance window. However, the rack must be normalized prior to using any of these cokands . If the rack is not normalized, the reader will not allow any movement of the rack using the Transport Maintenance window. An Electronic QC can still be performed if the PMT is not booted, but the PMT noise values will be 0.0. These 0.0 values will be flagged as being out of range on the final report. Cannot use the “START” button on the reader to start an Electronic QC. The “START” button will start a read cycle on the reader. A communication error will follow. Cannot start a read using the “START” button when the TLDREMS data PC is still on the comment line. This will cause a communication error. You have to enter a blank comment to ready the TLDREMS data PC for reader input. The approximate time to read 180 standard BetdGamma field cards using the recommended TTP is approximately 1 hour 16 minutes (-142 cardshour). The Reference Light and PMT noise are now displayed graphically. Some factors affecting the read cycle (e.g., rack speed, reader doors opened or closed, etc.) will have an impact on the displayed graph. Since these graphs were not available on the old 8800, these effects may have gone unnoticed.

If a PMT noise reading is taken after reading a card, the display indicates that the reading was started before the PMT cooled completely. This is illustrated on the graph by the line that displays the TTP (see attachment 1). This software version does not default to allow cooling to SO” C before unloading the card. The reduction in time

Page 14: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

between unloading the card and taking a PMT noise reading is the cause of this effect. The average PMT noise readings fiom calibration reads before and after the latest software update were compared (i.e., PMT noise reading taken after each card read). There was no significant change in the average PMT noise, per channel. Dip switches are available on the transport board if the user wants to adjust the amount of cooling prior to unloading the card.

reader are opened (see attachment 2). This effect is only seen on Reference Light readings that immediately follow PMT noise readings. The cause of this effect is the increased rack speed from PMT noise position to the Reference Light position. When the rack moves fiom the PMT noise position (read) to the Reference Light position, the shutter is momentarily opened to allow the Reference Light sources under the PMT. This allows a small amount of room light to expose the PMT. This causes a hysterisis effect on the front end of all the channels involved. The amount of this effect is dependant on the reader orientation to the light source. A good practice would be to keen the reader doors closed during anv drrta processindhking. Figure 5 demonstrates how much this affected the Reference Light readings.

The Reference Light readings can be affected by room light when the doors to the

Figure 5: Reference Light Open vs. Close Door Comparison

Reader 1 Reader 2

Door Closed

%Difference 16.1

Conclusion

The upgraded 8800PC TLD reader is a welcome change from the older 8800 model. The NT operating system provides a much more user friendly interface, especially when pedorming maintenance or testing functions. Performance testing of the 88OOPC proved satisfactory with both readers meeting the +/- 6% criteria. Trend analysis demonstrated virtually no change in the operating parameters after the upgrade. In fact, the 88OOPC demonstrated greater PMT voltage stability. Many software upgrades were needed to bring the first 88OOPC into compliance with the operating procedures. Though Reader 2 was upgraded in September 1997, it was not fully utilized until after the October 1997 upgrade. The lag time between hardware installation and software completion was substantial.

The comments in the Current Software Evaluation section are a guide to what upgraded 8800 users can expect. Upgrading to the 8800PC is recommended. The improved host computer improves reader operation and maintenance. New hnctions such as the history log and real time

Page 15: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

PMT data are just a few of the new outstanding features. An improved Transport Maintenance system reduces cryptic DEC codes to a double click. User interface is improved with easy to read and understand windows for operation and error codes. The software is now at the stage where current upgrades should have few problems, if any . The 88OOPC upgrade is backward compatible with data files created using the 8800 system. Trend analysis is virtually seamless from the 8800 data.

Page 16: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

a

PMT Noise --

a. a

-1.

.-

Attachment 1

Page 17: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

38.83 nil i i i 28C.8 nC

'4

Figure 5:

Reference Light Open vs. Close Door Comparison

m

Attachment 2

Page 18: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Conversion from

OOPC

Evaluation and Experience

Andrew E. Miner Lockheed Martin, Schenectady

Page 19: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

4

History

0 Lockheed Martin, Schenectady purchased two Harshaw/Bicron 8800 systems in 1990.

Starting with the first quarter of 1992, the Harshaw 88 15 and 8806 TLD card and case combinations became the dosimeter of record for whole body BetdGamma and Neutron personnel monitoring, respectively.

* In 1996 an order was placed with Bicron to update the 8800 readers to the 88OOPCs in 1997.

In August of 1997 one of the 8800 readers (Reader 2) broke down with a suspected problem in the host computer.

On September 8, 1997 the first 8800 PC in field upg rade performed by Bicron was performed on Reader 2. Reader 1 was upgraded on October 28, 1997.

Page 20: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Concerns

Will the upgrade affect system calibration?

Will the overall svstern sumort all of the functions operating

required in the dosimetry program procedures?

Page 21: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Comparison Test

Calibrated TL output is measured in generic units (gU)

Prerequisites:

1. Obtain a subset of calibration cards and one field card recently calibrated (within last 6 months) to the TTP being used in the test.

2. Establish a pre-fade and post-fade time for the irradiation and read.

3. Choose an irradiation value and irradiation methodology.

* Procedure:

1. Using the subset of calibration cards calibrate the TTP to be used.

2. Anneal the TLD card being used for the test.

3. Wait the appropriate amount of pre-fade time, irradiate the TLD card, wait the appropriate amount of post fade time, then read the TLD card applying all calibration factors.

4. Repeat steps 2 and 3 ten times. Complete all reads as soon as possible after calibrating the reader.

5. After the reader is upgraded, perform steps 1 - 4 of the procedure using the same TLD cards and parameters established in the prerequisites.

Page 22: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Data Analysis Established test parameters:

Pre-fade time Post-fade time Irradiation Value Irradiation Method

5 minutes 10 minutes 500 mR HarshawD3icron 6610C 13’Cs Irradiator

Figure 1: Reader 2 Comparison Test Data

Figure 2: Reader 1 Comparison Test Data

Page 23: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Trend Analysis Figure 3: Reader 1 Trending Data (1 of 2)

02

0.16

0.2 I 1 I I

0.1 ,

I I . om

Page 24: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Trend Analvsis J

Figure 3: Reader 1 Trending Data (2 of 2)

e51 641 631

0 3 5 , I I

&(5 -t

I Hgh Voltage Data, Reader 1, Channel iii [

I Reader Calibration Data. Reader 1. Chamel ii 1

I I -.- I

Page 25: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Trend Analysis Figure 4: Reader 2 Trending Data (1 of 2)

Ref. Light Data, Reader 2, Chamel ii 220

p zlo - - 200 - $ tw --- 2 180-

J n t o We27 WyZZ J&22 od-15 -7 in Fab.27 Apr-24 hn-20 AuplO Nw48 Jan48 Jul-29 Mar-27 May22 M 2 2 od-15 0.007

F.b-27 ~pr-24 hn-20 ~upw mvM) JUKIE

I I Jan29 Mar-27 May22 JuW -15 0.007

F.b-27 Apf-24 h 5 0 Aupl9 Nw46 i n 4 E We

L I 1

024, I

0.16 t I 0.12 - 0.08 om - --*

0 - I JRl-29 W-27 My22 .U-Z 03-15 -10

w &r-24 h 2 0 plg-19 tba JsI-12 nte

* 0.12 3 0.08 v- 0.04 O../

- - I I I

1 I 0.04 1

Page 26: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Trend Analvsis J

Figure 4: Reader 2 Trending Data (2 of 2)

I I e42

632

J

M e r 2 Calibration Data, Chamel ii I I

i “[---i ai

Page 27: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Software Review Host version 26469.000.001 TLDREMS 23688.020.003

1 I Inability to perform an Electronic QC. *

2, Controlled Shutdown did not work when the UPS is activated.*

3. No audible alarms for error conditions (e.g., Halt Machine Sound Alarm). *

4. TLDREMS did not properly store the channel location if less than 4 elements are used in the TTP.*

5 . Program stop location for the rack was inoperable.

Glow Curve printing defaulted to filling in the glow curve.

Printer did not page advance when a new group number was started.

6.

7.

8.

9.

TLDREMS referred to a start button on the reader monitor to start the read. However, there was no start button on the reader monitor.

When the barcode reader was unable to read the barcode, a separate window would prompt the user for a card id. This window would not time out and allow the read-to continue. It would remain on the screen stopping the reader until the user performed some action (i.e. enter a card id, reject the card, or accept a blank id). This function did not require that a card id be entered. Therefore, cards could be read without recording its barcode number.

10. Occasionally would get “Photronics Bin ## Out of Range” error.

* - Required by local procedure to be operational prior to using the reader

Page 28: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

A- >

Host version 26469.000.003 TLDREMS 23688,020,003

1. All of the numbered items, above, were corrected, except #3 and #9.

2. Beep tones were added for missing card ids, end of read, and when errors occur. However, the Halt Machine Sound Alarm error did not have an audio alarm.

3. The Electronic QC was functional, but when the Electronic QC was completed the start button on the reader screen (item #8 above) was missing. It remained missing until the screen was refreshed.

4. The missing card id dialogue box (item #9 above) was enhanced with a time out function. However, the enhancement still allowed user input of blank card ids. Another noted problem in this enhancement occurred when the reader was unable to read the card id on the last card in a cartridge. After ufiloading ths card the rack would return to the empty load cartridge. Though the rack would not retrieve a card, the reader would not recognize that the rack was empty. The reader did then try to read a card id. When it was unsuccessful, the routine for a missing card id would be initiated. If the user entered a card id or a blank id the reader performed a read cycle on an empty rack.

5. During testing of cards that included .035" thick CaF, Phosphor (TLD- 200) with a signal of approximately 2uc, a loop error would occur and shut down the reader.

6. When the reader shut down due to error conditions it would not unload the card being read. The card would remain under the PMT Tube until rejected at the start of the next read.

7. Bicron notified Lockheed Martin of a nitrogen sensing problem. The reader did not correctly sense low nitrogen pressure.

Page 29: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Reader 2 Hard Drive

CRASHED

Page 30: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Host version 26469.000.007 TLDREMS 23688,020,005

1. All problems noted in items 1 - 7 were corrected.

2. The approximate time to read 180 standard BetdGamma field cards (i.e. 7776 card) using the recommended TTP is approximately 2 hours.

3. If a card requires a reread and there is a loss of nitrogen just prior to the reread, the reader will unload the card and the rack will cycle between the read position and the unload position until the user intervenes.

4. Occasionally during an anneal cycle a window will be displayed showing the message “Value not within Allowable Range”. However, this did not stop the anneal cycle and no data was corrupted.

Page 31: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Current Sofhvare Evaluation Host version 26469.000.01 1 TLDREMS 23688.020.005

Cannot start a read with the Carrousel Control window opened.

Cannot start an Electronic QC with the Carrousel Control window opened. If this occurs you must use ctrl/X to exit the Electronic QC program on the TLDREMS data PC. Remove the Carrousel Control window on the reader and then start over.

The volume of the alarms on the reader is low.

When testing the barcode reader using the Transport Maintenance window, the first card id that is detected by the barcode reader will be displayed in the card id text box. All other subsequent cards will beep as though they have been read, but the card id text box will not be updated.

If the reader is powered off without first performing a s hutdown o f the NT operating syste my then when power is returned, the date on the reader may be wrong. This may affect communication between the reader and the TLDREMS data PC

If the screen saver is used it will: 1. Pop on during the read if no mouse or keyboard buttons have been

used. 2. When clearing the screen saver at the completion of reading a card using less than 4 channels, the unused channels will be grayed out.

estion: Turn qjjf th e Screen Save r !

Page 32: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

c f

Y

e A change from the old 8800 reader is at the completion of a read the data PC will not exit to the comment line.

There is no longer a warning if the reader has been started and no cards found.

When you turn the reader on, the PMT tube will need to be booted prior to performing an Electronic QC. The PMT boot can be performed using the rack position commands in the Transport Maintenance window. However, the rack must be normalized prior to using any of these commands.

Cannot use the “START” button on the reader to start an Electronic QC.

Cannot start a read using the “START” button when the TLDREMS data PC is still on the comment line.

The approximate time to read 180 standard BetdGamma field cards using the recommended TTP is approximately 1 hour 16 minutes (-142 cardshour).

The Reference Light and PMT noise are now displayed graphically. Some factors affecting the read cycle (e.g., rack speed, reader doors opened or closed, etc.) will have an impact on the displayed graph. Since these E raphs we re not ava ilable on the oId 8800. these effects may have gone unnoticea

PMT cooling during noise reading.

Room light can affect the Reference Light readings when the reader doors are open.

tion: keep the reader doors closed during any data . sgrocessi ‘nghali ing.

Page 33: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

PMT Noise

b * u .

e-

" -,

Attachment 1

Page 34: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

c 9 .

c l d 9 . 5 8 nCi

36.83 rii# i i i ZBG.8 nC

28.33 nk

Figure 5:

Reference Light Open vs. Close Door Comparison

. -

Reader 1 Reader 2

% ... :, . Attachment 2

Page 35: (K-98037) CONVERSION FROM 8800PC-EVALUATION …/67531/metadc... · t KAPL-P-000068 (K-98037) CONVERSION FROM 8800 to 8800PC-EVALUATION & EXPERIENCE A.E. Miller, B.J. Lawson ~0~,1F-780396--

Conclusion The upgraded 8800PC TLD reader is a welcome change from the older 8800 model.

The NT operating system provides a much more user friendly interface.

Performance testing of the 8800PC proved satisfactory with both readers meeting the +/- 6% criteria.

Trend analysis demonstrated virtually no change in the operating parameters after the upgrade.

Many software upgrades were needed to bring the first 8800PC into compliance with the operating procedures.

The comments in the Current Software Evaluation section are a guide to what upgraded 8800 users can expect.

Upgrading to the 8800PC is recommended.

History log and real time PMT data are just a few of the new outstanding features.

Improved Transport Maintenance system reduces cryptic DEC codes to a double click.

Easy to read and understand windows for operation and error codes.